Author: Lucy Cowell

  • HPH148 : How do you know you’re properly prepared for a self build? – with Dean Scott

    HPH148 : How do you know you’re properly prepared for a self build? – with Dean Scott

    Dean Scott explains the preparations that have been involved in his self build project.

     

    dean-and-hannah

    Interview with Dean Scott

    Dean Scott and his wife Hannah are both engineers with an interest in watching self build TV shows, so it is almost a logical step that they would want to build their own house! They have never bought a house together as they haven’t been able to find somewhere that they were both really excited about, so the opportunity available at the Graven Hill development means they are on the verge of turning their self build dream into a reality.

     

    Finance has been the first consideration

    Unlike Grand Designs where self builders always seem to have an extra pot of money to dip into, Dean stresses that he and Hannah have a finite budget with no reserves to fall back on. For that reason finance has always been the starting point of the process for them, judging whether it was something they could realistically afford to do.

    Dean explains the difficulty of putting a budget together when going round in circles in a self builder’s loop: What sort of house do you want to build? That depends on how you’re going to build it. That depends on how much you’re going to spend. That depends on what sort of house you want. That depends on where you’re going to build it.

    It was a little more straightforward for Dean and Hannah. Because they’re renting they don’t have any assets to consider so are relying on their cash savings. After discussions with a BuildStore mortgage broker, looking at savings, earnings and outgoings, they were able to build a picture of the total pot of money they would have available, which thankfully aligned with the expected costs for the size of the house they hope to build.

     

    Take time to understand the cash flow process

    Understanding the process of an arrears based mortgage was an eye opener for Dean, as you need to allow for the fact that you’ve got to build to the next stage before the funds are released to you. Dean says that the bulk of his work has been looking at how to manage the cash flow, when they’ll be needing to buy the plot, the foundations, fees and timber frame, before having funds released.

    “Don’t just think that because you’ve got a lump of cash and you can borrow a certain amount of money and therefore you’re fine. You need the money at the right time.”

     

    Create a mood board on Pinterest for ideas

    As well as being valuable for gaining inspiration, Dean explains that it has been a useful way for he and Hannah to share information and ideas together. Thankfully they have both had similar ideas of what they like!

    They also recommend using Google Docs and setting up a project folder on something like Google Drive as a way of sharing documents and spreadsheets to collaborate effectively together.

     

    The Graven Hill development is an attractive proposition with affordable plots

    With most of the land in the Oxfordshire region where they live being way out of their price range, they were excited that the Graven Hill development was so close and seems to be offering plots within an affordable range for them.

    They have expressed an interest in a particular plot and are due to meet with the sales team this week with the hope of being able to reserve it.

    img_1572

    Part of the requirements are that you need to already have a house concept and a realistic budget in place. Although it has taken a few months to have those in order, the benefit of Graven Hill is that they won’t need to worry about ground conditions, services and planning permission, which would be potential headaches in a typical self build.

    Dean is excited about the prospect of being involved in the scheme. For him, it’s not just about building their own house, but potentially building a community. He’s looking forward to sharing the highs and lows of self building with other people in the same position, and is particularly excited to see the variation in house styles that will be produced.

    graven-hill

     

    The house is likely to be a Passivhaus cube shape for efficiency

    Being engineers, they are interested in efficiency where possible so a Passivhaus design makes perfect sense to them. Their brief to their architect, Tom Gresford, was to maximise the living space while keeping it as efficient as possible from a thermal point of view. The concept he has proposed is a cube, with the square elements following through the design in terms of the windows and some of the room layouts.

    Because they don’t want to spend too much money in fees before they even have their plot confirmed, they have only carried out basic costings to give them some ballpark figures. Their budget for the build is around £180,000 and based on the intended size of the house and a cost of approximately £1,400/£1,500m² they expect to be slightly over that amount. For that reason when it comes to a more detailed breakdown they are going to have to be extremely careful to bring it back in line.

     

    * Since recording this interview, Dean and Hannah have had a meeting with the Graven Hill Sales Team and paid a deposit to reserve their chosen plot. Congratulations to them and we look forward to seeing how their plans progress!

    img_1579

     

    Find out more

    Check out Dean and Hannah’s blog

    Follow Dean and Hannah on Twitter

    Join their Facebook group for people looking to self build at Graven Hill

     

    Transcript

    Download a transcript of the interview with Dean Scott.

     

    The Hub update

    We have added some new content into The Hub, with our second case study – Buckinghamshire Passivhaus. In this first video we look at the plot and find out about the plans. The clients orginally wanted to do a retrofit but it turned out not to be so straightforward. Their architect, Janet Cotterill, worked out two different schemes; tackling the retrofit and then looking at a new build option. They have opted for the new build, with particularly being able to claim the 20% VAT back being a big swaying factor.

     

    Please connect with me

  • HPH147 : A Passivhaus standard Q & A – with Elrond Burrell

    HPH147 : A Passivhaus standard Q & A – with Elrond Burrell

    Architect Elrond Burrell provides answers to a few common questions that people have about the Passivhaus standard.

    elrond-2-v-2

     

    Interview with Elrond Burrell

    As part of Ben Adam-Smith’s video work, podcasts and meeting with other self builders, he is often asked questions about the Passivhaus standard that he doesn’t know how to answer. He recently took the opportunity to put those questions to Elrond Burrell.

    Born in New Zealand, Elrond has been working in the UK for the last 18 years. As well as being a qualified Architect and Associate at Architype, he writes a plain speaking and successful blog about Passivhaus, which has a global following. Before he returns to New Zealand we caught up with him to tap into his Passivhaus expertise, and also find out what his plans are for the future.

     

    Is it necessary to have a heating system in a small Passivhaus?

    This will depend on the specific heating demand of the project. It is possible on a very small project to get away with just a portable electric heater, bathroom heated towel rail or similar.

    A risk of doing this is that if the house is sold or has different occupants they might not be fully aware of this and find that they do get a little cold on rare days of the year. Elrond suggests a more robust approach is to just put in a very small heating system.

    Another thing to consider is that heating is only one part of the equation in terms of power consumption, and actually in a Passivhaus building, providing the hot water can quite often be a bigger heating load than providing the space heating.

    “And so you tend to design a system that can provide all the hot water needs for the year, and have enough capacity in that to provide the small amount of heating that you might need in the cold days of the year.”

     

    Why might you not want the heat source to be incorporated into the ventilation system?

    Firstly, air only has the capacity to carry a certain amount of heat.  Water and solid surfaces can carry and radiate much more heat than air can. If you need more heat than the air can provide then you can’t do it all through the ventilation system.

    Secondly, you need fresh air all of the time! In order to guarantee good quality, fresh, filtered air all year round, then you need the ventilation system running all the time. You don’t necessarily want the heating system running all the time though. There may also be times when you want more heating than the ventilation can provide. Although there is some logic in combining them, they are two quite separate systems in a way.

     

    To avoid overheating, can you integrate a cooling system into the house?

    The Passivhaus standard allows for 15kW annually of heating per m², and likewise allows for the same of cooling if required. In a relatively mild climate like the UK you shouldn’t need cooling if you’re designing the building well. In much warmer climates you would expect that in a very efficient Passivhaus you may have a small amount of cooling, the same way you have a small amount of heating. Like the heating, it can be provided by the ventilation system or separately through a radiant or other cooling system.

    In a Passivhaus project you wouldn’t put something in as a ‘just in case’ measure, because using the Passive House Planning Package (PHPP) software you can very accurately design and predict how the building will perform.

    “So you shouldn’t be putting in stuff just for the eventuality that it might be needed and you should be designing it to get it so you don’t have that need.”

     

    Does it make sense to have mechanical blinds to give you a sense of control?

    More commonly used in Europe and the US than they are in the UK, Ben says that some of the people he comes across like to have the mechanical blinds to give them an extra bit of control. Elrond suggests that it is important for people to feel in control of their environment and that they can modify and change things if they wish to. They shouldn’t feel that they’re living in a house which they’re not allowed to touch or interact with, so if people feel strongly about having the blinds then they should go with it.

    Something to be wary of is if they’re built within the window it can be an expensive operation to fix or replace them if something goes wrong.

    “So it’s not something specific to Passivhaus but it’s more the approach a lot of people that come to Passivhaus want to take is really simplification and trying to avoid moving parts and things that might go wrong at a later stage.”

    The power consumption and how they get detailed and built into the building will also need to be accounted for in the Passivhaus modelling.

     

    How adaptive can the house be in terms of comfort?

    Regarding temperature, this will come partly come down to the design of the building. The upstairs rooms are likely to be a little warmer so personal preference about whether to sleep in a cooler or warmer room may be a contributing factor to the design. And if heat is being delivered by the ventilation system then wherever the air is being delivered is going to be warmer than where it’s being extracted from. If you’re heating through a radiant rather than ventilation system, then these can be located in areas where you would want to feel warmer.

    Another thing about adaptive comfort, which is in the Passivhaus Institute guidance, is ensuring that all occupied rooms have got windows that can be opened.

     

    Future Projects

    When Elrond returns to live in New Zealand in the near future he will be continuing with his blog at elrondburrell.com. He has also set up a new company, VIA architecture, and will be offering a ‘PHeasibility’ service.

    It is important to Elrond to embody his own personal values in the work he does. “So not just what looks like sustainability but what really counts in the details and in the putting it all together.” VIA architecture is based on the idea “that particularly using the Passivhaus standard we should be able to use architecture to transform the quality of peoples’ lives and so it’s really a process of using architecture to get to a good outcome. Whether it’s a really healthy, comfortable home, or a school or a business or what-have-you. And so architecture is kind of the process to get there rather than the end product in itself.”

    The PHeasibility service involves Elrond taking early designs and running them through the PHPP in a basic way, before a commitment to employ a Passivhaus designer has been taken. It will give an indication for self builders or architects without Passivhaus experience, as to what might be involved, taking into account constraints and design, for the building to achieve the Passivhaus standard. It will look at the key aspects which determine if the fabric, orientation, windows etc are going to be of the required standard. They will then be better informed as to whether to pursue the certification.

    pheasibility-header-co-uk3

     

    Find out more about PHeasibility

    Visit the PHeasibility website

    Special offer: subscribers to Elrond’s blog can get Pheasibility for £495 instead of the standard £745 if they book it in September or October. To subscribe to the blog (direct link to subscribe: http://elrondburrell.com/hph_subscribe) and then send an email to PHeasibility@elrondburrell.com

     

    Find out more about VIA Architecture

    Visit the VIA Architecture website

    Follow on Twitter

    Check out the Facebook page

    Follow Elrond Burrell on Twitter

     

    Relevant Articles

    5 things to know about Passivhaus

    Passivhaus Overheating: Design it out

    Passivhaus: Solar Orientation Doesn’t Matter. Or Does It?

     

    Transcript

    Download a transcript of the interview with Elrond Burrell.

     

    The Hub update

    The Hub has now been going for a year and we’d like to thank the founding members who have put their faith in us. We’re always looking at ways to improve what we are offering and in the coming months we’ll be trying to make the modules even more step by step and easy to follow.

    Our second case study is now under way, the Buckinghamshire Passivhaus, headed up by architect Janet Cotterill from CTT Sustainable Architecture. The project first started out as a retrofit so find out why it didn’t continue that way, and went on to be a new build.

     

    Please connect with me

  • HPH146 : Could engaging with your local council help your self build? – with Emma Osmundsen from Exeter City Council

    HPH146 : Could engaging with your local council help your self build? – with Emma Osmundsen from Exeter City Council

    Emma Osmundsen from Exeter City Council suggests ways of enagaging with your local council for the benefit of your self build project.

    emmaosmundsen

    Interview with Emma Osmundsen

    Emma Osmundsen is a qualified chartered building surveyor who has been working in the public sector for the last 8 years. She is currently Shadow Director (Development) and Client Lead (Build) at Exeter City Council and her time there has seen her introduce the Passivhaus standard to the local authority and encourage its use for the City Council’s own new build council housing and commercial properties.

    barberry-close

    Exeter City Council were an early adopter of the Passivhaus standard

    Back in 2009, Exeter City Council were fortunate to have government funding to look into and adopt the Passivhaus standard on a couple of sites as part of their infill redevelopment programme. This resulted in the UK’s first Passivhaus certified multi-residential development, for over 55s flats. Since then they’ve been working to reduce costs to make Passivhaus new build comparable with conventional new build, which is something they achieved with their second generation of Passivhaus council housing which were completed over 3 sites last year. Their fourth generation of Passivhaus, an extra-care scheme of 53 apartments with communal facilities, is about to commence on site and they are preparing to start work next spring on site for a new Passivhaus leisure centre and bus station.

    Initially they were attracted to using the standard as a way of addressing fuel poverty, but have come to realise the commercial benefits and value for money that it brings them as landlords. Understanding that they can proactively influence the quality of the buildings, they are now pushing beyond the Passivhaus standard and adopting the German Baubiolgie (building biology) standard and also carrying out research with Exeter University to ensure their buildings are climate ready up to 2080.

     

    “The aspirations of self builders tend to be a little bit diverse to what we can offer them as a City Council”

    Local authorities have to keep registers of prospective self builders, and public land that is available to them and over the last 5 years Exeter City Council have attempted to get co-housing and smaller scale housing schemes off the ground, but have found it to be challenging. Generally most of the public land they have available tends to be infill plots so the prospect for self builders of investing their time, money and sweat equity in a plot on an existing larger housing estate, tends not to be attractive.

    Emma gives the example of countries like the Netherlands where larger areas of land are carved up and sold as individual serviced plots, which is not something that is common in the UK. She suggests it can be a good idea for self builders to re-think their aspirations and consider living in a more sustainable city centre location which already benefits from enhancements in respect of travel and facilities. She explains there can be opportunities for local authorities to negotiate with volume house builders to ensure that some of the plots within those developments are made available for self builders, for which you could register your interest.

    “So I would say that there are opportunities out there but perhaps there needs to be a realignment of self builders’ expectations of what really is there and will be available to you.”

    exeter-housing

    Approach your local authority with a solution

    Emma suspects that most local authorities will not be able to offer a huge amount of resources and officer time for helping self build projects get started, so she suggests approaching them with something that appears viable and deliverable. This could mean getting together with a few other self builders as a collective to set out your ask of the authority.

    “Because generally speaking a local authority might be in a position to put the land in on a long lease but you might well have to consider ways in which there can be perhaps repayment of that land transfer at a later date, or ways in which that land can be held as an affordable land plot in perpetuity.”

    Emma explains that you should do your due diligence and try and build a good understanding of the likelihood of land coming forward for housing, and be mindful of the local authority’s obligations with regard to affordable housing, realising that there will be obligations that still apply to that land, not withstanding the fact that you’re self builders.

    “I think it would be time well spent on a self builder to actually examine what the potential constraints are likely to be and to provide some potential solutions.”

    From a local authority perspective, they have to look after the best interests of the whole community, which doesn’t necessarily go hand in hand with the motivations of lots of individuals focused on their own separate projects. For this reason Emma suggests it could be worth seeing if you could enter into some sort of joint venture with other self builders to take to the public sector land owner, offering to take on the design, facilitating the development and taking on the project management, but sharing some of their time and resources and look at doing perhaps a mixed tenure scheme so that the public sector get a net return on that land value.

    “So I think it’s about working more cooperatively and collaboratively and perhaps thinking that would be an easier way to bring forward development as opposed to just individual self builders pepper-potted here there and everywhere.”

    exeter-terrace

    Engage with your local political members

    Political members generally speaking are in a strong position to support your cause and encourage some of their officers to be more proactive in helping you realise your ambitions.

    Along with speaking to the planning authority and planning officers, Emma suggests approaching housing enabling officers within the local authority as they might be aware of council land available from their dealings with house developers.

    Another idea is to speak with local authorities that might be doing development schemes themselves, as they might be more receptive to consider opportunities that are outside the norm.

     

    “I think it’s a very exciting time and, as we were pioneering eight years ago with Passivhaus, I think we need to pioneer new ways of delivering new self build opportunities.”

     

    Find out more

    Follow Emma Osmundsen on Twitter

    Follow Exeter City Council Housing on Twitter

    View the EXEseed Contractors Framework

    Read the Exeter City Council Passivhaus development scheme information

     

    National Self Build and Renovation Centre – The Big Green Home Show

    Ben will be speaking at the Big Green Home Show on the 8th and 9th October 2016. He’ll again be flying the flag for Passivhaus and sharing his experience of the many that he has seen. We’ll also be holding a House Planning Help meet-up there and will email out details to our subscribers. If you would like to join that mailing list, fill in the details below.

     

     

    Please connect with me

  • HPH145 : An urban infill that embraces simplicity – with Bernard Tulkens from Tectonics Architects

    HPH145 : An urban infill that embraces simplicity – with Bernard Tulkens from Tectonics Architects

    Architect Bernard Tulkens tells us about his award-winning Lansdowne Drive Passivhaus.

    DSC_0030

    Interview with Bernard Tulkens

    Bernard has been running his own architectural practice for the last 12 years, with a focus mainly on residential projects. He recently won the 2016 UK Passivhaus Trust Award – Urban category – for his Lansdowne Drive Passivhaus, the first Passivhaus he had designed, and for which he was the client.

    Lansdowne Drive_Tectonic Architects

    Being a small, urban infill site led to many constraints

    Bernard bought a house in 2004 in Hackney, East London, with a garden that had been extended by a previous owner. It made an ideal, small infill plot and he decided to build something to keep himself, rather than for sale. Although his parents-in-law now live there, he initially designed the building without a particular client in mind.

    There were multiple constraints on the site. Being in a conservation area there were considerations around the massing, appearance, privacy of neighbours, light for neighbours, etc. The planners made the “suggestion” that it be half sunken, which was something Bernard could appreciate, although it cost him an additional £100,000! He is grateful that they allowed him to build something unique, despite being in an area of Victorian terraces. Planning permission was finally granted in 2010.

    1.0 fromlandsdowne

    Groundworks added additional expense

    The commencement of the project was delayed following the 2008 financial crisis, with banks being unwilling to lend to finance the project, particularly with Bernard having no experience of development.

    Initially his plan was to build two smaller units with the intention of selling one and keeping the other, but that brought complications with the extra funding required and the council not being keen on the additional development. Bernard thinks they probably under-developed the site but is ultimately pleased with that decision as it has meant they haven’t had the financial obligation to sell.

    The cost of building the shell was in line with Bernard’s predictions, though he had to spend an additional £80,000 on groundworks, excavating and enabling the site before construction started.

    5.retaining wall and excavation 3

    A small house with large spaces

    Having to dig down meant that to a certain extent there were technical constraints about some of the materials that could be used on the house. Bernard explains that the idea of the construction and the idea of the space are intertwined. His vision was for it to be a small house with large spaces, and the use of cross-laminated timber offered the possibility of exposed construction. They are big elements that are installed in a simple way, are good environmentally and have low air leakage. The decision to use exposed concrete was partly financial and partly aesthetic, and came naturally when the materials were being assembled.

    10.Isoquick3

    16.eurban5

    The Passivhaus element actually came quite late in the process.  As the scheme developed Bernard realised that this way of building was allowing him to create good airtightness, be able to insulate well and eliminate all the cold bridges.

    16.eurban9

    “And that’s what takes time on a project, to make sure that the various choices you make all end up pointing in the same direction rather than having conflicts between the different choices.”

    Although a Passivhaus, it has no south-facing glazing

    Initially Bernard was told by people that he spoke to that the site wouldn’t be suitable for building a Passivhaus. A couple of years later he met Peter Rankin, a Passivhaus Designer, who took on the challenge. The structure benefited from being very straightforward with continuous lines of insulation and no thermal bridging. By looking at the materials Peter was able to calculate their properties and found a balance between a lot of insulation in the walls and letting more sun in, using a more transparent glazing, from the west.

    “That’s what I love about Passivhaus is that you can decide how you achieve it, all you’ve got to do is feed the properties of the material and the calculations into the planning system.”

    So far the building has performed very well. The windows have roller blind shades that have micro-perforations that cast shadows while still giving views of the outdoors. The properties of the wood fibre mean it performs better than extruded polystyrene in terms of thermal inertia and thermal mass. Bernard will also be putting sedum on the flat roof which will help the protection on very hot days.

    Keep it simple and supervise every step

    Bernard stresses that Passivhaus requires a greater attention to detail, but by keeping the detail simple it will be easier to make.

    Bernard was in the fortunate position that his office was next door so he was able to be on site sometimes up to 3 times a day which was a great help for supervising the works. Instead of using a general contractor, he would have a trade come in to do their job, analyse it, and then move on to the next.

    The construction works took a year to complete

    Once construction work started, the whole build was actually quite quick to complete. The concrete works took 6 weeks, followed by a two-day installation of the cross-laminated timber, window installation and wrapping the building in an airtightness layer, which took 2 months in total.

    18.windows taped1

    The internal fit-out took slightly longer because Bernard was waiting for individual trades, but in total the whole construction took a year to complete.

    Lansdowne Drive_Tectonics_4

    Summary

    In summary, Bernard shares his main lessons learned from the project:

    • A positive experience that he would do again.
    • The decision to expose materials on the inside was determined more by finance and not having a particular client, but while lovely, may not suit everyone.
    • Use natural materials: “You can feel it when the building is finished, and that’s a great lesson.”
    • Managing to get lots of light into the building and keeping the rear garden makes it feel like a house, rather than an infill development.
    • Be patient!

    Find out more

    Check out the Passivhaus Trust website

    The Hub update

    We are excited to announce that we have a new video case study that we are introducing into The Hub. Buckinghamshire Passivhaus is a timber frame build (with a floor area of 350m²) that uses the PH15 system from Passivhaus Homes. Architect Janet Cotterell will be our guide.

    Please connect with me

  • HPH144 : What do you do when you can’t find land?

    HPH144 : What do you do when you can’t find land?

    Three self-builders explain their next steps after struggling to find land upon which to build their new homes.

    Interview with Corrine Mitchell

    IMG_4340

    Corrine and her husband first entertained the idea of a self build back in 2005, but put their first offer in on a plot in 2008. The site proved to be problematic with electricity cables running overhead, and they eventually pulled out. It wasn’t until 2013, when they became aware of Graven Hill, that they had finances in place and thought there was a real opportunity. The intention was to use finances in the bank to pay for the land and sell their existing property to cover the costs of the build. They eventually decided that the Graven Hill development wouldn’t be right for them; they wanted to get away from living on an estate, particularly one that could be a building site for the next decade, and it didn’t seem easily suited to building to Passivhaus standard.

    The biggest challenges to finding land in their area have been the high cost and sites ideal for a small house with a garden, garage and workshop, being bought by developers to put two dwellings on. Corrine has also found that local land tends to be sold by sealed bids, a system which she feels disadvantaged and frustrated by.

    Corrine has learned many lessons from her experience of looking for land. The main one has been how to appraise a site: looking for additional factors that might affect the cost and be problematic, and in future if she found a site without planning permission, she would probably hire a planning consultant. She sees her chances of finding land in the future as relying on word of mouth, getting in before anyone else hears about a plot. Eventually Corrine expects that they might move away from the area to where land is at a price that they are happier to pay, but for the time being she wants to remain local to where their friends and lives currently are.

    Corrine’s advice to anyone else looking for land is to be prepared for it to be a time intensive task. You really need to put the work in, registering with estate agents and ringing them all every two or three weeks to see if there’s anything new available.

    “Google Earth does come in very handy. You can walk down roads, have a look around, look at what’s nearby. But when you get there often it’s a bit different to what you expect so you’ve got to go and do the research and you’ve got to go and have a good look. Especially for the issues that might cost you money when you come to build.”

    Land searches for Corrine and her husband are currently on hold while they take on a renovation project instead. They have bought a small terraced house and are taking their time to do it up, using it as a chance to gain valuable experience that they can eventually put into a self build.

    P1100174

    Despite the renovation project, Corrine is still keeping one eye open for land opportunities and says that hopefully next year they will have finished the works, can sell up and start looking for land seriously once again.

    Interview with Nigel Banks

    IMG_1043

    Nigel Banks lives in Leeds with his wife and two children and has had challenges finding a suitable plot within an existing established urban area. Initially he was looking for self build plots in a fairly wide area, but eventually decided to narrow it down to within two miles of their eldest son’s primary school.

    Largely using Google Maps, cycling and walking the streets, they found two or three potentially viable plots. They approached the Diocese of Leeds, who they discovered were the owners of one plot, only to be told they already had plans for it. These plans, Nigel later discovered, involved an application for 14 houses! Another plot they were interested in ultimately had plans for six flats, offices and basement parking, whereas Nigel had just intended to put on a single house with a small garden.

    After two years of searching, Nigel decided to instead build a Passivhaus office in his back garden. Shortly after he started digging the foundations his wife came across a Victorian house, around half a mile away, in need of major renovation. They realised they could refurbish it to near Passivhaus standard and moved in a year ago.

    Had they not gone down the refurbishment route, Nigel thinks one option he might have pursued would have been trying to find other like-minded people locally to set up a cohousing project.

    Having invested a huge amount of time and energy into their new project, and being fairly happy and settled where they now are, Nigel has shelved plans to try and self build. He emphasises however that the dream to build his own home is still there, though it may be another 15 or 20 years before that can become a reality.

    Triple glazed sliding sash windows from Green Building Store 34

    Interview with Rob Rickey

    IMG_2071

    After taking a course in Environmental Design at Cardiff University and later the Passivhaus Designer course, Rob was keen to live in a low energy home.

    They wanted to stay close to their existing community where all their friends lived. This limited the search area and meant that they really only saw a handful of opportunities. One was a barn conversion with planning permission, but this was reflected in the price! They also considered developing another site that had planning permission for four dwellings. By selling or renting three they could fund their own build. However, the location wouldn’t have been that quiet as it backed onto a school.

    Ultimately they decided they couldn’t afford it and so they looked for a property to retrofit. This was much easier as dozens of opportunities came onto the market each week.

    Rob says he’s quite happy in his retrofitted home – where he’s reduced his gas usage by 75% – and has no desire to self build! He can get his fix from his work, designing houses for other people.

    IMG_1228

    Find out more

    Follow Nigel Banks on Twitter

    Visit the website of Rob Rickey Design

    Please connect with us

    Subscribe, rate and review us on Apple Podcasts

    Like our Facebook page

    Follow Ben Adam-Smith on Bluesky

  • HPH142 : What is a Passivhaus Designer? – with Marine Sanchez from Enhabit

    HPH142 : What is a Passivhaus Designer? – with Marine Sanchez from Enhabit

    Marine Sanchez from Enhabit explains the role of a Passivhaus Designer.

    Marine Sanchez 03

    Interview with Marine Sanchez

    Marine studied general engineering at university before completing a Masters in sustainable buildings. Realising that buildings weren’t performing the way they should do, she studied further to understand the performance gap, which led her to Passivhaus. As well as being a Certified Passivhaus Designer for the last four years, she is a building physics engineer and now also teaches others who are studying for the Passivhaus Designer qualification.

    Being a Passivhaus Designer is about understanding the physics of how a building works

    Training to be a Passivhaus Designer involves an intensive two week course. Marine says that they get quite a range of people, from architects, structural engineers and mechanical & electrical engineers, right through to a few brave self-builders! At its core is a lot of maths and physics to really understand how a building works. There are two qualifications from the Passive House Institute in Darmstadt – Passivhaus Designer, and Passivhaus Consultant. Marine explains that there is very little difference between them, and it is just a matter of what type of degree you did at university.

    Beyond that, there are independent Passivhaus Certifiers who will review the design and advise whether the building can be certified, and Passivhaus Tradesperson who are the people on site that are trained to work on low energy buildings.

    A Passivhaus Designer guides the whole design team as to the concepts that are being worked towards

    Ideally a Passivhaus Designer would want to be involved from the start of the project, so that the low energy aspect is not a costly constraint on a design that is brought to them much later. Being involved early on means they can guide the design team, including the client, through the early feasibility stages on what type of concepts you want to work towards. Any changes on a design can have an impact on how the building will perform, and as the Passivhaus Designer is the one to make promises on that, they need to have an overall view and understanding of what everyone on the team is doing.

    Marine explains that it’s easier if everyone on the team has Passivhaus experience, but even if they don’t the standard can still be achieved if a Passivhaus Designer is involved. It might make it a little more challenging and time consuming, but would be a good learning curve for everyone involved! What is important though is that everyone buys into it and works proactively as a team.

    © Paper Project Architecture and Design
    © Paper Project Architecture and Design

    © Paper Project Architecture and Design
    © Paper Project Architecture and Design

    Passivhaus Designers might be approached through an architect or directly by a client

    If they are approached by an architect then they will often find themselves working in different teams on each project. If a client goes to them directly however, Marine explains that she would suggest three or four architects they have liked working with previously, and leave the decision to the client, based on the type of architectural style they might be looking for, and who they feel they could interact well with.

    If you’re looking for a Passivhaus Designer you will find them all listed on the Passive House Institute website, but because the Passivhaus world is quite a small community you may find names cropping up once you start talking to people and doing initial research.

    A typical week for a Passivhaus Designer…

    Any week is likely to be a combination of a few different tasks. They tend to be:

    Desk-based work – such as modelling using PHPP (Passivhaus Planning Package), thermal bridging calculations and moisture transfer modelling, to assess how a building is going to perform.

    Project team work – part of the week will be dedicated to interaction and team work with the rest of the design team, so architect, structural engineer, quantity surveyor, client etc.

    Site visits – this provides the opportunity to ensure that the designs are being implemented on site, support the builders in understanding the concepts that are being asked for, and checking and testing the design.

    Owner / architect case study

    Enhabit are currently working on a project where the architect is also the owner and has undertaken the Passivhaus Designer course. He and his wife had already had an architectural concept design but approached Enhabit for support in terms of insulation strategy etc.

    ©Paper Project Architecture and Design
    © Russel Hayden

    From that stage they did a feasibility study, where even if they didn’t know all of the details they had a good idea of what was going to be required so could make it work in PHPP to give a performance specification.

    A detailed design process followed to make sure that each performance for every element was being met according to the targets set. All of these elements are refined and finalised before going on site.

    This particular project is now on site and they are currently working on the roof insulation.

    © Russel Hayden
    © Russel Hayden

    Don’t rush the design

    This would be Marine’s key piece of advice:

    “If you want a low energy building it will take a bit longer to design. It’s okay but I think that if people don’t rush it through design and really get it right, I actually think that your build goes so much smoother. And it could potentially go quicker as well because you don’t have to sort things on site and things you haven’t thought of, or compromise on the target that you wanted, which is what happens when people don’t actually work enough on the design before going to site.”

    Find out more

    Visit the website of Enhabit

    Follow Marine Sanchez on Twitter

    Transcript

    Download a transcript of the interview with Marine Sanchez.

    Please connect with me

  • HPH141 : What is a structural engineer? – with Andrew Collinson

    HPH141 : What is a structural engineer? – with Andrew Collinson

    Andrew Collinson explains the role of a structural engineer.

    DSC_0021

    Interview with Andrew Collinson

    Andrew Collinson is a structural engineer based in Herefordshire. His degree course in the subject was mostly based on theory, so his real training came from learning on the job for a big contractor. From working on site he moved to the design office and this background gave him a good understanding of the practicality of a design.

    “The basic job of a structural engineer is to make things stand up”

    The engineer’s involvement will usually begin with receiving architects drawings, and their job is to make sure the foundations are suitable, and any beams, floor timbers, roof timbers etc are the correct size.

    Quite often they will be appointed through the architect who already has the building design but just needs engineering help in certain areas, like the foundation details or beam sizes. In these cases Andrew will be dealing with the architect directly and may not need to meet the client.

    Most people don’t go to the expense of having a site investigation

    For most jobs the ground conditions aren’t fully known before work commences. The structural engineer will have to make a best guess that will cover most circumstances, by writing down the assumptions that the ground is likely to be something suitable and that particular foundations will work with that. If, once the contractor starts digging, they find anything outside those parameters then they will come back to the engineer for a revision. Andrew says that in most cases standard foundation solutions will work, but there will always be a few that don’t, based on whatever surprises are found once digging starts.

    “Until you dig in the ground you don’t know what’s under there so you either pay up front to get someone to come and have a look at it, or you take the risk when you dig that there might be a slight delay.”

    And it’s important to remember, that everything can be resolved – it just may come with a heavier price attached!

    Most cases are covered by Part A of the Building Regulations

    Part A of the Building Regulations has a series of descriptions, and depending on the loading of the wall coming onto the foundation, it stipulates the minimum foundation width and how deep they need to be. Andrew says that most people could read off these tables if they knew what the loading coming down the wall was. There are variations for example if there are trees nearby or it is clay soil. Doing something smaller than is covered by Part A of the Building Regulations might need more careful engineering, and for that you would need to know soil conditions.

    Natural materials are less well covered by the Building Regulations

    Masonry builds are very well covered by the Building Regs. Timber frame for example is less well covered by the documents but often that is designed by the supplier who will have their own engineers.

    It is more challenging to convince building control officers that materials like rammed earth, cob and straw bale have been designed right and won’t fall down, because they are not so well defined structurally and it is difficult to put a figure on their strength.

    Andrew recommends that if you’re wanting to use one of the less common building materials it’s good to get an engineer on board early so they have time to research, and ensure there aren’t any difficulties that are likely to arise.

    Steel or timber frame?

    Steel is very stiff and an efficient material from an engineering point of view. Steel beams can be made to be near identical, and if you have limited head room it can be hidden effectively. It is readily available, fairly inexpensive and builders know what to do with it. With steel though you would normally need to get someone else to cut it for you and it has to be right first time.

    One advantage of timber is that it can be cut on-site to get the exact size required. Every timber beam will be different so can have more of an aesthetic quality. And being a natural material it tends to have more movement, particularly from drying and shrinkage with green oak. Timber also benefits from less embodied energy than steel.

    As a client, it’s important to manage changes in the right way

    Andrew uses the example of a current self build project he’s working on, where the scheme is virtually complete but the client is very hands-on, has done a lot of research and is open to making changes. Andrew says that it is refreshing to work with a client like that who is able to understand the more technical details and can have more informed decisions about whether to make changes to improve the scheme. He does add however that there’s a fine line between that and an interfering client who keeps changing things!

    “Because when you’re trying to move things along quickly, change needs to be managed as a process. Nothing wracks up bills more quickly than constant changes by the client because it can often involve going right back to square one and re-doing a whole load of stuff, which isn’t readily apparent to someone who doesn’t understand.

    “So it is important to manage changes in the right way as a client. Which doesn’t mean to say that you can’t change things but you need to understand there may well be consequences.”

    Use personal recommendation to find a good structural engineer

    Recommendation is the best way to find a good structural engineer. Ask a previous client about whether they produced things to a reasonable time scale, were the costs reasonable, and even just getting a gut feeling about them from speaking on the phone.

    “Do they feel a bit stand-offish, are they someone you could have a discussion with? Are they the sort of person that you would want working for you or not? Because sometimes if people don’t speak to you nicely on the phone the first time, how are they going to talk to you later on?”

    Transcript

    Download a transcript of the interview with Andrew Collinson.

    Please connect with me

  • HPH140 : What is a quantity surveyor? – with Jerry Thomas of Smith Thomas Consult

    HPH140 : What is a quantity surveyor? – with Jerry Thomas of Smith Thomas Consult

    Jerry Thomas explains what a quantity surveyor does, and when you might need to use one on your project.

    DSC_0015

     

    Interview with Jerry Thomas

    Jerry Thomas is company director of Smith Thomas Consult, a cost consultancy practice established in 1987. He qualified with a degree in quantity surveying but explains that other people might come into the discipline from more general backgrounds and then specialise as they go through their career. A quantity surveyor (QS), either as an individual or as a practice, will be a Member of the Royal Institute of Chartered Surveyors, and carry out 20 hours per year of Continuing Professional Development to ensure that they are maintaining their professional standards.

    A QS can assist with many stages throughout a self build, including: initial budget cost estimates, working up tender packages, help with costings, assistance with funding options and bank appraisals, tender evaluation, value engineering, monthly evaluations to ensure the contractor is paid regularly, and making sure that necessary paperwork is in place and the final account is agreed.

     

    Don’t leave it too late to appoint a QS!

    Jerry explains that often people won’t think to appoint a QS until they’ve already had their grand plans drawn up by their architect, by which time his role becomes more about providing a sanity check on costs. Appointing a QS at an earlier stage to provide an indication of budget per square metre based on the type and specification of property they are looking to build, can keep the project attainable. Otherwise they’ll have to go through the painful process of diminishing the designs, reducing the specification and aspirations, and stomach additional costs associated with reworking those designs.

    Ideally Jerry would be appointed when there is a simple, sketch design that shows: floor plan, typical elevation, roof type and pitch, fenestration levels, construction type and cladding material. From this Jerry would work out a base cost figure of £X per square metre, and use this as a starting point with subsequent variations to e.g. window types, heating system, roof covering choices etc, adding or subtracting from that base cost, to give a reasonably good idea of what the eventual cost is likely to be.

     

    The level of involvement that you need a QS for will vary according to the scale of your project

    Jerry would always recommend appointing a QS for a building project, but the level of involvement required wouldn’t always be the same. For a £20,000-£50,000 extension for example, 2-3 hours work (costing around £250) would provide a quick sanity check giving a very high level order of magnitude that what has been proposed is feasible.  For building a multi-million pound house you’d be more likely to need a full suite of services ranging from initial budget advice right the way through to the final accounts stage.

    af046cdbb74

     

    A QS will use experience and a wide variety of resources to work out costs

    Quantity surveyors pay for access to the Royal Institute of Chartered Surveyors (RICS) nationwide database of costs, the Building Cost Information Service (BCIS). It provides average costs by building type, inflation indices, build cost indices and tender price indices. They would use this as a high level check towards the initial cost estimate.

    They will then use in-house projects as a benchmark to show how similar projects have compared, and with the differences that the architect and client are proposing, what impact they would make to the costs.

    Annual cost books list the costs of every major component that’s needed in a building, eg cost per square metre for brickwork, stonework, timber etc.

    And then you will be relying on their general experience. A good QS will be keeping an eye on market trends and the building press to keep up to date and even ahead of the cost books.

    Lower Swell Photo

     

    Online calculating tools may not capture everything needed to provide a full project cost

    Jerry wouldn’t recommend that a self-builder rely on online cost calculating tools to work out accurate costings. While he can see they have a value on very small projects, he emphasises that there is a huge danger that you could miss out on many of the peripherals that go to build up a full project cost. Rather than just looking purely at the building costs, you need to consider the many factors associated with drainage connections and connections of services for example.

     

    A QS can help the client get the best value from the tender stage

    For a self build, Jerry would always recommend going down a traditional route of procuring work which has a bill of quantities and specification clearly set out. An alternative would be to issue a contractor with a set of drawings and performance requirement for the specification, and allow them to come back with a proposal. This runs the risk of a contractor submitting a low tender price in order to get the foot in the door, who then might be trying to recoup those costs throughout the build, either by cutting corners or saying that some items hadn’t been included so will cost extra.

    The skill of a QS lies in ensuring there is sufficient documentation to rigourously check the tenders, comparing like for like, and understanding what might be causing variations in pricing, to establish what is actually going to be best value for the client.

    “So whether with a schedule of works or a bill of quantities we can actually do that analysis at tender stage which prevents problems maybe post-contract when the works are on site with a contractor who is trying to recover a bad position.”

    Schedule of Works

     

    Always have a contract in place with your contractor

    You should always have something in place before the commencement of the work, even if it’s a letter forming the rudimentary basis of a contract which just confirms the start and finish dates. Ideally it would also include what the sum is that you’re paying, and that the sum is based on which named architectural drawings and specification. The Joint Contracts Tribunal (JCT) have a range of contracts available for this purpose.

     

    Planning, planning, planning!

    Jerry’s final tips are to ensure that all the designs are finalised, costs sorted, and tenders agreed with the contractor and incoming services have been arranged before work commences.

    Ensuring that you have a full, considered, joined-up package of information, cost, programme and contract before you start, even if that means deferring the project for 6 months while you get everything together, will mean that you are less likely to have unexpected variations, problems and costs later on.

    80c42748bbc0

     

    Transcript

    Download a transcript of the interview with Jerry Thomas

     

    Find out more

    Visit the website of Smith Thomas Consult

     

    The Hub update

    Our latest update sees Ben return to Long Barrow Passivhaus, having a chat to Alex Baines and a look around the building. Some things have changed – one window has increased height size which they were able to almost take out a layer of the ICF to make the space for.

    Our latest module in The Hub is on “Building your team”. Who do you need to hire? Everyone always says they want to be involved from the beginning of the project, so how is that even possible? We look at the different individual roles and how you might bring a team together.

    For more details of how to become a member, check out Houseplanninghelp.com/join.

     

    Please connect with me

  • HPH139 : Building biology principles – with Tomas Gartner from Gale & Snowden

    HPH139 : Building biology principles – with Tomas Gartner from Gale & Snowden

    Architect Tomas Gartner explains the principles of building biology and how they can be applied in your self build.

    tom_gaertner_grey

     

    Interview with Tomas Gartner

    Tomas qualified as an architect in Germany before moving to the UK in 2007 where he started working for Gale & Snowden, a Devon based architecture practice specialising in low energy, ecological design. He became a BREEAM code assessor and took a Passivhaus course in 2009 at the time that Gale & Snowden were doing their first Passivhaus buildings in Exeter, before studying for a building biology course in Germany.

     

    Building biology evolved in Germany in the 1960s

    In the early 1960s, when construction activity picked up in Germany, industry responded with more highly processed, cheaper goods which could be installed more quickly and with shorter drying times. Up until that point they had typically been using traditional materials such as brick, concrete, glass and timber, but Tomas estimates that today, probably 90-95% of construction materials have a petrochemical content and are highly processed, with adhesives, additives, coatings and treatments.

    So this led to the development of building biology, which aimed to establish whether there were associated health risks with any of these chemicals.

    “So it’s not about you can’t use them but it’s more about if they are a health risk, is there an alternative that we can use, economically but also technically without compromising on the performance, which takes that risk out of the building.”

    Sherwood - Regenerative Design, Integrated Permaculture Landscape and Passivhaus Principles in Devon
    Sherwood – Regenerative Design, Integrated Permaculture Landscape and Passivhaus Principles in Devon

     

    The building biology standard is not a certification standard

    Instead it provides a 3 page report defining healthy levels of potential hazards in the indoor environment, such as pollutants, VOCs, CO2 levels, temperatures, surface temperatures, radiation, dust, particles and mould.

     

    Air quality

    While Passivhaus will give you a good air quality compared to a naturally ventilated building, Tomas explains that it is fighting the symptoms because it doesn’t actually look at the materials that are being used. A ventilation strategy can only reduce the concentration of pollutants in a building, but there will still be constant off-gassing which a resident could react to if they’re particularly sensitive to certain chemicals.

    “But what building biology is about is one step before that actually. It’s not looking at right, let’s put together a building, don’t care what it is because we have a ventilation system takes it away anyway. We take it one step before that: what materials are we using in the first place, minimise the emissions from these materials, potential risk to it before we then look at the ventilation strategy and get a ventilation strategy that is as good as possible.”

    Building biology has a human focus and starts with an optimum environment, which they try and achieve in as energy efficient and economic way as possible. That will vary from client to client according to their needs and what feels comfortable to them. Then the architect can tailor the building to them.

    With a Passivhaus, Tomas suggests that sometimes, rather than squeezing it down to 0.3 air changes, it can be better to go for 0.5, compromising on energy efficiency but providing better air quality.

    “We want to come to a natural or as close to a natural undisturbed environment as possible.”

    Sherwood - Regenerative Design, Integrated Permaculture Landscape and Passivhaus Principles in Devon     Sherwood - Regenerative Design, Integrated Permaculture Landscape and Passivhaus Principles in Devon
    Sherwood – Regenerative Design, Integrated Permaculture Landscape and Passivhaus Principles in Devon

    Radiation

    The World Health Organisation provide a list of potentially carcinogenic agents, with figures based on a range of studies, which include the magnetic fields from household electricity, high frequency radiation from mobile phones, DECT telephones and Wi-Fi. It isn’t clear how radiation is linked to cancer but there seems to be an increased risk for certain types of cancer where people are exposed to higher rates of radiation. Building biology uses a precautionary principle. It doesn’t seek to prove these things lead to cancer, but they attempt to minimise the risk and design it out where possible.

    Tomas stresses that it’s not about dictating what you can and can’t have, but it’s all about the exposure rate and trying to minimise it to a safe level, particularly in areas where we spend a lot of time, such as bedrooms. He explains that a mobile phone, even if switched off, will build up a connection every 30 seconds or so to check on connectivity, emails, etc. Tomas recommends that if you do need your phone in the bedroom that you switch it to Flight Mode, as this will not build up connections and is relatively safe.

    Tomas questions whether you even need Wi-Fi enabled at night. If not, it can be on a timer to switch off automatically at a set time.

    When it comes to wiring, they use a radial system which means every room has its own circuit so they don’t get pollutants from any other room into that wiring system. They then create a distance from the bed space to potential appliances – even moving sockets half a metre away from the bed will be enough to drop down to reasonable levels immediately. Another suggestion is using shielded cables if within a lightweight construction, which can reduce the fields considerably.

     

    Off-gassing / materials

    Tomas acknowledges that it can be extremely hard to get all the information you need about materials, as it is not something suppliers will generally want to reveal. He uses the example of traditional paints which have 4 or 5 ingredients in them, compared with modern paints which contain over 150 substances, most of which are on the carcinogenic list of substances. Although the amounts are very small, they might be put on walls in multiple layers. Add to that the varnish treatments and fire retardants on floors, drying agents in paints, substances that make paints a little easier to apply, etc. These things generally don’t benefit the end user, they just mean that the building can be handed over a bit quicker, but it is the end user who will be living with the off-gassing in the coming months and years.

     

    Water

    With water quality in the UK being relatively good, what is important is maintaining that quality once it’s within the building. Water quality within a house can be compromised by old lead pipes, old appliances and stagnant water sitting around in long pipe runs. Gale & Snowden start by making the connection to the drinking tap as short as possible and use a stainless steel connection because it’s anti-bacterial. Then they design the rest of the water system depending on the softness of the water, the pH value, and use materials that don’t get affected by it.

    They wouldn’t normally recommend water filtration because a filter is only effective if regularly maintained. Otherwise a residue builds up which can backflush into the system and provide ideal conditions for bacteria and mould to develop.

    “And so the lower risk is actually not to have a water filter, have decent materials in there, design it in the way that where you get your drinking water from, you flush it regularly through that and have short connections to that point.”

     

    Outside Spaces

    Outside spaces are important for mental and physical health, and for social interaction. Building biology looks at urban design too, whether there are better forms of living that can be considered and how we can integrate with the landscape. It also has strong connections to permaculture principles. Where there aren’t such opportunities it’s still about creating a healthy living environment and trying to improve it wherever possible. If you’re at the start of a project, that can include making use of opportunities to impact on regional planning and creating external spaces as well as healthy internal ones.

    “And that starts with your energy grid. Bringing it back to radiation, where you have your mobile phone masts for example. How you supply energy and resources, water to the scheme, but also how these spaces that you create interact and how you create social spaces as well which support family living as well as elderly for every part and every member of our society, a holistic approach in that as well.”

     

    It’s not about being fanatical

    Tomas is keen to stress that building biology is not about worrying people and being fanatical, but about taking a reasonable approach, understanding the risks and trying to improve wherever you can.

    “You will be surprised how far you can get with very simple measures that have minimal impact on your lifestyle.”

    Sherwood - Regenerative Design, Integrated Permaculture Landscape and Passivhaus Principles in Devon
    Sherwood – Regenerative Design, Integrated Permaculture Landscape and Passivhaus Principles in Devon

     

    Find out more

    Visit the website of Gale and Snowden

    Follow Gale and Snowden on Twitter

     

    Transcript

    Download a transcript of the interview with Tomas Gartner.

     

    The Hub update

    Our case study, Long Barrow, is currently up to date with progress on site. If you listen to podcast episode 100 you’ll hear Alex Baines giving an overview of progress to date and explaining why he chose to stop before running out of money. You can catch up on all the videos we have produced on the build so far, taking you through plot assessment, the dig, insulating the slab and why you’d do that, the concrete pour, basement walls, steel frame and all the ICF construction and the roof going on. And we’ll pick this up again once construction work resumes.

    We’re currently looking for our next project to follow and are continuing with Self Build Success Stories in the meantime.

    The latest module we are working on is about building your team, and in what order you should bring people together, etc.

    If you’d like to know more about The Hub, please visit houseplanninghelp.com/join.

     

    Please connect with me

  • HPH138 : Why an integrated design approach works well for self build – with Charles Grylls and Nick Grant

    HPH138 : Why an integrated design approach works well for self build – with Charles Grylls and Nick Grant

    Charles Grylls and Nick Grant explain what is meant by integrated design and how it can benefit a self build project.

    Charles Grylls
    Charles Grylls – Dempsey Decourcy Architects

    Nick Grant - Elemental Solutions
    Nick Grant – Elemental Solutions

     

    Interview with Charles Grylls and Nick Grant

    For the last 5 years, architect Charles Grylls has been working with a design team on Passivhaus projects in Herefordshire. The team includes Nick Grant (Passivhaus Consultant), Alan Clarke (Services Engineer), Allan Pearce (Structural Engineer), and Mike Whitfield (Contractor). Although they are independently employed they collaborate together on projects, which benefits the client but also develops their expertise and aids their understanding for the future.

    Their first project working together was a Passivhaus in Garway, which has led on to subsequent builds.

    Garway
    Garway – Photo by George Mikurcik

    As Nick explains, traditionally it tends to be that the architect draws something, the engineer has to try and make it work, and the builder has to try and build it. A collaborative approach from the outset enables non-hierarchical input and advice, working together, to make the project a success.

     

    Working relationships and connections were already in place

    Charles knew Nick and Mike from working with them when he was an employed by Architype. Mike and Allan Pearce had both been involved when Nick had built his house, so there had already been working relationships in place for 15 years or so.

    Nick said: “We’re a bunch of friends. I know it’s often not the best thing to work with your friends, it can be a recipe for disaster, but we get on well and we respect each other.”

    It did take a few weeks of working together as an integrated team to understand what each members’ role would be and what each would be bringing to the design team.

    Nick stresses that although it’s an informal arrangement they have, it is based on trust and responsibility. The contractor particularly is seeing problems on site through the eyes of the rest of the team and has a responsibility to notify the others if they think something needs doing.

    Charles Grylls and Mike Whitfield
    Charles Grylls and Mike Whitfield

     

    There can be less risk using a negotiated tender process

    In a traditional contract a client would work with an architect from concept through to a detailed design, which would then go to planning. Once planning has been achieved it might go out to tender, so already you’re a long way through the process before even speaking to a contractor or consultant about how to build it or how to solve energy problems.

    Charles sees there being risks in terms of cost and quality control using builders through this process who don’t have Passivhaus experience. His experience of competitive tendering for a Passivhaus project is that they will either come in with a low price because they don’t understand what they’re going to have to build, or price it for risk and so overprice it. Using a negotiated tender process, which is still a traditional route to go down, can be less risky.

     

     

    It’s about quality and people who care!

    Nick says that you don’t necessarily need to find a builder or team members who have had Passivhaus experience, but they just need to care about what they’re doing. Often smaller builders will be at a disadvantage when it comes to tendering because they don’t have a department specifically geared to do that, but Nick says they’ll happily turn up, do the job and work for a fair price. By finding a small builder and speaking to previous clients, you could end up with a cheaper and better job.

     

     

    Good, but not superfluous, communication is required

    The team collaborate using shared folders online for consultants’ information so that everyone can cross-check, evaluate and provide an immediate response to information that goes out. The client can also be included in this way. They also make sure that people are only involved when they need to be, so their time is not being wasted.

    Being a group of friends, some of the team’s communication takes place down the pub, chewing over challenges and working out solutions and better ways of doing things in the future!

    Charles stresses that as a client, starting off with a good brief, keeping on-site changes to a minimum, and ensuring that communication lines are kept open throughout are some of the most helpful things you can do. He suggests a flow diagram can be useful in showing members’ roles and responsibilities if it gets complex. Within this team it tends to work slightly differently from a traditional procurement where the architect is project manager and administers the contract, because Mike (the contractor) forms a contract direct with the client. Charles explains that this keeps things simple because everything has been worked out between the team beforehand so there are not usually too many changes.

     

    Establish and be honest about your budget from the outset

    Nick explains that sometimes when projects are drawn up and put out to tender, they come in way over budget and so then go through a “value engineering” process to strip out all the good bits to make it affordable. Far better is to establish a budget and be honest about what that is. There’s no point in being coy and saying your budget is lower than it is because the danger is the design may not then include the features that you might have desired but, according to your stated budget, couldn’t afford.

    Having the builder involved early on is an advantage because they can give input from experience on how much things are likely to cost, so things are not added to the design that may later need to be removed because of budget constraints.

     

    Reviewing the finished project benefits the team as well as the client

    Going back and seeing how the building is performing can help the occupants establish whether it’s being used to its full potential and whether any adjustments can be made to increase comfort, etc.

    As Nick says, the team are only likely to be offering this if they’re fairly confident there won’t be too many problems! If there are problems they want to know about them and learn from them, to avoid them from happening again.

     

    Transcript

    Download a transcript of the interview with Charles Grylls and Nick Grant

     

    Find out more

    Visit the website of Dempsey Decourcy Architects

    Visit the website of Elemental Solutions

    Follow Charles Grylls on Twitter

    Follow Nick Grant on Twitter

     

    The Hub update

    We are currently looking for our next self build project to follow in The Hub. Ideally it would be a Passivhaus that is different from our first case study Long Barrow (e.g. not built with insulated concrete formwork) and again we would focus on the decision-making process from the design stage right through to construction.

    If you think you have a project that may be suitable, then please do get in touch and tell us about it.

     

    Please connect with me