  • HPH278 : A beginner’s guide to self build – with Geoff Stow

    HPH278 : A beginner’s guide to self build – with Geoff Stow

    Having worked on his own hands-on group self build project, and site managed others, Geoff Stow shares his experience on where to start when it comes to self build.

    Interview with Geoff Stow

    Geoff’s involvement with self build started years ago when he worked with a community arts project in south London, making a video with a group of self builders who were promoting their scheme in Lewisham. So when Lewisham decided to do another scheme he put his name down, chairing and being part of a group of 13 that built their own houses on a Walter Segal project. From there, his involvement continued with working as a site manager for other group self build schemes, including the Hedgehog project in Brighton.

    “My background isn’t as a builder really but I think in some ways that’s quite interesting because it’s actually coming at it as a novice. I’m sympathetic with people who are trying to get a scheme off the ground.”

    Geoff also runs courses on timber frame self build, and self build project management at the Centre for Alternative Technology in Wales.

    Hope Wharf
    Hope Wharf

    It’s likely to be harder than you’re expecting!

    Geoff says he’s never met anyone who said they wished they hadn’t done it, but does stress that you should be prepared for a lot of hard work. He thinks there is actually very little in place to make things easier, with the majority of things at the beginning like planning and finding out how to connect services, being geared up to failing.

    Whereas most people spend their time at the beginning sketching designs for a plot they don’t yet have, he recommends instead taking that time to research and understand the issues involved. That could be around planning, environmental issues, insulation, ventilation etc.

    Take the opportunity to go to the exhibitions to grow your understanding and help you talk the same language as the experts, but bear in mind that a lot of it is sales focused.

    Understand the issues around claiming back the VAT, and get yourself organised with a good accounting system so you can keep track of staying within budget.

    Build your knowledge by checking out some of the self-build books around, like Mark Brinkley’s Homebuilder’s Bible. They’re worth reading for finding out about things like health and safety requirements, working out how you’re going to organise your project, whether you might be able to site manage it yourself, and understanding what the relevant issues around that might be.

    Use your suppliers by asking for detailed information, and if they can’t provide it then don’t use them. Geoff gives the example of a window supplier, where you should be providing wall designs and asking what’s the best way of fitting them.

    Have a sensible budget

    Keep in mind that things rarely come in under budget or ahead of schedule, so have a sensible budget that is based on real costings, not just how much you’d like to spend or how much other people have spent. Be wary of the figures that people quote when they say their house cost X amount per square metre, as you never quite know what has been included and what has been omitted.

    Budget high for all of the initial stages. Things like the foundations, services and access roads can have plenty of unknowns and it’s much easier to price up more accurately for the above ground works. Add on a good contingency once you get quotes in as this should free up money later on.

    In addition to budgeting for the overall cost of the build, if you’re using a self build mortgage you will need to consider your cash flow. They work by releasing money once a stage is finished, so although you might have enough money in total, you might find the project grinding to a halt if you do not have it available at the right times.

    Finding land will probably mean making compromises

    Geoff’s key piece of advice for finding land is to be flexible, as there’s not that much of it around. He thinks it best to spend time in the area where you’re looking as quite often word of mouth can be helpful.

    Take the time to understand your site

    Geoff estimates that, depending on your skill base and level of organisation, around a year is a good length of time to spend on your research. As part of this he recommends spending time on your site and understanding how to place the house so you can get the best out of it. This will include things like orientation, window placement and learning how the sun falls on the site at different times. During this period you can also be going to exhibitions and talks, doing courses, going on Passivhaus open days and speaking to other people that have built their own homes.

    Focus on getting the fabric of the building right

    Geoff says you’re never likely to hear someone say that they wish they’d put in cheaper windows or used less insulation! So concentrate on getting the insulation, windows, detailing of doors, heating systems etc right, and getting it to the best quality that you can afford. It doesn’t necessarily have to be the perfect house straight away, and you can always retrofit your dream kitchen or build a second stage later when finances allow.

    Speak to other people for advice

    Get as much information as you can from suppliers and manufacturers about their products and their detailing. Also speak to builders’ merchants who might be able to suggest alternative products that you might not have come across.

    Geoff follows a couple of Facebook groups which he says, if you filter through a lot of the rubbish and sales pitches, can actually have really good information and experience that people are willing to share.

    “There’s no right way of doing it…what there are is a lot of wrong ways!”

    Geoff stresses that there is no right build system to use, and the method that you choose will be based on a lot of criteria. Whatever method you do choose, just make sure that it’s of the highest quality you can afford.

    A lot of it will be down to personal preference, and whether you like timber, stone, brick etc.

    Geoff’s preference is for timber frame, partly for the accuracy and speed which it affords. He personally would also avoid very innovative systems by very small companies as there can be a question of whether or not they can actually deliver.

    Also consider what kind of products you want to be using. Some people might want high performance foam insulation, whereas others will want to go as natural as possible and use sheep’s wool or Warmcel type insulation.

    “Whatever building method you go with, you just need to really understand what the issues and the criteria are. The good points and the bad points. And ignore what people say about their method being the best, it’s modern or it’s developed by NASA or something ridiculous. Just understand what the issues are with all of them and base it on real costs.”

    Decide how much involvement you’re going to have

    As a client there are options as to how involved you will be on the project, ranging from paying huge sums of money to a building company who will do everything for you, to getting hands-on and doing practically everything yourself.

    Probably the biggest deciding factor is thinking about what skills you have, but not necessarily assuming that because you can do something yourself it will necessarily be quicker or cheaper.

    “So, if a job that a skilled person can do quickly and well and you can do fairly well and take a long time over, that might mean that it’s longer before you move in and you’ve got more mortgage repayments, more insurance, if you’re renting a house then there’s the rent that you’re paying while you’re doing it. So, you might think you’re saving some money but actually, are you really?”

    You might also find that by doing a job yourself and taking longer about it, you might be holding up the next trade that can’t come in and do their job until you’ve finished. Instead there might be jobs that you can do which won’t involve holding anyone else up, like prepping and putting up cladding for example.

    When it comes to managing the project, you have the choice of paying someone else to do it, or doing it yourself. Obviously doing it yourself in theory should save you money, if done well, but consider whether you have the expertise to: keep things on track and on budget, get prices and employ subcontractors, nudge people when needed, make sure the work is being done to a high standard, check health and safety standards are being adhered to, keep neighbours on side etc.

    Do it on the terms of what you can afford, what skills you have and what you want your level of involvement to be.

    Being too fixated can be a common pitfall

    Geoff sees people that might become completely fixated on building a straw house for example, when actually the site they have might not actually be ideally suited.

    “It’s just understanding the issues around those sorts of things and not necessarily getting very fixated on one thing where you end up making your build really complicated because you’ve got this one fixed idea that you saw somewhere on television that you want.”

    He also says that no matter what you do there will be people saying that you shouldn’t have done it that way. And maybe even you yourself will look back and think you might have done it differently, but just try to get as much right as you can based on the knowledge and research at the time.

    People always say they want to be in by Christmas!

    Geoff suggests when it comes to how long a project will take, that if you’re planning to do a lot of the work yourself then try and avoid it going over two winters, as the second is always particularly tough (especially so if you’re living in a caravan!) Realistically you could be looking at 12 to 18 months on site, but less than that if you have builders.

    He also recommends trying to get as much finished as possible before moving in, even if that means throwing money at some good contractors to speed things up. Finishing off works once you’re living there is much harder to do and becomes less likely to ever get done.

    To help keep on track with the budget and schedule, try not to make changes as you go along. You can make minor changes but you don’t want to be deciding to change window placement or move walls once work is on site.

    Work with an architect who is on your wavelength

    Keep a scrapbook of ideas and images that you like and can show to a designer or architect, and make sure you work with someone who is going to design the sort of thing you want.

    Although it’s not necessary to employ an architect, having a good one on board that is sympathetic to your ideas can elevate your plans and give you a wow factor, rather than simply being a series of rooms joined by a corridor.

    Having an architect involved could just be paying someone for a simple check over your plans and offering advice, to a full package of designing the house, getting it through planning and building control, and seeing the whole project through to completion and sign-off at the end.

    A key consideration in choosing who to work with is finding someone who is on your wavelength that you feel you can work with. Ask for proof that they really understand the issues that matter to you, as some might claim to be providing a sustainable and energy efficient building just because it complies with current building regulations.

    Participants on a timber frame course

    Find out more

    Visit the website of the Centre for Alternative Technology

    Join House Planning Help’s Facebook group

    Transcript

    Please connect with me

    Subscribe, rate and review the podcast in iTunes

    Rate and review the podcast on Stitcher

    Like our Facebook page

    Follow us on Twitter

  • HPH277 : The importance of building performance evaluation  – with Professor Fionn Stevenson

    HPH277 : The importance of building performance evaluation – with Professor Fionn Stevenson

    Professor Fionn Stevenson explains why building performance monitoring and post-occupancy evaluation should be mandatory on new homes.

    Interview with Fionn Stevenson

    Having spent eight years in practice as a chartered architect, Fionn was finding that the housing wasn’t performing as well as she had designed it to do. This led to her interest in building performance and eventually she became a researcher and academic in the subject, as Professor at University of Sheffield – School of Architecture. She has now been involved in building performance for over 20 years.

    Six simple action points in a light touch review

    A light touch post-occupancy evaluation involves going into a home to check how well it’s performing against its design intentions.

    The first step is for the expert to spend around half a day studying the original drawings and specifications for the project, as these are what will be checked against during a tour of the home. They provide the baseline of what is supposed to have been done.

    This is followed by a half day tour of the home with the occupants, plus the designer and contractor. The occupants will explain about living in the house for the evaluator to see what’s going on and check that against the original design intentions.

    The occupants will also complete a simple two-page survey which provides a lot of further information.

    A half day thermographic imaging survey is then carried out to see how the fabric of the building is really working.

    Next is looking at how the building is performing in terms of energy used and water consumption. This can be done at the simplest level of looking at utility bills, or recorded through smart metres.

    And finally, there will be a spot check where, during the half day tour, the evaluator will use a hand-held 4-in-1 metre to check on the room temperatures, plus levels of light, sound and humidity.

    UK housing doesn’t perform as it should

    Given the nature of unique sites and being very contextual, Fionn says UK housing does not perform as it is expected to do. She says that research shows that on average new homes in the UK use at least twice the amount of energy they’re supposed to use. That can be down to the design but also the quality of construction.

    Another concern is the indoor air quality results, with high levels of carbon dioxide build-up, low-level toxins from off-gassing of new materials, and air fresheners which are supposed to make the air quality better but can actually make it worse. New homes need to have good ventilation strategies, but often they have been poorly designed, constructed or commissioned.

    Building evaluation should be mandatory

    As well as post-occupancy evaluation, there can also be building performance evaluation. This involves starting the evaluation process from as early as developing the brief, and right through the complete cycle of the project.

    Fionn says it’s amazing that there is no mandatory requirement to carry out post-occupancy or building performance evaluations, and that is something she is lobbying to get changed. The RIBA is now producing new guidance and in the future is looking to mandate its practitioners to make it a part of their service. But there’s no mandatory requirement to carry it out as currently it requires consent from the client.

    “If it was mandatory there would be an automatic performance feedback loop because people would have to automatically report what is actually going on in the housing. That reporting would then go into databases and everyone could see what was going on.”

    Fionn has worked with a number of volume housebuilders, and says that although they carry out extensive customer satisfaction surveys to see how well their buildings are performing, they are not asking the right questions. They don’t drill down into why the house is or isn’t working for them, and this is because they haven’t had to be accountable for the performance in mandatory terms.

    “What they’re interested in is selling the home. They’re not as interested in how well the home is performing once they’ve sold it. They just want to make sure the customer is happy, they want to make sure that they get their NHBC scorecard with the highest number of stars, and that’s all about reputation. And their reputation rests on the initial customer satisfaction survey, not the overall performance of their homes.”

    There needs to be databases of results

    Fionn mentions the Building Performance Network as being a group of organisations and experts who are spearheading the drive to make building performance evaluation and post-occupancy evaluation routine. They are collecting data and setting up a UK database.

    And Fionn says that this is what needs to be happening. She says there should be two databases: one a private one where people can access their own data, and the other a public one with anonymised results to give a national picture of how everyone is doing and enable people to benchmark and compare against others.

    A culture shift is required

    Fionn explains that at the moment the process for architects and clients is “let’s design a home.” In fact what it should be, is “let’s design and evaluate the performance of a home.” The majority of architects don’t go back to really evaluate how well their buildings are performing. Fionn says the key message she is trying to get across in her book is that this should be routine.

    Be energy sufficient, not just energy efficient

    Fionn is in the process of starting her own self build project. But rather than design it herself, as she has been out of practice working as an academic for so long now, she is using the networks she has built up to find the best team to deliver her project.

    She has prepared her brief and will be looking for people that will champion her wants, needs and follow the details of the brief throughout.

    A fabric first approach will be used to make sure the house is properly insulated, airtight and ventilated. With that is the importance of getting the size of the home right. She explains that it’s not enough just to be energy efficient, but we need to think about whether we are being energy sufficient. In other words, having the house optimally sized and not any larger than it needs to be.

    “There’s a bit of a misnomer about zero-carbon because of course you can make your home automatically zero-carbon if you go onto a renewable energy supplier. But that doesn’t mean your home is actually being very good for the environment. We’ve got very large self-built homes that are claiming to be exceptionally low energy or carbon zero but actually the embodied energy, the amount of materials that are being used in them is huge.”

    Keep the buildings simple

    Fionn says that there is a temptation with self build to have the house of your dreams and put in a lot of unnecessary kit. Her own research has found that often in homes that were using heat pumps together with PV and solar-thermal, often they were contradicting each other as they weren’t designed to work together. Also, solar renewable energy installations hadn’t been installed correctly or on the wrong orientation, meaning they weren’t performing as they had been designed to do.

    Another thing the post-occupancy evaluations have thrown up, is how important it is for any mechanical ventilation system to be well designed, brilliantly constructed and have the minimum duct runs possible. It must have vents perfectly positioned and be ergonomically designed in a way that is accessible for the occupant to interact with it.

    There isn’t enough data to help self-builders with decision-making

    Fionn explains that we’re still flying blind with a lot of modern building systems as there just isn’t enough data from post-occupancy evaluations to see how well they perform. Being laboratory tested can only do so much.

    “Who is going out there, outside of the laboratories, into the homes with the thermal imaging camera, doing the walkaround, seeing the little bits of mould that are appearing in the corners? If we move on to service systems, we’ve got loads of mechanical ventilation heat recovery systems. But who went out there and actually asked the occupants whether they can use them? That’s been the issue, that it is difficult for self-builders to choose systems and know that those systems have been not just rigorously tested in the laboratory where the products are developed but that they’d been systematically tested around the country in every city, in every town, as a routine part of post-occupancy evaluation which is then fed back into the industry. This is exactly why the housing industry performs so badly.”

    An investment worth making

    Fionn stresses that you should be alert throughout the whole design, build and occupancy process, but there are key points where attention particularly should be paid.

    The first is at the outset of the project, where post-occupancy evaluation is included in the brief, and budget allocated for it. Typically it might cost around £5,000 for a light touch post-occupancy evaluation, but it could be saving you tens of thousands in identifying hidden risks and defects.

    Other benefits are that you’re also future-proofing for climate changes, ensuring there won’t be overheating as UK summers continue to get hotter, and also improving health issues with better air quality.

    The second critical stage is the commissioning of the home. When the services, heating and ventilation systems are commissioned is a crucial time for there to be an independent evaluator checking whether they have been set up properly, to avoid a lot of problems down the line.

    Find out more

    Follow Fionn Stevenson on Twitter

    Check out Fionn’s book:

    Transcript

    Facebook Group

    If you’re on the self build journey and would like to connect with other like-minded people in our private Facebook group, then apply to join at talkselfbuild.com.

    Please connect with me

    Subscribe, rate and review the podcast in iTunes

    Rate and review the podcast on Stitcher

    Like our Facebook page

    Follow us on Twitter

  • HPH276 : A case study of Hope View Passivhaus – with Tracey and Roman Iwanczuk

    HPH276 : A case study of Hope View Passivhaus – with Tracey and Roman Iwanczuk

    Tracey and Roman Iwanczuk explain how they managed to build a Passivhaus on a sloping site in an Area of Outstanding Natural Beauty.

    Interview with Tracey and Roman Iwanczuk

    Having lived in the US for 20 years and at the point where they were preparing to build a house there, Tracey and Roman made the decision to move back to the UK. Being unable to find a house or building plot that ticked all their boxes, they decided to embark on what initially seemed like a fairly improbable chance of getting planning permission to build a property on their six acre field overlooking the Malvern Hills Area of Outstanding Natural Beauty.

    It was a leap of faith

    Initial meetings with a planning consultant and a local architect offered little in the way of optimism for ever getting planning permission on the site. But they persevered and found another architect who offered a more encouraging 50/50 chance.

    Being a greenfield site they used the Paragraph 55 application process for a house of exceptional design and quality that could enhance the area. As Tracey explains, being a greenfield site isn’t always the best use of a piece of land, and their steeply sloping site wasn’t practical for agricultural use.

    “It was a matter of coming up with a way of saying let’s do something that is a benefit for our environment, our area, and maybe even the people who live around here that makes sense.”

    The scheme they came up with was to return three acres of the land to natural woodland by creating an orchard of local species trees.

    They also put in a flood prevention strategy for the neighbours below, who’s properties had experienced flooding from run-off from the field previously.

    The house nestles into the hillside

    The house was designed to have a minimal visual impact and be future-proof for any long term needs.

    The design came about from a series of 15ft² boxes joined together in a single-storey. The principle rooms are south facing and benefit from the floor to ceiling glazing to maximise the beautiful views, with the other rooms being at the rear.

    Despite the glazing, the temperature of the house remains relatively even. The rear wall is built into the hillside so has a lot of surface area that is removed from the equation.

    Being built into the hillside to a large extent determined what build system they could use. In order to get the required structural strength they used concrete, and felt less guilty with the knowledge that the orchard they were creating would be off-setting the carbon.

    A “long, skinny Passivhaus”

    Roman describes the shape of the house as providing its own unique challenges, of which air leakage was probably the biggest. The concrete block walls at the rear get no sunlight, whereas the pre-fabricated concrete plank roof gets a lot of light and a lot of heat. So with different thermal expansion rates between the roof and the walls they used a Passivhaus window tape as a barrier for the airflow and to provide enough flexibility to accommodate any thermal expansion.

    A ground source heat supply provides hot water

    Excavated soil was used to create a level area in front of the house where they could lay pipes for the ground source heat supply. They chose this over an air source system as it is such a peaceful location that they felt it would be less noisy.

    About 80% of the supply is used for hot water, with very little actually being needed for heating. Tracey points out that it does use a lot of energy to run a ground source heat pump and they really notice the difference in their electricity bills in the winter when they’re running it to heat the hot water.

    When it’s sunny they don’t need to use the ground source heat pump as they export excess solar power to an immersion tank for the hot water supply.

    There is a 30 panel solar array

    The array gives almost nine kilowatts of generation capability. There are two first generation Tesla Powerwalls which that feeds, that can store around 14 kilowatts. They don’t have the means of exporting power from the batteries, but what they can do is “time shift” the excess energy generated during a sunny day for it to be used to run the house at night.

    With advancements in technology, the battery system is one thing that Roman is considering changing. When they were installed the only batteries that were readily available were these kind that sit on the DC side of the system. They are almost directly connected to the solar panels, which means that the system is designed to completely switch off the electricity in the event of a power cut. This is because there could be a danger of feeding the power back onto the grid and electrocuting anyone working on it, but it does mean they can’t access any of the energy sitting in those batteries during that period.

    The more modern Tesla system works on the AC side. If there were to be a power cut it would isolate the house but still allow the batteries to generate AC voltage.

    “If there is a power outage, then your house effectively becomes an island of electricity and you can use whatever power is in the batteries.”

    To upgrade to this system will mean a bit of disruption in having to change the location for the batteries, but Roman thinks that it will be worth doing. There is also a second hand market for the Tesla batteries so they can be re-used by someone else.

    The plant room

    They have high praise for their team

    Tracey and Roman consider themselves to have been very lucky in how smoothly the project generally went. The only real issue they had was with the window supply, which has taken around three years to fully resolve, but they do say to the company’s credit they have stuck with it to get a resolution.

    Tracey praises their architect who had never done a Passivhaus before:

    “He was more than happy to park his architect ego, listen to the Passivhaus consultant and do the right thing to achieve a Passivhaus. He was happy to learn all of this stuff and take it on board.”

    They selected a contractor who had also worked with the architect before, and this helped with maintaining good working relationships between them all. Tracey also praises their integrity and says they were very respectful in how they communicated with her.

    Think about your window to wall seals!

    One area that could have challenged the successful outcome of the project, was the seals between the windows and walls. Despite their Passivhaus Consultant, Nick Grant, flagging up how important it was to get right, it had been forgotten about in amongst all the other decisions that had to be made. It wasn’t until a week and a half before people were due to do the render that they realised they hadn’t thought about the window to wall seals at all. It was pure luck that they were put in touch with someone who had some spare pieces from their own self build that they could use.

    “If that had not been done, it would be a nightmare right now. We’d be dealing with silicone, silicone in windows all the time, just doing all of that stuff that would make life miserable. I can’t say enough to anybody who’s looking at doing a self-build; think about that very, very early on because we only fixed it by accident. It was a very, very lucky accident.”

    Roman warns that when you have a window company dealing with the windows, and a builder dealing with the building envelope, things like how those windows will join with the building envelope can become overlooked.

    A HEPA filter would be a worthwhile investment

    The one oversight that Roman feels they made was the issue of airflow in the house. The MVHR draws in outside air but, being in a rural spot, this can include the smell of burning horse manure! The basic filters are there to get rid of particulate matter, but they don’t deal with smells. He recommends the inclusion of a HEPA filter, which he doesn’t think is something he can now retrofit because of lack of space. He considers the £500-£1,000 for a HEPA filter would be money well spent, even more so in an urban environment with emissions from exhausts.

    ASBP Healthy Buildings Conference and Expo 2020

    This is taking place in London on 27th February, and will be addressing the subject of healthy buildings in a climate emergency. Check out the website for the full programme and booking tickets online.

    Find out more

    Visit the website of Warren Benbow Architects

    Follow Nick Grant on Twitter

    Transcript

    Please connect with me

    Subscribe, rate and review the podcast in iTunes

    Rate and review the podcast on Stitcher

    Like our Facebook page

    Follow us on Twitter

  • HPH275 : How to reduce the cost per square metre on a self build – with David Snell

    HPH275 : How to reduce the cost per square metre on a self build – with David Snell

    With 14 projects under his belt, author and serial self builder David Snell explains how you can stop costs from running away from you.

    Interview with David Snell

    Some people see self build as a once in a lifetime opportunity to have the house of their dreams, but David Snell has had a different approach. Having never spent more than three years in one place, he finds the desire to move on coming from a mixture of boredom and opportunity. Currently approaching three years in his latest house (but he’s starting to get itchy feet so it might not necessarily be his last!), David is able to draw on experience from his previous 14 projects to offer advice on how to stick to a budget.

    There is a profit incentive

    As well as the joy of creating a house of your requirements in the place of your choosing, a big incentive of self building for David has been getting it for a price that also gives you a healthy profit. His current house, including the price of land and construction, cost £237,000. By the time he moved in it was worth upwards of £400,000.

    Each time he has moved it has been to suit their situation at that time, but always in mind was gradually building up their equity to get to their current point where they are mortgage free in this house, while also owning other debt-free properties.

    Have a benchmark to work from

    Almost as soon as he has some plans David will send them out to costing organisations such as Online Estimating Limited to make sure that he is on the right lines. He will always have a benchmark price in mind for what he can afford and thinks is worthwhile putting on that plot in order to make positive equity. If the costs come back significantly higher than that, he knows he would have to go back to the drawing board with the design.

    Shop around to get the best prices

    David says that many self builders come from within the construction industry and are familiar with what sort of prices they should be paying for labour and materials, so he puts himself in their shoes.

    He doesn’t believe in settling for the figures that the estimators come back with. He sees them as targets to beat.

    There will always be extras

    Whether they are from unanticipated groundworks, or “elective extras” on finishes, there will always be extras in any building project, and it is for this reason that a contingency fund is necessary.

    David does warn against going overboard on spending on finishes where it’s possible to spend an awful lot of money without any particular gain. He says that it is easy to become obsessed with wanting specific items. Particularly if you’re looking at the house as an investment, just remember that anyone coming to look round to buy the house isn’t going to be looking at the brand name of the taps or toilet!

    “It’s something that people can get obsessive about at the build point and they can be sucked into buying and paying twelve-hundred pounds or two-thousand pounds for a bath where they could get something that would look absolutely identical and work absolutely the same way for a tenth of that.”

    Photography Simon Maxwell c/o Homebuilding & Renovating

    The house cost £861 per square metre

    That price includes carpets and curtains, so David has had to be clever with his purchasing. One tactic was to buy kitchen floor tiles from a company dealing with end of line goods and seconds. Even though he bought a lot more tiles than needed (in case of breakages etc), he paid £20 per square metre for a tile that he says you could be charged £60 per square metre for in a different shop.

    David also picked up a bargain with his oak internal doors. He happened to be passing Howdens when they had an end-of-line sale, and he got them for half price.

    “I bought them long before I needed them and I stored them in my son’s garage until I needed them. I looked out for an opportunity, I bought them and I saved the money on them.”

    He has been meticulous about logging expenditure in his notebook

    From his starting point of knowing the projected cost, David was able to keep a running total of everything spent and how much money was left. By logging the net cost and the VAT, it was also useful in keeping track of how much VAT they would be able to claim back at the end.

    Keeping these records up to date and cross-checking them against the original costings gives visibility of any overspends, and therefore whether savings will need to be made elsewhere towards the end of the project on the high value finishes.

    “I’m not stingy but I’m frugal. I don’t spend more than I’ve got or have originally budgeted for.”

    With any luck there will be savings made along the way which will allow more money to be spent on the kitchen and bathrooms at the end.

    Incorporate landscaping into the budget

    If it’s left until the end, often the landscaping can be the thing that falls by the wayside as there’s not enough money left by that point. Instead, David incorporated it into the costings as he went along and the landscaping was happening while the house was being built.

    There was plenty of landscaping to do on this project, with about 400 tonnes of material being dug out. It was initially put in a heap at the back and then brought back when it was needed during the build. They ended up creating the levels as they went and the landscaping became a generic thing that happened as they built the property.

    Don’t believe that you’re on an unstoppable train

    “You are on a train that you can stop. At any time if it’s running ahead and away from you money wise, you have to have the ability and the power to say stop. And you do have that ability and power because it’s your chequebook that’s paying for this. If it’s not going right and you want to stop and think, do so.”

    If you end up having quotes that are much higher than anticipated, be prepared to take the time to wait until you can beat them. By believing you’re on this unstoppable train you can get carried away paying the larger sums to keep it moving and soon being way over budget.

    He is still learning!

    A lesson learned from this project is to never mix MDF and timber in things like door linings. David has got MDF architraves with timber door linings, and says that they behave and shrink differently and separate.

    Inflation hasn’t been a factor across his projects

    David has worked out the cost per square metre of his last five projects:

    • 2001 – £706
    • 2004 – £1,063 (but for a more avant-garde design)
    • 2007 – £900
    • 2009 – £880
    • 2016 – £861

    Looking at those figures he hasn’t really seen any radical inflation in costs. What he does believe is that people can go over the top with spending. They get engrossed with all the new innovations available that can be thrown into a self build, and he thinks this is what escalates costs way beyond what you need to do and spend.

    This could be his thirty year house

    Now aged 75, David has built this house with their long-term future in mind. And if he doesn’t get the bug to take on one further project, then this house should cater for their needs going forward. All the door openings are the right width for wheelchairs, the taps can be used with impaired hand movement, and in addition to a downstairs lounge, there is a lounge upstairs that could be converted if needed.

    Find out more

    Visit the website of Homebuilding & Renovating Magazine

    Listen to our previous podcasts with David about what to look for in a plot of land and hiring contractors and subcontractors.

    Transcript

    Please connect with me

    Subscribe, rate and review the podcast in iTunes

    Rate and review the podcast on Stitcher

    Like our Facebook page

    Follow us on Twitter

  • HPH274 : An innovative cork house, designed for disassembly – with Matthew Barnett Howland

    HPH274 : An innovative cork house, designed for disassembly – with Matthew Barnett Howland

    Award-winning Cork House was the world’s first to use a solid cork construction system. Matthew Barnett Howland explains the concept and how he managed to build it himself.

    Matthew with Cork House collaborator Dido Milne – Copyright Magnus Dennis

    Interview with Matthew Barnett Howland

    Matthew Barnett Howland is Director of Research and Development at CSK Architects in Eton. He has always had an interest in making things, as well as designing them, and in 2013 he teamed with academic and industry partners to research and develop the solid cork construction kit, of which the Cork House is the first pilot.

    Copyright David Grandorge

    The idea was to design a building with respect to its material ecology

    The process of designing the Cork House wasn’t to try and build a house made from cork. Instead it developed from a general dissatisfaction about how modern houses are constructed in the UK. They have a complexity at almost every stage of the building’s life cycle:

    “From the resource stage and landscaping packs; through to even the design stage, specifying different materials with different properties and so on; through to on-site sequencing of trades, interfacing between trades; through to the performance gap that you almost always get in houses where they always perform less well than they’re predicted; right through, particularly most importantly probably, to the end of life scenario where you have a destructive demolition.”

    So one of the project’s main motivations was to think about the material ecology and then develop the architecture from that, rather than the reverse.

    A holistic design approach was used

    The design of a house is typically the result of a response to site characteristics, a client brief, planner’s input, engineer involvement, a construction that will pass building regulations, followed by a pricing and value engineering process. Inevitably there tends to be a granular, rather than holistic approach to a project. What the Cork House allowed Matthew to do was be the client initiator, researcher, designer and builder, allowing him a single-minded and holistic way to approach it.

    The brief was for a building envelope that used a single bio-renewable material

    The Cork House was specifically sited at the rear of their existing house, at a bottleneck between two gardens that creates a threshold space and articulates the junction between the two.

    Copyright Phil Broom

    The brief was driven by a desire to find out whether they could make a building envelope, walls and roof out of a single bio-renewable material that would fulfil all the functions and performance requirements of the modern building envelope.

    He contacted Innovate UK and EPSRC (Engineering and Physical Sciences Research Council) and together they created a research team of academic and industry partners, who in the space of two and a half years, tested, prototyped and developed the proof of concept for the solid cork building envelope.

    Cork possesses a range of ideal qualities and uses

    The team worked with the Portugese company Amorim, who are the world’s biggest manufacturer and supplier of cork products.

    Cork comes from the bark of the cork oak tree. The majority of a harvest is used as bottle stoppers, while another part of the industry uses granulated cork mixed with a polyurethane glue to make a range of products.

    The waste from these industries ends up being made into expanded cork. The cork waste is granulated and heated to around 360°C with dry steam passing through it. The granules expand and release a natural resin, suberin, which melts and as it cools it re-bonds the expanded granules back together again. The result is a fully bio-renewable and bio-degradable product.

    Cork has a number of qualities which made it ideal for the range of uses required for this project: the structure, being watertight, airtight, insulating, internal and external finishes.

    The life-cycle of the house was an important consideration

    The house has been designed so that if a time arrives when it should come to the end of its usable life, the materials can be easily recovered for reuse or recycling.

    There is no mortar or glue between the cork blocks, and the connections between the timber elements are all bolted and screwed, meaning that everything is accessible and demountable.

    Anything that can’t be reused or recycled, being pure cork, can be granulated and put back into the soil to biodegrade and be a soil improver.

    Research was carried out to test performance

    Prototypes were made and tested in-situ for the cork’s airtightness and weather performance, which aided the research and knowledge for the construction process.

    They also undertook a range of lab tests. These tested for performance in wind-driven rain and fire protection, as well as a number of structural capabilities.

    The architecture, spaces and forms are as a result of the cork properties

    For example, the pyramidal roof shapes came about from a series of decisions about using cork.

    “It works best in compression, we don’t want to use glue and mortar for disassembly reasons, and the wall works with the tongue and groove system so a logical consequence of that for the roof is rather than introducing a new set of materials and systems that would introduce complexity, you offset this wall system using these solid blocks of cork to take the load through them. So, the form is a result of those considerations and those factors.”

    It’s built off removable steel screw piles

    The motivation for the removable steel screw pile foundations was the ability to return to a pristine site if the building was ever dismantled and removed.

    On top of the foundations, a 300x100mm timber beam was bolted all the way around the perimeter. CLT (Cross Laminated Timber) floor plates were dropped onto the ring beam giving a solid timber deck with cork insulation underneath.

    From there, prefabricated cork blocks (1268 in total!) were tapped down and held with friction to build the walls. This process was very quick and easy until it came to where they interfaced with the timber ring beam and valley beams.

    The vertical load in the house is taken down to the timber slab via the cork. The lateral and sheer loads to stop the house folding over in the wind are taken through a sort of timber ladder beam at eaves level. Matthew describes trying to ratchet strap and clamp the prefabricated timber elements with the prefabricated cork elements as being particularly challenging.

    There is a limited but consistent palette of materials throughout

    They have used spruce tri-ply and TILLY board for the built-in joinery. The bed, sofa and dining table are made from reclaimed spruce CLT, the kitchen stools are made from storm-felled oak, and the floorboards are oak unplaned timber screwed down into the spruce CLT floor.

    Copyright Magnus Dennis

    Variations to this are with the solid brass worktops, a bespoke folded solid brass bath and basin, and copper for the gutters and downpipes. All are unlacquered, pure material that can be recycled back into the manufacturing chain.

    Solutions had to be found for the plumbing and electrical work

    With solid walls that don’t have cavities or voids to hide services behind, everything is exposed and had to be thought through carefully.

    The bathroom is a self-contained independent solid CLT box structure which acts as a hub for all the services, and the CLT floor panels were pre-routed to accommodate pipe runs under the floorboards. The built-in furniture and structural wardrobes were also pre-routed for service routes.

    Matthew had a dual motivation for doing the project

    Firstly, it was to build a house which they could use themselves, and secondly it was to use their skills in design and research to respond to some of the pressing issues of our time.

    He started designing the house with his father, who was also an architect. When his father passed away he felt that it was a good use of the money that his father left him to work full-time on it to complete the project. Matthew estimates he worked on the project full-time for around five or six years.

    He is keen to continue the research and learning

    With work completed on the house there have been areas that they’ve had to return to. One was to add a foam tape on the internal face of the block joints to improve airtightness, which Matthew says would have been nice to achieve without a foam based product. And on the roof they have introduced cedar weatherboarding to help shed the rain, otherwise it wasn’t watertight just as a pure cork structure.

    Matthew enjoyed the process of research and learning, and the way of going about things in terms of conceiving and developing an idea, putting together a team, getting the funding, lab tests, prototypes, getting it through building control, etc. He would also be keen to do more work around life cycle issues, which they’re currently doing on another cork project for a client, but also look at it with other low carbon materials such as timber or stone.

    Copyright Ricky Jones

    Find out more

    Visit the website of CSK Architects

    Check out Matthew Barnett Howland’s website

    Transcript

    Please connect with me

    Subscribe, rate and review the podcast in iTunes

    Rate and review the podcast on Stitcher

    Like our Facebook page

    Follow us on Twitter

  • HPH273 : A hemp house that also minimises plastic use – with Paloma Gormley

    HPH273 : A hemp house that also minimises plastic use – with Paloma Gormley

    Architect Paloma Gormley of Practice Architecture explains how versatile hemp can be as a building material, and how plastic use can be reduced on site.

    Copyright David Grandorge

    Interview with Paloma Gormley

    Paloma and Lettice Drake’s Practice Architecture made their name when they were approached to design a roof-top cafe above a car park while in the third year of their architecture degree. Not knowing where to start with appointing a contractor, they decided to build it themselves. From being incredibly inexperienced and using power tools they’d bought from a supermarket, they successfully constructed “Frank’s Cafe” which became an incredibly popular venue.

    Frank’s Cafe and Campari Bar, Peckham. Paloma Gormley and Lettice Drake
    Image Credit Andy Matthews

    Being closely involved with the construction process is a theme which has continued throughout their approach to architecture.

    Hemp is a versatile plant

    Industrial hemp is a plant within the cannabis family that has very low THC – the psychoactive element of the plant. It’s legal to grow in the UK with a licence and has a multitude of uses, with the fibre being used in rope and linen, the seed which has nutritional value, the bud which can be used medicinally, and the shiv which is the stalk of the plant that can be combined with clay to form hempcrete.

    Hemp also sequesters carbon more than most other plants. As it’s growing it sequesters carbon into the body of the plant and also into the soil.

    Paloma’s interest in using it as a building material began with a friend’s group, Hempen, that had set up a hemp farm in Oxfordshire. The friend had suggested using hempcrete as a building material for a three-storey London self build house they were working on, and it turned out to be a very practical material for the design. It was cast in-situ and infilled between a Douglas Fir frame.

    Image Credit Oskar Proctor
    Image Credit Lettice Drake
    Image Credit Oskar Proctor
    Image Credit Lettice Drake

    Drying time issues can be overcome by using pre-fabricated cassettes

    Paloma agrees that there can be an issue with drying and curing times when using hempcrete, depending on the binder that is being used. Some of the more reliable binders have a cement content, which isn’t ideal, but those that are pure lime can be more tricky to use as they can set too fast or slow or don’t hold.

    While it can set in 24-48 hours depending on the binder, the drying times can be incredibly long. They can average at around three months for the building to completely dry out depending on temperature and air flows, meaning secondary finishes can’t be applied during this time.

    Another limiting factor can be that it is not ideal to be casting hempcrete on-site during the winter period. There’s a risk that there can be too much dampness in the wall for too long before it has a chance to dry out, causing all kinds of problems.

    One solution is to take the wet process off-site. This means the drying can take place somewhere else and then delivered to site as dry cassettes ready to use. The benefits are a more streamlined construction process, with it being cleaner, less complicated, no time spent waiting about and all twelve months being available for building.

    Hempcrete Cassettes – Image Credit Paloma Gormley
    Image Credit Paloma Gormley

    Hemp is being used innovatively at Flat House, Margent Farm

    Margent Farm in Cambridgeshire are an organisation that are growing a 40 acre hemp farm. They carry out R&D and are developing a number of hemp-based bio alternatives to plastic products.

    The brief for the farmhouse on the site was that it needed to have a good connection with the landscape, have very low embodied carbon and to avoid plastic use wherever possible.

    Plastic in its various forms is prevalent even on buildings with high ecological credentials, being used as polyurethane rigid foam insulation, vapour barriers, sticky tapes, expanding foam, nylon thermal bricks and gaskets. It can also be other things invisible to the eye such as the wiring, ducting, pipes and vents.

    Hemp cladding has been used

    It wasn’t possible to achieve the elimination of plastic completely, because of barriers in terms of cost and also in terms of alternative products just don’t exist. But overall, Paloma said they did pretty well.

    They achieved it partly by returning to what is known as breathing construction. This takes moisture from the air inside a room, absorbs it into a wall and then breathes it out the other side.

    “There are many reasons why that’s a really good thing. It limits condensation, you can have a self-regulating moisture content in a room because if the moisture content in a space gets too high, it just gets pulled into the walls and then evacuated, and it means that when something goes wrong, you know it’s gone wrong because breathing construction generally involves a much more direct relationship of material.”

    Achieving a high level of airtightness hasn’t been a key concern on this project. The main priority has been to make a well thermally insulated, incredibly low embodied carbon building.

    “So, you always have to have a level of background ventilation which we used to achieve by just having slightly leaky buildings. Now we’re making incredibly airtight buildings and then making intentional holes, which I think is a funny logic in a way, because so much generally plastic goes into making incredibly airtight buildings and then we’re punching holes in them.”

    One of the products developed from the crop at Margent Farm is the cladding that they are using on the farmhouse. It is a hemp fibre with a sugar based resin derived from agricultural waste. They are combined, pressed together and baked in a heat moulding process.

    Image Credit Paloma Gormley

    The circular economy is informing design

    Cost concerns meant that aluminium windows were chosen over timber, and although it is a very high embodied energy material, the way it can be recycled means it fits in well with a circular economy way of thinking.

    Getting the foundations right was one of the biggest challenges on the project, and they opted for concrete foundations with a suspended timber joisted floor. Since then, they have been thinking of alternative options for future projects. One possibility would be screw piles, which are dependent on the type of soil you have and can’t be used in every situation. The thinking here is again about the circular economy, where these could be unscrewed and used on another project in the future.

    Another option they’re excited by is compacted hardcore such as flint or stone which could be sourced very locally.

    A cassette system was used for the walls, based around an eight by four sheet made in a factory as boxes, filled with hempcrete and dried. They were brought to site and erected within two days.

    Image Credit Paloma Gormley

    The roof was a straight forward joisted construction, with a wood fibre insulation.

    Image Credit Paloma Gormley
    Image Credit Paloma Gormley
    Image Credit Oskar Proctor
    Image Credit Oskar Proctor
    Image Credit Oskar Proctor
    Image Credit Oskar Proctor

    The Flat House led to the establishment of Material Cultures

    Material Cultures is a not-for-profit organisation that explicitly researches and explores these different materials in the realm of off-site construction. The aim is to make them more accessible, available and affordable. They are looking to start manufacturing at a larger scale, drawing on the model of the Flat House.

    Material Cultures are also working on research projects with two universities and are developing another prototypical building with architecture students at University of the Arts London, all feeding in to the broader research.

    “So, it feels very important to us that this project and these processes happen in a very reflective way, that we’re constantly learning and moving and developing thinking.”

    Find out more

    Visit the website of Practice Architecture

    Check out Practice Architecture on Instagram

    Find out more about the work of Material Cultures

    Learn more about the uses of hemp from Hempen’s website

    Transcript

    Please connect with me

    Subscribe, rate and review the podcast in iTunes

    Rate and review the podcast on Stitcher

    Like our Facebook page

    Follow us on Twitter

  • HPH272 : What is the problem with plastic? – with Emily Penn

    HPH272 : What is the problem with plastic? – with Emily Penn

    Skipper and oceans advocate Emily Penn explains the damage that plastic pollution is having on our oceans, and how we can find solutions.

    Interview with Emily Penn

    Emily is co-founder and director of eXXpedition; an all-female crew research expedition that are circumnavigating the planet to investigate the causes of and solutions to plastic pollution. She is dedicated to studying environmental challenges and is a public speaker and adviser on issues relating to our oceans.

    Plastic can take on many shapes and forms

    Plastic starts life as oil, which is taken from the ground and turned into different types of polymers, depending on what properties the finished plastic will need and what its use will be.

    The types of plastic and their uses include: PET (for disposable drinks bottles), HDPE (cloudy milk bottles), PVC (windows, drain pipes etc), low-density polyethylene (plastic bags), polypropylene (a hard and durable plastic), polystyrene (packaging), plus a final category that also includes biodegradable plastics.

    Plastic fragments

    Plastic can accumulate in ocean gyres

    Data shows that around 80% of plastic in the ocean is coming from land, and 20% from ships. At sea the largest contributor is the fishing industry, with lost lines, polystyrene lids, nets etc. There are also a surprising number of containers that fall from ships with their contents being scattered. The discovery of some of these contents which have washed up across the globe have actually helped scientists understand more about ocean currents.

    While some plastic waste spreads far across the planet, others can be found in gyres. These are the calm patches at the centre of rotating currents in the ocean.

    Discarded fishing tackle

    The biggest problem is beneath the surface

    While some plastics float on the surface, others are broken down into smaller fragments by UV rays, wind and waves and can start to sink. Statistics show there’s around eight million tonnes of plastic that leaves the land and ends up in the oceans each year, but only around a quarter of a million tonnes can be accounted for on the surface. Most likely the majority of that is sinking so deep that we don’t really know what’s happening to it.

    Microplastics are hazardous to marine life and can enter the food chain

    Emily explains how it is very easy for birds, fish and marine mammals to mistake plastic for food. Once they eat it they can die of starvation as it sits in their stomachs and they can’t get any good nutrients in. She describes a recent dissection she worked on in Hawaii of a sea turtle, where they found 78 pieces of plastic inside its stomach and gut.

    As well as issues of starvation and entanglement for marine life, there is also the impact of the chemical hazards associated with the breakdown of the plastics and also how this can impact humans in the food chain.

    Emily highlights other chemical compounds, such as those used to make things fire resistant or weather proof, that also end up as a pollutant in the marine environment once they’re washed in washing machines and eventually make their way to the ocean. Making their way back into the food chain they can be carcinogens and disrupt hormones.

    Stop the waste leaving the land

    With trillions of fragments in the oceans so small that they can’t be removed without also removing other marine life, algae and plankton, Emily says the solution is to look further upstream and prevent the plastic from ever getting into the sea or on the land.

    “Better still, the next stage is closing the loop. If we are using plastic, how can we make sure it gets recovered right at the point that it’s finished its use so it can stay in a closed loop system?

    But better still than that is just avoiding it completely. How can we switch to alternative products and really alternative systems that mean we can live life without plastic?”

    Design for end of life

    If you’re looking for something to last forever, then plastic can be a good material, but it is important to think of what will happen when it is no longer required. We should be ensuring that it can be taken apart and reused for something else, and avoid using composite materials that are different types of plastic all stuck together that can’t then be used again.

    “We so often design for the primary function but we don’t design for end-of-life. And I think that’s the ultimate message. We just need to think about what happens at the end.”

    Close the loop

    In Norway and Germany 98% of the bottles are recycled in a closed loop system. The price of the bottle is artificially inflated by a financial deposit that you pay at the point of purchase. That is repaid in a sort of reverse vending machine when the bottles are returned, thus incentivising people to return the bottles in a good condition.

    Down-cycling is more prevalent rather than recycling

    Emily says there is a misconception about our plastic waste being recycled, with it actually being as little as 9% of the plastic we use. For all the different types of plastic, in the UK only PET and HDPE are recycled, and even less than that in other parts of the world.

    Many people’s understanding of recycling is that it is an ongoing circular process where things continually are turned into something else. In reality, Emily says that plastic bottle or PET packaging might be turned into a bus shelter, drainpipe or carpet, which can’t then be turned into anything else. It’s not a closed loop system and she describes it as more like down-cycling than recycling.

    eXXpedition has three aims

    Emily and her crew set off in 2019 on a two year circumnavigation of the planet conducting scientific research to understand where the solutions lie.

    A large part of what they are trying to do is to understand the make-up of the anonymous soup that is a quarter of a million tonnes of plastic floating on the surface. By understanding whether it is tyre dust from cars, or polyester microfibres from clothes in the washing machine for example, they can pinpoint where the opportunities on land will lie.

    The second of the three aims is about storytelling, and passing on important messages about the Ocean’s beauty, the challenges it is facing and how crucial it is for our own survival.

    And thirdly, it is about building community and taking people with different skills from different backgrounds and different countries to work on the problem together and drive solutions.

    The challenge is turning the greater awareness into action

    The last couple of years have seen a big change in the public consciousness about the issue and companies are waking up and wanting to do something about it, even if they’re not entirely sure yet what it is they should be doing.

    “The challenge we have now is turning all of that great awareness into action so that the ocean can feel the results. Because I crossed the Pacific again last summer, ten years on from that first time, and there was more plastic in the Pacific last summer than on really any of my other expeditions.

    That was a little bit disheartening especially among all of this great energy around the issue. But I don’t think it’s too late. I think we need to act now but I do think we can do it.”

    Self-builders can work with suppliers to reduce waste

    With self-building comes a lot of packaging, much of which is single use. Emily suggests trying to work with the suppliers to try and find a solution whereby perhaps the packaging could be reusable and returned, which also has a financial incentive for them.

    With so much material already out there in the world, Emily would advise looking to use reclaimed materials wherever possible. Even better if you take the site itself and are able to keep as many existing materials there as possible without producing waste or importing new things.

    Have conversations around the issues

    Emily welcomes people following eXXpedition and becoming part of the movement.

    She is also involved with OceanChangeMakers.com which has a toolkit of resources to help people take ideas into their own lives, homes and businesses, and really look at what more they can do.

    “But most of all, I would just encourage everybody to ask questions, realise that actually lots of other people around them are asking the same questions, and have these conversations. Whether it’s your supplier who you’re working with or some sort of waste that you’re trying to deal with. Start talking about it because there are always ways to solve these problems.”

    Healthy Buildings Conference and Expo

    The Alliance for Sustainable Building Products are hold the Healthy Buildings Conference and Expo. Emily Penn was a keynote speaker in 2019 and you can check out their website for details of who will be presenting at this year’s event.

    Find out more

    Visit the website of Emily Penn

    Visit the website of Ocean Change Makers

    Transcript

    Please connect with us

    Subscribe, rate and review us on Apple Podcasts

    Like our Facebook page

    Follow Ben Adam-Smith on Bluesky

  • HPH270 : What is the WELL Building Standard? – with Olga Turner Baker from Ekkist

    HPH270 : What is the WELL Building Standard? – with Olga Turner Baker from Ekkist

    Olga Turner Baker describes the WELL Building Standard and explains how the principles can be applied to improve health and well-being on individual projects.

    Interview with Olga Turner Baker

    Olga is a chartered surveyor by training. She first came across the WELL Building Standard back in 2016, and was surprised to find it wasn’t being adopted more widely in the UK. She quickly became passionate about it and started her own business, Ekkist, to specialise in design-led buildings, with a specific focus on health and well-being within.

    Ori House

    The WELL Building Standard is based on medical research

    Launching in the United States in 2014, the WELL Building Standard took all the medical research that had taken place around the world that looked at how buildings impact our health, collated it over a seven year period and turned it into a building code.

    Olga explains it as being a review of all the best practice and best guidance, of all the different components of building design. It covers the best guidance on air quality, water filtration, the safe use of building materials, and even through to management of buildings and how to operate them. It also touches on things like mental health and sense of community.

    While there are criteria that must be met in order to achieve the minimum certification, there are also optimisations which are points that can be earned to get to a higher level.

    Olga describes it as a very technical standard, where you submit documentation and are also tested in practice through performance verification testing. It is a robust procedure which assesses the building in use as well as in design.

    There are ten core areas of buildings that the standard covers:

    Air

    This looks at air filtration and ventilation, keeping the worst of the chemicals and particulate matter and dust out of the buildings, so as not to exacerbate things like allergens or asthma.

    Water

    In much the same way as air filtration, this is to keep out anything that could be harmful, such as coliforms, public water additives, agricultural contaminants, and by-products of disinfectants. It’s about ensuring that the water has been filtered to a high quality, which can be through a carbon filtration system or reverse osmosis.

    Nourishment

    Probably more relevant to buildings that have an operator providing food on site, but also adaptable to our own homes, this looks at the kind of food that is provided within a building. It considers portion sizes, allergen labelling, and reduction of added and refined sugars and any kinds of additives. It encourages healthy food messaging by promoting ethical sourcing of products and eating as much fruit and vegetables as possible.

    Light

    Ensuring we have the right light in buildings helps keep the circadian rhythm and body clock functioning as well as possible. The standard has guidance on sufficient distances from windows, making sure rooms aren’t too deep for the windows provided, and that the right colour quality is being used in relation to the time of day or night.

    Movement

    This thinks about how we encourage activity in the building to improve health. It can be about connection with the outdoors to make it easy for children to play, or in larger buildings it may be about ways of encouraging staircase use rather than lifts.

    Outside of the WELL Standard, but another idea that Olga suggests, is making outdoor space that is usable throughout the seasons, which will naturally encourage more outdoor activity for longer periods of the year.

    Thermal comfort

    Keeping buildings within comfortable thermal parameters is important for not aggravating conditions like asthma, eczema and stress, and making sure that our skin, eyes and organs function properly. Achieving this might be through shading and natural ventilation or mechanical cooling and ventilation systems.

    Sound

    Although not a mandatory part of the WELL Standard, acoustics make up an optimisation which far exceed UK building regulations.

    It looks at both transference of noise between rooms and also transference within a room. Olga says there are plenty of products on the market which can help absorb noise, and materials she particularly likes using for this are cork and clay plaster.

    Materials

    Firstly this looks to avoid materials that we know to be toxic, such as asbestos, mercury, lead and PCBs. In the optimisations of the standard it also considers VOCs and how they can be released from furniture, varnishes, paints and glues. When you’re designing a home you should be trying to reduce these levels by looking at natural sealants and products like sheep’s wool as a furnishing fabric and natural oils.

    As well as reading the specifications on the products, Olga suggests looking for external accreditation that any product you are using has been tested for a health component. Examples of these include Cradle to Cradle and Oeko-Tex.

    Mind

    This looks at how buildings impact our mental health, and what can be done to encourage better mental health through building design.

    Much of this can be down to access to nature, whether that be views across to green spaces or incorporating greenery in and around your rooms.

    Ori House

    And even using wood and other natural materials has been found to have calming effects.

    Community

    The WELL Standard looks at access to community services, community programmes, and how you’re incorporating the wider community as part of your building and initiative.

    Olga also recommends looking at the new NHS Social Prescribing Guidelines, which emphasise how our personal health can really gain from spending time with others, whether that be in group activities, gardening, etc.

    Innovation

    Olga describes innovation as being the most fun part of the WELL Standard. It is where you can be awarded points for coming up with new ideas that help increase health and wellbeing within buildings, that aren’t already covered by the standard. This could be anything like different lighting or having pets on site, as long as there is medical research to support the benefits.

    WELL Standard principles can be applied to individual projects

    While it is not possible to certify a single building, (there must be a minimum of five units and they have to have a common structural element) the principles and good design practice can be applied to individual projects.

    While some designers might be doing these things intuitively anyway as good design practice, for others the standard can just push them a bit further and support them with the scientific research.

    Ori House applies the principles

    Ekkist have worked on a conceptual standalone dwelling, Ori House, where they have applied the principles and taken on the parts that really resonate to homeowners, such as the daylight, air quality, water filtration, and using space better for social interaction but also to encourage privacy within the home.

    “We’ve tried to really think about that and create our own version of what it means to be a community but on an individual building level.”

    Ekkist are currently looking for sites to build this on, and are also working on an urban version, which Olga sees as being important as cities become ever more urbanised.

    “We want the quality and the health benefits of a rural home delivered in an urban environment. That’s our next big goal.”

    Find out more

    Visit the website of Ekkist

    Follow Ekkist on Twitter

    Find out more about the WELL Building Standard

    Check out our episode with Elinor Elisa about how she created a healthy home for her family.

    Transcript

    Please connect with me

    Subscribe, rate and review the podcast in iTunes

    Rate and review the podcast on Stitcher

    Like our Facebook page

    Follow us on Twitter

  • HPH269 : What is snagging? – with Chris Parsons

    HPH269 : What is snagging? – with Chris Parsons

    Chris Parsons returns to Ben Adam-Smith’s self build home after a year to look for defects. He explains what snagging is, how the list is compiled and how the rectification process works.

    Interview with Chris Parsons

    It has already been a year since Ben Adam-Smith completed his self build project. In that time, Chris Parsons has taken retirement from his architecture business, but still has a few outstanding projects to work on. But before he can entirely devote his time to his new interests there’s the matter of snagging to carry out on Ben’s home.

    There are contractual obligations

    The contract that Ben had with his builder stipulated a 12 month rectification period, whereby they would return to put right any defects of materials or workmanship that arose during that time.

    As part of that contract Ben kept a financial retention to ensure that happens. Once the work has been finalised Chris can issue a certificate and the remainder of the money must be paid.

    Normally if defects occur they can be left and dealt with together at the end of that period, but any that occur that prevent you from enjoying your property should be dealt with in a reasonable time, which is where a good working relationship with your contractor can be advantageous.

    “All defects are inconvenient, but I don’t know anyone who can build absolutely perfectly, spot on, day one.”

    The architect and residents may notice different defects

    Having lived in the house for 12 months there are bound to be things that a resident would notice, which an architect coming to do a defects list may not. This is why Chris recommends keeping your own list, so that the architect can determine whether they are proper defects and if applicable add them to his list for the contractor. Likewise there will also be things that his professional eye would spot that may previously have gone unnoticed.

    A water mark in the kitchen revealed a problem
    The shower tray had dropped and caused the sealant to crack

    Some shrinkage and movement is to be expected

    Chris explains that shrinkage isn’t technically a defect, though a contractor would likely return to put it right anyway. When using some natural materials and any type of plastering process that involves putting in a lot of moisture there will be an amount of shrinkage.

    There will also be some movement as the building settles into position. This may result in cracks on walls or gaps in sealants. Generally the plan to rectify it would involve some filling and redecoration, although this could amount to a considerable amount of work.

    A window with several streaks on the central pane
    The glass in most of the windows had to be replaced

    Ben’s snagging list

    Ben is thankful that there are only a dozen or so items on his snagging list, including:

    • They are aware of some sound connection in the MVHR from the en-suite down into the kitchen, so this is something that Chris will have to check on the drawings to try and work out what could be the cause.
    • The biggest issue they’ve had has been the glazing. There were defects in the glass panels which was down to a manufacturing error, but the supplier dealt with it effectively and these were replaced.
    • There have been some minor shrinkage cracks, but also one around the window reveals where the angle bead has moved which will need to be addressed.
    • The shower tray has dropped a little which may be the cause of a small leak down into the kitchen where the silicone has pulled away a fraction.
    • There is some creaking in the upstairs floorboards, which Chris thinks could be down to natural movement over time and changing during the seasons.

    Occupants need to learn how to use their houses

    During the hottest period of the summer Ben’s house did very briefly reach 28 degrees, but this hasn’t been a cause for concern. Chris says that some houses will naturally be easier to keep cool than others, based on their orientation and site constraints, so at the design stage they will try to mitigate what will likely cause the overheating. He says occupants should also learn the techniques for cooling their house.

    “As designers we need to be looking carefully to try to make sure that our houses can stay cool because we’re going to get more and more of those heatwaves. We need to understand that. We need to make sure that people know how to use their houses, but most of all we need to make sure that designers know what they’re doing. This is not true of the Passivhaus fraternity but I’m not convinced that many of our house designers fully appreciate that problem.”

    There can be a fine line between defects, and wear and tear

    An architect in this situation can take on the role of adjudicator. Chris calls this client management, where an occupant might have something on their own snagging list that actually Chris would put down to being a matter of wear and tear, rather than a contractual defect. It’s Chris’ job to determine what is fair to add to the list that is presented to the contractor.

    Not all defects will be detected within the 12 months

    Even after the 12 month period there may continue to be some movement and shrinkage, however this will then fall outside the responsibility of the contractor.

    There are other defects that the contractor can continue to be held liable for even after this time. These are called latent defects, which might be a defect in materials or workmanship. Even if it’s several years later they can still have some responsibility to come back and put it right. Chris explains that there is a technical legal limit to it, but it’s basically at the point at which it should reasonably have been discovered.

    Later alterations are your responsibility

    Ben is thinking about adding another external water tap. Because the water supply will be inside the thermal envelope Chris advises caution when drilling a hole through the building fabric and making sure a grommet is put on to avoid too much air leakage.

    “But it’s something that is completely down to you to organise. There is no responsibility left for any of the people that were involved in the build contract to deal with your alterations, extensions, or anything else you want to do, other than making sure that you’ve got all the information you need to be able to do it properly.”

    Find out more

    Follow Chris Parsons on Twitter

    Transcript

    Please connect with me

    Subscribe, rate and review the podcast in iTunes

    Rate and review the podcast on Stitcher

    Like our Facebook page

    Follow us on Twitter

  • HPH268 : The state of self build in the UK – with Jason Orme

    HPH268 : The state of self build in the UK – with Jason Orme

    Self-builder and renovator Jason Orme reflects on the main challenges you face if you want to tackle a house build in the UK.

    Interview with Jason Orme

    Jason Orme is the Editorial Director of Future Plc, the publishing house behind Homebuilding & Renovating magazine, of which he is the former editor. He would categorise himself as a serial self builder, but more recently has taken on a renovation project in Derbyshire with the intention that it will be his family home for at least a few years.

    Doing a renovation has made him a bigger fan of self build!

    With the renovation and remodelling project coming to an end, Jason says the process has been more ambitious, costly and stressful than a self build. Once you have planning permission on a self build you are theoretically in a position to have control over everything, whereas with renovation you tend to be at the mercy of the unknown with old houses that are full of surprises. It’s not something he would be keen to repeat!

    Despite that, Jason and his family were drawn to the project because of a love of the plot, the location and even the original house to some extent. They didn’t need to create much additional space, but rather remodel what was already there and make it more energy efficient.

    Covering up the 1960s ugly stone-clad facade, they built a third layer around the outside which provides excellent levels of insulation, although airtightness will always be more of a challenge to achieve than if starting from scratch on a new build.

    Although Jason is happy in the house and looking forward to enjoying it for the next few years, he hasn’t ruled out another self build in the future, although it would take something special to move away from the location they now have.

    Justify spending on the house by calling it an investment, not expenditure!

    Jason has always tended to put any spare money into property, which he hopes will end up being an investment rather than a cost. He says he’s happy to have large outgoings and mortgages on properties because ultimately it should pay back, while at the same time you have the enjoyment of living there.

    Self build is delivering fewer homes than ten years ago

    2005 saw a peak in self building of up to 19,000 homes a year. That is now closer to 14,000, although the demand is probably greater than ever. Jason cites the two main causes as being problems for people selling existing properties to provide the finance, and the types of plots available. While land opportunities have improved a little, it is typically serviced plots on large developments like Graven Hill, rather than individual plots. When people dream of building their own home part of that dream tends to be the location, and living on a large estate, whether a self build or not, isn’t to everybody’s liking.

    Jason sees some kind of balance being self build communities that can give an element of individuality and isolation to people.

    “This has been my twentieth year in the self-build sector and the frustration for me really is that we’ve sold an awful lot of magazines over the years and met hundreds of thousands of people at the shows and spoken to people on the websites, more than you can imagine really. We haven’t actually really made a fundamental difference if we’re honest with ourselves in terms of the number of self-build homes that have been delivered.”

    Research they have carried out with the National Custom and Self Build Association has shown roughly a million people in the UK are ‘actively’ looking to build a home, yet only a few thousand each year go on to do it. Jason suspects the majority of these people have a look on Rightmove and are put off by the out-of-reach prices. For those that do continue, his instinct that what’s stopping them isn’t not being able to find a plot, but that they’re so fixated on a certain type of plot which they’re not going to find at a realistic price, or perhaps they just somehow can’t make the commitment.

    “So, I think if people can be flexible and have that imagination then by and large, with a reasonable budget and obviously that varies from area to area, it shouldn’t be unrealistic for them.”

    There should be an influx of plots on the market soon

    The right to build legislation came about in the UK in 2016, which made it compulsory for local authorities to keep a register of people interested in buying plots of land, and ensure that they had that same number of plots available to purchase within three years. We’re now at that point of those three years having passed so thousands of plots should be coming to the market, but whether they will be plots that people want or in areas they want to live in will be the issue.

    Right to Build

    Self-builders can have an advantage over developers

    In his seminars at the Homebuilding & Renovation Show, Jason explains how there are two types of building plots.

    One type is that which has a ‘For Sale’ board outside and can be found on the market through estate agents and auctions.

    The second is what he describes as the plots that developers go after. These can be found using planning permission data and using Google Maps.

    Opportunities for self-builders arise where there are plots that large and small scale developers can’t quite see how they could build housing. Where they’re looking for a field or flat piece of land to build ten houses, they won’t be so keen on more awkward scraps of land, like old garages.

    “So, the self-builder’s opportunity, I think, is in actually embracing the stuff that makes them different which is the individuality of the design and that agile nature of development.”

    Management of budget is critical and needs flexibility

    Jason has often found that people who work in offices don’t feel that they are well-placed to self build, but actually he thinks they have transferable skills like organisation, project management and making tough decisions about money.

    Having control of finances is crucial and Jason says it helps to think of it in terms of a spreadsheet where if some things are going above original estimates, then reductions might need to be made elsewhere in order to balance it out. He thinks if you can be flexible in terms of these smaller pots of money rather than thinking of it as one big pot, then you can begin to take back control.

    With finance often being the biggest cause of stress on a job, but plenty of other factors beyond your control to add to it, Jason says to some extent it should be part of the main contractor’s role to absorb that stress on your behalf.

    Where costs do go out of control during the construction, it isn’t usually down to the construction but flaws in the design process. A good design process should include the budget, engineering issues and proper site layout.

    “Where I see the failures, it’s usually where the architect at that early stage hasn’t been able to put all those different factors together into a package that the main contractor can then go on to deliver. It’s often just left to the main contractor to work out the gaps.”

    There is always more to learn

    With twenty years in the business, Jason says it’s a constant learning experience and you’re never going to know it all. From talking to other self builders, architects and contractors you will find out other ways of doing things and improving on them.

    In his experience it’s often self-builders that are also engineers who quite often try to find out everything they need to know about house construction on their own, so they can almost second guess the designer and the architect. Jason says this usually ends in tears because they’re never going to know it all!

    In his experience it’s far better to leave all that to the people he is employing to do it. Where it often falls apart is where there is a breakdown in trust between the homeowner and the people that they’re employing.

    When it comes to architects, the ones to avoid are those that struggle to understand the relationship that they’re meant to have with their client. It shouldn’t be a case of dictating ‘this is the design you should have’, or even ‘what do you want me to design for you?’

    “The happy medium is the one that you’re looking for where architects can deliver something that obviously adds their value in. And going back to that thing about trust really, I want architects to be able to come up with ideas that I can’t and solve problems that I can’t. That’s really what you’re paying for.”

    Architects often tend to be specialised in limited styles of design, rather than excelling at all different types of house.

    “It’s wise, I think, to try to pick a design style first and pick almost a process and a target, an objective almost for the project, and then begin to put the team together on the back of that.”

    There needs to be trust within the team

    Jason says there’s also a misconception in the sector that builders are there to be feared or controlled, when actually, the good ones clearly know far more than their clients and should be empowered and just left to get on with it.

    Finding that builder that you can trust in this way is he says part art and part science: the science being the recommendations and background company checks.

    The other part comes down to gut instinct, and thinking about whether they listen to you, are constructive, understand what you’re trying to do with the house, can relate to the family and can appreciate that the budget is tight and that this will be critical to the project. It will need to be someone you think you can trust to be around for the duration of the project and sometimes have difficult discussions with.

    Design flexibility into the house

    Having seen so many self builds, Jason is able to grasp the feel of a home and what does and doesn’t work so well. The right mix can be a space that doesn’t feel too grand or clinical, but instead gives you that ‘wow’ moment each time you walk in, and that is down to good architecture.

    It is important to build flexibility into the design, with space for a growing family so far as is possible. And while the rooms and spaces themselves don’t have to be large, if they can be flexible in their design it allows a family space to spread out and do their own things.

    With the trend for adding extensions to create an open plan living, cooking and eating area, Jason feels they are often designed with daytime and summer in mind, but come winter or the evening they can be lacking that cosy, snug space where actually people just want to curl up in front of the TV.

    Jason cites a number of reasons why people are staying in their houses for longer: houses are more expensive, stamp duty makes it very costly to move, flexibility in working arrangements means people don’t have to move for work as much. And while people tend to stay in their homes for longer, their needs change depending on children growing up, moving away etc, so that flexibility again is so important with being able to adapt to the occupants, rather than moving out.

    It isn’t affordable enough for younger generations

    A notable change in the types of people attending the home shows is that the self build community is getting older and greyer. Nowadays self build can take more money to do than it used to, with greater demand for land and resulting prices escalating, and the cost of materials increasing.

    Jason worries that the opportunities for self build are not as available now to people in their twenties and thirties, and this is something that he would like to see change. But that will take changes in financial offerings, planning law and land availability.

    His advice to them would be to be realistic and flexible in terms of area and the type of plot to go for. He warns against holding out for the perfect plot on the edge of a village with panoramic views, and suggests instead considering looking at the less attractive plots. He says as well as ugly duckling houses, there are ugly duckling plots which, once landscaped and with a well designed house on top, can really add value.

    Jason suggests starting out in self build like starting on the property ladder, where you start small, do it two or three times and work your way up to building the house of your dreams. And with labour accounting for roughly half the costs on the build, he says you can save thousands of pounds by doing things like the tiling, kitchen fitting, decorating and landscaping yourself.

    “One of the great unwritten things about self-building and renovating as well is that you never seem to quite get that day where you sit back and you say, ‘I’ve done it’ and you can sit back and enjoy it.

    “You’ve just got to enjoy it as it goes through and take those little marks because there’s always going to be the garden to do; there’s always going to be that bit of the house that you didn’t quite finish off properly. I think for people who are interested in housing like we are, and there are thousands of people like us, I think, you have to just realise that that’s part of the process and part of the pleasure.”

    Find out more

    Visit the website of Homebuilding & Renovating magazine

    Visit the website of Real Homes

    Visit the website of Period Living

    Follow Jason on Twitter

    Please connect with me

    Subscribe, rate and review the podcast in iTunes

    Rate and review the podcast on Stitcher

    Like our Facebook page

    Follow us on Twitter