Author: Lucy Cowell

  • HPH224 : What due diligence should you carry out before buying land? – with Rob Wiggans

    HPH224 : What due diligence should you carry out before buying land? – with Rob Wiggans

    Rob Wiggans from RMP Property explains how you can minimise risks when buying land for development.

     

    Interview with Rob Wiggans

    Previously we spoke with Rob about what self-builders can learn from commercial land-buyers when looking for a plot of land. Rob used to work in the land buying department of Taylor Wimpey, and now works in property investment for RMP Property (now the Property Hub), so he knows a thing or two about what checks to carry out before buying a building plot.

     

    More due diligence means there’s less risk

    “Due diligence is the vital, critical research that any person buying land has to conduct in order to provide security to their purchase and ensure that whatever they’re buying is right for their objective for that particular site.”

    Even with due diligence carried out, things still can go wrong. But the more you do, the less risk there is likely to be.

     

    Create your network first

    Establish your team of key people before you get started. By first making contact with a recommended architect, they will be able to provide access to the relevant consultants to conduct your due diligence.

     

    Carry out initial brief checks

    On finding a piece of land, the key people Rob would first contact would be:

    • Solicitor – to provide a quick red flag check on whether anything may crop up from a legal perspective;
    • Ground consultant – they would do a quick check of local maps in the area;
    • Architect – usually the sites Rob would be interested in have planning permission, so the architect would assess the quality of the planning permission and any conditions that are attached to it.

    If further information was needed following that, options might be to go to an ecologist, services consultant or traffic consultant.

     

    Understand the ground conditions

    In terms of the site, the key piece of due diligence to explore is understanding the ground below the site to determine what foundations and ground works will be required. While virtually all pieces of land can be built on, the costs could be high if the ground conditions aren’t favourable.

    A ground investigation should comprise a phase one and a phase two. Phase one would be engaging a ground consultant to carry out a desktop study, using historical mapping and records to show how the land has been used in the past. This would cost in the region of £500-£1,000.

    The ground consultant would then be able to advise to what extent you need to do a phase two, ie a physical investigation of the site where boreholes and trenches would be dug. If phase one has revealed any doubt that there could have been mining or contamination on the site previously, then there would need to be a more rigorous phase two investigation. This could be around £5,000-£10,000 for a small site.

    A ground investigation can also provide some information on how good the drainage would be, but there is the option to carry out further drainage and flood surveys. Drainage design for foul and surface water will need to be submitted as part of the planning application or as a condition of the planning approval before works commence.

    The extent to which archaeology and ecology surveys are needed would be dictated by the local authority.

     

    Check how you can connect utilities

    One option is to employ a services consultant to look at and assess what services are in the immediate locality. Alternatively you can go through the local authority and contact local service providers who can give you this information and advise how much it is likely to cost to connect to your house.

     

    Ensure there is adequate site access

    Access fundamentally covers whether you can get emergency services, waste trucks and other vehicles in and out of the site.

    The first thing to bear in mind, is ‘visibility splay’: whether you can reverse out of your drive and adequately see traffic, and whether you can be seen by that traffic. Planning applications will need provision for adequate access, and a traffic consultant would be able to provide that information.

     

    Explore legal considerations

    Ensuring you have a legal right of way onto your land is crucial. A solicitor would check if you are legally able to access the land from a title perspective and covenant perspective, whether there are ransom strips, and if you’re crossing unregistered land to get to the site. Taking out an insurance policy of generally a few hundred pounds would cover costs if an applicable unregistered piece of land was later claimed for example.

     

    Go with your gut instinct

    “If you’ve always had an element of doubt about a particular site or ‘there’s something not right here,’ there probably is.”

    Rob advises that if you don’t have confidence in the site, then don’t go ahead with it.

    “Don’t develop a bias in terms of eagerness to pursue a site, just because you want to or you’re desperate to get on to a self-build project. Take your time.”

     

    Do a trial run

    If you find a piece of land that is out of your price range, or not in the area that you want, Rob suggests doing a dry run and practice the due diligence process. Consider it from access and legal perspectives, chat to a local architect about it and try and find out why it hasn’t sold or what the positives and negatives of the site are.

    By doing this practice, when you do find the site you want you’ll have that experience and a sharper eye to know what to be looking out for.

     

    Find out more

    Visit the website of the Property Hub

    Follow The Property Hub on Twitter

    Listen to our previous podcast with Rob about what self-builders can learn from commercial land buyers.

     

    Transcript

    Download a transcript of the interview with Rob Wiggans.

     

    Please connect with me

  • HPH223 : What is it like to self build at Graven Hill? – with Dean Scott

    HPH223 : What is it like to self build at Graven Hill? – with Dean Scott

    Dean Scott takes Ben on a tour of the Graven Hill development, and of his own energy-efficient self build.

     

    Interview with Dean Scott

    When we last spoke with Dean, he and Hannah had expressed an interest in a plot at Graven Hill and were making preparations to push ahead with the purchase. That was nearly two years ago and Ben recently returned to find out how much progress they have made and, particularly, what has been unique about building at the Graven Hill development.

     

    As well as new homes on site, the infrastructure is changing too

    With all the construction and infrastructure work going on, some roads are being closed off while others are being opened up. This can make following directions quite challenging (as Ben discovers)!

     

    Proximity to other houses under construction can influence schedules

    Some houses are being built with a metre distance of neighbouring plots. So with just a two metre gap between buildings, and scaffolding for each being a metre wide, there can be a problem with sequencing.

    Their direct neighbours had their scaffolding up before Dean and Hannah were ready, which meant that they couldn’t dig their service trenches down the side of the house, so this has had to be put on hold.

    With the scaffolding needing to be tied together, they’ve had to use the same lift heights as their neighbour, as will the neighbours that follow on the other side.

    With three or four different scaffolding companies being used and joining onto each other, Dean thinks it probably would have made more sense to have used a single one. He is unsure about whether there might be issues when they start being taken down, particularly if one neighbour is ready before the other.

     

    Planning requirements might depend on what your neighbours are doing

    “I think there are some planning requirements we have to go through, but because everyone’s developing at different rates, it sort of depends on what your neighbours do.”

    Dean and Hannah submitted their designs before their neighbours did, so there were no planning restrictions because of their house. This means they haven’t had to use frosted glass on some windows where otherwise they might have needed to.

     

    The house follows a cube design

    Dean has taken 3 months off work to concentrate on the build and be on site as much as possible. Two months in, and construction work has so far brought about an almost weather-tight shell, with the Cross Laminated Timber frame, cladding, windows, doors and roof installed.

    With the plot being eight metres wide, and the building spread over three storeys to get the floor area they wanted, Gresford Architects came up with the concept of a cube design for the house. The windows are all square and Dean is currently working on the detail of the front door, to try and follow the square theme around the rectangular frame. The cube shape also allows for two areas of double height space, for the sense of drama.

    The windows they are using are from the Idealcombi Futura+ triple glazed range, and open inwards. They are tilt and turn, so Dean is hoping they won’t be awkward and get knocked. Despite them being large he has found the mechanisms to work efficiently. They shouldn’t have any overheating in the house, but to be sure, they are installing external roller blinds on the windows.

     

    Do what’s needed to move in, then treat it as a long-term project

    Dean and Hannah are looking to move in as soon as they can. They are currently renting a home so are keen to divert those funds into this house. Some of the decoration may have to wait, but the big things that still need doing for Building Control will be flooring on the upper floors, fire doors, fire treatment on the inside of the walls, window reveals, service runs, electrics, MVHR, gas boiler etc.

    Dean is unsure how he will define ‘finished’ on this project but expect they will move in before all the decoration work has been completed. They may for example get the family bathroom done, but leave the en-suite until later.

    This does have to be balanced against the VAT reclaim. What they don’t want to do is move in and then buy lots of things they’re unable to reclaim the VAT on.

    “I think I’m definitely prepared to relax what I feel is a finished state, just to be able to live here and just to get on with life again.”

     

    They under-budgeted, rather than over-spent

    Dean and Hannah think they are probably around 8-10% over their budget, or as they prefer to think of it, they under-budgeted by 8-10%. They haven’t spent more on luxury items, it’s just been the cost of delivering what was planned.

    “I think ultimately what it means on the budget is that gone are the dreams of any sorts of luxuries, essentially. It’s just barebones basics to get in and then we’ll develop it over the next two, three years or whatever it takes. But as long as we get in and it’s comfortable, which I’m sure it will be, then we can just get on as a family and we can take it on from there.”

    It does mean they may have to take on more of the work themselves and be cautious with remaining quotes. A trickier issue for them currently is cash flow.

    They have been using Ecology Building Society for their mortgage and found them to be brilliant. They have had three revaluations as they have gone along, to then be able to have funds released. And on occasions when they have been caught out by an invoice, they have emailed asking for another release of funds and the money has been in their bank account later that day.

    “So, we’ve got value still to release, which is good. That money is there. And that’s the good thing. We have built the value. We’ve not got ahead of ourselves. So, the building is worth what we’ve spent on it, if you like, which is good news.”

     

    Despite the hard work and stress, he hasn’t fallen out of love with the house

    Dean is hesitant to say that he has actively enjoyed the self build process, but he does get joy from entering the house and being in the spaces they have created. He says it feels more like he’s working on someone else’s house, and that it doesn’t yet really feel like it’s theirs. But as contractors finish up and they’re able to start tidying up inside, it’s starting to feel more like a home.

     

    Images of the Graven Hill Development

    One of the things that stands out at the Graven Hill Development, is the diversity of houses being built. These images show some of the self build, custom build and affordable housing being built in the first phase on the site.

     

    UK Passivhaus Awards 2018

    The shortlist has recently been announced for the 2018 UK Passivhaus Awards. Among those listed are Ruth Butler’s Hampshire Passivhaus.

    Read Lloyd Alter’s take on the nominees.

     

    Talkselfbuild.com

    In the last few days we have launched our new Facebook page, www.talkselfbuild.com. This group is a place to discuss the challenges you might be facing, get fresh input on your ideas, share resources and inspire each other through what can be a roller-coaster ride. Although it’s free it is a closed group so please do take a look and join.

    For those that would like access to more resources, video case studies, step-by-step modules, and monthly progress calls, then join our community at The Hub. In fact, Dean Scott was our first member!

     

    Find out more

    Check out Dean and Hannah’s blog

    Follow Dean and Hannah on Twitter

    Find out more about Graven Hill

     

    Transcript

    Download a transcript of the interview with Dean Scott.

     

    Please connect with me

  • HPH222 : How easy is it to buy land at Graven Hill? – with Karen Curtin

    HPH222 : How easy is it to buy land at Graven Hill? – with Karen Curtin

    With the first phase well under way and residents already moving in, Karen Curtin, Managing Director of Graven Hill Village Development Company, talks through the process of finding and buying a plot at Graven Hill.

     

    Interview with Karen Curtin

    Karen Curtin has been in post as Managing Director on a permanent basis since July 2017. When we spoke with her predecessor, Philip Singleton, the first plots were being prepared for release and he gave an overview of the opportunities available and the vision for the scheme. Since then the site has been taking shape with plenty of landscaping, infrastructure going in and the first homes already completed and occupied.

    The current masterplan is for 1741 units, with 30% being affordable housing. So far they have sold around 100 of their “Golden Brick” self build plots, 50 affordable housing plots and 30 of their custom product.

     

    Inspiration for the Plot Shop came from the Netherlands

    While Graven Hill is a pioneering development in the UK, similar schemes exist elsewhere in the world, most noticeably Almere in the Netherlands. Inspiration for the Plot Shop came from there, with the idea being it could be an information hub providing details about the different products available and offering hints and tips about how to build a home.

    The Graven Hill Plot Shop is currently based in Bicester, a short drive away from the development. With so much building work going on there it has been important to consider the health and safety implications of members of the public visiting, but they plan to move the shop to the site once it is safe to do so.

    Monthly tours to the site are provided so people can get a feel of what it’s about and see the areas that have plots and houses for sale.

    At the Plot Shop a floor map shows all of the residential plots that are for sale, colour-coded to indicate the size and whether they are allocated for Golden Brick or custom projects. The map shows the plot locations (with some locations having different design flexibilities in terms of getting planning compliance within 28 days), notional house types with the number of bedrooms possible, the size of the plot and the maximum gross internal area.

    The sales team are able to tell you what the foundation type is for any given plot and provide a land price, but not advise how much the Golden Brick will actually cost. Until they know what the building design will be they won’t have the structural calculations to know how much it will cost to support the structure. Not knowing the Golden Brick price on reservation can be challenging for buyers, but the team are working on a product where they can offer a combined price for land, Golden Brick and superstructure.

     

    Golden Bricks are sold as serviced pieces of land

    Often an expensive element of building from scratch can be connecting the utilities to the site. At Graven Hill the services are delivered to the edge of the boundary where they can be brought into the property as required. Also included in the purchase of the land is the foundation for the design, the warranty and insurances, with the added benefit of having no VAT to pay.

    In order to streamline the planning process, purchasers are provided with a Plot Passport which lists the freedoms and constraints of the plot design. If the design is compliant, planning permission can be guaranteed within 28 days. Projects which don’t fulfill the Plot Passport criteria are allocated a Delivery Liaison Manager to offer advice and navigate the process through the reserved matters route.

     

    A beautiful village community of like-minded people

    Key to the success of the development is making a community where people want to live. The site has areas of mature woodland which are being retained along with plenty of green open spaces.

    On the village green will be a pub and there will be a school opening in 2020/21. There will be a retail area which might have a supermarket, coffee shop, health provision and smaller offices, and in Phase 2 there will be a million square feet of commercial space made available.

     

    Customers need to be fully educated about how the process works

    Part of the job of the sales team at the Plot Shop is to ensure that customers are fully educated about the process before making the purchase. They usually work with purchasers for around four to eight weeks getting them ready to be able to buy a Golden Brick plot. This will include making sure they are financially qualified and have engaged with suppliers to fully know what they’re doing, how much it’s going to cost, and the timescales in which things take place.

     

    Timescales are of great importance

    Once a plot has been reserved a purchaser has seven months to get to the position where they can exchange, then four to eight weeks before the foundation is delivered, and a further two years to complete the build.

    The timescales are important to ensure that people aren’t continually living amongst building sites, with plots only being released in phases to ensure projects are moving along at a similar pace.

    “The important thing for me is that I want people to come and live on Graven Hill and know that whilst they are like-minded people building their own houses, wanting to live on a unique community such as Graven Hill, there is a point where you want to be able to sit in your garden, have a glass of wine, look at the hillside and not see cranes and not hear people doing brickwork or landscaping work. So, that importance for me is about bringing that phasing on at the right space and time.”

     

    Experience from Phase 1 will feed into Phase 2 design

    When it comes to delivering Phase 2, careful consideration will be given as to what has sold well and been most popular in Phase 1. So far the plots that have sold best have been the larger plots and also the one and two bedroom plots, with the three bedroom ones being a bit slower to go. Everything learnt from the pioneers, Phase 1A and 1B, will feed into probably delivering an altered masterplan for Phase 2.

     

    Financial advice is available

    Like other developers, all of the finished products are eligible for the Help to Buy scheme. Karen says they are also lobbying the government to consider a Help to Build fund for people wanting to build their own house.

    Graven Hill have been working with BuildStore to make sure there’s a lender panel available there, along with independent financial consultants who can give advice. BuildStore also oversee the financial qualification process. This checks that if you’re a cash buyer you have the money to go forward with the transaction, or if you need to get a mortgage then you have to have a decision in principle, to ensure you have the funds to not only buy the land and the Golden Brick, but also complete the build.

     

    Health and safety on site has been one of the biggest challenges

    On a traditional site, members of the public are kept away until the houses are ready and can be moved into. With houses here working to different schedules and owners being responsible for their own plots, there has had to be a very strong health and safety presence.

    “It’s one of the most important things to me because in order for a site like this to work, everybody’s got to comply. That’s from wearing PPE to driving around the site at the right speed limits, making sure they book their deliveries because what we don’t want is three or four cranes on site at the same time.”

     

    More whistles and bells on the houses!

    Karen explains that with the saved equity from self building and cutting out the developer, rather than focussing on it being 20% cheaper, people often end up using that money to pay for premium finishes as they intend to live there longer than they might have done on a traditionally built site.

     

    Register with Right to Build

    Local authorities are required to research demand and maintain a list of people wanting self build plots in their area, and make plots available. Karen encourages people to register their interest in self build with their local authority to make sure that enough land is being made available to meet demand.

     

    Find out more

    Visit the website of Graven Hill

    Follow Graven Hill on Twitter

    Find out more about the Right to Build register

     

    Transcript

    Download a transcript of the interview with Karen Curtin.

     

    Please connect with me

  • HPH220 : How to finish a self build when money is tight – with Mike Coe

    HPH220 : How to finish a self build when money is tight – with Mike Coe

    Mike Coe provides a progress update on his second self build project, with finances being stretched as construction is set to begin.

     

    Interview with Mike Coe

    When Mike and Lizzie built The Autonomous House in Cropthorne, they weren’t prepared for quite how popular and influential it would become. Although Mike wanted it to be ground-breaking with as few demands on the environment as possible, he was surprised at how it captured so many people’s interest then, and does even now. With The Autonomous House now sold, Mike and Lizzie have moved to Scotland and are ready to embark on their next self build project, albeit this time taking a little more of a back seat role.

    There is less enthusiasm the second time around!

    Mike was very hands-on with the construction of The Autonomous House, expecting to be staying there for the long-term, but by the end of the three years it took he suffered from self-builder fatigue and had just about had enough!

    So when they moved to Scotland they initially looked for a ready-built house that they could move into. Failing to find anything suitable they have instead purchased a plot of land and are preparing to employ contractors to take on most of the work for their new self build.

     

    This build is following a more conventional path

    Mike doesn’t recall signing contracts for the construction of The Autonomous House. Much of the team he used then was based around local networks on ad-hoc and informal bases.

    This time he is using a much bigger architectural practice, Rural Design, who have been instrumental in challenging the traditional white-rendered walls and slate roof vernacular of local dwellings in the Isle of Skye area. The processes have been more formal, with tender documents assembled and sent out to local practices. The original contract period of 12 months has been extended to 15, to enable Mike to take on some of the work, though he hopes not as much as on the previous house!

    The location has provided unique challenges to this project

    Their planning decision was delayed by 4 months because the department had only one officer while another took maternity leave! This had knock-on effects to the programme as building in the Hebrides in the winter can be very difficult and best avoided.

    The house is being built to the Passivhaus standard, so there has been additional design work involved which the local architects didn’t have any particular experience of.

    As well as the absence of a large pool of local tradespeople used to building this way, just the availability and transporting of specialised products is a challenge, with extra expense incurred and some suppliers not even delivering there.

     

    A delay could make the project unaffordable

    Mike and Lizzie built The Autonomous House in a way which reflected their desire to live there for many years, so moving on and selling up only 4 years later has meant that they have lost a considerable amount of money from the sale.

    They decided to proceed with their new project around a year ago when the pricing came back from the quantity surveyor and appeared to be just about affordable. However, when it went out to tender a year later they were shocked at how expensive the sums were being returned, with only one local contractor being any kind of an option to pursue. Mike concludes this has probably been down to a general increase in the price of materials and labour, heavy demand for contractors on the Isle of Skye, the Pound losing value against the Euro and general uncertainty about what will happen after leaving the EU. And with the interest on his savings not keeping up with inflation, the build is suddenly looking a lot less affordable.

    With these factors likely to worsen, and not wanting to be in a position where it becomes too expensive in the future to proceed, Mike and Lizzie have decided to push ahead with the build now.

    Without making a conscious choice to value engineer on the project, Mike thinks it has been built into the whole project anyway. It is however still the house they want to build and are still going to try and build.

    The method of construction is based on The Autonomous House

    Despite being a large plot, Mike and Lizzie haven’t felt pressured to build a bigger house than they need. In fact they intend all of the spaces in the house to be well utilised, with some areas having dual purpose.

    Drawing on their experience of The Autonomous House, this time they have again opted for a high thermal mass house. The structure warms up during the summer and returns that heat to the interior during the winter. It also helps keep temperatures stable in the summer.

     

    Items have been removed from the contract in order to proceed

    After discovering their chosen contractor hadn’t included certain items like floor tiles and kitchen units, they decided to proceed on the basis that as a minimum (and he hopes a maximum), Mike would take on the electrical wiring and installation of the MVHR unit.

    They have also removed a number of items from the contract, not wishing to commit to an amount they couldn’t be sure they could afford. Changes that have been made include the removal of the decorating from the contract, simplifying the plumbing, doing the pipe insulation themselves, and not proceeding with building the garage.

    “Removing all these items got us down to a price where I could say I’ve got that much money. Let’s sign it and proceed from there, and then as we get nearer the end, we’ll see how things go.”

    With no contingency fund, if they hit groundworks issues when they get started shortly then their project will inevitably be prolonged. If necessary they could move into the new house in a barely habitable condition and convert the 1960s bungalow in which they’re currently living on the site into a holiday rental, which could prove lucrative. Taking out a small business loan to do this with reasonable interest rates and flexible repayment terms would mean they wouldn’t be taking money from the budget of the new house.

     

    Find out more

    Mike is putting video reports about his project on his website. There is also a webcam providing image updates every 30 seconds so once construction starts it can be followed in almost real time on a daily basis.

    Visit the website of Portree Passivhaus

    Follow the progress of Portree Passivhaus on Twitter

    Follow Mike on Twitter

    Listen to our previous podcasts with Mike, about The Cropthorne Autonomous House and whether you should consider the resale potential of your self build.

     

    Transcript

    Download a transcript of the interview with Mike Coe.

     

    Please connect with me

  • HPH218 : Stopping and later restarting a self build – with Alex Baines

    HPH218 : Stopping and later restarting a self build – with Alex Baines

    Alex Baines explains the impact a mid-construction delay has had on him, his family, and his Long Barrow Passivhaus project.

     

    Interview with Alex Baines

    We have been following Alex’s Long Barrow Passivhaus project in The Hub and on the podcast since it went through the planning stages. When we last caught up with Alex his employment status had recently changed and he was unable to secure a mortgage to complete the build. It’s been two and a half years since then and work has finally resumed and progress is being made.

    The ICF withstood the exposed conditions well

    Alex has used insulated concrete form to create the main structure of the building. Whether this was the right choice he will reserve judgment on until they have completed the airtightness test. It has however been excellent in terms of the construction job it has done and how well it has stood up to the elements with no degradation at all in the two years that the site has effectively been closed. Had it been constructed from timber Alex would have been concerned about leaving it open and exposed for that length of time.

     

    No stage was left incomplete

    A complication with the excavations and additional costs that caused meant that they didn’t have the funds available to complete the airtight and watertight stage. So instead they stopped before putting the windows in and render on, knowing that leaving either of those only partially complete would leave the internal timber window frame at risk of water damage.

    Because they had the money to complete various sections, they didn’t leave anything halfway through and ensured they they stuck to their finite stop points. They went through a checklist with the builder to sign-off on the items to show which parts of the contract were or weren’t complete.

    The JCT contract they had in place covered completion, quality and cost, and very little about timing as Alex knew that was the one thing he was prepared to compromise on if necessary. The builders were contracted to finish the job, so the pause happened between specific contract items, with the next item only being started when they were invited back on site.

     

    Costs still accrue, even while the project is on hold

    One extra cost they incurred was the scaffolding. It stayed on site for four months, with Alex expecting work to have resumed in that time, so when it didn’t he had to pay for that additional time, plus the extra costs of setting it all up again when they restarted.

    In the meantime, Alex has still had the additional costs of paying for rent, site insurance and third party liability insurance.

    Alex has had financial assistance from his parents to get the project moving again, who have taken out mortgages on their property to fund it through to completion, with Alex taking out a mortgage at a certain stage to pay them back. This has meant that there have been emotional strains for the wider family being stakeholders, as well as for Alex, his wife and children.

     

    Focus has been diverted during the delay

    During the period of cessation, Alex has been focused on professional life, family life and getting the money to do the build. He has held back from pursuing contracts with utility companies etc, as these often only have 90 days on them.

     

    The biggest delay has been caused by the construction company closing

    Getting the project restarted and back on site has been a painful and lengthy process. In July 2016, six or seven months after they had put the project on hold, they had finance in place and invited the contractors to return. After several months of not being able to get answers about when they would re-start, they were contacted to say the company was being closed down by their parent company. They were trying to get out of the contract but Alex knew the parent company would still have to honour and complete the contract, even if the team that were doing the building and the company responsible for it were no longer operating.

    It has taken until the summer of 2017 to finally get work restarted. Fortunately they were able to re-hire the original site manager, but the company that closed didn’t leave any of its data with the parent company, so the current team are having difficulties finding their way without the original details.

    When the contractors finally returned to site they reviewed the waterproofing of the building. Being below the water table means that’s a detail they need to get right, and they discovered that their original plan wasn’t robust enough. This was discovered when the same method on another site failed over a period of time.

     

    Work has finally resumed

    There had been some damage during the previous winter, where the pumps and electricity on site had stopped, and had ripped off part of the external waterproofing. Progress has been incredibly slow in getting that remedied and Alex had been keen to get the render and waterproofing details confirmed so he could order the windows. The contractors have struggled to find the right team to render the building but with an 8-12 week lead time on the windows he decided to order them anyway.

    As of May 2018 there has been a recent flurry of activity with the base-coat rendering finished and the windows being installed.

     

    Current finance should be enough to make the building habitable

    First on Alex’s long list of tasks is to get the ventilation system organised. He is still waiting on the final waterproofing detail before he can get the landscape contractors to do the backfill. Following that will be ordering the utilities, which come into the house at above head height on the below ground floor.

    Alex is hoping that his finance will cover, at a minimum, a certain amount of first fix upstairs, get a bathroom in place, ventilation system installed and an operating kitchen, to make it a usable building.

     

    It has been an emotional roller coaster of a journey!

    Spirits are currently high with the previous week of activity making tangible differences to the aesthetics and fabric of the house.

    “The process has obviously been very, very challenging. So, we are now looking at and trying to mentally break the process being awful and not associate that with I hate the whole thing, and I hate the building.”

    While the last couple of years have been challenging and caused a bit of love loss for the building, Alex remains thankful that they still love the location. He is hopeful that once the building is finished they will be able to leave the negative thoughts behind as being part of the methodology and the process.

     

    Transcript

    Download a transcript of the interview with Alex Baines.

     

    Find out more

    Follow Alex Baines on Twitter

    Listen to our previous podcasts with Alex – “How a public consultation helped a rural self build” and “Constructing Long Barrow Passivhaus”.

     

    Please connect with me

  • HPH216 : Do self builds get any easier for a seasoned pro? – with Mark Brinkley

    HPH216 : Do self builds get any easier for a seasoned pro? – with Mark Brinkley

    With decades growing his knowledge of self-building, Mark Brinkley shares some of the surprises, challenges and joys involved.

    Interview with Mark Brinkley

    Mark Brinkley has been immersed in the world of self builds and renovations since the early 1980s, working firstly as part of a group who were building and renovating properties in and around Cambridge, before completing his first self build in the 90s. In the years since then he has been writing up this knowledge in articles and the phenomenally popular Housebuilder’s Bible.

    For the last 18 months, and 25 years after his first, he has been concentrating on his second self build.

    Have a go and see what happens!

    This was the philosophy Mark and his companions started out using. Rather than coming to the construction industry from a traditional route of apprenticeships, they each turned their hands to the various trades with a ‘give it a go’ approach, learning on the job and taking courses. The one trade they each attempted but decided they should leave to the experts was plastering!

    Mark considers themselves to have been “gifted amateurs,” rather than as good a builders as they probably thought they were at the time!

    Being the client was a bigger job than anticipated

    Having accumulated building plots thinking that he and his partner would become property developers, the housing market downturn in 1991/92 left him in a position where, in order to gain more space for his family, he had to build on one of those plots for himself. Mark found all the decision making incredibly taxing, with the realisation of what a big job being the client is. While there were textbooks on how to build a house, what he couldn’t find was guidance on what you should put into a house and what makes a good house. The subsequent success of his book, Housebuilder’s Bible, led him to concentrate entirely on his writing.

    “I’ve spent years going around interviewing people, visiting businesses and looking at houses, but actually doing the process, I’d forgotten what a lot of hard work it is and how taxing it is. Even with this whole lifetime’s worth of knowledge about what you can and can’t put in a house.”

    It was important to challenge themselves with their second self build

    Together with his architect, Mark has wanted to challenge themselves with this build and experiment with new techniques and materials, like the metal roofing and external cladding. Luckily the team of tradespeople working with him have been up to the task, and engaged and enthusiastic in their undertaking of it.

    The street view was a key element of the design

    The design for this build went through three or four iterations and liaising with the planners, conservation officer, and keeping neighbours on side, before coming to a final design they were happy with. What was important to Mark was the street view and trying to create a wow factor, with the amenity of the building being considered later.

    The old warehouse that was originally on the site was an oblong box with a pitched roof. Mark’s build covers the same footprint, just with a little extra height. It also probably would have had a pitched roof, but neighbour’s complaints that they wouldn’t be able to see the chimneys on the other side of the house meant they had to work through a complicated process of giving it a flattened profile.

    Theirs is a tight site with no space around it, so all materials have had to be kept either in the house or garden. If work needs doing on one room, it means moving everything out to another room or somewhere else. This has caused challenges when it comes to trying to find things!

    “One of the old sayings is that it’s the biggest shopping trip of your life. It’s also the biggest cleaning session of your life!”

    Despite huge amounts of pre-planning, Mark and Mandy have remained open to change and been flexible about the decision making as they go along. One example of this has been with the living room ceiling. Originally drawn as a plastered ceiling, they decided they would prefer something more interesting and have been experimenting with lime-washed Douglas Fir. With the leftover planks they have been making slatted shelves for the airing cupboard.

    At the time of the interview Mark and Mandy had only moved in a few days earlier, so it will take a while before they get to grips with and know how effective their solar panels will be at providing sufficient electricity and hot water for the house. Using PVs seemed sensible, rather than packing in more insulation and having even smaller rooms.

    Being an urban build has presented extra challenges, with consideration about traffic management, getting skips and cranes in and out and deliveries blocking roads.

    Keep a very careful eye on spending

    On this project Mark is acting as the builder, as a service company with accounts at various builders’ merchants. Some of the big subcontracts, like the roofing, he has put out to tender, but others are a case of searching for suppliers, building a relationship with them and negotiating on price.

    Often the price will be based on a day rate, which Mark has always found to work well and feels has not been taken advantage of.

    “If you do it on a price, you could end up arguing about the extras, this changed and that changed. I want the freedom to come in and make changes.”

    To a certain extent, Mark is a believer in the saying that if you’re on time, you’re on budget. He is currently a little over-time and a little over-budget. He estimates his overspend is likely to be around 5%, which will come from within their contingency sum.

    Mark recommends starting out with a generous budget and keeping on top of spending. His meticulous spreadsheet of costs currently extends to nearly 600 rows of data!

    More options available has made decision making more complicated

    Mark doesn’t believe that the actual process of building has changed much since Victorian times, with people getting involved and solving problems. What has surprised him though is the amount of red tape that has been introduced in the last 25 years, with the planning process being much more time consuming and every job being riddled with planning conditions.

    Mark finds that the range of options available to him now is phenomenally larger and more complicated than it was back in the 90s. Even with the seemingly simple task of selecting light switches there are dozens of different styles to choose from.

    “You actually get fatigued by these ridiculous decisions you’ve got to make, when actually all you want is a functioning house.”

    Building this house has, Mark says, taught him how little he knows:

    “I do know a lot about it, but without having been doing it continually for twenty years, you get a very different perspective commenting on it, writing it and interviewing people. There’s nothing quite like doing it to realise you’re at the cutting edge. And also, finding out where the bounds of your knowledge are.”

    Mark does find that the process of self build takes over your life, what with employing people on a daily rate and wanting to make sure the money is spent properly, to having many a sleepless night!

    Thankfully he has been keeping plenty of notes throughout this project and at some point will look to pass on this knowledge with a new edition of the Housebuilder’s Bible.

    Find out more

    Visit Mark Brinkley’s blog

    Follow Mark Brinkley on Twitter

    Listen to Mark’s House Planning Help podcast about how self build in the UK compares to Germany

    Listen to Mark’s House Planning Help podcast about putting together a budget

    Transcript

    Download a transcript of the interview with Mark Brinkley.

    The Hub update

    Our video case study at Buckinghamshire Passivhaus is coming towards the end, but this month we have a new episode about plastering the interior and how the brick slips will be attached.

    We also have a new course on developing house designs.

    And our guest on this month’s progress call is Adam Dadeby from Luft MVHR.

    If you’re not yet a member then find out how to become one at houseplanninghelp.com/join.

    Please connect with me

  • HPH214 : What self-builders can learn from commercial land buyers – with Rob Wiggans from RMP Property

    HPH214 : What self-builders can learn from commercial land buyers – with Rob Wiggans from RMP Property

    Rob Wiggans shares his expert tips on how to find a plot of land for a self build project.

    Interview with Rob Wiggans

    Rob Wiggans studied for a law degree before entering into a graduate apprenticeship with Taylor Wimpey. It was a two-year scheme where he shadowed people in each department, including production, sales, finance and technical. He chose to move into strategic land, starting off in a commercial role before moving to where he was physically going out and finding land. He now works in property investment with RMP Property (now the Property Hub).

     

    Portfolios had a fairly even split between land for immediate development, and long-term future projects

    Land Teams in each region would consist of no more than 10 people, and would include the Land Director, Land Managers who form the relationships with the agents and negotiate the deals, and an Estimator who crunches the numbers to check whether there will be enough profit to make the project viable.

    Rob explains that in his experience of national house-builders, each region would have between 12 and 18 live sites at any one time. The staff would either work in the Strategic or Immediate Land team.

    Strategic Land – In most of the strategic land cases the house builder doesn’t yet own the land. It has no planning permission but they are progressing it through the planning system and promoting it for development. They are able to progress it by having a long term ‘option agreement’ with the landowner whereby they give an initial payment of, say, £10,000 to promote it through the planning system for 10 years. If it still hasn’t progressed at that time they might offer another £10,000 for a further 10 years, and so on. If they successfully take it through planning and purchase the land they will take a 20% discount, because of the significant costs involved with promoting it through the planning system. It benefits the developer because although they are taking the risk, they save a significant amount of money on the purchase price, and also benefits the landowner who receives a good price for not having to take any risk or have any financial outlay.

    The developers will look for when there might be a new local plan being published and use that window as an opportunity to bring it forward for development. Usually they will look for land on the edge of existing settlements, or follow where the growth is going in terms of new infrastructure, such as link roads or stations being built.

    Immediate Land – This is land that the house builder owns, has planning and is ready to be built on. This often comes their way from agents who approach the national house builders. According to Rob, the network of land and planning professionals in any given area is very small, so when a good land opportunity arises it is known very quickly to them all.

     

    It’s about looking where other people might not be looking

    One tactic Rob uses is to monitor planning applications, and will approach a landowner as soon as a planning decision has been granted. A landowner being approached directly might be keen to proceed if you’re able to demonstrate that you can do a quick transaction and are offering a good land value, instead of putting it on the open market and paying agent fees (typically of 1-3%).  Rob suggests being persistent, not giving up and having the right positive mindset.

    Planning applications vary in quality dramatically so care needs to be taken with the due diligence. Things to look out for are access, ground conditions, ecology, drainage and service connections.

    “It’s a nice, idyllic flat piece of land, but people always say, ‘All the issues are below the ground, not above it,’ and when it comes to land, it’s very true.  It’s about trying to uncover the unknowns.”

     

    Establish a relationship with land agents

    Because the networks tend to be quite small, it is advisable to contact your local agents, who will be part of the network, and build a relationship with them. Rather than High Street estate agents, these might be local land agents or surveyors specialising in land.

     

    Don’t be put off by auctions

    The fear of buying at auction is always that there must be something wrong with the land. While this might sometimes be true it doesn’t automatically mean that it’s not an opportunity to be pursued. It might be at auction because the landowner’s circumstances just require a quick sale, or if there is something wrong with the land, can it be solved and can you get value?

    If you’re interested in something that has a few unknowns and you don’t have the time to do due diligence, if it fails to sell at auction you can approach the owner afterwards, say you’re interested and buy yourself some time to carry out the checks.

     

    Find out who owns the land

    By setting up an account with Land Registry, you are able to find out the owner of any piece of land for as little as £3. So if you’ve seen something you think would make a suitable plot you can approach the owner directly to see if they might be interested in selling.

     

    Trust your instincts

    “I’ve found that when you think to yourself, ‘There’s something not right here,’ and you don’t know what it is, if you don’t know and you still have that feeling, don’t do it.  Trust your gut is probably one of the biggest pieces of advice I could recommend.”

     

    Assemble your team

    Rob advises growing your team from the outset. Even for a single self-build plot he suggests employing a highly regarded and recommended conveyancing law expert, an architect, a planning consultant and a land agent. Even though you will need to pay them all a fee, you might be saving yourself significant problems in the future.

     

    Have an exit plan

    Ensure you have a clear idea of what’s going to happen once you get planning and prepare for how you’re going to build it. Engage with reviewing build costs straight away and understand those costs before you end up spending too much money.

     

    Know when to walk away

    Even if there is an opportunity that you’re really keen on, but something’s not quite working, instead of investing many months of effort then know when is the right time to say enough is enough, and move on. Rob stresses that there are always plenty of other opportunities available if you know where to look.

     

    “In simple terms, don’t see any barriers. Try and think outside the box. How can you get in contact with people for the land that you want?”

     

    Find out more

    Visit the website of the Property Hub

    Follow the Property Hub on Twitter

     

    Transcript

    Download a transcript of the interview with Rob Wiggans.

     

    Please connect with me

  • HPH213 : Do I need a contract with my builder? – with Steven Thompson from RICS

    HPH213 : Do I need a contract with my builder? – with Steven Thompson from RICS

    Steven Thompson, from the Royal Institution of Chartered Surveyors, explains why it can be sensible to have a contract, and what type you might need for a self build project.

    Interview with Steven Thompson

    Steven Thompson is a Chartered Surveyor and has worked in the construction industry his whole career. He advises professional clients about their projects, particularly when it comes to the financial management, but also the contractual arrangements that apply.

     

    There is no legal requirement to have a contract

    Although you don’t need to have one, it’s certainly a nice to have. A contract can even be verbal although the absence of anything on paper could run the risk of either side denying that something has been agreed. Having this scenario may or may not work in your favour.

    Some contractors might be scared off by having a contract as it might be perceived to be to their advantage if they’re able to leave things as undefined as possible. Steven suggests approaching them with “I intend to use a contract – you’re still on board aren’t you?”, instead of simply asking whether they are happy to use a contract.

    On balance, for security and clarity, it is probably better to have a formal contract which lets everyone know where they stand, and forms ‘the intentions of the parties’. In a dispute situation a Judge would form a decision based on what they think was likely that the parties had intended.

    Steven explains that it’s also good to cover the “what ifs” in a contract. So as well as detailing the relationship between the parties and what the building comprises, it could include “if I change my mind as a client, this is what happens next,” and also circumstances that might be forced on a client such as ground conditions, weather and insolvency. The contract can state “this is what’s going to happen if these future events happen.”

    In some situations, such as a self-builder who is doing all of the work themselves, then these contracts won’t be appropriate and will be totally over the top for what is required. Steven uses the example of buying supplies in a hardware store where the receipt forms the agreement between the parties.

     

    The type of contract may depend on the size of the project

    The larger the project, the more sensible it would be to have formal contract terms in place. The chosen contract will also depend on the type of contractor you’re dealing with and the nature of the contractual relationship. One overall project contract might be appropriate if you’re handing everything over to the contractor to deal with, whereas something else would be required if you’re project managing yourself and employing trade contractors.

     

    Types of construction contract might include:

    Trade contract – a small construction contract between you and the contractor. It is similar to one you might have with a main builder, but instead you could have several of these with all the different trades being used. The downside of this is you’re coordinating it all yourself, managing each of them independently and are responsible for sorting out any scheduling or other problems that may arise.

    ‘Labour-only’ trade contract – an example could be where the client provides the timber that they have sourced themselves but requires a contract with a carpenter to provide labour at the right time to put it up. Labour-only craftspeople may not want wish to have a formal contract but instead be paid a set amount for each day’s work.

    ‘Supply-only’ trade contract – Steven uses the example of a ready-mix concrete company. They will supply the concrete under their terms and conditions, so there’s not a lot of room for negotiation. You do need to be aware that it is still a contract and you do still have certain obligations.

    Material purchase – this covers items sourced, ordered and paid for by the client direct and delivered to site and off-loaded, for example the pieces of timber that will make up the frame or the roof tiles or the kitchen fittings. Again these will be on terms which the self builder has no control over and will be the merchant’s standard T’s & C’s.

    One-off payments – this might be something like a fee payable to the Local Authority for Building Regulations approval. The contract in this case is governed by statute rather than by a contract that you write.

    Consultant appointments – a contract set out with your architect for example.

    If you’re project managing the build yourself then you are likely to be coordinating all these different contracts in terms of timings and finances. An alternative would be to pay a consultant to look after it all for you.

     

    The contracts have three common aspects

    To be valid, appropriate and safe, any of the above contracts will have the same three key attributes. They are:

    Price – clarity is needed as to whether the price is fixed, an estimate or budget, or a day rate. As Steven puts it, “there’s an element of needing to be smart and cautious about the use of terminology from builders, irrespective of what you ask for.” The contract will provide provisions in this section for how to value change, ie if a delay occurs which means the builder will be on site for longer.

    The price section of the contract will also need to cover when payment is made, ie in one payment at the end or in stages throughout.

    Programme – a defined start and finished date is required, not just a block of time. Without dates the contractor is only obliged under contract theory to finish whenever they can. In the contract you provide for the opportunity to make amendments to take account of delays and decide how they are dealt with, ie what happens if the contractor is late, whose fault it is, and when the package of works is deemed to be finished.

    Scope/Quality of Work – clarity is needed as to the exact extent of the work that is covered by that package of work, and the quality standard that is required, such that a pre-agreed benchmark quality standard is set out. At the end of the package of work, the contractor needs to be able to defend themselves if the self-builder says, ‘that quality of work is not good enough’. Somewhere, there needs to be a reference standard – ‘what does good look like?’ This would normally be a national (or international) published standard. In the UK there is the National Building Specification which is a model set of clauses which can be built into a contract as a reference point.

    The contract can also determine how defects should be dealt with.

    Further areas a contract should cover include: client changes, termination, suspension, insolvency, dispute resolution matters, insurance, warranties, retention amounts, damages, and the legalities related to how the contract is signed and the period of time that the self-builder has to take action.

     

    Template contracts are available to purchase

    If you are employing a contractor to carry out all the work for you then a JCT (Joint Contracts Tribunal) contract might be suitable. They provide a whole range to suit different types of jobs, and a Minor Works contract might be suitable for a fairly standard scale of build. You can buy a pre-printed contract from them and fill in the gaps with your name, price, etc. JCT also produce a Homeowner contract which might be suitable for a renovation, refurbishment or extension of a property, rather than a new build.

    Professional bodies such as RIBA and RICS publish contracts covering consultant appointments.

    Supply-only and labour-only contracts which have been legally tested can also be found online.

     

    Contracts will have a provision for dispute resolution

    Ideally you will be able to solve any issues directly with your contractor, but if this is not possible then in the UK there is an obligation under statute to go to adjudication. Steven explains that “in the self-build environment, the issue at large shouldn’t be that large, complex and costly as to warrant anything more than a simple adjudication.” This would need to be paid for and should take around a month with an independent adjudicator deciding the case on its merits.

    If adjudication failed then the case would need to be settled in court.

     

    Find out more

    Visit the RICS website

    Follow RICS on Twitter

     

    Transcript

    Download a transcript of the interview with Steven Thompson.

     

    Please connect with me

  • HPH212 : What challenges does an ‘L’ shape Passivhaus present? – with John Fenwick

    HPH212 : What challenges does an ‘L’ shape Passivhaus present? – with John Fenwick

    John Fenwick discusses the challenges of building his award-winning Passivhaus with an atypical form.

     

    Interview with John Fenwick

    It was around eight years ago that John and Jeanette Fenwick sold their house in order to retire to the West Highlands of Scotland. The idea for a self build only came about when they couldn’t find anything on the market that they wanted to move into. The large plot they bought looks out onto Ben Wyvis and was originally crofting land that was overgrown with birch, and quite boggy in places.

    Their intention had been to build a kit home but weren’t sure how they would get a builder for it or how to take it to planning. It wasn’t until they attended a Housing Expo in Inverness in 2010 that they came across Passivhaus buildings. After speaking with the consultant there, and later the architect that had designed the Passivhaus Terrace for the Expo, they decided that this would be the route forward.

     

    A modern interpretation of a traditional style

    Key to their plans for Tigh na Croit was a single storey dwelling that would reflect the traditional steading style of building in the area. The ‘L’ shape of the design came naturally with one length of the house incorporating daytime accommodation and the other length housing the bedrooms.

     

    Getting the ventilation strategy right was the biggest challenge

    John explains that ideally an MVHR unit would be at the centre of a house so that the system is balanced, with everywhere being treated equally when it comes to ventilation, heat recovery and heat distribution. In Tigh na Croit, the ventilation equipment is at the corner of the ‘L’. John has installed sensors so is aware of the temperature differential between the recovered heat that is distributed closest to the ventilation equipment (30-35 degrees), and those rooms at either end of the building (23-24 degrees). To get through the harsh winters the living room at one end of the ‘L’ has a Passivhaus certified stove, and the main bedroom at the other end of the house has a heated mirror-like far infrared panel. Together with a water-based post heater supplied by an air-source heat pump, they provide the main heating to the house. Additionally the air-source heating circuit powers three small towel rails in the bathrooms.

     

    Tigh na Croit uses a Passive Wall system of construction

    OSB panels are pre-filled with insulation, pre-membraned and put together like a timber frame to create the airtight envelope. The finish gives clean lines inside the house and with three double-height spaces within the floor area they were able to achieve an attractive effect using the closed panels for the walls and for the roof.

     

    Frequent site visits would have been advantageous

    Building in the Highlands anyway was a big challenge with there not being a great many builders to choose from, and the fixed-price contract deterred a few from tendering. One local company agreed to take on the contract and sub-contracted out many of the trades.

    As they were living 300 miles away, they employed the architect on a traditional contract where he would visit the site once a month.

    “We thought once a month would be sufficient, but clearly, when you’re building a house using principles perhaps not familiar to the builder, I think being on site for the build would have been hugely advantageous. The build wasn’t without its issues, let us say.”

    Being able to communicate with the builder and know which days he had been on site was very difficult to monitor from such a distance away. With the builder invoicing monthly, and John only able to visit every six weeks or so, he would sometimes arrive wondering what work had actually been carried out since his last visit.

    The contractor’s lack of attention to detail and knowledge of what was required to achieve the Passivhaus standard meant there were some frustrating delays.

    “So, the first air test was actually a waste of time apart from telling us really that the builder hadn’t understood that attention to detail as far as taping and stuff like that, was absolutely paramount.”

    They found a fist-sized hole where air was getting in and in areas where airtight foam had been specified, the builder had used standard building foam because he hadn’t been able to get the correct one at the local builders’ merchants.

     

    The harsh climate is a challenge even for a Passivhaus

    John and his wife did debate whether or not to install underfloor heating, and believe they made the right decision not to go ahead with it. Being a Passivhaus would have a beneficial effect in that the underfloor heating wouldn’t be worked as hard as in a standard home, but the problems arise when the house is suddenly flooded with sunshine and can become difficult to cool down, as underfloor heating takes a few days for the effects to wear off.

    Even being a Passivhaus there are times when the heating needs to have a bit of a boost. This is particularly the case if the house hasn’t been occupied for a period of time. Generally though they manage to maintain a temperature of around 18 degrees which, without drafts, they find comfortably warm.

    Perhaps the one thing they would change if they did it again would be their bedroom window. It’s a very large picture window that is triple-glazed, but despite the quoted u-values, isn’t as insulated as a wall would be so does feel cool and will inevitably lead to a temperature decrease in the room. Finding blinds to fit it has also been one of the biggest challenges they’ve faced!

    Copyright HLM Architects

    John thinks the house naturally settles at a temperature of around 15 degrees warmer than outside.

    “So, if it’s minus eight outside and you’ve got a mechanical ventilation running, the air that’s coming in is at minus eight whatever happens. You can put a defroster on the system to make sure that the whole system doesn’t freeze up, but you’ve still got pretty cold air actually going into the mechanical unit. Five degrees is often the air going in, and you’ve only got so much heat from the extracted air mixing with that. So, the colder it is outside, the more challenging it is for the house full stop.”

    John has experimented with switching the MVHR unit off overnight in the winter and found that it doesn’t make a great deal of difference.

    “You have to be aware that if the temperature goes up a few degrees outside, you do notice the difference inside. So, the house reacts to the temperature outside, there’s no doubt about it. And where we are, the challenges are pretty extreme really.”

     

     

    Find out more

    Visit the website of HLM Architects.

     

    Transcript

    Download a transcript of the interview with John Fenwick.

     

    Please connect with me

  • HPH211 : How does a local building contractor approach a competitive tender? – with Mark Feldman

    HPH211 : How does a local building contractor approach a competitive tender? – with Mark Feldman

    Mark Feldman of MARS Building Ltd offers an insight into how he prices up potential new jobs (including when he’s invited into a tender process).

    Interview with Mark Feldman

    Mark Feldman runs his own construction company based in Hertfordshire. He began in the industry working as an apprentice carpenter and over the years had experience as a trainee site manager before returning to carpentry. He started his own business in the early 1990s and since then has built it up to be a limited company working on large extensions and new builds. His company, MARS Building Ltd, is the main contractor currently working on Ben’s Passivhaus self build.

     

    A good standard of work comes at a premium

    Mark likes to make sure that he has work scheduled for at least a six month period, and while they mostly do large extensions or new builds he might also take on a smaller job if it will fit in between other planned projects. Most of their jobs are won through recommendations from previous clients but they do also get approached as a result of their website, signs and vans.

    Mark concedes that they may not be the cheapest contractor but they pride themselves on providing a good standard of work and feel this is reflected in the price.

    Where jobs don’t come with a specification and they have to specify the job themselves from the drawings they aim to be as comprehensive and detailed as possible. Again this could account for a higher figure as other contractors might put in a lower price but be constantly adding additional works and extra items throughout the build process.

     

    Items are specified by the architect but quantified by the builder

    Mark has to rely on the fact that the architect and client have got the specification accurate and that those details match the drawings.

    On receiving a tender package Mark would work through the drawings and specification and highlight if there is anything unusual so that he can research and get prices for those items. Then it is a case of working through and pricing the specification, then coming back to it a few days later and checking it through again.

    As they haven’t been involved in a Passivhaus construction before, Mark has been careful with the pricing for Ben’s project and built in a bit of an allowance, not so much for risk, but to cover additional time and taping. The architect having broken everything down well means that they’ve been able to price for the individual items instead of having to guess at what they need to do to achieve the airtightness.

    Mark does say that on other jobs, “sometimes architects can go too far with detail, and you end up pricing every little item down to the last screw almost. Everything gets a little bit added on to it, so it can make it quite a bit more expensive for the client if it’s too detailed for a specification.”

     

    Tender submission prices may vary depending on existing workload

    Some items on an architect’s specification will have a profit allowance next to them. For others Mark will cost for labour, materials and allow for a bit of profit on top. He will also put in a cost for site management, allowing for a day or two each week which covers the time he spends in discussion with architects, looking things up on drawings, general organisation and mediating between the trades.

    Prices they submit will depend slightly on the circumstances at that time and how much work they already have lined up. Their most competitive prices are likely to be when they are running close to the end of a job and don’t have anything else lined up for when they finish.

    Work on projects may overlap

    Obviously a common question clients have is when the contractor might be available to start. Mark explains that the type of people they want to work for are those that want someone doing a decent job and as such might be prepared to wait until they are available.

    There is often a transition period where jobs can overlap by a few weeks. It might mean starting on groundworks and brickwork on the next job while still finishing off their current project.

     

    Communication tends to be more effective with an architect’s involvement

    If they are working on a project where the architect has a continued involvement, then both the contractor and client will communicate via the architect.

    In other projects the client may only employ an architect to produce drawings, and will oversee the works themselves. In this situation the contractor would be dealing directly with the client.

    Mark says it is probably more efficient working with the architect but either process works well.

     

    A combination of factors is causing higher tender submission prices

    Ben was alarmed at the prices that came back on their tender submission and had wondered what might have been the cause. Mark suggests the following reasons:

    • Labour costs have seen an increase recently
    • A shortage of bricklayers has put their prices up
    • The pound being weaker against the Euro has increased the price of imported goods
    • The cost of insulation has dramatically risen over the last year – as much as 30%
    • Timber and other items have also seen price rises.

    Some of these prices have previously been absorbed by the contractor to try and win the work, but in order to maintain profit their prices are now creeping up.

     

    Find out more

    Visit the website of MARS Building Ltd

     

    Transcript

    Download a transcript of the interview with Mark Feldman.

     

    Please connect with me