Author: Lucy Cowell

  • HPH288 : Renovating a 1960s house for comfort and efficiency – with Russel Hayden

    HPH288 : Renovating a 1960s house for comfort and efficiency – with Russel Hayden

    Architect Russel Hayden explains how he sought to renovate a derelict 1960s house to EnerPHit standards.

    Interview with Russel Hayden

    Russel is an architect who, up until four years ago, had spent his whole working life in London. Prompted by a desire to leave London and move closer to family, he and his wife bought a derelict house in Stockport with the intention of it being a project to renovate, before selling it on and moving out of suburbia.

    They bought the house through a sealed bid system

    At the time, Russel and his family were renting out their house in London and lodging with his in-laws in Stockport when the house opposite came on the market. It had been left in a state of abandonment for around ten years after the owner had died and heirs were being sought.

    The house went to sealed bids, and they won it with a bid of 5-10% over the asking price.

    The budget was set by what they thought the house would be worth when complete

    At around the same time they left London, they received an inheritance which enabled them to buy the house in Stockport, with enough left to cover the renovation works. Despite a few little extravagances, they mostly kept things simple, and having the budget set gave them a clear direction and target. They did end up spending a little more than they expected to, but felt they got good value.

    Upon completion, they had the house valued at significantly more than they had expected. And despite thinking this project would be a stepping stone to something else, they love the house and the area, and have no intentions of moving.

    Time pressures meant there was no fixed price with the builder

    As they hadn’t finished all the drawings, they recruited a local builder to get the house stripped back while they were still living in London. Once they moved, Russel was able to take on the project management role, finish the drawings and oversee the procurement of materials.

    Having that experience and understanding now, he does acknowledge a new found respect for builders for the work they put into getting the materials, finding the right price and coordinating their delivery.

    The builder embraced the learning involved

    The builder had been recommended to them, and although he had never done a project like this before, he had a good attitude and a genuine interest in learning about Passivhaus. That’s not to say there weren’t also times where he found it frustrating not being able to carry on with his work in the usual way.

    Russel paid him and his team of two helpers a daily rate, which isn’t something he would necessarily recommend a self-builder do, but he was living opposite with his in-laws and could be on-site every day to keep a close eye on things.

    Passivhaus consultants were employed

    Russel had done the Certified Passivhaus Designer course before leaving London, so understood the principles involved, but knew that he didn’t have the experience to tackle it on his own.

    They engaged Enhabit to help with the Passivhaus consultancy, who set out four options of how far they could take it: getting it to Building Regulations standard, to AECB Silver, to EnerPHit, and to Passivhaus standard.

    With Russel effectively wanting to use it as his business card for his new venture in the north, they felt it was important to do something that was certifiable and within a reasonable cost. Settling on EnerPHit basically then set their brief.

    “On reflection, it was a very helpful device actually because it then made everything very clear about what we had to do. I think that’s one of the beauties of Passivhaus. Although there are infinite ways of achieving it, you do have a very real target.”

    The building was wrapped externally with insulation

    The house needed a new roof, so making the decision to go with that and wrapping the brickwork in external wall insulation, gave them a clear steer of how they were going to develop the project.

    They sought planning permission because the 280mm insulation would increase the house footprint by around half a meter, and with an extra foot of height on the roof ridge line.

    One of the biggest challenges was with the concrete slab floor, and the problem of the cold bridge at the perimeter. Without wanting to spend huge amounts of money on it, they decided to accept there would be a cold bridge there, but put insulation on the retained slab. They mitigated that by dropping 150mm of insulation externally down to the foundation level.

    They kept structural changes to a minimum

    By deciding not to move windows and doors around unless absolutely necessary they were able to keep the costs down. They did need to remove a chimney breast though, as it wouldn’t have worked with Passivhaus.

    Adding the floor insulation meant the floor was raised to the level of the first step on their stairs. On the first floor they removed the ceiling plasterboard to expose the joists and give a sense of a bit more height.

    Copyright The Modern House

    One of the big changes they made was reducing the size of the garage and extending onto the back of it to make a space that is used as a garden room, office, and exercise studio. It has a timber frame construction with a straightforward flat roof, making it a cost-effective addition to the project.

    Russel’s wife Anna is also an architect and she spent a lot of time researching materials for the interior finishes, and finding fittings which weren’t necessarily particularly expensive.

    They chose a parquet flooring for the ground floor and a lighter oak parquet for the upstairs, which together with the full height doors in the rebuilt partitions, gives continuity between the spaces.

    They fell just short of their airtightness target

    One of the biggest challenges on the project was getting the connection to the existing house right, and particularly minimising the thermal bridges where the garage and extension connect.

    Russel thinks the workmanship around that connection was responsible for them just failing to achieve their airtightness target, with a result of just over 1.1 (where 1.0 is required for EnerPHit). By the time they had that final airtest they were past the point of being able to go back and remedy where the problem may have been. This did mean that frustratingly they weren’t able to get the certification they were hoping for.

    The hands-on experience has been invaluable professionally

    Among the things Russel learnt from this project, was about having the right and patient approach with people. This was particularly the case with having employed a builder on a daily rate rather than a contract.

    He also found that being so involved on site and doing the taping himself, meant that he was gaining a much better understanding of things that worked and things that didn’t, which invariably will influence the way he goes back and details buildings.

    “I think what’s been brilliant about the Passivhaus Designer Course is that I’ve realised that for the last thirty-odd years I’ve been detailing and designing buildings not terribly well without a proper understanding of moisture and how buildings work, thermal bridges and things like that.”

    Copyright The Modern House
    Copyright The Modern House

    He is now working on a Passivhaus self build

    They have since bought a 1960s concrete panel bungalow in the Lake District which was won through another sealed bidding process. With the bungalow quality not living up to that of the view, it became quickly apparent that their best option would be to demolish and replace it with a new building. It is currently at the planning stage and they are looking to make it a timber frame construction built to Passivhaus, or ideally Passivhaus Plus, standards. Being in a World Heritage Site they are keeping their fingers crossed!

    Know your limitations and keep things simple

    For anyone thinking of carrying out their own retrofit, Russel says the budget will be key but it can be very difficult to know how far you can go within that. The balance between getting to the level of comfort required without spending a huge amount of money can be a challenge.

    It is easier if a particular standard is the target, but without that you are left with a number of options.

    It is best therefore to understand the difference between what you want to spend and what you need to spend. Spend it carefully and you’ll get what you pay for. By keeping it simple it will be easier to design and build, and you’ll get a lot more for your money.

    Find out more

    Visit the website of HESKETHHAYDEN

    Follow Russel on Twitter

    Transcript

    Please connect with me

    Subscribe, rate and review the podcast in iTunes

    Rate and review the podcast on Stitcher

    Like our Facebook page

    Follow us on Twitter

  • HPH287 : A beginner’s guide to retrofit – with Russell Smith

    HPH287 : A beginner’s guide to retrofit – with Russell Smith

    Russell Smith of Parity Projects explains why a whole house plan is the best way forward for tackling a renovation.

    Interview with Russell Smith

    Russell is a chartered civil engineer whose interest in renovation began after a secondment with the charity Forum for the Future. He began to understand the gravity of climate change and learn about the impact of energy and carbon emissions attributed to the housing stock. This led him to tackle his own housing renovation project, around 16 years ago, at a time when most of the talk was about new builds.

    The renovation of his Victorian property managed to get his heating bills down to around £50 per year. He opened his house up to around 3,000 visitors during the three years he worked on it and was honest with them about what he had discovered, how hard it was and how much it cost.

    Russell realised there was a business opportunity in it and started his own company, Parity Projects.

    A ‘whole house retrofit’ is something of a misnomer

    Russell describes retrofit as being the bits and pieces that are retrospectively fitted. A whole house retrofit is actually a deep refurbishment where everything is done at once.

    “Provided you’ve got a game plan right at the start knowing how everything should fit together in the long-term then your retrofits should add up to a whole house refurbishment in the long-term.”

    Too much information can scare off new customers

    Providing full and detailed calculations and drawings at the outset is likely to overwhelm the majority of people, as they wouldn’t be aware that quite so much was needed.

    Instead, Russell starts by using just enough data to help a customer understand the size of the problem and the opportunity of what is possible with the house. By displaying what the priorities are, they can agree on an appropriate package of measures before moving to the next phase. This would involve much deeper analysis and calculations for every element of the building.

    Phasing a renovation over time takes extra consideration

    Russell explains it can be particularly difficult to get all the elements to fit together if they’re not carried out together in one plan.

    “If you’re only installing some of the measures or you’re only tackling some of the things that you would want to do upfront, really you want to make sure that those things don’t have to be undone to do the next things later on.”

    So ideally it makes the most sense to carry it out in one go if possible. It’s the least costly way of doing it, materials can be bought in bulk, it can all be carried out while no one is living there, it doesn’t have to be tidied away completely at the end of each day, and the airtightness layer and ventilation can be considered for the whole building rather than just room by room.

    Russell does acknowledge that this won’t always be possible as people might not have somewhere else to stay or the finances available all at once.

    Ultimately we want to reduce our demand for heat

    The first step therefore is looking at where heat is being lost. Using the example of a three-bedroom semi-detached property, he explains the different areas:

    Solid walls

    The biggest proportion of heat loss will be through the walls, and without a cavity the insulation will need to either go on the outside or the inside of the building. Careful consideration needs to be given into the way the building was designed to behave, and whether there is already moisture in the brickwork that needs to dry out before any work can start. External wall insulation can be relatively straightforward provided it’s designed properly.

    Windows and doors

    This involves heat loss both through the windows and doors themselves, as well as infiltration around the outsides where they have been installed. If they’re not going to be replaced then the gaps around the structures need to be dealt with very well.

    Under-floor

    Russell says typically around 15% of the heat loss can be through the floor so it’s important to address it early on.

    Roof

    The roof makes up a large part of the surface area of the house and there are plenty of elements which make each unique, such as the different type, orientation, and rainfall.

    Ventilation

    Once the building has been made more airtight and insulated, you need to ensure a good level of ventilation so that the air quality for the occupants is of a high standard.

    “Once you’ve got all of those things dealt with in combination, you’ve resulted in a much lower energy demand than you would have done in the first place. And that’s the point to start considering your heating system and how you would put some heat into the building.”

    The Passivhaus standard deals with these elements

    It is important to ensure that you are ventilating and insulating in combination to get to such low levels of heat demand where a heating system can be virtually unnecessary. But while that’s an aim for every property, the restrictions of budget, priorities and logistics will mean that not every building will be able to reach that.

    There needs to be government backing

    Russell believes there needs to be a government campaign to make people understand the potential of their property and where it can get to provided that strong decisions for a whole house plan are made.

    “It’s got to happen. We’ve got no choice. That is going to happen so that when they are planning their shiny new kitchen, the new bedroom or they’re just redecorating, they can incorporate those things into their thinking.”

    There also need to be low-interest finance options to enable people to move forward.

    Quality depends on good communication

    Quality starts with the design, putting the right list of things together and communicating it properly to the contractor.

    “I think people tend to bash contractors in the first instance for poor quality but the bottom line is, if the contractor’s not been told what to do very well then it’s never going to work.”

    Something Russell has been working on for the last seven years with a cooperative he set up called RetrofitWorks, is bringing those disparate parts of the industry together as part of one organisation. The aim is to give everyone tools at their disposal to do the design, communicate with each other and implement the work so that they can all check anything at every step of the way.

    Cosy Homes Oxfordshire is a manifestation of the key partners they have built up in that area. With some central government funding buying into the model they have been able to define the marketing, clearly describe the approach they think their customers want, design their processes as a cooperative, push forward with the advice, the whole house plans, the detailed design and putting a tender process in place so the right contractors are selected and they can make sure their work is done well.

    Charlie Luxton visits a deep retrofit in central Oxford

    Charlie Luxton visits a refurbishment of a listed barn

    Charlie Luxton checks out a retrofit of a semi-detached property

    They have also used their established supply chains with the creation of the Warmer Sussex scheme, and Ecofurb which will be launching in London soon.

    There aren’t enough skilled workers to meet government targets

    Parity Projects have used modelling tools to identify that the current workforce of around 160,000 in the sector would need to be virtually tripled in order to achieve the government’s target of every house in the UK hitting a minimum EPC score of C by 2030.

    Russell sees this time as a massive opportunity to be training people up from other industries for working in managerial roles as well as the labourers. He thinks that all students in the building sector should complete the same one year course before branching out into their specialities. That way there might be more respect and understanding on site.

    Select a team that is willing to learn

    Russell’s advice to a homeowner considering a renovation project would be to contact a local retrofit coordinator. They will be able to give you advice and technical knowledge to put a plan in place for your property.

    He stresses that if you’re going to do your home up you will probably need to accept that some people working on it might need to learn something new, so ensure that you team up with people that have the right attitude, a genuine interest and are keen to help. Even if they don’t necessarily know it, they will learn and find out.

    There are also free resources available on the AECB website in their Knowledgebase section, and from the Centre for Sustainable Energy.

    Find out more

    Visit the website of Parity Projects

    Learn more about RetrofitWorks

    Follow Russell Smith on Twitter

    Check out our previous episodes with Parity Projects, about what to expect from a detailed energy assessment, and how an assessment can inform retrofit measures.

    Parity Projects carry out an energy assessment at Ben’s parents’ house

    Transcript

    Please connect with me

    Subscribe, rate and review the podcast in iTunes

    Rate and review the podcast on Stitcher

    Like our Facebook page

    Follow us on Twitter

  • HPH286 : What is the Living Building Challenge? – with Martin Brown

    HPH286 : What is the Living Building Challenge? – with Martin Brown

    Martin Brown from Fairsnape explains how the Living Building Challenge is a holistic standard that benefits health and the environment.

    Interview with Martin Brown

    Martin has been working in the construction industry since the 1970s, initially in site engineering and project management, before moving into business improvement. Since 2000 he has been working as a business improvement and sustainability consultant, with the job title of Sustainability Provocateur.

    He helped bring the Living Building Challenge to the UK

    Around 11 years ago, Martin came across the International Living Future Institute, based in Seattle, who were having the kinds of discussions around sustainability that he had an interest in. He and a few friends pledged to bring their Living Building Challenge (LBC) to the UK, so formed the UK Living Building Challenge Collaborative, hosted by Leeds Beckett University.

    Desert Rain – photos copyright Chandler Photography
    International Living Future Institute case study – Desert Rain

    It takes a lot of its messages from nature

    Martin felt that 10 years or so ago sustainability was getting a little stale, and tended to be focused on energy and waste. The Living Building Challenge however had a different, regenerative, way of thinking: about doing more good than just striving to reduce impact.

    It uses flowers as a metaphor and has seven elements, or ‘petals’ as they’re known by, to describe a regenerative building:

    • Place – how a building is aligned to its place, such as where it exists in terms of bioclimatic and ground conditions
    • Energy – with the requirement for a building to generate 105% of its own energy on a net energy basis without using any combustion
    • Water – the building should be independent, taking only what it needs and cleaning what it puts back into the ground – much like how a tree would function
    • Health & Happiness – having a civilised, healthy, just environment
    • Materials – ensuring no toxic materials go into the building
    • Equity – seeking for buildings and those working on them to be ‘just’ in their approach
    • Beauty and Spirit – the concept of biophilia, inspiring and educating the next project and the next generation.
    International Living Future Institute – Living Building Challenge Petals

    There are quantifiable elements that can be monitored

    There is a requirement to complete 12 months of continuous post-occupancy monitoring. This can check on the quantifiable elements such as demonstrating that the building is generating more energy than it uses by 105%, and that it is meeting its responsible approach to water.

    Despite the rigorous elements of the standard, there is no saying how they must be achieved. Instead, it enables teams to come up with their own innovative approaches and solutions.

    It uses biophilic design

    Biophilia is based on the theories that we have an innate love of nature, and the more we shut ourselves away from it the more detrimental it is for our physical, mental and social health. Biophilic design is a way of bringing nature back into buildings, not just with plants and greenery but also in terms of wind and light.

    That discussion is now moving towards how to make it not only beneficial for us as humans, but also for nature in terms of conservation, rewilding and improving our local environments.

    Biophilia is something that Martin thinks should be more widely adopted.

    “Not just going through the elements of biophilia but getting people into that right mindset when you start to design. Not necessarily bringing all the baggage from other buildings which haven’t worked so well. Just taking a fresh approach of, how can we get this build more related to the local environment and in doing so improve the health of the occupants.”

    The red list identifies things that should not be used in the building

    The list originated from the Institute of Living Futures but is now also used by many other standards, such as the WELL building standard.

    It incorporates 21 products, elements and chemicals that have an impact on our health and should not be used in a building, whether that impact is in the production or extraction of the material, in the manufacture of the product, or in its installation through the building process and then through the life of the building.

    Martin says that it’s important to be pedantic about what gets used in the building, which can also lead to interesting debates and innovative thinking about what alternatives there could be.

    The Cuerden Valley Visitor Centre is the first UK LBC project

    Opened in 2018, the Cuerden Valley Visitor Centre has increased footfall in the park by around fourfold.

    Copyright Fairsnape

    Barbara Jones’ Straw Works team worked with the trust and specialist consultants to meet the Living Building Challenge imperatives.

    The building is based on Barbara’s innovative approach not to use any cement or concrete. Instead, the foundations are made from discarded rubber tyres, there is a timber frame construction and a strawbale wall infill.

    The roof was constructed first to make a dry interior space on which to construct the strawbale walls. Once they were in place, the roof was lowered onto the walls to make a semi load bearing strawbale construction. A lime render was then applied to the walls.

    Copyright Fairsnape

    The building will be zero waste on demolition

    In terms of the circular economy, when the building reaches its end of life Martin says that around 50% of the materials are natural and could be composted, if they couldn’t be reused. The remainder are very modular components that could be reused on other projects.

    The declare labels provides helpful product information

    In terms of planning future projects, Martin thinks it’s important to remember to question the health aspects of materials that are being put into buildings. He says it can be easy to just use things that are readily available, but one of the LBC guiding remits on materials is known as the precautionary principle. That means that if there’s any issue of impact on health then the precautionary route should be taken and that material should not necessarily be used.

    The LBC’s declare label is a way of helping to understand the impact of a product. It doesn’t specify whether something is good or bad, but just gives the information and guidance about where the product comes from, what it is made from, and where it goes at the end of its life.

    International Living Future Institute – Declare Label

    Meeting the RIBA Sustainable outcomes

    The RIBA has set out its 2020 plan of work for sustainable outcomes, with a challenge for the targets to be met by 2030. When comparing the current building standards, Martin says that the Living Building Challenge is the one that best meets their criteria.

    “I veer away from making that direct comparison between all of the standards because they’re all different for different purposes. But I think the Living Building Challenge and its associated programmes really is the regenerative solution for addressing the climate and ecological emergency that we’ve all made declarations on.”

    Find out more

    Visit the website of Fairsnape

    Follow Martin Brown on Twitter

    Find out more on the Living Building Challenge in UK and Europe

    Find out more about the ILFI’s Living Building Challenge

    Check out the RIBA’s Sustainable Outcomes Guide

    Read about Terrapin Bright Green’s 14 Patterns of Biophilic Design

    Listen to our podcast with Straw Work’s Barbara Jones

    Transcript

    Please connect with me

    Subscribe, rate and review the podcast in iTunes

    Rate and review the podcast on Stitcher

    Like our Facebook page

    Follow us on Twitter

  • HPH285 : Developing plant-based building materials – with Judith Thornton

    HPH285 : Developing plant-based building materials – with Judith Thornton

    Dr Judith Thornton of Aberystwyth University explores how plant-based materials are being used in the building industry, and why they are so important for our future.

    Interview with Judith Thornton

    Judith works within the Department of Biological, Environmental and Rural Sciences at Aberystwyth University. She specialises in projects at the interface of plant science and material function, with her main interest being the use of plants as building materials.

    It’s about more than just building with straw or hempcrete

    Judith says that, historically, because of the finely honed skills required for each approach, there has been a tendency for the natural building industry to divide off into those that build with straw, and those that build with hempcrete. There are of course many other plant types that can be used, depending on the design criteria.

    She explains that we shouldn’t assume that we could build the whole project out of plants either, and nor should we assume that only one plant type will be suitable for each of the different building elements.

    Judith uses walls as an example, where because they provide the dual functions of structure and insulation, it might make sense to separate those elements out and use different materials. She says that otherwise, wherever you’re trying to get a particular product to perform multiple functions, you may well end up with significant compromises.

    Do your research

    Even within strawbale building there are different types of straw that can be used, but Judith says people rarely demand a particular variety, and generally just accept what they’re given.

    “I have yet to meet a strawbale builder who knew what wheat variety was in their building!”

    Historically the tendency is to use wheat straw, within which there are also a number of varieties, but sometimes barley straw is used. Barley straw however is far more prone to rotting than wheat straw, which Judith says should be a bit of a red flag when thinking about building with it.

    In Wales they have tested out building with miscanthus straw, which is a grass that can grow to three metres high, so is much tougher than wheat or barley, and presumably should be more resistant to breaking down.

    Judith says that there tends to be an assumption that strawbale buildings are inherently low energy, but that’s not necessarily the case. If they’re not built properly they can be leaky and rot, not very airtight and have high energy bills in the same way that any other building can.

    There is a lack of aspirational standards

    “We’ve got a regulatory system where we’ve got a fairly ineffectual stick and absolutely no carrot. So, ‘this will comply with building regs’, and people will say that as if that’s a good thing. Well, complying with building regs is as bad as you’re allowed to be before you get prosecuted. That isn’t an aspiration, is it?”

    Judith believes that there is a lack of incentive to build to the Passivhaus standard using low impact materials. She sees it is a combination of lacking aspirational standards and not valuing building enough as a trade, when it’s actually a very skilled profession and a challenging undertaking to build to Passivhaus standards.

    One of the key challenges with Passivhaus is getting the airtightness, and particularly concentrating on the junctions between different materials. It can be as problematic for man-made materials as it is with plant-based materials though. Particular care needs to be taken when designing details at junctions between timber and straw for example, where you might get some shrinkage in the plaster when it’s butted up against a timber frame.

    There would be no sense in trying to build an entirely plant-based building

    Judith thinks it would be ludicrous to even try. Using airtightness tapes as an example, she explains it as the law of diminishing returns: where a small amount of a very high tech materials provides a massive benefit. She says there is no point in obsessing about whether your strawbales are tied with polypropylene string or whether your airtightness membrane has got formaldehyde glue in it.

    “Partly because it makes almost no difference to the total carbon in the building and partly because it’s based on this completely false premise that natural things are safe and manmade things are dangerous. That simply isn’t true. But it’s a very commonly held environmental world view.

    “We do this weird moral balancing in the UK where we say, ‘I’ll fly abroad on holiday, but I did do my plastic recycling’. The whole plastic debate for me is seeking to shift blame to manufacturers as an alternative to examining our own behaviours.

    “It’s not rocket science. As individuals, we need to eat virtually no meat, we need to stop flying on holiday, and we need to insulate our houses.”

    Establish what the building industry needs

    Judith thinks that academics can have a tendency to come up with solutions for problems that don’t necessarily exist. So part of her role is having conversations with the building industry and the plant scientists to work out the areas that need new materials, and how the plant science community can contribute.

    One example is of insulating solid wall houses in Wales and doing that with vapour permeable materials. She says that hemp lime or another material mixed with lime is an excellent way of achieving internal wall insulation whilst minimising risks of interstitial condensation. It then becomes a question of analysing what it is that the plant material is doing in that mixture, seeing whether other plant materials are available, and then carrying out testing.

    Prevent biodegradable building materials from biodegrading!

    There are significant differences between various plant materials in how easily they biodegrade, and this will impact on the longevity of a building. The key thing is to stop moisture from getting in.

    Plants contain variable amounts of silicon and lignin in their cell walls which are protective against being broken down by microorganisms. Even different wheat straw varieties will contain different levels of lignin, which would impact on how quickly an individual piece of straw would rot if it were exposed to moisture.

    So one of the initial decisions to make when planning your build is as to how you plan to deal with moisture, and whether for example you have a vapour-permeable construction where moisture can diffuse into and out of the wall, or whether it will be a completely sealed envelope that relies on mechanical or window opening systems for moisture management.

    We will need to move to a plant-based economy

    Before fossil fuels we had a plant-based economy, and going forward this is something that we will need to revert to once again.

    Judith is involved in the university’s BEACON project, which looks at plants as products and how biorefining can help us move to a natural feedstock-based economy.

    “Everything we use on a day-to-day basis, be it building materials or plastics or everyday items, is going to need to be made out of plants and it’s a question of how we best do that.”

    Online Learning Resources

    Check out these sites for online resources, including webinars and training:

    Find out more

    Learn more about the work of BEACON

    Read Judith’s Blog

    Transcript

    Please connect with me

    Subscribe, rate and review the podcast in iTunes

    Like our Facebook page

    Follow Ben Adam-Smith on Bluesky

  • HPH284 : Build It magazine’s Self Build Education House – with Calum Taylor and Opinder Liddar

    HPH284 : Build It magazine’s Self Build Education House – with Calum Taylor and Opinder Liddar

    Calum Taylor and Opinder Liddar talk through the design and construction of the ‘Self Build Education House’ at Graven Hill.

    Interview with Calum Taylor and Opinder Liddar

    Calum Taylor is the owner of Build It Magazine, the longest running self build magazine in the UK. Together with their website and exhibitions, their aim is to provide expert advice and information in a practical and down to earth manner, to help self builders make the difficult decisions as easy as possible.

    Calum has been working on Build It’s Self Build Education House at Graven Hill with Opinder Liddar. Opinder is a director of lapd Architects. They are based in Oxfordshire and specialise in residential projects, particularly for self builders.

    It is a showcase of possibilities

    Coinciding with Build It magazine’s 30th anniversary, Calum’s idea for the Self Build Education House was to showcase the possibilities available to self builders by demonstrating the processes and some of the products that can be involved in a self build journey, whether or not they themselves were building at Graven Hill.

    It would also be a great experience for Chris Bates, the magazine’s editor, to have hands-on involvement with the project management.

    The house has been built on the Graven Hill development

    Graven Hill is a ground-breaking development: the first of its kind in the UK. The land was formerly owned by the Ministry of Defence before being sold to Cherwell District Council to develop. The site has planning permission for 1800 new homes, up to half of which are designated for self build.

    Calum says it has its fair share of cynics however, who question the plot sizes as being more like developer plots.

    “But I think it’s incredibly important that for self-build to really become the norm in the UK as opposed to what is done by a relatively few, relatively wealthy people, that we need to look at different models and we need to look at how you can have fantastic housing on smaller plots of land. And if you can do that with the profit on the land going back into the local community via the council then that strikes me as being a perfect model.”

    The plot passport outlines the parameters

    A number of plots had been allocated for show home use and, following a tender process, Calum successfully won a corner plot around the back of the houses featured on Grand Designs: The Street.

    Each plot comes with its own “plot passport” which defines certain parameters, such as maximum height and the footprint of where the house needs to be. With those established, the design can begin to develop as a response to the site aspects.

    It needs to work as a showcase, and a home

    In five years’ time the function will change from show house to a home that will be lived in, and this consideration formed part of the brief. It needs to have enough space for people to walk around in, while still feeling like a home.

    “Primarily we want people to look at it as ‘I want to live here. This is an amazing house.’ We don’t want them to think, ‘this works very well as a museum.’”

    With a plot restriction of 160m², the design was put in for planning at a size of 150m². The Graven Hill calculations don’t include basements and void spaces, so together with a basement plus an attic that would be prime for conversion, the overall area is closer to 230m².

    The budget has been for high-end specification

    Calum explains that the budget is rather difficult to define, as it’s not being constructed in the usual way. Typically a similar house might cost £2,000 per square metre, or around £470,000 in total. But as Build It’s complete guide to the house highlights, you could build the same size of house for substantially less if it wasn’t to the same high level of specification.

    By adding in the expensive finishes and details, Calum explains that it is giving people the opportunity to look at where they want to be spending their chunks of money.

    The corner plot dual aspects led much of the thought about design

    Opinder also likes the aesthetic of a steep roof pitch on a house, and to make a dramatic feature of the front he designed two gables, with the feature continuing around to the side.

    Insulated Concrete Form (ICF) was chosen as the construction method for a variety of reasons: it has good energy efficiency, is very airtight, performs well acoustically, and was particularly well suited for constructing the basement.

    Following discussions with Nudura, their ICF supplier, Opinder decided to push the design and show the materials at their best. The resulting design has a balcony that projects over the car parking area, hanging off a cantilevered wall that flies out at the first floor level. There are also frameless windows that turn the corner and are taken up to the underside of the gables.

    The ‘wow factor’ was an important consideration

    Often the space required for a plant room is underestimated, so the Build It house is a good example of showing how much area can be needed. Their plant room is in the basement to house the mechanical ventilation with heat recovery (MVHR) system, along with the inverter for the solar panels, battery storage, water softener, control hub for the Niko smart home system, and the amplifiers for the whole house sound system.

    Calum wants visitors to have the ‘wow factor’ when they walk in, so Opinder has designed a triple-height entrance hall. There you are greeted by a sculptural ash staircase that winds its way up. The eye is also drawn through towards the back of the building and the garden.

    A mixture of door types have been used, with pocket doors that slide into the walls, and a glass screen that gives the flexibility of sub-dividing the open space if needed.

    There is further architectural interest on the ground floor, with a curved wall that comes around from the cloakroom and into the kitchen, next to the floor to ceiling windows that give an amazingly light and spacious feel.

    The ground floor is open plan with lots of hard surfaces, but the oblique angles stop it from being acoustically noisy.

    The timber posi-joists, which are great for running services through, can be prone to noise transfer, so they have used acoustic boards, acoustic insulation and a screeded floor on top.

    On the first floor there is a glass balustrade which further enhances the connection with the outdoor space.

    Each bedroom is individual because of the different aspects and how they sit within the roof forms.

    It has been a typical self build journey in many ways

    The project hasn’t been without its challenges along the way.

    Calum explains that many of the difficulties have been in the project management of coordinating suppliers and contractors to work together.

    Issues were with communication, building to the same tolerances, and even incorrect measurements on site meaning that windows and doors didn’t end up exactly where they should have been.

    His tip for self builders is to keep on top of checking things like that because you could be storing up problems for a later date if things aren’t nipped in the bud as soon as possible.

    “The problems are about people and communication and scheduling things and dealing with the weather and all of those little curve balls that come your way and how you can actually try and continually pull it back to keeping it true to the vision of what you’re trying to create and as originally in the plans. Because it can be quite easy to deviate off slightly and end up with a house that doesn’t quite look and doesn’t quite perform in the way that you hoped it would.”

    The house shows what can be achieved on a tight plot

    With Calum working on the house from a Project Director level, it has been Editor Chris Bates who has been project managing the self build, going through the hard learning process and gaining valuable lessons and insights from it.

    Regular readers of Build It have been following the journey in the magazine and have been visiting to see the finished building. And for other members of the public with no prior experience of it, there are infographics around the house that help them understand the journey and the choices that were made around materials and suppliers.

    Going forward, the house will be paramount to the magazine’s editorial, as they can relate back to the experiences and decisions they made, or what they might have done differently in another scenario.

    Although the house went over budget and needed their contingency fund, (primarily due to weather delays), Opinder is keen for the house to show what is achievable on a fairly tight plot. He says it shows that it can be attainable for everybody and offers a genuine alternative to buying a typical “Noddy-box” house.

    More Graven Hill podcasts

    We’ve been following the Graven Hill scheme with interest for some time, so if you would like to know more about the background of the project and what it’s like to build there, then check out some of our previous podcasts:

    Find out more

    Visit the website of Build It magazine

    Follow Build It on Twitter

    Find out more about lapd Architects

    Please connect with me

    Subscribe, rate and review the podcast in iTunes

    Rate and review the podcast on Stitcher

    Like our Facebook page

    Follow us on Twitter

  • HPH283 : Modelling the embodied carbon of your build – with Tim Martel

    HPH283 : Modelling the embodied carbon of your build – with Tim Martel

    Tim Martel explains how to model the embodied carbon of your build using PHribbon, a tool that plugs in to PHPP (Passive House Planning Package).

    Interview with Tim Martel

    Tim is a qualified architectural technologist and Passivhaus designer. He also works for the AECB and is a course tutor for the CarbonLite retrofit course. Helped by a background in programming he has used his research and experience of working on new builds and retrofits to create PHribbon – a tool which enables people to model the embodied carbon on their build.

    PHribbon is designed to specifically work with the PHPP software

    While there are other specialists who do work on embodied carbon, PHribbon is unique in that it has been designed to work specifically with the Passivhaus Planning Package (PHPP). This is a benefit because around 80% of the information needed is already in PHPP. The additional information needed will be the things that aren’t covered by PHPP, such as internal walls, floors and roof coverings.

    PHribbon front screen

    The calculation is built around a RICS document

    The Royal Institute of Chartered Surveyors (RICS) wrote a document in 2017 called ‘Whole Life Carbon Assessment for the Built Environment.’ It’s a statement of what members have to adhere to and sets out in detail what is expected of the calculation. While the RICS calculation can only be done once a building is complete, Tim is able to use quantities that are in PHPP to give a good estimate of what the embodied CO2 of the building is likely to be.

    Information is gathered from Environmental Product Declarations

    The RICS calculation uses information from Environmental Product Declarations (EPDs), which are documents that work to European EN standards and which quantifiably demonstrate the environmental performance of a product. RICS also go through the whole lifetime calculation with detail on what should be done at each stage and what assumptions should be used. Assumptions being necessary sometimes for standardisation, because of the inconsistencies of different people coming up with different answers even for the same building. With lots of companies producing these declarations, (Tim now has around 200 in PHPP covering many different materials) the challenge might be in convincing manufacturers of products with lower environmental credentials to share their information.

    CO2 results can be shown in different ways

    As long as you are able to provide the net internal area (NIA), results can be shown as kilograms of CO2 per metre squared of net internal area. In addition the graph can be customised to show total CO2 for the whole building, kilograms of CO2 per metre squared of TFA (that’s usable space in Passivhaus language), and even CO2 per occupant.

    Awareness is drawn to potential inaccuracies

    Tim stresses this isn’t an official calculation, but it does closely follow the RICS standard. There will however be some inaccuracies, and these are highlighted by a colour coded system in PHribbon to draw attention. Some EPDs they can be fairly certain about so will be coloured green, but others that they’re less confident of will be orange or red. They might be ones that are based on RICS assumptions like 300km being the assumed transport distance from various manufacturers to the site if its a national product, whereas in reality it’s likely to be more or less than that.

    Generally speaking, the information is likely to get more accurate as more EPDs are produced, and with more available it’s highlighting just where the missing information is. In particular, it would be useful to show information for the end of life stage, and include reuse and recycling benefits.

    Results can be tailored to show alternatives

    With several examples already completed, Tim says his findings show a typical semi-detached house as having around 14 tonnes of CO2 for the whole life of the building, with about 10 tonnes of that just for the materials themselves. The benefit of using PHribbon is that comparisons can be made in a graph by using different options, such as what the figure might be if the house was made out of brick, as opposed to timber.

    Example of whole building using timber, PIR versus brick
    Example showing 100m2 wall using timber, cellulose versus brick

    More information is needed about the end of life stage

    With some of the more typical timber constructions where I-beams and cellulose are used, both of those have quite a large storage component so a large bar represents that storage which offsets all of the emissions in the RICS calculation.

    Tim says there’s a catch with this though, as one of the assumptions is that in order to include storage you have to do a full life calculation. That then uses the RICS assumption that 75% of the timber is incinerated at the end of life stage, with the other 25% going to landfill. Unfortunately there isn’t currently enough information about recycling and reuse to produce those in the EPDs as an alternative.

    “If you could say, ‘this building has been built so that it can be taken apart and recycled. This material is ideal for being recycled so it can be made into OSB, MDF or anything’, if that can be done and we can prove the figures for it with an EPD for that process then you could legitimately add that as another option.”

    Find out more

    Visit the website of the AECB

    Follow the AECB on Bluesky

    Please connect with me

    Subscribe, rate and review on Apple Podcasts

    Like our Facebook page

    Follow Ben Adam-Smith on Bluesky

  • HPH282 : How to share knowledge, test and debunk! – with Nick Grant

    HPH282 : How to share knowledge, test and debunk! – with Nick Grant

    Nick Grant shares his thoughts on the lessons learned from 30 years of the AECB (Association of Environment Conscious Building).

    Interview with Nick Grant

    Nick Grant from Elemental Solutions is a Passivhaus consultant and also Technical Director of the Passivhaus Trust. He’s been on the podcast a couple of times before talking about value engineering and integrated design.

    Nick has had a long involvement with the AECB (Association of Environment Conscious Building) and at the conference last year, celebrating 30 years of the AECB, Nick and Alan Clarke gave a presentation about lessons that have been learned during that time, and Ben was keen to explore this further.

    The AECB has an openness of critical thought

    Nick highlights that the AECB has a strong ethos of accepting when you’re wrong, realising mistakes that are made and learning from each other’s mistakes. That’s not to say it’s an easy thing to do, particularly when you’ve spent years becoming an expert in something and then admitting that’s perhaps not the best way of doing it.

    “So, some of these things, it’s better to know than not know because you could carry on for the rest of your life to your grave doing things that turn out to not be worthwhile.”

    Becoming aware of all the negatives and then getting rid of them, leaves you with the bits you want, which turns it into a positive.

    Passivhaus works!

    Nick explains that when he built his own house, he’d heard of Passivhaus bu there wasn’t enough information in English to know much more, other than it was about thermal bridges and airtightness. His own house was designed intuitively without any energy modelling, because with the walls over a foot thick and a foot thickness of loft insulation, there didn’t seem much point. It was only later when they modelled it that they realised it wasn’t great, primarily because of the form factor.

    Nick’s self build project
    Sheila makes the engineered DIY rafters (to save a bit of cash)
    Nick and Sheila’s house
    House interior

    The term ‘thermal bridges’ wasn’t in the Building Regs, and while they knew what it meant, they didn’t realise that around a third of the heat could be escaping through them if they weren’t dealt with. It’s only now, having done the analysis on hundreds of buildings, that they have a learnt intuition.

    Nick attended the first Passivhaus conference, back in 2007, partly to debunk it, and partly out of curiosity. But having been to the talks and seeing some of the buildings, he realised that it actually worked and was very impressed with what he saw.

    Whereas before there would be arguments about thermal mass and all sorts of discussions that were points of opinion, now Passivhaus is a simple model that can be used to give the answers.

    It’s important to use critical thinking and questioning

    This is something that Nick says the AECB has been particularly good at, and should be a fundamental part of learning.

    Not everyone does this however. Particularly among some designers there can be a resistance to it, because of not wanting to have constraints that will mean their visual design won’t work.

    He would rather embodied carbon be kept separate from the Passivhaus Standard

    In the early days of the AECB, Nick says where there tended to be more emphasis on using natural materials, then the performance aspect had to be abandoned and the building justified in other ways, such as lower embodied energy.

    Nick says this doesn’t have to be the case and just because you might be talking about one aspect, it doesn’t mean the others have to be ignored.

    “I think the problem is when you pursue one and it causes a problem for the others or it excludes the others. So, if the energy performance requires things that are ugly or polluting or something like that, then that’s a problem. But that’s not what I’d want to do. So, it’s a compromise.”

    In terms of whether Passivhaus should go down the route of incorporating more about embodied carbon, Nick doesn’t believe that it necessarily should. He would rather it be kept separate from the standard, otherwise there can potentially end up being trade-offs that happen in other green building standards, like where there’s lower embodied energy there can sometimes be higher operational use.

    The problem with embodied energy is complex

    There are conflicting views, with a good example being timber.

    “Depending on how you do the accounting, some people see timber as a negative thing and that leads to the idea that the more you put in the building, because you’re locking up carbon, even to the point where the building is not emitting carbon until ten years into the future when the operational has overtaken the embodied.

    We think that’s nonsense. Most of our buildings do use timber but we don’t see that as negative. It’s still every time you cut down a tree and turn it into a building, carbon is emitted. I’m not an expert but I’m assuming there’s less emitted than if we use steel or masonry and so on. That’s why we like to use timber. But we don’t see it as negative.”

    A timber frame construction using i-beams

    Off-setting alone isn’t enough

    When it comes to off-setting, Nick says there aren’t enough trees that can be planted to do all the things that we need for building, flying, running vehicles, heating homes, making electricity etc.

    “We’ve got to do off-setting in the sense that we’ve got to plant loads of trees and we’ve got to do all that stuff. But we can’t do that instead. We can’t say, ‘I’ll fly to America and plant a tree and that’s fine.’ We’ve got to do the not flying to America and the planting of trees and the not using energy. There’s not enough off-setting possible.”

    Existing building stock is a problem

    Nick says that most of his work is new buildings, partly because it frustrates him that the new buildings of today are being done so badly and are the retrofits of the future. But a bigger challenge is what should be done with all the existing building stock, and this is something that he doesn’t have the answer to.

    One thought is to retrofit them all to Passivhaus standard, but that seems incredibly difficult, particularly with listed buildings. In some cases where they’re in a state of disrepair, adding in extra insulation or triple glazed windows is a no-brainer, but a lot of retrofit isn’t like that. Many are perfectly good buildings that are going to cost nearly as much to retrofit as a new building would cost.

    Designing buildings for the future gives a false sense of security

    Nick says that designing buildings that can adapt to higher temperatures or flooding in the future can be a dangerous thing as it gives a false sense of security that we can survive this. We need to be designing for the hot summers and extreme weather that we get now.

    With so much change happening so quickly, such as a rise in fascism and better awareness of climate issues, Nick says it’s hard to predict even one year ahead.

    “But that’s what keeps us going I suppose, thinking that at least we’re doing the right thing. On one level, incredibly pessimistic; absolutely can’t see any way this is going to end well. But at the same time, what else do you do?”

    Photo credit Bill Butcher

    The AECB has had a big impact

    Nick explains that although the AECB is a small organisation, it has had a big impact, with most of the best performing buildings having had AECB members involved.

    In contrast, he says things like the World Green Building Council seemed to be made up just of people who had paid to have membership, with no Passivhaus buildings, and none that the AECB would consider to be exemplary.

    “Within our little group, it feels like things are moving forward. But if you step out of the bubble then it feels like it’s unknown what we’re doing.”

    Image credit Lancaster Co Housing and Eco-Arc

    Find out more

    Learn more about the AECB

    Visit the website of Elemental Solutions

    Follow Nick Grant on Twitter

    Transcript

    Please connect with me

    Subscribe, rate and review the podcast in iTunes

    Rate and review the podcast on Stitcher

    Like our Facebook page

    Follow us on Twitter

  • HPH281 : What’s it like to be an owner builder? – with Tully Gallagher

    HPH281 : What’s it like to be an owner builder? – with Tully Gallagher

    Tully Gallagher of Beartooth Passive House, explains what it was like to take a leap of faith in swapping a desk job with building a ‘forever home’ for his family.

    Interview with Tully Gallagher

    Tully had been working as an engineer in Denver for ten years when he and his family decided to move back home to Montana.

    “We went from having a very stable income, stable benefits, a pretty consistent life, to moving back home, not having jobs, living in rental houses.”

    With intentions to return and build their “forever home” for his family that would be a healthy and comfortable place to live, Tully had originally selected a builder to achieve their high performance house. When that fell through in 2017, and with the chance of finding an alternative that had even heard of Passivhaus, let alone built one, being fairly unlikely, it seemed the natural decision to take on the project themselves.

    Tully took on the house building project full-time while his wife found work at the local school to keep an income coming in.

    Passivhaus Builders’ Training gave him confidence and connections

    With his construction experience amounting to limited remodels of previous accommodation, Tully took the Passivhaus Builders’ Training in 2017. With that came access to highly knowledgeable people that he could lean on for tips and feedback during the planning phase.

    Keeping it simple was crucial

    From the outset when they decided to build the house themselves, they opted to keep the form very simple: a two-storey rectangle with engineered roof trusses.

    Emu Systems, who delivered the Passivhaus training, were trying to standardise construction methods for different climate zones and were looking for partners to pilot their system. It was a good fit with what Tully was looking for so they worked together on the construction system, building science, wall details, window installs etc.

    The remote location brought its own challenges

    Located about four miles from the town of Red Lodge (population of around 2,000), their site was relatively flat at the top of a hill in a sparsely populated area. One of the biggest problems about the location was the absence of any major DIY store; the closest being an hour and a quarter away.

    The location for the house was based on a transformer being a couple of hundred feet away so they could connect electricity without a problem.

    For waste water they had a septic system installed, and for incoming water they hired a company to drill a well. A pump runs from the well and is connected to a line that runs into the house, with a pressure tank supplying the pressure to the house and holding a reserve of the water.

    They used a pre-determined build system

    Partnering with Emu meant the construction system was already determined, which was a Passivhaus double stud wall system. Overall wall thickness is around 20 inches, incorporating mineral wool batt insulation, interior finishing and exterior siding.

    With the house being a basic rectangle shape the airtightness strategy didn’t pose any problems. The only junction that took more consideration was at the second storey floor system and how to get the air barrier out and around the floor joists.

    “But it was definitely something that we thought of early on and we picked the materials that we used for that air barrier specifically because they were really easy to work with and they were really strong and robust. They could stand up to if somebody accidentally bumped into them or something accidentally hit it and ripped it. It was pretty easy to repair and get it back to air-sealed.”

    They have moved in while finishing the interior

    Tully and his family moved into their home during November 2019. It isn’t yet finished but the pace of work has only slowed a little now that they’re in and are working on finishing the interiors. Interior doors are due to arrive soon, then it will be finishing the window trim and putting a lime plaster on all the interior walls. The bathroom installation is currently underway which Tully sees as a fairly big undertaking because of its size and his lack of experience.

    Make time to have a break

    A particularly difficult part of the build was the roof, which he saw as his nemesis and was one of the times he wished he was back at his desk job! Although not afraid of heights, he doesn’t particularly love them and with the ridge of the house being around 30 feet off the ground even getting the sheathing up there was difficult.

    He remembers one specific heart-sinking day where they had stapled all the underlayment down when it started getting very windy. Looking up from where he was having lunch at his parent’s house nearby he could see it starting to billow in the wind before a big length of it gave way and started flapping about. They ended up putting a metal roof on the house, with Tully admitting that the first couple of panels while they were figuring it out weren’t the prettiest and were put at the back of the house where they wouldn’t be seen!

    The biggest challenge Tully faced was knowing when to walk away and take a break.

    “I was wanting to get things built and it got to the point where coming out every day, I started to become a little bit more easily agitated and I just needed a break. That’s something that was a struggle for me all the way through building, knowing that I want to continue making progress so that we can move in, but at the same time I needed to take a break so that mentally and physically I could recover.”

    Take your time in the planning stages

    Tully says that although it’s been hard and taken a long time, if they hadn’t first gone through such a detailed design and planning stage it would have been a lot more difficult.

    “So, from a design phase and early implementation phase, that’s the time where it doesn’t cost you really much more money to take another month or two months to really get things lined out and understood. So, that was a big learning experience for me.”

    From a teaching perspective going forward, he would like to specialise in high performance building envelopes and the installation of that system, including the air barrier, insulation and windows. He would also like to explore the possibility of doing that in a pre-fabricated manner where the walls, floors and roof can be made into panels that can be trucked to the site and installed within a matter of days.

    It’s been a stressful but satisfying experience

    Tully’s advice to anyone taking on something similar, is to be prepared for it to take a very long time, especially if you’re doing it yourself. Spend time planning and thinking everything through as it’s a lot better to make the mistake during the planning stage than when you’re actually building it.

    Tully spent a lot of time doing 3D modelling in SketchUp, using it to model every single framing member before cutting any timber at all. He found it helped him to think through all the different junctions and how it would all work together.

    He also says to be prepared for it to cost a lot more than you are expecting.

    “So, if a budget constraint comes up and you have to choose between having really nice counter tops or spending the money to put in an additional X amount of insulation and focus on airtightness, I would say really consider that airtightness and insulation piece because you’ll probably never do that again or never have the opportunity to do that again. But you can save up for a year and upgrade your kitchen counter tops really easily.”

    “It’s stressful. I’d like to say that I’ve had way more stress in the last year-and-a-half than I had in the previous eight years probably combined. But I think I’ve also lived more and experienced more in the last year-and-a-half both in emotion and physical, actual achievement, than I had in previous years.

    I’d had an office job for the most part. I did a little bit of fieldwork. But when you go in and you’re on a computer, you can build some really cool spreadsheets or do some cool stuff in software but it’s not the same thing as being able to go to work, work hard all day, then leave and look at a forty foot long, nine foot tall wall that you built and stood up that day.”

    Find out more

    Visit the website of Beartooth Passive House

    Follow Beartooth Passive House on Instagram

    Transcript

    Please connect with me

    Subscribe, rate and review the podcast in iTunes

    Like our Facebook page

    Follow us on X

  • HPH280 : A beginner’s guide to the Passivhaus Standard – with Jon Bootland

    HPH280 : A beginner’s guide to the Passivhaus Standard – with Jon Bootland

    Chief Executive of the Passivhaus Trust, Jon Bootland, explains the processes and benefits of building your house to the Passivhaus Standard.

    Interview with Jon Bootland

    When Jon Bootland finished his university degree he began his employment first as a building services designer, and later working on good practice for sustainable low energy buildings, now with nearly 30 years experience. He has also been involved with the Passivhaus Trust since it was formed back in 2010. With initially very slow progress since the first Passivhaus was completed in the UK in 2010, numbers are now increasing rapidly at around 1,200 completed buildings (of which around 200 are individual owner-occupied homes), with another thousand already in the pipeline.

    Carrowbreck Meadow – Image copyright Jefferson Smith

    There’s nothing hugely complicated about Passivhaus

    The origins of Passivhaus come from Germany, where the physicist Wolfgang Feist wanted to find a way of making sure that high performance buildings actually delivered on their claims, and performed the way that they were designed to do.

    “It’s all about building physics. There’s nothing hugely complicated about it. It’s just what do we need to do to actually make it work and do what we said it was going to do.”

    High in comfort levels, low in energy use

    The fundamentals of a Passivhaus are:

    Insulation – This is an important part of reducing the energy required to heat the building. A typical Passivhaus might have up to 30cm of insulation, meaning that the walls will be very thick.

    The building fabric and airtightness – The other parts of the building will also need to have a very high performance. Windows for example will need to be triple glazed with good quality frames and careful detailing about how they fix together. The airtightness of the building is important with the aim being to stop draughts coming in and heat leaking out.

    Ventilation – Because the building is now free of draughts, attention then needs to be paid to how to ventilate it. A mechanical ventilation system is used (MVHR) to bring fresh air into the building, while recovering the heat from the outgoing air.

    As well as dealing with keeping the house warm in winter, Passivhaus formulae also look at the sun and other heat sources coming into the building and how the ventilation and insulation can work to keep it cool in the summer.

    Old Holloway – Image copyright Juraj Mikurcik

    Have a Passivhaus expert in your team

    Jon says that building a Passivhaus is harder to do than a normal house, but that doesn’t necessarily mean you have to employ a team of specialists. He would however recommend having someone in your team that does have Passivhaus training, and preferably experience. It doesn’t have to be the builder, but could be the architect or a consultant.

    The Passivhaus Planning Package does the calculations

    You will need someone who knows what they’re doing to fill in the Passivhaus Planning Package (PHPP) and work out the answers to the calculations with you. It is a tool that takes a holistic approach to making all the elements work together, to make sure you end up with a building that has the performance and comfort that you are looking for.

    There are benefits to having certification

    PHPP should be used right from the beginning to look at the size and shape of the building, the window locations, balconies or anything else that might penetrate into the building etc. A certifier is able to check what is being put forward and advise on whether what you’re suggesting is actually going to work in the way it is intended.

    Without having a certifier on board you will not be able to call it a certified Passivhaus, which does have some value in being able to sell the project. Certification is the best way of ensuring that your building will meet the required standards and provide the comfort and energy performance that you are looking for. If you’re not planning to use a certifier, then Jon recommends ensuring your team of architect, builder and consultants have plenty of Passivhaus experience between them to give you confidence it will perform as intended.

    There are health and cost benefits

    Jon outlines some of the key benefits of a Passivhaus:

    Lower energy bills – The extra insulation and airtightness means less heat is escaping from the house, and therefore less energy is needed to heat it. Typical heating bills for a standard sized Passivhaus might be around £100, compared to several hundred for a non-Passivhaus equivalent.

    Health benefits – Jon says there are research projects planned in the next few years looking into this, but there is still plenty of anecdotal evidence from occupants talking about the health benefits of living in a Passivhaus. As well as thermal comfort, the air that comes in can filter out air pollution and pollen, and people have reported improvements in asthma conditions. The mechanical ventilation also reduces moisture levels in the building which prevents condensation and mould.

    Some construction methods will be harder than others

    Jon says that although you could achieve Passivhaus with any construction type, it will be harder to achieve with brick and block for example than with timber panels. Although it’s possible to do, it will just need to be approached differently.

    The extra outlay is money well spent

    Jon uses social housing to get comparable benchmarks for how much more a Passivhaus will cost to build over a standard form of construction. Typically the additional cost of building a Passivhaus will be around 4-8% higher. Jon says that probably half of that is just on better quality building, which actually should be applied to all new buildings anyway, regardless of whether they’re Passivhaus.

    So on a £200,000 – £400,000 build cost, that’s likely to add on just £8,000 – £16,000 extra.

    “So, say you’re going to get a much better quality building that will make you more comfortable, more healthy and will perform better for 50, 100 years or more, it’s a very small amount of money in my book and it’s a much better way to spend your money than on a super flashy designer kitchen.”

    There are ways to keep costs down

    The shape and form of your building is crucial in keeping the costs down. Adding on multiple wings, outlying parts, differing floor levels, balconies additional roofs, lots of corners and odd shapes, will all make it more difficult to make a Passivhaus work, and will be more costly.

    Jon wouldn’t recommend everyone try and build a square box as being the answer, but the closer you aim to a square box shape the easier it is to achieve Passivhaus.

    Another way to keep costs down is to bring in your Passivhaus expert as early as possible. Don’t wait for the design to be finished and then call them in to do the calculations, but involve them at the design stages to help develop the building shape, window sizes and locations etc.

    Multiple heating sources are not needed!

    Jon explains that it can be challenging mentally to think of a house not needing multiple heat sources in it, but really they’re not needed.

    Commonly though, people might put a radiator by the front door so that as you walk in there is a perception of extra warmth, while your body adjusts from the cold outside to the comfortable 20-21 degrees inside. A heated towel rail in a bathroom is also quite popular.

    The design needs to minimise overheating risk

    With homes becoming more energy efficient, the risk of overheating in the summer is becoming more significant and has to be planned for.

    The main source of heat coming into the house in the summer will be from the sun, mostly in the late afternoon and evening. To stop the heat coming in without losing the views, Passivhaus buildings will often have some kind of shading or overhang on the west or south facing walls which keeps out the heat until later in the evening when the temperature drops.

    There are also other heat sources to take into account such as the occupants and appliances, which heat the house slowly during the day. This data also feeds into PHPP to calculate how much heat will need to be taken out of the building to keep it cool. This can be done using the mechanical ventilation, or by opening the windows, particularly overnight. The temperature fluctuation in a Passivhaus will only be a few degrees, compared to 10-15 degrees in other houses.

    “But the extra insulation and the extra performance of the windows, the doors and so on helps in the summer. Just as much as it helps in winter in keeping the heat in, in the summer it keeps the hot air out.”

    The Passivhaus Trust oversees the standard in the UK

    The standard was invented and developed in Germany, but in the UK it is looked after by the Passivhaus Trust. Their job is to look at how to apply and make the Passivhaus work in the UK, with our differing weather patterns and culture. Jon gives an example of these different considerations being parts of Scotland, where people don’t want to open their windows for night-time cooling because of midges coming in, so different approaches have to be developed.

    The second aspect to their work is promote the adoption of the standard, by engaging with central government, local authorities and trying to get people on board.

    Jon accepts that while it’s a great standard it’s not perfect, so the third part of their work is carrying out research on specific aspects that can be changed and improved over time.

    There are different levels of Passivhaus standard

    There are two main standards: Passivhaus Classic for new build and EnerPHit for refurbishment. The criteria for achieving EnerPHit are slightly less stringent because it is that much trickier to do a retrofit. Certain aspects of the building are fixed and can’t be changed, so an allowance is made that if you can’t change those things you can still get Passivhaus.

    The Barrel Store – an EnerPHit Standard youth hostel. Image copyright Mac McClure

    In addition there are also two new standards: Passivhaus Plus and Passivhaus Premium, which are effectively the Passivhaus Classic but with renewables. Passivhaus Plus is where the energy generated by the renewables will exceed the energy demand of the house and reach zero carbon. So the energy generated will be equal to or more than your energy used during the year.

    Passivhaus Premium takes that a step further with enough renewables to create an energy positive house, so you’re generating more than you need and reclaiming money back from the grid.

    PHPP can be used to calculate embodied energy

    Within the planning tool they are now looking at add-ons which consider the embodied energy of the materials that you use and form part of the Passivhaus calculations. This will benefit people who are keen to use natural materials or who are just interested in understanding how much embodied energy there is. Jon stresses it is not a requirement for achieving the standard, it’s just developing the capacity to do it for those that would like it.

    Find out more

    Visit the Passivhaus Trust website, and learn more about their Passivhaus goes Personal campaign

    Transcript

    Please connect with me

    Subscribe, rate and review the podcast in Apple Podcasts

    Rate and review the podcast on Stitcher

    Like our Facebook page

  • HPH279 : A beginner’s guide to building terminology – with Lee Fordham from Architype

    HPH279 : A beginner’s guide to building terminology – with Lee Fordham from Architype

    Lee Fordham from Architype simplifies some of the terminology you might come across if you’re thinking about doing a sustainable self build.

    Interview with Lee Fordham

    Shortly after qualifying as an architect in 2004, Lee spent time travelling and working for architecture practices in New Zealand and Australia. When he returned to the UK he decided to pursue his passion for sustainable design and started working at Architype, one of the UK’s leading sustainable architects, where he is now an Associate Director.

    A beginner’s guide to terminology

    For those that are just setting out in their self build journey there can be an overwhelming array of technical terminology used that can be baffling to anyone outside of the industry. Lee takes us through some of the common terms that you might come across in a sustainable self build.

    Passivhaus / Passive House

    Passivhaus (Passive House in the United States) is a building standard that was developed in Germany around 30 years ago. Using physics, the aim is to reduce the performance gap between how the building is designed to perform, and how it actually performs.

    The aim is to make the building more comfortable for the occupants and reduce how much energy the building uses, which is done with a better quality of build.

    Liz and Mike Hill’s Passivhaus – designed by Architype

    The experts will use the Passivhaus Planning Package (which you’ll hear referred to as PHPP), which essentially is a very complicated spreadsheet of data that allows them to design a building that will meet the Passivhaus criteria. The contractor will use that information to construct the building, and a certifier will guarantee the work and certify it if it meets the required standard.

    Passivhaus plaque

    MVHR

    You’ll commonly hear a Mechanical Ventilation Heat Recovery system referred to as an MVHR. They’re most likely to be used in Passivhaus buildings, but not exclusively. It is a ventilation system which extracts the used air from inside a building. It takes the heat from that air and mixes it with fresh air which is being brought into the building from outside, to provide every room with fresh, pre-warmed air.

    The air is filtered coming into the building, and different filters can be used according to whatever is in the external air in that area.

    A key benefit over natural ventilation is the element of control over any given space, ie removing moisture from bathrooms etc.

    An MVHR for a domestic dwelling is roughly the size of a combi-boiler and will need to be incorporated into the building’s design.

    MVHR unit at Landsdowne Drive Passivhaus – Green Building Store

    Foundations / Footings

    These will usually be designed by a structural engineer and are what sit under the building to evenly transfer the weight of the building to the earth. The type you use might be dependent on what your ground conditions are like, but some examples are pile foundations, deep strip foundations and raft foundations.

    U-value

    A complicated one to explain, but essentially it’s a way of measuring how thermally conductive a component or a series of components (like a piece of glass, wall or roof) is. It is the rate at which heat travels through. The lower the U-value, the better it is.

    The aim is to have fairly consistent U-values across all the components in a building. Having just one element that isn’t consistent could act as a magnet for moisture and potentially damage the structure. This can partly be achieved by better insulation, triple-glazed windows etc.

    The U-values form part of the data that feeds into the PHPP system.

    Airtightness

    At a very basic level, this is about eliminating drafts in a building. It’s relatively easy to achieve but needs to be thought about at the design stage. At Architype they denote the airtightness layer on their detailed drawings using a red line, which shows the contractors where to take particular care in the construction so as not to damage it.

    To meet building regulations, when the building is finished an air test will be carried out. The building has a giant fan attached to it and is either positively pressured, ie blowing air in, or negatively pressured, ie extracting air. The rate at which the air leaks gives you your air test result. It is a measure in pascals of the pressure of an internal area. Building regs require you to get a result of 10 or less.

    The method in a Passivhaus building is slightly different. This takes an average reading from the building being both positively and negatively pressured, to give an n50 value which is how many volumes of air changes there are in an hour. The Passivhaus requirement is that it should be less than 0.6, so significantly better than building regulations.

    Build system / construction method

    This is a way of describing what method you are going to use to construct your building. Examples include timber frame, masonry, brick and block, insulated concrete formwork (ICF), pre-cast concrete, in-situ concrete, and cross-laminated timber.

    Pre-fabrication

    Pre-fabrication is where components, or indeed whole buildings, are made off-site. This could be from wall panels, to timber frames, to bathrooms that are fully plumbed and tiled, to entire houses.

    MAKAR production facility

    You can even go to the factories and choose your handles, paint finishes, floor finishes etc. When they reach the site they are connected together. The advantages of building the elements off-site is it can be quicker, they’re not subject to delays or damage from the weather, and often it can result in better quality and working better when brought to site.

    Huf Haus

    Zero carbon

    Lee says that this is a difficult one to explain as there are many different interpretations of what it means.

    Generally it refers to off-setting the energy use in a building. So the better your building is, ie a Passivhaus, the less carbon you have to off-set because you’re not using as much energy.

    Looking deeper into it, some people will be referring to zero carbon in use, which is the energy that is used starting from the point of when it’s been built, through to its end of life.

    But there’s also embodied or sequestered carbon, which takes into account everything to do with the design and construction of the building, together with the in-use energy and sometimes through to the demolition. This is more complicated to account for, although there are tools which can help explain for instance, how much energy is used in getting a tree from Germany to the UK to use in a timber frame.

    Custom build

    Whereas self build has many decisions for you to make, whether or not you’re doing it in the purest sense of building it yourself, or whether you’re commissioning someone to carry that out for you, custom build can take some of those decisions away from you. There will be an offering from the custom build company, but with options for you to customise it. That could be in terms of the style of the house, the layout or the finishes. It might not be as individual as you would get with a self build, but it can take away a lot of the headaches!

    Potton Homes design

    Solar shading / brise soleil

    Effectively the same thing, brise soleil or solar shading would be used on the south facing side of a building to limit the sun coming in during the summer months when you don’t want the building to overheat, but allowing it to come in during the winter when the heat is required. Generally it would be a horizontal component that sits over the south facing glazing, whether that be a roof overhang, external canopy or series of louvres.

    External louvres – Charlie Luxton Design
    Wimbish Passivhaus Scheme – Parsons & Whittley
    Ditchingham Passivhaus Scheme – Parsons & Whittley

    On an east or west elevation you would usually have a vertical component, and that’s just to do with the angle of the sun at certain times of day and certain times of year. Windows on the east and west elevation can be harder for dealing with glare and overheating issues.

    Lee says the ideal situation is to have the building facing south where the solar gains can be controlled more easily.

    Design team

    The core members of a design team are likely to include: an architect, structural engineer, civil engineer, mechanical and electrical (M&E) engineer, and possibly a project manager.

    Beyond that, depending on your site and your level of involvement and interests, you might also have: landscape architect, ecologist, arboriculturist, quantity surveyor, Passivhaus designer etc.

    Renewables

    Renewables refers to technology that generates energy. This could be photovoltaics, wind turbines, hydro power etc.

    Air source and ground source heat pumps

    An air source heat pump takes energy from the temperature in the air. Any air above zero degrees has energy in it and this can be taken and transferred into heat or hot water for your house. Similar in size to a washing machine, they’re put on the outside of a building.

    The ground source heat pump works in much the same way but will take the energy from the ground. They have pipes which can either be spread horizontally in the ground which will require a lot of space, or as a vertical spread of pipes, which need less space but are a lot more expensive.

    Plans, elevations, sections and details

    These are examples of the different types of design drawings, created by Parsons and Whittley for Ben Adam-Smith’s house:

    Plan – This is an aerial view, looking down onto the building. You can have different plans to show each floor of the building, but they can show the roof, doors, walls and windows, together with the internal layout.

    Elevation – An elevation is a drawing of what the outsides of the building look like from where you’re standing. A south elevation for example would be the side of the building that is facing towards the south.

    Section – This is like slicing down through a building to show what’s inside. It will show the components of the walls, floors, roof etc.

    Details – By taking a section drawing and zooming in you will create a detail. They can be various scales, such as 1:2 or 1:10, and are an in-depth analysis and instruction for the contractor showing how to construct that part of the building. It would show them where the airtightness line is, where the insulation is, and how wide cavities would need to be.

    Soft landings and performance monitoring

    A soft landing is about making sure that once the building has been constructed, that the operator of that building knows how to use it. Obviously if you’ve built it yourself then this wouldn’t be necessary, but if you’ve largely commissioned other people to complete the project then you should have someone tell you how it all works.

    Performance monitoring can take place throughout the build process but in particular Lee refers to monitoring once the building is complete. This uses sensors to check on things like the internal temperature, humidity and CO2 levels, to make sure the building is performing as it was designed to do.

    Tender

    The way you tender will depend on what kind of contract you will have, but essentially a tender is a set of information that is put out to someone for a response. They will price up the aspects on the tender and return it with their figure and requested documentation. It can be a tender for a design team or for a contractor. The returned tender documents are then scored and weighted according to whatever your priorities might be. For some that might be 80% of the marks will be based on how competitive the price is, but for others they might weight it more heavily in favour of quality and not necessarily who is the cheapest.

    A key thing is to make sure the information and drawings you are sending out are as comprehensive as possible. That way it can be priced accurately for what you will be needing. Without that detail they will be adding an element of price risk to their response which will invariably make it much more expensive.

    Window parts

    • Sill – The ledge at the bottom of the frame.
    • Head – The top of a window where it meets the wall. It can be internal or external.
    • Jamb – The side of the window
    • Reveal – The part next to the jamb. Can be internal (usually plasterboard) or external (usually timber or brick). If the reveals are set very deep into the thickness of a wall they can provide some shading to the window
    • Mullions and transoms – Found on traditional Victorian style windows, the mullions are the vertical bar in the middle of the window, and the transoms are the horizontal bar.

    Roof parts

    • Trusses – The pieces, usually made of wood, that actually make the roof structure
    • Joists – A horizontal structural element that supports the floor and/or ceiling
    • Eaves – The part of the roof that overhangs the wall. Usually if it’s a sloping roof it would be the part which overhangs the gutter
    • Soffits – Underneath the eaves, the soffits are the horizontal section that you can see
    • Ridge – The point right at the top of the roof, usually where two pitches come together
    • Verge – The part at the side of the house. Usually there would be a bargeboard or piece of wood that goes down the side
    • Parapet – Usually a piece of wall that protrudes up above a flat roof
    Roof trusses
    Roof joists

    Find out more

    Visit the website of Architype

    Follow Architype on Twitter

    Transcript

    The Hub

    If you’re new to self build and looking for more information, then be sure to check out The Hub. It’s full of great resources, video diaries and support from a community of like-minded self-builders.