Author: Lucy Cowell

  • HPH267 : Self build tips, eco design and the climate emergency – with Kevin McCloud from Grand Designs

    HPH267 : Self build tips, eco design and the climate emergency – with Kevin McCloud from Grand Designs

    Kevin McCloud from Grand Designs shares practical advice on how to approach an ecological build, and comments on how architecture needs to change to address the climate emergency.

    Interview with Kevin McCloud

    Kevin McCloud has been synonymous with self build for the last 20 years. No doubt anyone planning their own project has had conversations with friends, family and colleagues about Grand Designs, as the programme has inspired a generation of people to dream about building their own home and, for some of those, to make it a reality. As well as being integral to the success of the TV show, Kevin is also the founder of HAB custom build houses.

    Grand Designs has diversified

    The busiest period of filming for Grand Designs is between May and October when Kevin can be filming up to fifteen hours a day, for three days a week. Because it’s impossible to know whether a project is going to take several months or several years they’re never quite sure what is going to end up in each series.

    Kevin attributes the show’s longevity to being able to find interesting stories that they haven’t covered before, whether that might be about a Passivhaus construction, a new technology or building for a disability.

    The Grand Designs brand has expanded to include ‘Grand Designs: House of the Year‘ in association with RIBA, and in 2019 also brought us ‘Grand Designs: The Street‘. This followed a number of self build projects taking place on a single street on the Graven Hill development in Bicester, with plans to return and film another series.

    Kevin says one of the most significant films he made was in series one, which was a community housing project in Brighton called The Hedgehog Housing Co-op, that used a Walter Segal construction method. In the future he would be keen to follow another community self build co-housing scheme, but says that they’re sadly very hard to find.

    There have been some stand-out eco projects

    Some of Kevin’s favourite projects have been ones with a focus on sustainability. One he particularly enjoyed was Ben Law, who in 2003 built his house out of his own coppiced wood. He describes it as being a beautiful story where nothing went wrong to create a fabulously beautiful house.

    “It was a film in which the word sustainability was mentioned once by Ben and I thought that was great. It elegantly told the story without hammering it on people’s heads.”

    Copyright ben-law.co.uk

    Another memorable one was the Lammas Project, which followed a couple building in Wales. He says it was a beautiful film about super low-impact living that was as much about the lifestyle as it was about the architecture.

    “It’s rather like ecological cars. They don’t exist. There’s no such thing as an ecological car. It doesn’t matter whether it’s full of batteries or it runs on dog poo. The point is, it’s all about our consumption and use of vehicles that determines whether their use has an impact on the planet. That’s where fundamentally the largest amount of environmental impact happens, in use.

    “And it’s the same with dwellings. So, you can build yourself an eco-house but if you continue to drive fifty miles to work every day and continue to live an exorbitant lifestyle, it doesn’t really achieve very much.”

    Being asthmatic himself, Kevin had a keen interest in Elinor Olisa’s healthy home that featured in the last series. With two children that suffered from life-threatening allergies, Elinor researched every product coming into the home to check for VOC levels and potential triggers. She has worked with the University of York to monitor the environmental performance and the results have been staggering.

    “A fabric first approach is glorious”

    A theme of the recent series and also in his own work, is a leaning towards a fabric first method of building, rather than bolting things on to make them seem more sustainable. Invariably the latter is an expensive and unnecessary way of working, but choosing the right materials and using them in an intelligent way is a far better approach.

    “It’s like the argument about the Americans and the Russians in their Space Race. The Americans spent tens of thousands of pounds developing a ballpoint pen that would write upside down in space, and the Russians used pencils. I don’t think that’s true but I just love the story.”

    A sense of responsibility

    Kevin believes the responsibility as architects and builders should be to build buildings which are super-efficient in terms of how they use energy and their resources, but they should also ‘deliver a quality of life that makes their arguments utterly compelling.’

    Achieving this takes a combination of good design where homes cost very little to run, where the experience of being in the buildings is uplifting and where people want to stay and build a community.

    “It’s the idea of how you use the spaces in between buildings to create social sustainability which has in itself a collective reduction in demand on the planet’s resources. In other words, if you share an allotment and you grow your own food; if you join a car club because you know your neighbours and you want to do it; if between you, you buy a bicycle for the street; or buy one trampoline for five households for the kids; or one shed; or one lawnmower between five homes; what you’re doing is actually, you’re sharing cost, you’re saving yourselves loads of money, and you’re also saving resources and making your collective imprint on the planet lighter.”

    People often think of self build as a collection of ideas at the start

    These ideas might be around what sort of bathrooms, kitchens, taps, sofas, lights etc that people like, and they assemble the home based on aspects which are more associated with the interior design than the architecture.

    Kevin sees architecture as being:

    “a process of design which is very good at resolving all kinds of issues to do with how buildings, places respond to where they are, to site, to the environment, to their location, to the passage of the sun, to how they function in engineering terms, but also how they provide uplifting and exciting spaces for their occupants that lift the spirits.”

    For him architecture is about creating a connection with the outdoors, while also problem solving things like storage space, and a lot less about the taps!

    Grand Designs ‘The Street’ (copyright gravenhill.co.uk)
    Grand Designs ‘The Street’ (copyright gravenhill.co.uk)

    Enable more people to self build, as it can be truly empowering

    Kevin says that it’s pretty much established that the middle classes can go out and build for themselves, and he would like those opportunities open to more people. He believes that through community you get a far greater sense of attachment to a place and an accompanying sense of empowerment from building your own home. It’s a combination that could be life-changing for many people.

    To do this, self build needs to be:

    • More widespread
    • Facilitated by local authorities
    • Have dedicated sites, with communities of self-builders working together
    • Truly affordable
    • Have more co-housing community schemes
    • Have housing associations working with groups of their residents as clients to build accommodation

    Kevin would like to see people being empowered in as many ways as possible, and yet the system in the UK is set up to favour the large developers controlling the market. While he wouldn’t suggest a future entirely dominated by self build or community self build, he would like to see a diversity of offerings which would create a healthier market.

    Large numbers of people wanting to build together within a community can put pressure on the authorities to deal with their land assets in a different way. There is even a question of whether land in public ownership should have a financial value attached to it, because of the net social capital that can be created by building together, and which is very evident in schemes across Europe. And if that community can be further enhanced with car share, improved cycle routes and better public transport and sharing generally, then that social capital has been increased even more.

    Development is a dysfunctional industry

    In considering what it would take to solve the housing crisis in the UK, Kevin says he would need to be the Prime Minister as the industry is so dysfunctional!

    “I would empower small and medium enterprises; I would mitigate against the large housebuilders; I would mandate every single local authority to allocate land. I’d use the Right to Build Act in fact.

    “The trouble is, everything I’m describing has already been tried. And that’s the difficulty. It’s not one problem. We have a crisis in numbers; we have a crisis of quality; we have a crisis in affordability; we have a crisis in planning. We have only half of the number of planners that we need. And we don’t have within central government a statement of faith. And what I would personally like to see, if I could do one thing, I would announce a national statement of faith in social housing.

    “We need to move back to a world where we integrate, where tenure is blind, where you can’t tell who owns and who rents, where housing is considered a basic human right, and we need to create the mechanisms to make that affordable not just to own but to rent, to share, and to occupy by whatever means. There are plenty of tenure models around the world which work.

    “So, what we have is a binary system in the UK which is hilariously out-of-date and a market delivery mechanism which is dysfunctional and broken. So, we’ve got lots to mend, lots to do, but by just saying, ‘we believe in council housing’ or ‘we believe in providing high quality housing for all and we will do everything we can to achieve that’ would be a wonderful thing.”

    Grand Designs Live

    The Grand Designs Live exhibitions take place in the UK twice a year. Kevin is proud that they offer tangible opportunities for people to touch and feel products and experience their quality. As part of the exhibition there is also an exchange of ideas where you can get help and advice from experts.

    Milk bottle house at Grand Designs Live

    With his passion for innovation, Kevin is excited by the new technology being showcased, with exhibitors now selling products on their stands that only a couple of years ago were in the ‘Green Heroes’ section.

    Find out more

    Catch up with previous episodes of Grand Designs

    Visit the websites of:

    Transcript

    Please connect with me

    Subscribe, rate and review us on Apple Podcasts

    Like our Facebook page

    Follow Ben Adam-Smith on Bluesky

  • HPH266 : How to invest sweat equity into a project while maintaining quality – with Ajay Boardman and Nigel Bowley

    HPH266 : How to invest sweat equity into a project while maintaining quality – with Ajay Boardman and Nigel Bowley

    Client Ajay Boardman and her builder/carpenter Nigel Bowley share their experience of working together on her self build project. In addition to project managing Ajay is labouring for Nigel. We look at why this relationship has worked well and consider how much money she is saving.

    Interview with Ajay Boardman and Nigel Bowley

    Ajay is building a 260m² Passivhaus in the South Downs National Park, using the PH15 build system. Having found Nigel Bowley to build the timber frame, it seemed natural that, being a practical person who didn’t have a job at the time, Ajay herself would take on the role of project manager and labourer.

    Parental support has been invaluable

    A big factor in Ajay being able to take on the project has been the support of her parents who live on a farm next to her and the site. Having plenty of experience helping her dad out with manual work on the farm has stood her in good stead for transferring her skills to the building project.

    Not only has her dad helped out with the labouring when she has needed a break or to concentrate on the project management side, but he also always has the right tools for the job. In addition, Ajay’s mum helping out with childcare has meant that Ajay has been able to put in the extra hours while still having the children close by.

    Nigel and Ajay quickly realised they would have a good working relationship

    A carpenter by trade since joining a YTS scheme in 1986, Nigel has had a varied career working on projects such as house building, extensions, internal renovations, roofing and some commercial work. He is equally used to working on his own or having a small number of sub-contractors and labourers alongside.

    From previous experience of working with labourers, Nigel had his doubts about how successful having Ajay and her dad work with him would be. However, Ajay soon demonstrated that she had a great interest in the building, listened, followed instructions and had good manual coordination and skills.

    Working on a weekly payment basis rather than a contract, Nigel had the ability to walk away if he needed to, but after a successful first week levelling the site they both realised they would be able to work together well.

    They also found that their different skills complemented each other well. Where Ajay’s knowledge of the parts and the process was lacking, her admin and communication skills helped take what was in Nigel’s head and translate it into something that she could work from.

    Breaking the jobs down makes the whole process less overwhelming

    Nigel explains that looking at the entire job and thinking about what needs doing can actually be pretty overwhelming. He tries to keep things more simple by breaking each job down into smaller parts. That way the focus only ever has to be on those few things that are needed over a short time span.

    Doing it yourself gives you control over the quality

    Having been to see a different PH15 house, Nigel was confident about the timber frame aspect and getting it level on the slab. Moving forward they may get an electrician and possibly a decorator in, but the rest of the work they are keen to do themselves. This includes the MVHR and all the taping and joining because they are so aware of the importance of getting it right for the airtightness.

    Ajay and Nigel have found a happy balance in what they each need to control based on their individual skills, without controlling each other. While Nigel is in control of the job, he’s also answerable to Ajay’s quality control. This method has worked for them and hasn’t caused any conflict.

    Nigel’s tips for anyone else in a similar situation would be around communication: listening to each other and knowing your boundaries on what to say and when.

    Quality hasn’t been compromised by the cost savings

    Taking on the role of labourer and project manager has obviously been a cost saving for Ajay, and by taking jobs like sweeping up and placing orders away from Nigel, it means his time can be spent more productively.

    Having a relative novice alongside and working out things like the airtightness has meant that the speed of work has sometimes been slower than on his other jobs. However the quality hasn’t been compromised, with architect and co-creator of the PH15 system, Jae Cotterell, crediting the workmanship being of very high quality and better than a lot of professionals.

    It’s physically very demanding

    Nigel believes that sweat equity can work whether it is a PH15, masonry or other build system.

    “I don’t think it matters on the style or the type of building. It’s just really if you’re prepared to work, properly work. Because I don’t think a lot of people really work that hard when it comes to physical.”

    But doing it themselves has allowed an element of flexibility when it comes to working hours and fitting in around school runs and other responsibilities.

    They are not working to a programme

    Nigel is used to working to a programme, so not having one on this project has been one of the hardest things for him to adjust to. He is used to setting an ambitious timeline in order to keep the labourers motivated.

    “On previous jobs, you can burn your labourers up quite quickly and they become unmotivated and they leave pretty quick. So, you’ve got to really manage their physical abilities, your own physical abilities, and so you kind of have to let the job lead you in that way really. And knowing when that is going to be a physical effort, a mental effort, a slow part of the job.”

    It’s more about the process than the end result

    With a few months left on the project, Ajay is relaxed about how the house will turn out. For her, the greatest satisfaction is the process of making it, though the air quality and comfort that comes with it being a Passivhaus is something she is particularly looking forward to.

    Passivhaus Workshop

    If you’re new to Passivhaus and want to find out more about it, then check out the National Self Build and Renovation Centre in Swindon which is running regular workshops. There will be explanations of the key principles along with case studies and demonstrations.

    Find out more

    Visit the website of Nigel’s South Downs Eco Homes

    Find Nigel on Facebook

    Read more about the PH15 build system

    Transcript

    Please connect with us

    Subscribe, rate and review us on Apple Podcasts

    Like our Facebook page

    Follow Ben Adam-Smith on Bluesky

  • HPH265 : Preserving the beauty of a building while renovating to EnerPHit standard – with Jonathan Kearns

    HPH265 : Preserving the beauty of a building while renovating to EnerPHit standard – with Jonathan Kearns

    Jonathan Kearns of Kearns Mancini Architects, describes how he tackled a high performance retrofit of a century-old building.

    Interview with Jonathan Kearns

    Originally from Dublin and a keen environmentalist, Jonathan emigrated to Toronto in 1975. He became an architect and by 2008 was looking to incorporate his interest in sustainability into his designs. This led him to take the Passivhaus training, with his first project using this methodology being the Reach Guesthouse renovation.

    Reach Guesthouse
    Reach Guesthouse before renovation

    Reach Guesthouse was an experimental exercise

    Located two hours east of Toronto in Prince Edward County, Jonathan took on a late 1800s post and beam farmhouse. At around 1700 square feet it had a ground floor with smaller upper floor.

    “And so, that project became my learning tool and sort of an experimental exercise in how to renovate an older building and draw all the best qualities out of it while at the same time enabling it to be superbly energy efficient.”

    Renovations tend to be more tricky than new builds

    Jonathan explains that the Passivhaus training that was developed for new buildings hadn’t entirely prepared him for the task. It took a period of stripping away and demolishing the worst parts of the house to establish whether it would even be worth renovating, but the more raw structure that they uncovered, the more they realised that they could end up with something very interesting and unique.

    A friend of Jonathan’s was an artist who in his free periods would also do some construction work. He moved to the site to carry out the selective demolition, using his artistic eye and considered approach to decide what would be worth keeping. This approach did mean the time schedule became stretched, but Jonathan considers it to have been time well spent.

    The house was enveloped in Structurally Insulated Panel cladding

    Jonathan worked with a local contractor specialising in Passivhaus home projects, who built modular pre-fabricated components in his shop in the local town.

    Using 12 inches of SIPs cladding as an insulated jacket to the building, they were able to create a house form very similar to the original. Jonathan describes it as being somewhat surreal to cross from the entirely white exterior through to the contrasting original woodwork inside.

    Later additions to the original farmhouse had been poorly built, so they chose to demolish them but use the same foundation to construct a kitchen / dining space on the back of the house.

    “So, again, even within the house, you have a very nice contrast of the intimate, richly wooded finishes of the original house, and then you go through into the kitchen dining room and it’s a one-and-a-half storey high open cathedral ceilinged space that is painted white on the inside and is white on the outside and has larger windows that overlook the garden.”

    Excluding the basement from the Passivhaus envelope was a painstaking process

    With the basement being shallow and built of local stone, Jonathan says there wasn’t much opportunity to incorporate it into the house, so lots of insulation had to be added to the underside of the floor to achieve an air seal.

    As they wanted to keep the beautiful, original wooden floorboards, they lifted each one from the ground floor, recorded where they had come from, and preserved and set them aside until later. A layer of Oriented Strand Board (OSB) was laid, taped and sealed, with all the edges being sealed to the outside of the exterior cladding of the original house, so that when the house was wrapped with an air vapour barrier it could be taped to the edge of the floor. The original floorboards were then re-laid.

    A particular challenge was the four posts of the house. To complete the air barrier they had to tape three or four inches vertically up each post and down to the floor membrane.

    The next project will be a Passivhaus new build

    “It makes me want to do new build more than renovation because with renovation, it’s a journey and you don’t know the route. You know what your objective is but you’re starting with something where you can’t see all of the challenges. So, it’s not until you get in and you strip away and you discover all the nuances, that only then can you really make the right decision, make the right design choice.

    So, the renovation project really needs you as the architect and designer to be very hands-on and very engaged in the process all the way through. Whereas with a new build, you can really design, think out, calculate and detail every aspect of your new build before you start construction.”

    Following Jonathan’s renovation experience, he is now constructing a new Passivhaus guesthouse, called Endymion Guesthouse, which is also in Prince Edward County. Being a completely new build he has been able to site it facing south the way he wanted, and has chosen an ICF construction which could be built by a builder without much Passivhaus experience.

    His approach to sustainability has changed

    Jonathan says he has always liked the landscape and ecological approach to architecture. He went through periods of being very immersed in looking at photovoltaic panels, wind turbines and the use of geothermal for heating and cooling, but when he studied the Passivhaus methodology he realised they were all secondary to building the primary architectural enclosure to an extremely high performance level.

    At the Reach Guesthouse, they have very low energy consumption in summer and winter months for heating and cooling, and the shoulder seasons quite often rely only on keeping the energy inside the building that has been generated by people and appliances.

    Something Jonathan enjoys about Passivhaus is he feels it allows him the freedom to work with any material that is appropriate to the design, programme, location and landscape, whilst applying the science as stringently as possible.

    Find out more

    Visit the website of Kearns Mancini Architects

    Follow Kearns Mancini Architects on Twitter

    Read Lloyd Alter’s Treehugger article about the Reach Guesthouse

    Transcript

    Please connect with me

    Subscribe, rate and review the podcast in iTunes

    Rate and review the podcast on Stitcher

    Like our Facebook page

    Follow us on Twitter

  • HPH264 : Your forever home lifestyle – with Mark Siddall from LEAP

    HPH264 : Your forever home lifestyle – with Mark Siddall from LEAP

    Mark Siddall from LEAP explains his framework the ‘Forever Home Lifestyle’ and how he uses it with his clients.

    Interview with Mark Siddall

    Mark Siddall is an architect with a passion for designing low energy buildings. Recently he’s taken a look back at his last decade of projects and thought about the things that clients have asked for and what their cumulative thinking is. He’s used this as a starting point to come up with his ten point framework for a forever home lifestyle.

    Preston Springs Passivhaus

    Contentment and character

    The first step on Mark’s framework is to think about contentment in the right ways and in different timeframes.

    When we think about contentment it is usually in terms of an actual design and, largely the character of the design. That can be broken down into the interior and the exterior. Externally there might be constraints by planning related considerations, and internally it’s more about budget and aspirations that can transfer into elements of style.

    “The sense of wellbeing that comes from being content is incredibly important and it means different things in different contexts. It’s an opening into a deeper level of conversation that will allow people to make a more robust appreciation of what they actually want.”

    Convenience

    Once emotional constraints have been considered, then there’s convenience. This covers the room layout, the accessibility around the house, and the way that it supports and compliments our lifestyle. This means thinking about the flow, the circulation spaces, the function of the rooms, the furniture and fittings that come with that.

    When Mark goes through the process of developing a brief, he will conduct a survey of what people do and don’t like about where they’re currently living, to determine how important a particular factor is and what the implications are.

    “They’ve obviously selected to live there; they’ve made those choices and its informed their understanding. So, if they want to then move to the next level and improve their quality of life, how can we take the best of what they’ve got and then top it and make it even better?”

    Control

    Having control over your own comfort is very important, and ties in to an emotional criteria. That can be down to opening or closing windows, controlling heating systems, creating a healthy environment through air quality, noise levels and controlling sunlight levels to prevent overheating.

    Confidence

    This is about how confident a self-builder / homeowner can be about what they’re seeking to achieve. Mark says that his building performance evaluation provides evidence-based reassurance to support and justify decision making. Using PHPP is part of that process for Mark, as without it you wouldn’t get the quality control that is required for delivering buildings that the performance predicted. He says there are no definitive answers from this, but that he is there to provide guidance to help clients make their own informed decisions.

    Community

    Community is important when putting your 25 or 50 year framework in place. It is about thinking of whether you want to live in isolation, or within a hamlet or town setting for example, and considering what kind of support you might need in the future or can offer yourself. That can also lead to thoughts about co-housing or community-led housing which might compliment different lifestyles.

    Connection

    A natural progression is to then consider connection and accessibility of amenities and looking ahead to whether you will be living in an area that can support your needs in older age. These thoughts then inform what kind of site you’re looking for, and whether you’ll be able to walk or cycle safely, or if it’s a walkable distance from bus stops taking you where you might need to go once driving is no longer an option. Mark says clients will often have an emotional connection to a site because of the remote location or wonderful views, without thinking about how well it will serve them in the future.

    Larch Corner interior

    Futureproofing

    This looks at getting the right kinds of spaces and also thinking about how things might change over time. It also ties in with low-energy housing and Passivhaus, where energy bills can be fairly inconsequential, thus offering a level of financial independence once a mortgage has been paid off.

    There is sense in designing the building so that in the future it could be adapted if mobility was a problem, by making level flooring, having the right things in the walls ready in case handrails are needed, and having access through the house for wheelchairs or walking frames.

    Financial Peace

    As well as thinking about the freedom from energy bills, this is concerned with budgets and how to stick to them.

    Even before Mark is instructed as an architect he will do a piece of work using his experience of previous similar builds to give a rough range of costs. This can give the basis for conversations to be had around what might be achievable in terms of what the size and nature of the house might be, before even getting into the design stage. It is however only a starting point.

    “That means that informed decisions can happen before there’s a design taking place. And that’s really important. That way we understand what we’re designing because the budget informs the brief incredibly and we’ve got to design within those budgetary constraints.”

    “I can provide a bracket somewhere between this and that, at a very formative stage. There are things that I can do as an architect that can help to stack the odds in our favour of it being more cost effective in terms of the compact form and thinking about things like that, but at the same time, there’s that reconciliation and there’s always the changing marketplace which means that we always can find that there is going to be some movement and further conversations to have. It’s not done once and then never looked at again.”

    Faithful custodian

    Mark sees himself as an architect and also custodian of the built environment. He says that sustainability can seem broad and rather distant, but once his clients see themselves as custodians too they have positive and constructive conversations that develop and benefit their designs.

    “So, as a custodian, we’re thinking about how we can address climate change, how we can reduce carbon emissions, how we can live more sustainably, how we can help repair and remediate damage to the ecology and biodiversity. And how we can then start to use the buildings that we design collaboratively; how they can then start to do something restorative to improve the quality of life and at least impact less than may have been the previous case.

    There are all sorts of different perspectives about what that might mean and how it relates to their lifestyle, and that’s all fruitful conversation which helps enrich my understanding and I can then pass that on and enrich somebody else’s.”

    Abundant free time

    This asks how the house will support and provide a framework for having an abundance of free time and improving quality of life.

    In simple terms it can be about providing opportunities to work from home and avoid a long commute. It also thinks about diet and fitness and keeping physically and mentally active.

    Find out more

    Visit the Forever Home Lifestyle website

    Find out more about LEAP

    Follow Mark Siddall on Twitter

    Transcript

    Please connect with me

    Subscribe, rate and review the podcast in iTunes

    Rate and review the podcast on Stitcher

    Like our Facebook page

    Follow us on Twitter

  • HPH263 :A step-by-step EnerPHit retrofit of a mid-terrace home – with Harry Paticas from Arboreal Architecture

    HPH263 :A step-by-step EnerPHit retrofit of a mid-terrace home – with Harry Paticas from Arboreal Architecture

    Harry Paticas of Arboreal Architecture explains why care and hard work have been so important to the retrofit of his 1978 mid-terrace townhouse.

    © Agnese Sanvito

    Interview with Harry Paticas

    Harry has a background in art and maths, which he then followed with a degree in architecture. He says the turning point in his twelve years in practice as Arboreal Architecture was taking the Passivhaus training course and suddenly being able to understand how buildings perform.

    Together with his interest in building performance and the natural world, he also has a passion for retrofit, and is currently getting towards the halfway point of a phased retrofit of his own house, a project which was overall winner at the inaugural ASBP Awards 2019.

    “When you put passion in, you get something out”

    The house was purchased in 2016 with the aim of doing a retrofit project. Although they had intended on finding something a bit cheaper so they would have more money to spend on the works, this house cost rather more than they had budgeted for which is the reason they are not currently as far along as they had hoped.

    It is a south facing, slightly staggered mid-terrace property. It is a combination of a solid brick and block front wall that is tile clad, while the back wall is brick both sides with a cavity.

    © Agnese Sanvito

    It has been an intensive couple of years working on the house, with every Sunday taken up by long hours of DIY. It has been a massive learning journey which Harry says has also been of benefit professionally.

    Not only has the DIY element of the project been hugely rewarding, but it works in parallel with his professional role where he can now speak even more confidently and knowledgeably to clients. This could be about how the MVHR functions, how often you need to change the filters, how the pipes connect etc. Likewise, it aids with speaking to builders and helping them do a better job, which gains more respect from them in turn.

    The strategy involves four phases

    The first phase involved work being carried out before they moved in. They had sold a property and were renting so that they could get any of the dangerous, dusty and cold work out of the way while living in their rental accommodation. This included asbestos removal from ceilings, airtightness works to the ceiling on the top floor, putting in and taping vapour block boards to each other and to the walls, adding insulation to the loft, making the house secure and weathertight and installing three triple glazed windows.

    Generally the plan has been to work from the top of the house down to the bottom. Following the loft works and triple glazing to the front elevation they added insulation to the walls of those rooms. By this time they were living in the house and noticeably felt the thermal shift during the winter weekend when they added the cork insulation to the walls.

    A key part of the strategy was maintaining good quality ventilation before the MVHR unit was even installed. With the existing leaky double glazing they knew it wouldn’t be a problem, but when they were replaced with the triple glazing they specified night vents. These allow the handle to be put to 45 degrees off the vertical which gives a 3mm opening in the window at the top. This meant they could maintain decent air quality as an interim measure without the need for installing trickle vents.

    By doing lots of monitoring of particulate matter, nitrous oxide, carbon dioxide, temperature and moisture content, they could use the information to decide whether night vents should be open or not.

    Harry is currently finishing off bits of airtightness work and interior decorating of phase two before working on the next big phase which will be working out where the living space is going to be. The plans they submitted to the Passivhaus Institute had it on the first floor, but they’re now thinking of having it on the ground floor.

    © Agnese Sanvito

    According to their EnerPHit retrofit plan, the next phase is to temporarily insulate the garage door. This will instantly reduce heat loss through the whole of the living room floor, the ground floor hallway and a back wall of the garage. In order to do that they will need to block the door and create a new entrance into the garage.

    Along with insulating the porch and insulation to the bathroom, these will form phase three, with phase four being the ground floor front and back insulation, and insulation to the floor.

    Cork has been used for internal insulation

    Harry was always going to use an insulation material that was from renewable sources. He also wanted something that wouldn’t off-gas but be neutral in terms of air quality.

    His work with Jane Anderson on embodied and sequestered energy in a range of insulation materials has shown that cork actually has lower embodied energy than wood fibre, and is very good on both counts.

    It hasn’t performed as well as hoped in the heat

    While internal temperatures have reached 27 degrees, it hasn’t overheated in the Passivhaus terms of over 20 degrees for 10% of the year. With the new windows they are getting 20% less sun through, but with the cork they’re not getting much effect from decrement delay. They have a medium thermal mass and the top floor doesn’t cool down very quickly because of the blockwork walls and brick party walls.

    Currently being made are three bright yellow sails which can be attached to the front of the house and shade 100% of the top two windows and over 50% of the large living room window. They will provide a low carbon, low tech solution to shading and reducing overheating, and which can be packed away in a bag in the loft when not needed for the rest of the year. They will also be able to judge their effectiveness scientifically as they have installed sensors on the inside and outside of various rooms of both theirs, and their neighbour’s house for comparison.

    It’s also about respecting materials that are already in the building

    The process they have adopted has been to try not to replace something if it actually works quite well.

    “So there’s a little bit more of a lean towards embodied carbon, rather than very demanding interior design aesthetics.”

    This has led to what Harry calls some ‘fun moments’ and to a little bit of variation, which they’re accepting of and saying that’s what this is about, rather than trying to put his architectural stamp on everything and making it as perfect as possible.

    It has been an education for his son

    With Harry’s son soon turning eight, he was keen for him to be involved and remember the experience as much as possible, with a deep understanding of what it is they were doing and why.

    With only a little encouragement at first, his son has been producing a series of A3 posters with images, annotations and diagrams, about cork, airtightness, a thermographic survey, insulation and mechanical ventilation with heat recovery.

    © Agnese Sanvito

    His teacher engaged with the process and has encouraged him to display them in school and do presentations about them to his class.

    A direct result of the school presentations is that Harry is starting a charity or community interest company which will be about retrofitting schools. He will be delivering thermal performance workshops to school children and doing research with them where they look at the fabric of their classrooms and the school and coming up with a retrofit masterplan.

    There have been particularly pleasing elements

    Having never had them before, Harry particularly loves the triple glazed windows, which is an opinion shared by visitors to the house. They are inward opening with a central flying mullion which allows them to open up a whole elevation and achieve very rapid night time cooling.

    © Agnese Sanvito

    Another favourite feature is the MVHR unit. They still open windows when they want, but for general air quality which has been backed up with numerical evidence from their monitoring, it has been particularly pleasing.

    © Agnese Sanvito

    Harry says that working with and getting to know materials has also been lots of fun, particularly with the cork.

    Find out more

    Visit the website of Arboreal Architecture

    Follow Harry Paticas on Twitter

    Support Harry’s petition for zero rate VAT on deep retrofit

    Transcript

    Please connect with me

    Subscribe, rate and review the podcast in iTunes

    Rate and review the podcast on Stitcher

    Like our Facebook page

    Follow us on Twitter

  • HPH262 : Where do you put a low energy Cube micro home? – with Mike Page

    HPH262 : Where do you put a low energy Cube micro home? – with Mike Page

    Dr Mike Page explains how The Cube micro home project developed and why land availability turned out to be a major issue for those that liked the idea of tiny house living.

    University of Hertfordshire Innovation Exhibition

    Interview with Mike Page

    Mike Page has had what could be considered an unconventional background into low energy building. With a degree in engineering he moved into artificial intelligence and a career in cognitive psychology. He sees the engineering and psychology as being compatible for tackling climate change, which he says will need to be as much about changing behaviour as it will about technology.

    The Cube Project demonstrated low energy design

    Mike works at the University of Hertfordshire where he became interested in green building techniques and looking at the psychology of pro-environmental behaviour change. Back in 2008 he proposed a cross-department project looking to build a compact home that had low or zero carbon emissions, but still had modern comforts.

    The idea was to ascertain what the best things to have in a building of any size would be, and then put them into a building of a small size. Using the philosophy that some things have to be shown, and not just explained, they could then take the building around for people to experience for themselves.

    Introducing the low energy elements by design takes away the reliance on people to think about making those changes themselves.

    “So, what you’ve got to do is make it the default so they can almost do nothing else in a house. But you’ve got to make it so that they have their comforts and the sort of quality of life that they want.”

    QB1 attracted lots of interest

    Although not setting out to be a “we want people to live in small spaces” project, they decided on QB1 being a 3 x 3 x 3 metre space in which one or possibly two people could live a comfortable, modern existence but with a minimal environmental impact. Taking it to Edinburgh Science Festival in 2011 brought about lots of interest from people saying they would like a space like that.

    QB2 offered more usable space

    Mike felt QB1 was slightly restricted in that it didn’t have a full sized double bed, or space for more than two people to sit down to eat, so he designed QB2. This was 3 x 4 metres with a 3 metre internal height. It offered a better set of spaces, with a 4 metre long bathroom, a galley kitchen, a full sized double bed, 4-seater table, storage areas and space for a washing machine. There was a full size shower, a 4-burner induction hob, an air source heat pump, fan coil heating and a 32 inch LED TV.

    One of the constraints that Mike gave himself was that he didn’t want anything inside that folded up as that would always be an inconvenience, or have any ladders. So the design rule was that everything always had to be usable.

    Another design rule was that they wouldn’t use technology that was only appropriate to small spaces, because of their wider view of wanting to demonstrate what could be done in a building of any size. It did bring about challenges though of using extractor fans and heat recovery ventilation in such close proximity to the composting toilet!

    QB3 had moving internal walls

    The use of alternate tread stairs to reach the bed in QB2 meant it wasn’t accessible for people with restricted mobility, which led to the design of QB3. This was the same internal volume (6 x 3 x 2.5m) but built all on one level.

    Designer of The Cube Project’s QB3 compact home, Dr Mike Page, University of Hertfordshire, operates the building’s hand-operated rolliing kitchen unit. QB3 at Edinburgh International Science Festival, 2016. For more information, see www.cubeproject.co.uk Photograph: Allan MacDonald

    A key design feature of QB3 was that it had moving internal walls, so you could step out of the kitchen, wind the wall past you and step back onto the same floor which was now in the bathroom. Therefore the light and insulation for one space is also the same that is used for another space.

    “All the people who wanted one were exactly the same set of people who didn’t have land to put it on”

    A company was given the licence to build and sell the Cubes, but despite lots of interest at design shows, the problem of having the land to put it on was an issue.

    Although they were careful to keep the design within the definition of the Caravan Act, because it was a self-contained dwelling it would need planning permission. And if people had land with planning permission then they might just build a normal house and not need a microhouse. Even to be in someone’s back garden, it would need to be as an annex to the house, not as a separate dwelling where someone could live.

    The Cubes differ from the Tiny House movement in the US, which are largely designed to be towed and moved from place to place. While the Cubes meet the Caravan Act and are mobile by definition, in practice they would need to be towed by a lorry. While physically they are tiny spaces, they were meant to be fairly static and not moved around.

    It was also never the intention for people to be living in them in isolation. They had always thought it could be groups of young people living in a community of Cubes around a common space such as an allotment. What has been difficult to make happen is a planning arrangement that would allow groups to come together and create a network of smaller houses.

    Something like a site that has been designated for static caravans would be ideal, where they could create a low energy community.

    “I think it’s more the planning regulations that are conspiring against what we wanted to do with the Cube Project which is to let people live in their own private spaces with groups of other people nearby, in pleasant and low carbon surroundings.”

    Land reform is needed

    Mike doesn’t believe that planning really serves all members of the community, and that land reform is a big issue that needs to be addressed. There are lots of people and companies that own lots of land, with developers holding onto land until the need for housing becomes so desperate they will get planning permission and benefit from the massive increase in land value.

    Issue of zero carbon building

    Mike’s says what we really need are full-sized houses, and that is something he is now concentrating on.

    He is amazed that houses generally being built now are not zero carbon all the time, or at least on average.

    “So, what amazes me is that given that we’re going to have every house that’s got to be zero carbon basically by 2040 – Extinction Rebellion say earlier, the government says slightly later, but let’s say 2040 – why would you build any house in 2019, 2020 that would need retrofitting to meet that standard if you knew that that house was going to stand for sixty, seventy, eighty years? Why would you do that? That seems absurd. And yet just about every house I see being built is not of this type. It’s nowhere near being zero carbon. I simply don’t understand it. That’s a psychological problem.”

    Find out more

    Visit The Cube Project website

    Follow Mike Page on Twitter

    Transcript

    Please connect with me

    Subscribe, rate and review the podcast in iTunes

    Rate and review the podcast on Stitcher

    Like our Facebook page

    Follow us on Twitter

  • HPH261 : Reducing construction waste and reusing materials – with Duncan Baker-Brown

    HPH261 : Reducing construction waste and reusing materials – with Duncan Baker-Brown

    Duncan Baker-Brown from BBM Sustainable Design explains how we can reduce waste on our projects, given a little more time and with a different approach on site.

    With the construction industry being such a big contributor of annual waste, he also shares strategies for how we could transform things if we treat buildings as material banks, which are built with deconstruction in mind.

    Interview with Duncan Baker-Brown

    Duncan Baker-Brown and Ian McKay set up BBM Sustainable Design 25 years ago. The company has a passion for finding environmentally friendly solutions to architectural challenges, and carries out research projects to inform his practice, and vice versa. Duncan also teaches at the University of Brighton.

    An area of ‘protected’ rainforest is being mined for its resources

    Reducing consumption is crucial

    The construction industry is a huge consumer of raw materials, accounting for around 50% of those that are mined across the world. The resultant deforestation and destruction is a key reason why Duncan believes we should be trying to consume far less.

    Although on an international level many leaders seem to be ignoring the crisis, Duncan sees hope on a more regional level where groups and states seem to be taking matters into their own hands and making commitments to address climate change.

    “There’s no such thing as waste, it’s just stuff in the wrong place”

    Duncan defines a circular economy as being a world where one area’s waste, is a valuable resource for another area.

    The UK construction industry is responsible for 60% of annual waste

    With 600 million tonnes of things being bought in the UK every year, 200 million tonnes is thrown away. Of that waste, 120 million tonnes comes from the construction industry.

    Traditionally, resources are thrown at a site in order to keep it busy and not have delays while waiting for materials. This means a tendency to over order on materials by around 10% for wastage, resulting in around 10-15% of everything arriving on site being thrown away. With this cumulative effect on site, it means that for every six or seven houses that are built in the UK, one house worth of waste will go to landfill or incineration.

    Instead we should only be ordering the goods that are needed, planning the projects better so there aren’t periods of delay, and value the materials that actually arrive on site.

    We could also be shopping in a much smarter way. BBM do a resource map for their projects where they look within a 10km or so radius of the site and work out what resources might be nearby. That could mean a factory producing something, a woodland that’s managed for timber, or even a building site that is being deconstructed where they can salvage materials.

    “But it takes a different mentality and sensibility. And the big deal is the time to educate yourselves around the potential of a circular economy to provide a better product at the end of the day, and being able to be beneficial to the environment as well.”

    The Waste House

    In 2014, BBM completed the Brighton Waste House, an experimental project that was built by students under the guidance of the university. Initially the aim was to build a high performance house out of the material that normally goes to landfill or incineration. During the design and development stages they partnered Freegle UK, whose founder Cat Fletcher, suggested they raise awareness of the things that are thrown away on a daily basis, not just in the construction industry but in our everyday lives. It changed from being a project that proved construction waste was valuable, to a project that became more of a thought-provoker.

    The house was subsequently designed as almost a container for the waste products: a vessel for holding lots of products that had been designed without an end of life strategy. They used the plastic waste products as low grade insulation, and included 4,000 VHS tapes, and 25,000 toothbrushes (all unused) that were collected in just four days from Gatwick Airport!

    With 90% of the material used being other people’s waste, it performs to around Passivhaus standards.

    While they proved that it can be done, Duncan says it would take an experienced architect or contractor to understand the potential for using second hand material. With issues around insurance and guarantee of second hand materials, at the moment we don’t have the legislation or networks to support everybody doing it easily.

    Duncan certainly isn’t saying we should be using waste plastic in our homes, and if he did the project again he would use a resource map for construction and other materials to make a building that was a material store for the future.

    “What I would like to do is a project where maybe we find a building that is unwanted, and we deconstruct it and then reconstruct it with new owners, new use, new site. And the architectural challenge, apart from the deconstruction and reconstruction, would be how to tweak the building so it accommodates the new criteria – our new standards for insulation and energy production and that sort of stuff.”

    Lendager Group have reused an old brick facade

    Think through how you can limit waste on a self build

    If you’re doing a self build project, the best thing you can do is look to reduce your waste on site to zero. By using a pre-fabricated build system for example, you will only have delivered what you actually need. A further benefit is that things that arrive flat-packed and screwed together, could ultimately one day be unscrewed and reused.

    Avoid using the wet trades as far as possible too. As soon as you start mixing things with water there tends to be far more waste.

    Buildings can be material stores for the future

    On a large scale looking at financial industry buildings, Duncan explains that many are only designed with a business plan of perhaps 25 years, after which time they’re demolished and a new flagship building put in their place.

    He describes a project in Amsterdam by ABN AMRO bank. It’s an £18 million Circle Pavilion project, which has been designed so that when it is deconstructed in however many years time, the materials and components are assets that can be sold off or reused on other projects. As well as making financial sense it will avoid sending all the waste to landfill.

    Duncan sees a future circular economy having two spheres: a biosphere and a techsphere. The biosphere being everything that is made of natural materials that can be reused a number of times before they eventually become compost for the natural world. The techsphere incorporates those things that won’t decompose so will need more work to establish how they can be designed to be deconstructed and used again.

    Corporate responsibility is needed for end of life strategies

    Duncan believes there needs to be corporate responsibility of manufactured items, so when something comes to the end of its life, it becomes the responsibility of the manufacturer, not the end user.

    This fits in with the idea of things being material banks, where at the end of their life they would actually be an asset.

    The idea of lease agreements is gaining traction, particularly in Europe. One example is Philips who provide leased light fittings to buildings. The benefit to the end user is that Philips are likely to be supplying them with their most robust fittings because they don’t want to be repeatedly coming out to change the lightbulbs. And from Philips perspective, at the end of their lifespan they are able to take back the fittings and use the parts to make new ones.

    “And from a design point of view, and that’s whether you’re designing a light fitting or a phone or a building, it needs a different way of designing. You need to think about it differently, because you’re thinking about how to take apart the thing that you’re assembling as you’re designing it.”

    Differences can be made on self build and large construction scales

    On a self build scale, websites like Freecycle and Freegle can be a source of finding, or recycling materials. On a general construction industry level, Duncan says there will need to be changes to the buildings regulations to demand and facilitate reuse of materials.

    While some of the large contractors are already moving surplus materials internally to other projects, Duncan thinks it can only be a couple of years before large contractors will start swapping with each other.

    “I’m trying to communicate a really clear message because a lot of people are going to be crunching carbon numbers etc and trying to be carbon neutral and all that sort of stuff. And I just think that’s really difficult I think to understand how to really do it, and I think it’s a lot more straightforward just to say carbon is one of the things that we’ve got to reduce, but we’ve really got to reduce the amount of water we use, the amount of energy we use and the amount of materials and components that we use when we’re designing, building, inhabiting, maintaining, and ultimately deconstructing the built environment that we live and work and play in.”

    Find out more

    Visit the website of BBM Sustainable Design

    Follow BBM Sustainable Design on Twitter

    Read about more examples in Duncan’s book

    The Re-use Atlas

    Transcript

    Please connect with me

    Subscribe, rate and review the podcast in iTunes

    Rate and review the podcast on Stitcher

    Like our Facebook page

    Follow us on Twitter

  • HPH260 : What’s the difference between a self build and a speculative development? – with Mark Stevenson

    HPH260 : What’s the difference between a self build and a speculative development? – with Mark Stevenson

    Managing Director of Potton Homes, Mark Stevenson, looks at how self build, custom build and speculative development differ.

    Interview with Mark Stevenson

    Mark Stevenson has spent most of his career working for house builders and developers, including in the role of Construction Director for ten of those years. For the last seven years he has been the Managing Director of Potton Homes, a company that specialises in making the process of self building homes as simple as possible.

    Potton Homes Centre

    Self build is about self-commissioning

    While this isn’t the case in all projects, for the most part self build isn’t about physically building the house yourself, but about getting in the right team of people to build it for you.

    Even the biggest risks can be managed

    Mark cites obtaining planning permission as the being the biggest risk to a self-builder. He wouldn’t advocate buying a plot of land without a permission on it, but instead suggests identifying a piece of land, securing the rights to buy it with an option and then getting planning permission. Once that has been secured the sale can be completed.

    “So from a risk point of view in self build, it’s all manageable. It’s about the choices you make in how to limit your exposure to those risks, and make sure you’ve got a way to get out of a problem without it becoming too expensive too quickly. So I don’t think self building is actually that risky, if managed properly and managed professionally.”

    Custom build is a government re-brand of self build

    Their intention was to encourage potential self builders who didn’t have the confidence, or want the risk, of buying a plot of land, seeking planning permission or organising the build themselves. They wanted to explain to the market that planning permissions could be put in place on plots beforehand, builders are on hand to build them, and they just need the individual to customise the design to suit their requirements.

    Schemes like Graven Hill offer sites for both self build or custom build
    A Potton self build project on the edge of a developer estate near Peterborough

    Mark agrees that there are plenty of blurred lines between the two, with different offerings between custom build companies. To some, such as Potton, it means helping the owner move their plot forward and asking what house they would like to build there. Another company might offer a plot of land with a selection of five houses to choose from.

    Potton show homes try to provoke a response – be it positive or negative

    Potton provide a diverse mix of show homes at their centre with the intention that people walking round can immediately react to what they like and dislike about them. Provoking these responses helps mesh the ideas and concepts together of what would work for that individual.

    “By walking around the physical property you can start to understand how you could commission something that’s all about you and your family, and deliver something that functions in the way that you want to behave and live together as a family. And that’s just about spaces and how things work.”

    The centre is about being able to develop your brief with the subjective attributes that you perhaps hadn’t thought of before, but have been triggered as a response to being in those spaces.

    A speculative development can be one house or many

    A speculative developer tries to predict what someone would want to buy at the end of the entire process. They make the choices about what a purchaser may want, how it should look and how it should perform. In doing so they are trying to maximise the value of that asset in the hope they can sell it and make a profit. There is a fair amount of risk involved as they are speculating on the profit, which is only realisable at the point of sale.

    An individual buying a single plot with the intention of building a house to hopefully sell for a profit, is a speculative developer in much the same way as volume house builders, but without the economies of scale, the bigger margins and bigger profits to make.

    Mark estimates that a developer would be looking to make a profit of around 15-20%. Individuals might be happy to take a bit less as they don’t have the overheads. The volume builders may take decisions in the development process to maximise their profit in order to sustain their business, and push harder to cover their large overheads.

    Take emotion out of the process

    This is Mark’s first piece of advice to anyone wanting to undertake a speculative development. As soon as you start becoming emotional you might start incorporating things you yourself like, but others may not and therefore perhaps not add value to the house. It’s about keeping a keen eye on value and offering products, contents and functionality of the house that someone will give you the money back for.

    “Development is about a systematic approach to making the fundamental choices that maximise value and reduces your risk. And in doing that and controlling your costs, you make sure the return is as large as possible.”

    Market test to see what demand there is for what you’re offering

    With Ben’s intention to build his development to the Passivhaus standard, Mark suggests he market test to see what kind of demand there might be, and even if there is a demand, whether it would be likely to achieve a higher price. With the mainstream market being conditioned to accept that a house might not have great performance, sales are more commonly driven by factors of location and functionality.

    With far fewer people in the market looking for a Passivhaus, Mark questions the likelihood of finding one of those who is looking for that product, in that area, with the architectural design that has been chosen for them. With so many variables it may mean struggling to find a buyer for what has been created.

    Mark would advise being careful how it was marketed, highlighting the low energy bills, rather than emphasising it being a Passivhaus, in order to appeal to more of the house-buying community who may not know what the term means.

    Self build is driven from a personal viewpoint, speculative development is a business proposition

    Mark describes self builds as being about individuality and making sure you deliver on what is right for you and your family. You’ll invest and spend whatever you feel is appropriate.

    A speculative development on the other hand is a business proposition. You’re trying to appeal to certain types of individuals who might offer that bit more money to maximise profits. It becomes a set of business decisions based on whether you will get your money back and if there is a profit to be had.

    Developers appeal to the mass market, instead of pushing boundaries

    Mark says while it’s great to be individual, providing a safer, more standardised offering will produce more customers willing to buy your product, and ultimately raise prices and profit. And this is why there is a proliferation of the four bedroom executive house with a central front door and four windows, because someone somewhere has worked out this is the formula for building at the least cost to maximum return.

    For a lot of people, what’s the alternative?

    For many people with busy lives, who don’t have the time to shop for a second-hand house and spend several months doing it up, buying a developer home is about convenience. The only alternative is the nice new site just down the road, with the extra bedroom and space they need, offering a good price, part-exchange and legal fees paid. And, Mark says, that’s why we’ve ended up with a sterile development environment.

    Custom build can be a middle ground

    Mark sees custom build succeeding where it incorporates the individuality of a self build, and takes away the risk of speculating what someone might want to buy by asking them in advance and negotiating a price that both parties are happy with.

    Tips for tackling a small scale development

    • Anything you do well is normally driven by passion, and this is no exception. You need to really want to do this to do it well, and passion will carry you through the weight of the work
    • Be impersonal and keep emotion out of it
    • Do market research to understand what people want and how you can incorporate those things – perhaps even contacting local estate agents to find out what houses people want to buy

    “But just don’t go off on a leap of faith that your beliefs are the ones that everyone else should have, because it’s not necessarily the dream that everybody shares that you might have.”

    Find out more

    Visit the website of Potton Homes

    Follow Potton Homes on Twitter

    Transcript

    Please connect with me

    Subscribe, rate and review the podcast in iTunes

    Rate and review the podcast on Stitcher

    Like our Facebook page

    Follow us on Twitter

  • HPH258 : Using a turn-key design and build company to deliver an ecological home – with Neil Sutherland

    HPH258 : Using a turn-key design and build company to deliver an ecological home – with Neil Sutherland

    Neil Sutherland explains how using a design, manufacture and delivery company can give you a better quality of construction.

    Interview with Neil Sutherland

    Neil didn’t take a conventional route into architecture. After leaving school at 16 he undertook a technical apprenticeship with an engineering company for a few years. It was only after finishing his apprenticeship and going travelling around Europe that the wonders of Florence turned his head to architecture. He returned to Scotland, completed his degree and promptly set up his own practice, MAKAR, an architect-led, ecological design and build company.

    Makar House, Kinloss, Morayshire, Scotland.

    A unique entity focused on the delivery of great places

    Neil summarises MAKAR as not being an architectural practice, builder or manufacturer, but a combination of the three.

    His first ten years in business were spent working out how best to develop and design buildings, and was disappointed by the options available to him on the delivery side of things.

    When he moved to a live on a farm with his family around 16 years ago, he had land available where he was able to develop and grow his business to include the manufacturing. He now has a couple of large workshops and employs close to 50 people.

    Their unique offering means they are currently working at capacity producing homes mostly in the Scottish Highlands, but are also looking to mainstream what they do and make it more widely available.

    Certainties can be provided to clients

    Neil is able to offer certainties to clients, around design, programme, workmanship and cost. With the alternative being to work with a number of consultants and a builder, he says it can be difficult to find a company who are motivated by ecological progressive areas of working who are able to take on an architect’s idea and make it work.

    “As I’ve learnt over the years, the intention is the first stage but one has to figure out how to get things delivered. The execution of things is perhaps far more challenging than coming up with bright ideas.”

    There are three aspects to a successful project outcome

    The first is having a thorough understanding of the client’s brief. This involves taking time to sit down with them and really understand their needs.

    The second aspect is the site analysis. Every site will have constraints and opportunities, but there’s always context; things to respond to, things you want to exemplify or even perhaps reduce.

    The third element is a flexible delivery approach.

    Neil believes as long as none of these three aspects are compromised, as he suggests happens in the standard approach to the design and delivery of housing, the customer will end up with a wonderful outcome.

    Scotland has an abundance of quality timber

    Scotland’s forestry cover has an unusual species mix, dominated by pine, fir, larch and spruce.

    Neil’s company is looking to develop progressive ways of utilising that timber, from a structural perspective right through to insulation. They use the common characteristics of those species for different applications and avoid using chemical treatments wherever possible.

    Spruce and Scots pine for example can be used for the carcassing of a panel type construction, Douglas Fir for large section exposed beams and posts, and larch is used extensively on the external applications of buildings, such as cladding and decking.

    “There’s enough there to do everything we want to do, to do it without chemical treatments, and to work in anticipation of the circular economy, in anticipation of the idea that timber buildings are uniquely adaptable in the sense that they are repairable and you can change them. You can take them apart and put them back together again.”

    They work closely with sawmills

    In other parts of the world, and particularly in Europe there are many small to medium sized mills, which relate to their local resource and how it’s used. In Scotland, many of the small to medium sized mills haven’t survived so MAKAR tend to use a few large sawmills along with a small number of smaller ones.

    Rather than the usual design approach of designing something and then looking for what you’re going to use to build it, in normal situations they would look at the resource available and respond to that, buying the timber directly from the sawmill.

    They use a lean process

    Lean process improvement is largely used in manufacturing to improve efficiency and reduce waste.

    Neil’s interpretation is that it’s about people; what motivates them to do things carefully, and with a lot of attention to detail, getting things right the first time and really enjoying what they’re doing.

    “It’s when you go about making things, when you connect the theory and practice of things together, you get a third thing that comes out which is a kind of tangible, pragmatic capability which is not held up as important as it is, in actual fact.”

    And Neil believes it is the people who are making things who are the best people to ask about how to improve the process.

    An ecological approach to engaging with the world

    MAKAR use the term ‘meaningful work’ to explain their working methods. It’s about their work being respectful to everyone involved, and respectful to things beyond themselves.

    “Every time we build a house, we know that it’s going to impact on people’s lives in a very profound manner. MAKAR exists because we believe that great buildings and places change people’s lives.”

    The aim is for quality, not speed

    The main constraint that MAKAR have with building the houses is the transportation. Their standard panel size is around three metres wide so that it can be transported by road relatively easily.

    Such off-site construction methods may be more expensive than other alternatives, but they will be better and more consistently made and speed and cost reductions will come about over time.

    The pieces of the house are made in sequence: first the floor, wall and roof panels, then the post and beam elements and finally the modular elements which are the parts of the house that have the plumbing, ventilation and electrics in them.

    They try and do as much of the servicing within the modules at their workshop as possible as they believe this to have the best outcomes.

    “But the future is about having less and less equipment, more and more fabric first, more and more simplicity around buildings really. But use the word optimisations. So, what equipment you do have you have to make sure it is working well and it’s optimised.“

    Find out more

    Visit the website of MAKAR

    Follow MAKAR on Twitter

    Transcript

    Please connect with me

    Subscribe, rate and review the podcast in iTunes

    Rate and review the podcast on Stitcher

    Like our Facebook page

    Follow us on Twitter

  • HPH256 : What makes a well designed MVHR system? – with Tom Heywood

    HPH256 : What makes a well designed MVHR system? – with Tom Heywood

    Tom Heywood from Green Building Store explains why we need mechanical ventilation with heat recovery in high performance homes and why it needs to be well designed.

    Interview with Tom Heywood

    Tom studied architectural technology at university and was disappointed not to have been taught anything there about efficient building. So when it came to doing his dissertation he wanted to do something different, and decided to write it on Passivhaus principles.

    Tom is now the MVHR design manager at the Green Building Store.

    Airtight buildings need mechanical ventilation

    Natural ventilation tends to be unreliable. The supply levels might depend on how windy it is, with areas of the building in the path of the wind receiving more than elsewhere. There isn’t a way of delivering a particular amount according to the requirements of a specific area.

    With the increased ability to make buildings more airtight, comes the reduction of natural ventilation through trickle vents and leaky building fabric. At this point mechanical ventilation is required to provide enough fresh air to keep CO2 levels down and prevent dangerous build-ups of volatile organic compounds and other indoor pollutants.

    With a properly commissioned MVHR and an airtight envelope, you can deliver the right amount of fresh air to different spaces, ie more for a double bedroom than a single. The MVHR unit will also extract as much heat as it can from the exhaust air which will in turn drive down the heating load.

    Tom suggests that, as a rough guide, when you get to less than five air changes per hour, that’s when you should start introducing some form of mechanical ventilation, such as Mechanical Extract Ventilation (which is just extracting, not supplying or recovering any heat).

    Once you get down to three air changes per hour an MVHR starts to make sense, because then there’s not as much cooling going on with natural ventilation coming in.

    The MVHR supplies clean, fresh air

    An MVHR unit has two fans – a supply and an extract, and a heat exchanger. Stale, moist air (such as is produced in bathrooms, kitchens and utility rooms) is extracted and goes back to the heat exchanger, which is where the fans are.

    The heat is transferred to the incoming fresh air that is then supplied to the habitable rooms, such as the bedrooms and living areas. The air is also filtered, ensuring a clean, fresh air supply to the rooms.

    Concentrate on getting the design right

    “People often focus mainly on the specification of components, which is right, but at the same time you can spend as much money as you want on the specification of components; if it’s not designed right, they’re not going to work anyway. You’re going to have to turn it off because it will be too loud and it will be inefficient.“

    Rather than someone who provides a schematic of some ducting on a piece of paper, you want someone who is going to design it around the structure to make sure when you get to site that it will work efficiently and that the air supply will actually make it all the way along the ducting route to the required rooms.

    Tom says key information to ask from a designer at the design stage is for sound data and pressure loss data. Pressure loss is the resistance that the duct is providing to the airflow. If pressure loss is too high the fans will have to work harder to push the air through. And when the fans are working harder, it will increase energy consumption and the noise will be louder. Likewise, if you never change the filters, the fans will have to work harder to drive the air through.

    Tom says it’s always good to oversize the unit so that it’s not running too hard.

    He stresses how important it is to get the system designed early. Even as soon as the architects and engineers are doing their drawings you should be getting your plans submitted to a designer to get their opinion on unit location, duct sizing, where they need to run and what sized joists are needed to accommodate them.

    There are branch and radial systems

    Tom likes the branch systems (of rigid ducting) because it’s easier to get a low pressure loss with careful sizing of ducts.

    “A lot of people think that the radial system saves space, but if it’s done properly, instead of having one one-hundred mill. duct to, say, a bedroom, you’d have two ninety mill. ducts. Because those ducts are carrying the same amount of air but they’re smaller, so there needs to be more of them to compensate for that.”

    A radial system, also called an octopus system, has a main manifold at the start which is a box with lots of small spigots on it. The semi-rigid plastic radial ducting plugs into that and goes off to the rooms. Each room would have its own branch (or two or three), all the way from the manifold at the start to the air valve in the room. It is a good system for preventing any cross-talk sound travelling from room to room because the sound can’t make it all the way along the ducts.

    Tom believes radial systems do have their uses, especially in retrofits where the rigid ducts of a branch system would just be too big to get in.

    Whatever system is used, Tom stresses that the component parts should be on site when the joists are being put in place, so they can be installed as the joists are being erected.

    Commissioning a system takes a lot of toing and froing!

    Tom explains the method of commissioning a branch system. The unit is told what it is running at, eg 300m³ per hour on fan speed 2. If the supply to a master bedroom was to be 35m³ per hour then they would go into that bedroom and adjust the damper to allow more or less accordingly until it was at the required amount. An anemometer over the air valve measures how much air is coming out.

    But as that valve is closed down it will drive the air into another air valve somewhere else. So the next room would need to be checked to see if it has been impacted and needs adjusting. Any changes to one mean going back and checking all the others again, as it’s all on one system.

    Carefully consider external vent placement

    Ideally you want the intake and exhaust ducts on the north elevation. That way they’ll be shaded from the sun in the peak summer heat. The system will work more efficiently because you’re bringing in cooler, shaded air.

    You should also avoid placing them right next to a window or facing onto a neighbour’s garden, because they could be blowing quite hard and at audible levels.

    Too close to the ground and they could drag up leaves, debris and animal hairs into the intake duct, which will block up the filters more quickly. Ideally they should be 1.5m above ground level.

    If incoming smoke from neighbouring properties is a problem, then you can get active carbon filters which filter out the smell and smoke even better than the F7 pollen filters would.

    The controls should rarely need using

    The idea of the controls is to have them as simple as possible and generally left running on fan speed 2. They may only really need changing if you’re going to be away from the house for a long time, in which case you could drop it down to fan speed 1. And if you have a large gathering and are going to be doing lots of cooking, then hit the ‘party button’ which increases it to fan speed 3 for 45 minutes, before automatically dropping back down to fan speed 2.

    Generally there would be one main controller which would usually be in the kitchen for convenience to boost it if required. Alternatively you could have the main controller somewhere else with just a remote boost switch in the kitchen. Tom doesn’t recommend having it in a bathroom as boosting the system while showering early in the morning and late at night could become audible in the bedrooms and disturb the occupants. The fan is designed anyway to remove enough moisture whilst showering without the need to boost.

    Only a small amount of maintenance is required

    There shouldn’t really be too much maintenance required, other than changing filters every three to six months (depending on indoor and outdoor air quality, and whether you have children and pets).

    After five years it might be worth unscrewing the air valves in the bathroom and giving them a clean as they could collect dust and towel lint over time.

    And depending on the MVHR unit specified, the extract fan may need very careful cleaning, preferably by someone who has done it before.

    If the unit is turned off for more than two or three days there could be a risk of mould growth in the ducts. There shouldn’t however be any danger of that happening if the system is left on and each branch to each room has air flowing through it.

    Find out more

    Visit the website of Green Building Store

    Follow Green Building Store on Twitter

    Transcript

    Please connect with me

    Subscribe, rate and review the podcast in iTunes

    Rate and review the podcast on Stitcher

    Like our Facebook page

    Follow us on Twitter