Author: Lucy Cowell

  • HPH210 : A future-proof contemporary eco home – with Liz and Mike Hill

    HPH210 : A future-proof contemporary eco home – with Liz and Mike Hill

    Liz and Mike Hill explain the decisions behind the design of their contemporary eco home.

     

    Interview with Liz and Mike Hill

    When Liz and Mike decided to downsize from their family home they took the opportunity to divide their existing plot and build on the land.

     

    They selected their architect based on which one helped to develop their brief

    Ultimately their desire was for a sustainable property with functional and well-utilised spaces that worked better for their hobbies and for working from home.

    They produced an architect’s brief outlining what they wanted in terms of size, number of rooms and how they wanted to use the spaces, but soon realised that what they were looking for wasn’t available within their budget.

    Some of the architects they approached took their brief very literally and presented them with an unaffordable option based on what they had asked for. After narrowing it down to two local companies who had experience of Passivhaus, they selected Architype, who had said “we hear what you say, but what about these as alternatives?” That process of dialogue between them led to designs they wouldn’t have expected when they started the process, but which they feel actually work very well for them.

     

    The house is designed to utilise all of the spaces

    It was important for Liz and Mike to future-proof their home with the ability to accommodate elderly relatives if needed. They wanted a ground floor bedroom that could be converted into a bedsit with same level, wheelchair access to a bathroom.

    Liz was keen to buck the trend for totally open-plan living and wanted the kitchen to be separate from the living area so that noise, cooking smells and mess could be kept out of the way.

    They opted for three large bedrooms which they could use as studies or double bedrooms/guest rooms. Although they had space for four or five bedrooms they didn’t want guest rooms sitting empty for the majority of the time.

    From the options that Architype presented them with, they chose a modern-looking design of two inter-locking cubes. The interesting design did mean more consideration about window sizes was needed for it to meet the Passivhaus standard and prevent overheating.

     

    Early collaboration with the architect and builder was beneficial

    Being local, Liz and Mike were aware of  Mike Whitfield Construction, his work and his reputation, so didn’t go out to tender for the job. He was involved even before they went to planning and the ongoing three-way dialogue between themselves, Mike and Architype meant they could work together at this early stage to have confidence they were designing something that could be built effectively. Investing this care and collaboration in the early stages ensured only minor tweaks were required throughout, and the final project came in within budget.

    Groundworks lasted from the summer of 2015 through to the end of that year. The building work started in January 2016, with the house being waterproof within eight weeks, and they moved in during November 2016. It has a timber frame construction using I-beams and Warmcel insulation.

     

    The house combines high-end and budget finishes

    In some case Liz and Mike went with Mike Whitfield’s suggestions, such as oak door with oak latch, which they feel have really added to the aesthetic of their home.

    In other areas they researched finishes themselves and opted for more budget end items. What they were both surprised by was the sheer speed with which they needed to make decisions:

    “And when you’re asked about a decision, you can’t go away and say, ‘I’ll think about it for a week.’ It’s a decision that has to be made then and there.”

     

    Solar PV panels feed into the hot water tank

    Although they were keen to have rainwater harvesting from the house, it didn’t prove to be cost effective. Instead they are harvesting the rainwater from the garage and greenhouse which will be used outdoors.

    They have solar PV panels on the roof which feed into the hot water tank when they produce an excess of electricity, and has meant that between March and October they haven’t needed the boiler on at all.

    In keeping with the history of the village having local orchards, they have planted an orchard area which also replaces some of the trees that had to be taken down for the build.

    With the simple thermal envelope they don’t have usable attic storage space. Instead the architects designed deep cupboards along the upstairs corridor and a walk-through library en-route to the study.

     

    Liz and Mike are advocates for anyone wanting to build a sustainable home of their own. While they say it may have cost slightly more than a standard house, the long-term benefits in terms of energy saved means it more than pays for itself.

    The other noticeable difference for them has been in terms of the air quality. Mike has found that he doesn’t sneeze as often as in the old house and that the regular air changes make it feel much fresher.

     

    Find out more

    Visit Liz and Mike’s blog

    Visit Architype’s website

    Find out more about Mike Whitfield Construction

     

    Transcript

    Download a transcript of the interview with Liz and Mike Hill.

    The Hub update

    We have a new video episode of the Buckinghamshire Passivhaus case study available to view for members in The Hub. Paul Jennings is carrying out the preliminary airtightness test and, not wanting to spoil the surprise too much, it’s the best he has ever tested!

     

    Please connect with me

  • HPH209 : Why consideration for others matters when designing a new home – with Marlen and Tony Godwin

    HPH209 : Why consideration for others matters when designing a new home – with Marlen and Tony Godwin

    Marlen and Tony Godwin explain why it was important for their modern, minimalist Passivhaus home and office designs to be sympathetic to the neighbourhood.

    Architect, Tony Godwin and his family in their newly built Passivhaus in Whitwell, Rutland
    Photographed for Stamford Living Magazine

    Interview with Marlen and Tony Godwin

    Searching for a school for their son was the motivation for Marlen and Tony Godwin to move out of their London terraced home and build their own Passivhaus near Rutland Water. Tony is an architect and had been keen to create something sustainable that incorporated office space, without having too simplistic a form.

     

    Site constraints informed the design

    Despite Tony’s doubt that they would be able to find a plot of land easily Marlen spent a few minutes on the internet and found six possible sites within 4 miles of their chosen area! Instead of purchasing one of the level plots available, they gave themselves added challenges by buying one set slightly into a hill. Although this, and the hard stone in the area, would add extra costs, it did mean that designing the building came quite naturally. The main elevation faces south for the solar gains, and the bedrooms were put at the back to be further from the noise of the busy road nearby.

    The upside down layout was chosen so they could benefit from views out to the lake from the living area.

    Having researched other buildings in the area which were typically old stone barns with additions tacked on in later years, they followed the idea through with a mainly stone exterior but with the bedroom wing having a standing seam roof and different boarded finish, as if it had been added on later.

     

    The design was partly developed in collaboration with the parish clerk

    The route through planning was aided by them wanting to fit in with the village. Being in a conservation area of only around 50 residents they designed the house to be of similar width and roof pitch to the other barns.  Their planning officer suggested they meet with the parish clerk, who had always been very assiduous in planning matters in the village, and who took the plans round to explain to the villagers while retaining impartiality. Tony worked through the design with him, and where they disagreed on the junction between the garage and the main building, which Tony said would compromise the design and eliminate their view of Rutland Water, they agreed to let the planning system arbitrate between them.

     

    A planning re-submission for design changes to achieve the Passivhaus standard brought the project within budget

    After their original plans came in £300,000 over budget, and not being able to meet the Passivhaus standard, they went back to planning with a redesign. They reduced the overall square footage by incorporating the work studio into the house and leaving out the garage. They were careful to consider resale value and make sure they would be able to sell the house for more than they had invested in it, by taking their plans to local estate agents for feedback.

    But Tony also believes:

    “Okay, you’re going a little bit over what you can sell it for today, but actually, you’ve got to pay something to live in a beautiful home that you’ve created for yourself. That has some value.”

     

    Some challenges were only overcome at the last minute

    Waterproofing was a particular instance, where they had a retaining wall into the hillside with a timber frame in between. The moisture barrier came down the outside of the timber frame and the tanking membrane came up the retaining wall. They needed to come up with a solution for how to join the two, considering the differential settlement between the elements over time. Even finding an adhesive that would stick to the concrete without melting the polystyrene was a challenge.

    Tony and Marlen are thankful that they had a site agent who took a keen interest in the detail required to achieve the Passivhaus standard. It was particularly important when educating the traditional contractor and sub-contractors who had always built a certain way before.

     

    VAT doesn’t have to be claimed back immediately

    Working with a main contractor who was invoicing with zero-rated VAT means that they will only be able to claim the VAT back on things they have purchased themselves. They have left their claim open for the time being as they still plan to build the garage when funds allow.

     

    Tony shares some interesting disadvantages to building to the Passivhaus standard!

    • Increasing the aging and general population because it is so healthy to live in
    • Less tolerance of other people’s drafty old houses
    • When you’re used to living in a temperate 21 degrees you get caught out when you go outside as you didn’t realise how cold it was.

    And what does Marlen think to living and working in her Passivhaus home?

    “Love it, love it, love it, love it!”

     

    Find out more

    Visit the website of FCD Architecture

    Follow FCD Architecture on Twitter

     

    Transcript

    Download a transcript of the interview with Marlen and Tony Godwin

     

    Please connect with me

  • HPH206 : What solar PV panels should I get for my roof? – with Robert Flynn from Solarbarn

    HPH206 : What solar PV panels should I get for my roof? – with Robert Flynn from Solarbarn

    Robert Flynn from Solarbarn explains how to choose a solar array to suit your needs.

    Interview with Robert Flynn

    After spending 25 years in the IT industry, Robert had a change of career and set up Solarbarn. It was 2010 and at a time when the government introduced the feed-in tariff scheme which kick-started the whole industry.

    While we have spoken on the podcast before about solar PV, we haven’t discussed what is required for the installation process.  As we have been following Solarbarn’s installation at Buckinghamshire Passivhaus, our video case study in The Hub, we thought we would speak to Robert to give us an idea of what you’ll need to think about if you’re planning to install solar PVs.

     

    Higher watt panels are only really needed on a small roof

    How many panels you need will depend on your roof area, how much energy you want to produce, and how much you are prepared to pay.

    According to Robert, you can’t really have too big a system. A large system may well produce more electricity than you need at a particular time, ie during the summer, but any surplus isn’t wasted as it is simply fed back into the distribution network to be used by others.

    A standard solar panel is now 300 watts, but you can get 360 watt panels if you want to pay extra for a more efficient product. Robert suggests if you have a large roof you don’t need to pay for the more expensive panels, as you have the space to install more of the cheaper, 300 watt panels. He says the pricier 360 watt panels are really only necessary where you have a small roof and typical sized panels aren’t going to give you the power you need.

     

    Roof pitch should be considered along with orientation

    A south facing array will produce more killowatt hours in a year than an array pointing east or west, or south-east or south-west.

    The shallower the pitch, the less of an issue orientation is. For example, with a shallow, 20 degree pitch, the panels are closer to pointing up in the air than at the horizon. A 45 degree pitch will make a difference as it is pointing more to the horizon. So a 45 degree pitch east/west will produce probably 25% less than the same array on a south facing roof.

    In terms of consumption however, there can be benefits of going east/west. An east facing array will produce a little more in the morning, and a west facing array will produce a bit more in the afternoon than a south facing array. A south facing array will give you a bigger peak at midday, with perhaps less in the morning and afternoon.

     

    Installations on new-builds are built “in-roof”

    As Buckinghamshire Passivhaus is a new-build they have been able to do an in-roof installation. The solar panels are part of the roof so it ends up being tidier than a retrofit would be. It also means you save on the cost of roof tiles as these are not required under the panels.

    The roof is built, felted and battened. At that stage Solarbarn would lay interlocking plastic flashing frames onto the battens which will ultimately hold the panels in place. The roofers return to tile the rest of the roof up to the flashing frames and making it watertight. The solar panels themselves aren’t put in place until the roofers have finished their work, to make sure they are protected and aren’t going to get damaged.

    At this installation the clients are using a power optimiser solution. A power optimiser on each solar panel means that the panels can work independently of each other, so if one is shaded for example, it wouldn’t affect the output on any of the others, which on a traditional wired system can be an issue.

    The distribution network operators need to be notified of systems up to 4 kilowatts after they have been installed. Anything over 4 kilowatts, as in the case of Buckinghamshire Passivhaus (7kW), needs to have their approval in advance as they need to be sure that the infrastructure is capable of taking the load when power is being injected back into the network.

    The solar array is first tested on a sunny day to make sure there is enough power going into all the panels and optimisers. The inverter is switched on and is paired with the optimisers at a safe 1 volt DC. When it is fully up and running it will be up to around 400 volts DC.

    The inverters get hot when producing a lot of power and eventually they will need replacing. They should last at least 5 years, and are usually guaranteed to last between 5 and 10 years. The inverter on the Buckinghamshire Passivhaus project is guaranteed for 12 years.

    Buckinghamshire Passivhaus

     

    Excess power can be diverted to an immersion heater

    A lot of customers of PV systems now have an immersion heater diverter, because in a lot of cases PV systems will produce a lot of energy when you don’t need it. This channels any surplus power that would otherwise be exported, into your immersion heater.

    Robert doesn’t feel that the economics of using batteries are quite right just yet, as they are expensive, don’t store quite enough and don’t last long enough. He does see a tipping point where improvement in battery technology plus escalating electricity prices will make batteries in solar PV installations a more feasible option.

    They have future-proofed Buckinghamshire Passivhaus by laying cables ready for batteries and technology to measure how much of the power they use and how much they export. By being able to measure their actual consumption they will be better placed when it comes to buying a battery array that is right for their needs.

     

    Ground solar arrays can be an option if space permits

    A solar panel pointing to the sun produces as much electricity on a frame in the ground as it does on the roof of a house, so space permitting, a ground installation might be an option. To make it worthwhile there usually needs to be a meaningful sized array, and for that size you will need to obtain planning consent. They need to be kept secure from children and animals endangering themselves, and also from theft. Typically, the ground arrays Solarbarn install for clients tend to be for large country houses that have swimming pools and huge oil consumption.

     

    Benefits are now more about self-consumption savings, rather than feed-in tariff payments

    People are always keen to know how soon the system will start paying back. Previously the benefits to be had were in the feed-in tariff payments, but nowadays the benefits are more to do with self-consumption savings, ie “producing lots of electricity, using it yourself and therefore not having to buy it from the grid.”

    “Generally, the people that were motivated purely on return on investment and how quickly they could get their money back are not those that install solar these days. The people that install solar these days are the people that want to do it because they know it’s the right thing to do. ”

    The benefits of installing a solar PV system at the time of building a house are that it is zero VAT (because it is a new build) and there are no scaffolding costs because the scaffolding is usually there already. Most of the work they do on new builds is now just considered an extra cost at the time of construction that will provide a huge ongoing benefit thereafter.

     

    The Hub

    For in depth videos following the progress of Buckinghamshire Passivhaus and other case studies you can join our members only area of The Hub. As well as step-by-step courses, you will also be able to join in with our monthly progress calls where members can share news of their self build projects and get advice from guest experts.

     

    Find out more

    Visit the website of Solarbarn

    Follow Solarbarn on Twitter

     

    Transcript

    Download a transcript of the interview with Robert Flynn.

    Please connect with me

  • HPH204 : Why you shouldn’t rule out custom building on a developer estate

    HPH204 : Why you shouldn’t rule out custom building on a developer estate

    Five self-builders explain how they came to build their houses on the edge of a developer estate.

     

    All photos of Pip’s house copyright Potton. Photographs taken by Maciek Platek

    Interview with Pip, Yvonne and Martin, Jessica and David

    When Pip decided to move away from Surrey because building plots there were too expensive, and Yvonne and Martin knew that they wouldn’t be able to fulfill their 25 year year self build dream for the same reason in their home town of Buckingham, they found a developer site in Cambridgeshire offering more affordable plots on a street set aside for self builders.

    Jessica and David’s story is a little different. They lived around 5 miles from the site and went to have a look around one day out of interest. Having never previously spoken about building a house, they made an offer that same week and had it accepted.

     

    The land owner provided outline design guides

    The brownfield land was formerly a brickworks before being bought by a company called ONH. A number of developers were building on the site but one street of 13 plots at the outskirts, overlooking fields, had been set aside for self build. The outline guide included that the houses should be eco-friendly and contemporary in design.

    Challenges arose during the construction because, being at the back of the rabbit warren of narrow roads on the new estate, heavy lorries struggled to get past parked residents cars.

     

    The substantial plot sizes influenced the house designs

    David and Jessica

    As David and Jessica bought their plot on the spur of the moment, the design wasn’t something they had given too much consideration. They employed a local builder initially, who then recommended an architect and worked with him to develop their rough ideas into workable plans. They opted for four double bedrooms, two with en-suite, and a family bathroom upstairs. Downstairs they wanted a large kitchen with an open plan family room. Having attended a self build conference which emphasised the importance or airtightness, MVHRs etc, they decided to follow an eco-house route, with triple glazing, solar panels and under floor heating. They also have a large garden with an area used as an allotment.

     

    Yvonne and Martin

    Yvonne and Martin’s is a large plot so they felt they needed to build a substantial sized house, which although they are the only two living there, provides them with plenty of space when their children and their families come to visit. Having been built well with airtightness in mind, they have a comfortable home with low running costs.

    They also wanted to future-proof their home so it would still be accessible when they are in older age. They have four double bedrooms on the first floor, but downstairs has been designed to work as a fully self contained unit. It has a wet room and bedroom on the ground floor and space to install a lift if required.

     

    Pip

    Pip originally wanted a Passivhaus with a traditional exterior, but the council informed them it needed to have a contemporary design. Instead she worked with an architect at Potton who developed their ideas into a design they were blown away by. As the budget was stretched as works progressed they moved away from trying to achieve the Passivhaus standard and using ground source/air source heat pumps, but did manage to retain the solar panels and underfloor heating.

    Establish good relations with your fellow self building neighbours!

    Pip recommends getting to know your new neighbours as early as possible, particularly if you’re joining at the end of the plot sale process, so you can tap into their knowledge and previous experiences.

    Getting your finances in place is something Yvonne advises. The build process can be extremely challenging so ensuring you have sufficient cashflow sorted early on can help to eliminate some of the stress.

    Martin suggests working to develop a good relationship with your builder. His builder asked that if there were any changes or extras that he be notified early on so they could discuss and agree it so it wouldn’t be a problem, and this worked well for them. Martin also recommends thinking about the small things in advance, such as where sockets are going to go.

    Locating the services and getting them installed early on is something they all say is important. Several of the house builders on the site were already starting construction before the water had been connected, leading to lengthy treks to get some from friend’s houses or relying on the kindness of neighbours!

     

    Find out more

    Find out more about Pip’s Potton designed home.

     

    Transcript

    Download a transcript of the interview with Pip, Yvonne and Martin, David and Jessica.

     

    Please connect with me

  • HPH202 : Designing the ventilation, heating, and hot and cold water systems for Ben’s house – with Alan Clarke

    HPH202 : Designing the ventilation, heating, and hot and cold water systems for Ben’s house – with Alan Clarke

    Building Services Engineer Alan Clarke explains how he has designed and specified the ventilation, heating, and hot and cold water systems for Ben’s new house.

    Interview with Alan Clarke

    We first spoke with Alan Clarke back in 2015 where he helped answer our question of whether a Passivhaus needs a heating system. Alan’s role is to engineer the design of the plumbing, heating and ventilation within a house, and in this podcast we focus on the designs he has created for Ben’s Passivhaus self build.

    Alan’s aim is to hand over a specification that is as short and easy to follow as possible. On one hand it will act as a shopping list for a contractor to price from, but also provide basic instructions on things to be installed in particular ways, such as pipe size, thickness of insulation, types of terminals for the ventilation unit etc. It will be a comprehensive list of all of the kit required, the instructions on how to get it commissioned, and what flow rates to commission the ventilation system to.

    Start by getting the ventilation system right

    Firstly the design must make physical space for the required services, and make them work well. Alan will develop the ventilation scheme by looking at the plans and understanding the airflow, establishing which are the supply rooms and which they will need to extract from. At this early stage he will feed the information into the PHPP energy analysis programme, along with heat loss information which will help when it comes to working out the heat load details for the heating system design.

    The ventilation systems Alan uses are all Passivhaus certified. Using a certified unit tends to be cost effective as their efficiency is tested under the methodology that fits in with the energy calculation in PHPP. Some non-certified units tend to shut down the supply air in sub-zero temperatures, but the certified units have frost protection. They also have the commissioning controls to allow you to set them up in a properly balanced way, so you’re not wasting heat through unbalanced supply and extract.

    Ventilation Ground Floor Layout
    Ventilation First Floor Layout

    Larger ducts can produce a more efficient system

    With very little ceiling space the ducts can be made flat to be squeezed in unobtrusively. The downside to these is that more fan pressure is required to push the air through the narrower ducts. More fan power requires greater energy and more noise is generated at the unit. It also tends to be a system which doesn’t come with well sealed junctions in the duct work.

    The alternative approach is to use slightly bigger, round ducts which are inherently easier to make airtight junctions. This approach tends to produce quiet and efficient systems, but does require thinking more cleverly about how to make space for them all.

    In Ben’s house the ducts are spread around easily on the lower floor because there are open web floor joists which are engineered joists with a metal zig-zag, giving plenty of space to fit services through.

    Upstairs there is a truss rafter roof. In a Passivhaus they make the air barrier the base of the trusses. Lots of insulation goes on top and Alan wouldn’t want to be putting lots of ducts through that air barrier and into the cold loft space. Keeping them inside the warm, airtight envelope means that there needs to be a dropped ceiling somewhere to run the ducts through. They will be lowering the landing ceiling to accommodate the ducts, by virtue of it connecting the rooms together and not having windows so there will be no loss of window head height. The ducts stop at the bedrooms where there is a step up in ceiling height.  Here they will use a wall mounted, side throw air terminal to push the air into the rooms.

    Ben will be using a Zehnder Passivhaus-Certified MVHR

    It has a fairly large capacity so is ideally suited for family houses. It has been designed with integral airflow measuring inside the unit, meaning that whatever the conditions it will maintain the selected ventilation rate without losing performance.

    A change to the size of the kitchen and utility areas has meant that the MVHR will now be outside of the thermal envelope and inside the garage. It will be on the house wall of the garage to make the ducting run as short as possible, and the ducts will be insulated to reduce the heat losses.

    The house will have a mainstream boiler

    Alan is seeing more projects using air source heat pumps, which although they have a high capital outlay do benefit from low running costs. Using specialist imported systems can create problems when there is a fault, with a lack of qualified tradespeople available to fix them. A mainstream boiler won’t have those problems when it comes to parts and technical support.

    The hot water will have a flow restriction

    The system is designed to get hot water to the taps as quickly as possible without circulating hot water that is losing heat to the rest of the house.  Entering information into PHPP on pipe sizes and how they will match up with the flow rates and available pressure will help calculate the heat loss.

    Ben does have a concern about how the restricted flow will actually feel in the shower pressure, so it will be important to select a shower head that has been designed to work in conjunction with flow regulation.

    Hot and Cold Water Ground Floor Layout
    Hot and Cold Water First Floor Layout
    Plumbing Schematic

    Radiators have been installed to complement the flexible spaces

    Alan has considered the design of the house and how it will be used, to conclude that there will be radiators in most of the rooms. For example, one bedroom has three external walls and a balcony door so a radiator would seem sensible to accommodate people’s different comfort levels. Another spare room might have different temperature requirements depending on whether it is being used as a guest bedroom or a study.

    Heating Ground Floor Layout
    Heating First Floor Layout

    Underfloor heating wouldn’t be cost effective

    Alan explains that it is inherently a high output system, with the whole floor available to heat the space. By virtue of it being a Passivhaus the heating demand will be reduced by a factor of ten, so paying full rate to cover the whole floor with underfloor heating doesn’t seem logical.

    Find out more

    Follow Alan Clarke on Twitter

    Transcript

    Download a transcript of the interview with Alan Clarke.

    Please connect with me

  • HPH177 : Redeveloping a brown field site for a contemporary home – with Ruth Butler

    HPH177 : Redeveloping a brown field site for a contemporary home – with Ruth Butler

    Architect Ruth Butler shares the story of building a contemporary Passivhaus on an overlooked, brownfield site.

     

    Interview with Ruth Butler

    Ruth has been an architect for a number of years and was previously a partner at a practice in London. Part of the reason that she and her engineer husband left London for the south coast, where she has been running Ruth Butler Architects for several years now, was for the opportunity to build their own home.

     

    Planning permission on a previous plot helped fund this project

    After a long search they found a back garden plot but weren’t able to get planning permission on it for what they wanted to live in. Instead they decided to opt for a design that would get planning permission, and sell the land for a profit which they could use to bankroll the first few months build on their new site.

     

    Clearing the brownfield site was an opportunity, rather than a constraint

    The site had been the regional headquarters of St. John’s Ambulance and had a big, robust garage building on it which used to house the ambulances. The existing garage was knocked down and the component parts recycled into the build, with the brickworks being recycled into the hardcore, and the steel beams being used to build their own garage.

    One of the most significant constraints was that it was surrounded by 13 different neighbours, who were all keen to challenge anything being built on the site because of concerns for their own privacy. Ruth approached the neighbours and made it clear they were a family, not developers, and were keen to make their future there. She emphasised that she wasn’t interested in overlooking them, any more than they weren’t interested in being overlooked by her. By making a model of the proposed building and neighbouring properties, they were able to demonstrate how the property would look and how it would impact on the surroundings.

    Ruth and her husband enjoyed the challenge that the privacy issues and clearing the brownfield site threw up:

    “The more constraints, the better the design has got to be to overcome them.”

    Preparing the planning application took around a year, with getting the neighbours on side and getting the design right. The planning authority were supportive of the application, despite being a contemporary piece of architecture in a traditional setting, and they were granted planning permission without any problems or delays.

     

    Design should complement the site and complement the way you want to live

    Originally they would have liked a single storey dwelling, but the site wasn’t big enough and they also needed the height to shield some of the views from neighbours. Instead, the house has an L-shaped design which encloses a walled, entirely private courtyard garden. Traditionally entrance halls were used for draft-proofing, but with a Passivhaus that function isn’t required so they were able to re-think the entrance to their home. As you enter the front door you come directly into the kitchen, with the dining room and living room being at either end of the L-shape.

     

    A pre-fabricated structure was chosen for a faster build

    After selling their house to fund the project, they needed to rent while they were building so it was important to build quickly. They chose a cross-laminate timber structure which was pre-fabricated in Austria. It was erected and weather-tight in just 4 days on site. Completing the interior fit-out and exterior cladding took the whole build process to a total of 7 months.

     

    The design challenged Passivhaus stereotypes

    Although Ruth and her husband had been interested in Passivhaus they weren’t entirely sure they would be able to achieve it on this build. The site demanded a substantial size of building and their completed design is at least double the Passivhaus form factor rules. To ensure they have enough light in the single storey elements they have used roof lights and they have added more insulation to the roof and walls than they might otherwise have done. Where they have a large amount of glazing to create a good indoor-outdoor flow they have used sailcloth for shading which can be taken down in the autumn and deployed when it is needed.

    The house has a Passivhaus cat-flap which is super-insulated and programmable to and operated by an ID chip on the individual cat. They don’t come cheap though, at around £1,800 installed!

    “I think it’s really important that Passivhaus, you can prove that you can do good bespoke site-sensitive designs and still meet the Passivhaus standard. I don’t want to see a world full of very square, boxy solutions to Passivhaus designs, I want to see buildings that respond to their sites.”

     

    The Landscape Architect was given design freedom

    Ruth says that her clients would ideally give her a clear brief, knowing what they want to achieve and their functional requirements, without second-guessing what the design of their building might look like, as that essentially is part of her role. So when it came to the landscaping she was happy to give her Landscape Architect John Brooks a clear brief and the freedom to design it how he wanted.

    “But I had been to see some of his work and I had made some assumptions in my mind as to how I thought he might tackle it and he entirely surprised me and came up with a design that took my breath away really.”

     

    Ruth shares some helpful tips…

    • It is important to design the inside and outside in tandem.
    • Get the team right in the first instance. Their contractor hadn’t done Passivhaus before but that wasn’t important to Ruth. What mattered was whether they had the right attitude, and that applies to the whole design team.

     

    …and lessons learned

    If doing the project again she would:

    • Change some of the technical details, such as instead choosing a pre-fabricated insulated slab.
    • Use cross-ventilation in the bedrooms. The bedrooms are currently slightly warmer than she would like them to be.

     

    Find out more

    Visit the website of Ruth Butler Architects

    Follow Ruth Butler on Twitter

    Ruth’s building contractor – Nicholas Coppin Limited

    Ruth’s landscape architect – John Brooks

     

    Transcript

    Download a transcript of the interview with Ruth Butler.

     

    Please connect with me

  • HPH152 : Should you consider the resale potential of your self build? – with Mike Coe

    HPH152 : Should you consider the resale potential of your self build? – with Mike Coe

    Mike Coe explains what he’s learned while trying to sell his energy-efficient home and how it has made him re-evaluate for his second self build project.

     

    laird_on_croft

    Interview with Mike Coe

    Back in 2011 Mike and his partner Lizzie moved into “The Autonomous House” – a self build project described as one of the UK’s most sustainable homes, which we featured in Episode 54. At the time they built it they were expecting to be living there for the forseeable future, but have recently made the decision to relocate to Scotland. Now that they’re looking to sell their house they’re discovering that finding a buyer for such a unique property is not without its challenges.

    cropthorne-house-by-road

    Visit Cropthorne Autonomous House as part of the Passivhaus Open Days.

    The lure of one more project is compelling!

    Mike has devoted a lot of time researching climate change, and his own feeling is that in the next few years the temperatures in the south of England will get far hotter. Approaching his 60th birthday he is also starting to get a sense of excitement at the prospect of taking on one more big project, so although it is with a great sense of reluctance to be leaving The Autonomous House, a move to the Isle of Skye and a new self build project is on the cards.

     

    Using a conventional estate agent has not found a purchaser for this unconventional house

    Despite having a couple of interested parties, using a traditional estate agent has not secured a buyer for The Autonomous House. Mike believes that it won’t be for another 15-20 years that people will really understand the value of a house like it, with many people being put off by a lack of understanding about some of the features, eg composting toilet, rainwater harvesting system etc.

    “So I think the attitude is changing but I think it’s going to be some time before we have the level of awareness that perhaps they do in Germany where there are a lot more low energy houses, a lot more Passivhauses, people understand them, they’re not afraid of them. ”

    With the conventional estate agent route not yielding any results, Mike and Lizzie paid to advertise on the Green Moves website, which by its nature attracts people who are genuinely motivated to buy a sustainable home. Through this they are optimistic that they have found a potential purchaser and are now in a chain waiting for them to sell their property.

    Despite the systems Mike has built into the house, he explains that it’s actually a very simple house to live in. It might be different to living in a conventional house, but is no more difficult. It doesn’t for example have central heating systems and boilers to worry about maintaining, or complicated electrical systems to understand. He thinks that anyone with a basic degree of DIY knowledge and experience would be able to maintain it without difficulty.

    Selling the house will come at a financial loss

    When Mike and Lizzie built The Autonomous House, their plan was for it to be their home for the forseeable future. They didn’t build it thinking about potential resale value. Perhaps if they had, Mike says they might have been able to fit a bigger house on the site or done other things a little differently, to create a larger resale value.

    44

    Housing prices in Worcestershire have remained fairly stagnant since 2007/2008 so they have also been hit by property not being a reliable investment over that time. Mike explains that the only way to not lose money on the property now would be to remain there for several more years and wait for property prices to catch up. Being reluctant to do that, they have decided to accept that they will lose money on the house. He is conscious that, while they intend their new project in Scotland to be their home for the forseeable future with low energy and off-grid features, he will be bearing in mind potential resale values and maybe being a little more conventional, just in case!

    top-of-cropthorne

    “So in some senses it’s going to be a little more conventional and I’m not going to do things like have a whole house basement in order to store rainwater, because it’s a very expensive thing to build. So I’m keeping a little bit more of an eye on those kind of costs and I’m compromising a little I suppose but not very much. I’m compromising a little with an eye on possible future sale.”

     

    The new challenge!

    While Mike and Lizzie were looking for potential houses to buy for when they first make the move to Scotland, they were introduced to a plot which they quickly realised was going to be better than anything else they were going to find. With a great deal of financial manoeuvring they were able to buy it and are now looking forward to the new challenge that awaits!

    The plot is on the edge of Portree, a principle town on the Isle of Skye, which although not large, does have a good number of facilities for its size. The land is a sloping site which will give them views across Portree Bay, will be close to south facing giving them the option of another solar heated design, and has very little likelihood of further development happening nearby. There is also a stream running down the site which may give Mike the opportunity to run a micro-hydro system which, while probably not justifiable in economic terms, is something he says he has always wanted to do.

    The site from above - on the left behind the trees is the roof of a 3 bedroom bungalow that was included in the package
    The site from above – on the left behind the trees is the roof of a 3 bedroom bungalow that was included in the package

    The site from below, looking up the hill
    The site from below, looking up the hill

    View from the croft, looking back towards the site and over Portree Bay
    View from the croft, looking back towards the site and over Portree Bay

     

    Find out more

    Read the blog about creating The Autonomous House

    Follow Mike Coe on Twitter

     

    Transcript

    Download a transcript of the interview with Mike Coe

     

    Passivhaus Goes Personal


    This is a video we have produced for the Passivhaus Trust which was recently launched at the Passivhaus Conference as part of a campaign aimed at self builders. If you’re a self builder and haven’t made up your mind yet whether Passivhaus is for you, this will provide you with all the clear information to help you with your decision.

     

    The Hub update

    Our second video from Buckinghamshire Passivhaus is now available for Hub members. This one is all about how it’s going to be built, with details of the PH15 system along with some of the designs, plus how it’s being positioned on the site.

    We also have our second progress call where Hub members can get together to discuss challenges or other aspects of their projects. The recording of the call is available for members to catch up with at any time.

    Our latest module in The Hub is all about reclaiming VAT to make sure you don’t miss out on that 20% benefit.

    In 4 weeks we will be increasing the price of Hub membership, but if you join now you will pay at a lock-in price for as long as you continue to renew. Check out www.houseplanninghelp.com/join to find out more!

     

    Please connect with me

  • HPH151 : When does it make sense to demolish and rebuild? – with Jae Cotterell

    HPH151 : When does it make sense to demolish and rebuild? – with Jae Cotterell

    Architect Jae Cotterell explains why her Buckinghamshire Passivhaus clients changed their minds about refurbishing, and have instead opted to demolish and rebuild.

    Janet Cotterell

    Interview with Jae Cotterell

    We spoke with Jae in podcast episode 121 about the kit and system methods of building a Passivhaus. One of her latest projects, Buckinghamshire Passivhaus, uses the PH15 system that she has been developing, and we are following its progress in The Hub. We have taken the opportunity to find out more about the scheme and understand why her clients have decided to knock down the house that they had originally intended to refurbish, and instead build from scratch.

     

    It was originally intended to refurbish the existing dwelling to Passivhaus standard

    Jae explains that the existing dwelling is not particularly attractive, but it is on a very attractive site of around an acre. Her clients originally wanted to retrofit the property to the full Passivhaus standard, so this formed the basis of the first scheme that Jae produced. This initial study looked at how they could adapt it and give them the accommodation that they required. While the accommodation element worked for them, they realised that the complexities of dealing with the existing fabric meant that costs could be better controlled and without the need to make any compromises if they decided to build a new house instead.

    house-front

    dsc_0047

    “And there is always the issue about replacing a house that isn’t at totally the end of its life, but my feeling is it’s so invasive doing a retrofit in any case that the fact that you are then replacing it and building something that will last for a very, very long time, my own position is that generally I would go for replacement dwelling unless there was some particular architectural reason.”

    Another contributing factor in the decision was that being a new build they would be able to claim back the 20% VAT – a considerable economic benefit over a refurbishment.

    proposed-house-elevationsjpg_page1
    Proposed elevations

     

    The brief gave the architect plenty of flexibility in designing the outside spaces

    While the clients had firm ideas about the accommodation they wanted inside the house, they were happy to leave much of the aesthetics and external design to Janet. She has focussed on maximising the best features of the plot by making the most of the sun and the beautiful views. The house will be built in the centre of the plot to maximise the views, and divide the space up to create different sections which will each be treated slightly differently. The design incorporates a long brick wall leading to the house which creates the separation of public and private spaces, and will give a courtyard type feel.

    The external finishes of the house are determined largely by the local council design guide, but Janet was also happy to take on the challenge of creating a Passivhaus which still has the look of a traditional UK home.

    Basement Plan
    Basement Plan
    Ground floor plan
    Ground floor plan
    First floor plan
    First floor plan

    The Passivhaus construction system being used should help bring Passivhaus to more affordable levels

    The aim of Passivhaus Homes is to create a timber frame, Passivhaus compliant, solution, with details that can be passed on to other people. They have created a package of details which they have been tweaking as they go, and believe they are now at the point where most of it is working successfully. Their intention is that if you were to use their timber frame system, and built it in a certain way, the thermal bridge details would already be proved to work. By making this simplification and having standard details already done, it should save considerable money for the client.

     

    The timber frame will arrive as a puzzle of pieces!

    The pieces are being cut off-site by Passivhaus Homes and then delivered to be assembled by contractors at the plot. For Buckinghamshire Passivhaus there are likely to be around 500-600 pieces. The cutting machine they use is able to work out the most economical way of cutting all the pieces with the least amount of waste possible.

    Buckinghamshire Passivhaus timber frame
    Buckinghamshire Passivhaus timber frame – the timber portal frame design with ply plates inserted at eaves and ridge to join the different I-joists together

     

    However, rather than delivering a pile of pieces in one go, they also need to work out a system of delivering them to the builder so they can be unpacked in an order which will make sense, and only need to be unpacked when required. While this does end up creating a little more waste, it is still considerably less than the amount that would usually be generated on site. And with the waste being created at the factory, they are able to ensure it is properly recycled.

    dsc_0067

    dsc_0062

    We’ll be returning to speak to Janet about how the build is going, but you can also follow its progress in The Hub with regular video updates.

     

    Other examples of the PH15 timber frame system

    The orange colour are LVL’s (laminated veneered lumber) which are structurally quite strong, so are used for larger beams. The orange is a coating they put on to give a bit more moisture protection to avoid swelling on site should the contractor allow them to get saturated! The blue is a special insulated triangular lintel which is made up (and delivered ready made to site) to allow the windows to sit right up against the eaves without creating a terrible thermal bridge.

    Akerman Project
    Akerman Project – three terrace houses
    Tring project
    Tring project – detached three bed house

     

    Find out more

    Visit the website of Passivhaus Homes

    Visit the website of CTT Sustainable Architecture

    Follow Passivhaus Homes on Twitter

     

    Transcript

    Download a transcript of the interview with Janet Cotterell.

     

    The Hub update

    If you’re a Hub member you can watch the videos of the build as progress continues.

    If you’re not yet a Hub member and would like to find out more information, you can watch our short video which explains what it’s all about.

     

    Passivhaus Explained

    Here at Regen Media we recently produced a video for Architype, who wanted to create a training / induction aid to help newcomers understand what Passivhaus at Wilkinson School is all about. A big thank you to the four young stars of the piece who we think you’ll agree explain Passivhaus brilliantly!

    Please connect with me

  • HPH150 : Where is the balance between renewables and a fabric first approach? – with Alex Baines

    HPH150 : Where is the balance between renewables and a fabric first approach? – with Alex Baines

    Despite his background in renewables, Alex Baines explains why he embraced a fabric first approach on his self build project.

    Alex Baines in his office

     

    Interview with Alex Baines

    We’ve been following the progress of Alex Baines’ Long Barrow Passivhaus self build in episodes 74 and 100. This time we’ve brought him back to the podcast to draw on his background working in renewable energy. He first became interested in the idea back in 2008 and went on to do a Masters in Renewable Energy at the Centre for Alternative Technology, before getting a job advising a mechanical and engineering company about renewables installations.

     

    Renewables were heavily incentivised to encourage meeting carbon emissions reduction targets

    Until fairly recently it seemed to many that renewables were being hailed as the solution, and the industry was heavily incentivised with feed-in tariffs and the Renewable Heat Incentive to encourage take-up. The successful promotion of the industry meant there was, and still remains, a perception that by using renewables you create a ‘green’ or ‘eco’ house.

    It wasn’t long before Alex came to the conclusion that while renewables were a great part of the solution, they should only be the final part of the solution: “because technically you can get to zero carbon by building a pretty bad building and whacking in a massive amount of renewables.”

     

    Renewables should be “the final part to get you to the bit that you can’t avoid”

    For Alex it became important to look at fabric first in the initial instance, and then consider renewables for the parts that can’t be avoided, such as electricity. Whereas with Passivhaus you can avoid the need for the majority of heating, you can’t avoid the need for electricity around the house, which is where renewables can still play their part.

     

    Reducing the energy demand of a building means fewer renewables are needed

    It was quickly apparent to Alex that Passivhaus was where his focus needed to go, because he cared about reducing the energy demand in the first instance.

    “So you look at a building, the building is the demand and the renewables are something that meets that demand. So if you can reduce the demand then you reduce the size of your generator.”

    Alex points out that renewables will eventually fail, and at that point the building will no longer for example be zero carbon, or running at an improved efficiency.

     

    A change in public perception may need to be driven by government

    Alex explains that if/when the Building Regulations become more stringent, then people’s understanding may change too, as currently there is a general lack of knowledge and promotion around it. He uses the example of Brussels – where Passivhaus standard has been adopted – which has resulted in manufacturers coming to the city because that’s where the demand is (rather than sourcing products from overseas).

     

    Passivhaus is really a ‘human comfort’ standard

    According to Alex, the current Building Regulations don’t focus on a holistic approach of what is best for the occupants. Instead they are made of separate parts looking at individual elements, for example, ventilation requirements having no link to acoustic requirements, and having no link to energy demands.

    “I would much rather we just said right, let’s go for a human element design and actually funnily enough, you focus on the human element you end up with Passivhaus because that’s where Passivhaus came from.”

     

    Long Barrow Passivhaus progress – know when you can take a pause!

    Alex had opted not to take a mortgage for his self build until they got to the airtight / watertight shell stage, so when his employment situation changed nearly a year ago, they decided to pause the project. Because they are using Insulated Concrete Formwork (ICF) as a construction method they were able to pause before getting the windows in and the waterproofing on. With other building methodologies it wouldn’t be possible to pause until they are airtight and watertight, but Alex suggests you work out at what stages you would be able to take a break if circumstances unexpectedly arose that might make it necessary.

    Work is due to recommence shortly with the insulation waterproofing going on the roof, before putting the windows in and waterproofing the rest of the building. Once the services have been connected up Alex can start on the internal layout. The internal space has been designed to be flexible, which has the benefit that Alex can work on one part while still being able to live in the other spaces. If the budget allows at the end, he will be installing photovoltaics for generating electricity and solar thermal panels to provide the hot water.

    Roof-on-Long-Barrow

     

    Find out more

    Follow Alex Baines on Twitter

     

    Transcript

    Download a transcript of the interview with Alex Baines.

     

    The Hub update

    We’re just getting ready for our next progress call, where we bring people together within the community and try and resolve any issues. It’s always interesting to see the hurdles that people are facing at the various stages of their projects.

    Our new module is about VAT refunds, explaining how the process works and what you can and can’t claim for.

    The new module also ties in with the latest video project we’re following – Buckinghamshire Passivhaus – which started out as a renovation project. After doing all their research they realised it just didn’t make sense – either financially or in terms of risk and complexity. Combined with various other reasons they decided to opt for a new build instead. If you’re a Hub member you can check out the video now, and we have the next instalment coming very soon.

     

    Please connect with me

  • HPH149 : Can airtightness tests on developer homes be trusted? – with Paul Buckingham of Sustainable Lifestyles

    HPH149 : Can airtightness tests on developer homes be trusted? – with Paul Buckingham of Sustainable Lifestyles

    Paul Buckingham explains his frustrations about building standards in volume built houses.

    20160926_095744

     

    Interview with Paul Buckingham

    In Episode 99 we spoke to Luke Mahon about what it had been like living in his new, developer built, home. In this episode we are turning attention to the insights of someone who has worked within the industry and has been frustrated by the practices he has routinely seen.

    Paul Buckingham is a trained electrician but his interest in the energy efficiency of buildings led him to complete a Masters degree in Architecture: Advanced Environmental and Energy Studies at the Centre for Alternative Technology (CAT). Over the last 4 or 5 years his work has predominantly been in airtightness testing, and estimates in that time he must have carried out tests on over 2000 properties, of which he says none of them were properly airtight. Until recently much of the work he did was on volume built houses and he shares some of his experiences of that time.

    Paul now runs an independent consultancy, providing advice on achieving energy efficiency.

    thermal-camera

     

    The airtightness testing is about making the house pass the test, not about making it energy efficient

    Paul claims that his experience of testing was about quantity and not quality, getting as many houses to pass the test as possible.

    “All you’re doing is effectively bodging to get it through an air test…. And it doesn’t matter how good or how bad the building is, it will pass eventually.”

    He uses the example of dry lining which should be solid dab and fully sealed around the tops, bottoms, electrical outlets etc, but invariably the builders are not using anywhere near enough plaster. After the boards have been put up on the walls this can be spotted with a thermal camera to see where the dots and dabs are.

    Paul tells of a house he visited where the building failed the airtightness test because of a lack of mastic around the skirtings. He says the builders then put in the mastic, only for the carpet fitters to cut it out again. After it was then replaced by the builders and subsequently passed the airtightness test, Paul noticed them once again cutting it out as he was preparing to leave.

    “So they’ll go round, they’ll mastic it purely to get it through an air test but it does look a bit messy because they go in there, they literally just throw this stuff on there just to seal the skirtings up so they can get an air test pass on it. And once we’ve finished they come in and cut it all out again. It happens on pretty much every house I’ve ever been to.”

    Cold air flowing behind the  dry lining of a new house where it has not been sealed to specification.
    Cold air flowing behind the dry lining of a new house where it has not been sealed to specification.

    Wind blowing through the eaves and across the ceiling of a brand new loft conversion.
    Wind blowing through the eaves and across the ceiling of a brand new loft conversion.

     

    Some builders were prepared to take advice onboard

    Paul says there was a often a shortfall in knowledge on site about what airtightness is and how to make a house airtight, and it was his aim to advise people how to improve on this, rather than just get the buildings to pass the test. He found some site managers and builders more receptive than others to his suggestions and they were prepared to work with him to get the houses built right, rather than patching them up at the end.

     

    The tight schedules mean quality is often not a consideration

    On a large housing development the builders are given such tight schedules that Paul claims the builders themselves say they’re just throwing the houses up in order to meet deadlines and targets.

    “And when the guys that are building them turn round and say I wouldn’t buy one, then there’s something seriously wrong somewhere.”

    Loft space of a new house showing insulation that has fallen out because it wasn't installed to manufacturer's specification.
    Loft space of a new house showing insulation that has fallen out because it wasn’t installed to manufacturer’s specification.

    Absence of loft insulation on a new build house.
    Absence of loft insulation on a new build house.

    Paul was eventually fired from his recent airtightness testing job. He says his employers weren’t happy that he was spending time trying to get the message across and get the builders to change their ways, when he should have been keeping the customers (the volume house builders) happy by helping them to just get a pass on the buildings. Things came to a head after he wrote a report where he had used thermography to show missing insulation, air leakage around windows and air blowing in behind the plaster board.

    “But I think had they not sacked me I would have quit anyway because I got to the point where I just couldn’t do it anymore. I just felt like a total fraud.”

     

    Use an independent surveyor or airtightness tester if you’re planning to buy one of these homes

    Paul points out that when it comes to the airtightness test, “the trouble is the builder pays for it so the builders effectively own the compliance companies.” He suggests that if it was instead carried out by an independent tester or surveyor, and paid for by the potential purchaser, you could be sure of a more impartial result. He says this might be a step in the right direction of putting pressure on the builders to improve standards and practices. He would also like to see a tightening up of legislation, where things adhere to the Building Regulations to the letter, not just an interpretation of them which is what he currently sees.

    “I know how we can make energy efficient houses, it’s just that none of the main builders seem to be doing it. They just seem to be throwing up boxes and selling them. If I could work with these builders and advise them on how they can make them properly energy efficient then yes I think I’d be quite happy with that but at the moment I’m not seeing any of that!”

     

    Find out more

    Visit the Sustainable Lifestyles website

    Follow Paul on Twitter

     

    Transcript

    Download a transcript of the interview with Paul Buckingham.

     

    The Big Green Home Show – National Self Build and Renovation Centre

    A reminder that Ben will be speaking at The Big Green Home Show at the National Self Build and Renovation Centre on 8th and 9th October. He’ll be talking on the topic of what it’s like to be a self builder. He’ll be drawing on his self build experiences so far, some of the challenges that you might face, and also offering some of the tips that he has picked up from visiting a number of Passivhaus self builds across the UK.

     