Author: Lucy Cowell

  • HPH137 : Opportunities to self build at Graven Hill – with Philip Singleton

    HPH137 : Opportunities to self build at Graven Hill – with Philip Singleton

    Philip Singleton, Managing Director of the Graven Hill Village Development Company, talks us through what will be the UK’s largest self build housing project.

    _RYC0176

     

    Interview with Philip Singleton

    Philip Singleton has a 14 year background in architecture followed by a further 14 years in management roles, covering delivery of projects, town regeneration and town planning.

    Since January 2016, Philip has been responsible for leading the delivery of the UK’s largest self build housing project, which is at Graven Hill, near to Bicester.

     

    A coming together of 2 public sector opportunities

    The project began a few years ago thanks to the political engagement and ambition of Cherwell District Council. They had been looking for an opportunity, which they found with the Ministry of Defence’s decision to sell a 188 hectare piece of land which had previously been a substantial distribution and storage space for military equipment.

    Cherwell District Council created a private company, the Graven Hill Village Development Company, to buy the land at market value, fund it over a 10 year period, and look for a return on its investment. The company has the freehold on the land that they are acquiring over a period of years, in phases, from the MoD.

    _RYC8374

    _RYC8281

    “So the background was that there’s a vision, there’s a site opportunity, there’s a growth in the town, a great location, and then invest and set up in what’s been a small and growing private development company to execute and deliver the idea over a 10 year programme.”

     

    There will be heavy investment in the social, economic and physical infrastructure

    With millions of pounds already invested and continuing for a few years, it will be 2 or 3 years before the company see any return on that investment. They are spending money on the road infrastructure within, on the edge and beyond the site, the services and drainage, creating a primary school, a community centre, allotments and an orchard. And as well as providing individual plot opportunities they are also creating 30% of all the homes.

     

    It provides an opportunity for enterprising people

    The first release of plots is scheduled for 22 August 2016. The infrastructure will then start being rolled out in the autumn and those who have reserved plots can access them from August 2017. The land will come with foundations (as designed for the individual’s proposal) and services in place. Philip explains the time in between can be put to good use in terms of working with an architect on design development, perhaps looking at custom build opportunities as well as managing costs.

    While it is a long customer journey compared to buying from a volume house builder, it is enabling people to “really have the opportunity to build what they want, not what they’ve always had to buy.” They have recently appointed a sales team who will be working closely with the delivery team. They will be able to communicate with customers about their individual situations, finances and timescales, and make sure they have the ability to buy at the time required.

    With the market value of similar 3 bed detached properties in the area being around £375,000 and estimates for developing your own self build or custom build on the site for closer to £300,000, it is clear there are opportunities for owners to make a profit in the process. However, Philip is clear that they intend to sell to individuals, and not people wanting to use it as their own development opportunity. While there might be families, or people that want to group build and have an association of interest, they have systems in place to wheedle out those who are using it purely as an opportunity to make a financial gain.

     

    It is intended there will be less risk than for a normal self build

    The original masterplan for the site was created by the MoD. There is also a design code which sets out how the overall mass of a house can look relative to its neighbours, its position on the site and the pallet of materials that can be used according to the site position. The masterplan and design code gave comfort to the local planning authority so with such criteria already being outlined, they have been put into a Local Development Order and are able to say that if these criteria are met planning approval will be granted within 7-28 days.

    Putting in the foundations can be a risky part of a self build, but these plots are being sold with the foundations already put in place for the customer.

    Removing the planning and foundation risks can be an advantage when it comes to securing finance from a lender.

     

    There will be a diversity of choice

    The company are providing a number of options to customers. As well as the “golden brick detached” option of the plot with foundations pre-laid to the customer’s requirements, they are also offering a “tailor finished product”. They are developing terraced apartment blocks and giving people the option to work from a menu to decide how the interior of their home might look, including number of bedrooms, kitchen and bathroom type, etc. They will then be handed the keys to their home that has been designed to their own internal specification.

    Avenette 150903

     

    It is hoped a micro economy will be created

    The site is in a great location with Bicester being a growth town with 2 stations connecting it to Marylebone, Birmingham, Oxford and in a few years time, Cambridge. It also has useful links by way of the M40.

    Philip explains that in addition to being well connected to other areas he is hoping that there will be a diverse micro-economy of people that have built their homes and also want to work from the area too. The apartment blocks will be at the centre of the village, with the ground floors being dedicated to retail and to live/work space.

    “Graven Hill is all about a community of builders building a community. Because I think the purpose and interest is very common between all those self builders before they’ve even moved in.”

     

    Graven_Hill_Primary_Logo_RGB_1200x709

    Transcript

    Download a transcript of the interview with Philip Singleton

     

    Find out more

    Visit the website of Graven Hill

    Follow Philip Singleton on Twitter

     

    Please connect with me

  • HPH136 : 6 observations from 6 Passivhaus projects – with Ben Adam-Smith

    HPH136 : 6 observations from 6 Passivhaus projects – with Ben Adam-Smith

    Ben Adam-Smith shares what he’s learnt from visiting 6 self build projects, each shortlisted for the UK Passivhaus Awards 2016.

    Regen Media produced 6 video inserts for the ceremony and this gave Ben the opportunity to visit these homes. Now he reflects on each project and the key takeaways.

     

    1. Passivhaus can quickly get under the skin of a building team.

    Having completed Denby Dale Passivhaus and Stirley Farm retrofit, Green Building Store are onto their third Passivhaus project with Golcar Passivhaus.

    What’s interesting on this one is that Bill Butcher has been able to step back somewhat and let his team get on with it.

    Foreman Jude Wilson says: “As we’ve been doing these big projects, it is evolving and becoming more natural. The processes that we’re doing, we’ve learnt them, and so it’s second nature just to get on and do it.”

     

    2. Contractors who are new to Passivhaus can do it if they have the right attitude

    On the Lime Tree Passivhaus project, they engaged a contractor who had never built to Passivhaus standard before. However, the contractor embraced it wholeheartedly, taking the entire team through the Certified Passivhaus Tradesperson course.

    Architect Chris Parsons from Parson + Whittley says: “Choosing contractors to deliver Passivhaus is still difficult because there are very few that have got the experience but my mantra is have they got their attitude? Are they really interested in delivering the performance and understanding that that’s delivered simply through close attention to detail and quality? So no, I don’t think experience is the necessary factor, it’s the right cultural approach.”

     

    3. While a compact form is always a good idea, it is not essential to achieve Passivhaus standard

    Tigh Na Croit is an ‘L’ shaped bungalow, which is clearly not the most efficient form. However, this form is a response to the site. The bedrooms face east and the main living spaces face south, and thus there was a good architectural reason for going down this route.

    Again, it’s an illustration of how great architecture can be created that still complies with the Passivhaus standard.

     

    4. Embracing simplicity pays dividends

    Lansdowne Drive Passivhaus is a modest but striking Zinc clad building in the heart of East London. Architect Bernard Tulkens is also the client here and, as such, could do things that he never gets a chance to do! He wanted the building to be flexible and with a simple palette of materials.

    Bernard says: “When you realise that by reducing the elements you use, not having to choose finishes, you avoid a whole set of traps. I thought, why, if I’m building a building for myself would I start lining up a timber construction with plasterboard and worry about shadow-gaps or skirting boards or recessed lighting. No. I just decided that timber was going to be nice enough as a finish.”

    Simplicity, as we’ve heard many times before, can really come up trumps.

     

    5. Determination is fundamental to building your own home

    Chiswick Eco Lodge was a 7-year project! Right from the word go they were up against it. The plot was a garage infill and, as such, demanded that a large proportion of this house would be underground. What’s more, everything that came onto site had to negotiate a tree (with a Tree Preservation Order on it)! They also had a 3-year battle with planning.

    All that said and done, they achieved a remarkable contemporary urban dwelling which slots beautifully into its streetscape.

     

    6. A shell-only contractor can simplify the build process

    At the Old Water Tower they ran into few difficulties during the build because of how the work packages were assigned.

    Project manager Mike Jacob says: “I think that we were in safe hands with the timber frame specialist. One of the lessons that we’ve learned from the past is to try and go for easy wins and there are companies out there now who will take control of delivering a guaranteed, thermally bridge free, airtight, super insulated box and they can do that very quickly.”

     

    Find out more

    UK Passivhaus Awards

     

    Please connect with me

  • HPH135 : Tips for buying land at auction – with Tom Gresford from Gresford Architects

    HPH135 : Tips for buying land at auction – with Tom Gresford from Gresford Architects

    Architect Tom Gresford shares his experience of buying land at auction.

     

    Interview with Tom Gresford

    Tom Gresford of Gresford Architects qualified as an architect in 2002, set up his own practice in 2006 and for the last 5 or 6 years has been increasingly focusing on low energy and sustainable design.

    Tom finds auctions an interesting way of purchasing unusual properties and quirky development sites that perhaps aren’t found on sites like Rightmove, and he has bought 3 or 4 using this method himself.

    IMG_1127

     

    Do your research and employ a planning consultant

    Buying at auction is much the same as buying any plot, in that you should do your research first, even though there’s no guarantee of being the successful bidder. Tom recommends hiring a planning consultant to do 5 or 6 hours of work on the site and local appropriate policies, probably costing around £500 or £600, to advise on the likelihood of gaining planning consent.

     

    Look for potential where others may not see it

    Tom explains that because the market is quite overcrowded, he tends to steer away from anything straight forward. Instead he looks for quirky or unusual things that other people might not think they can do anything with. His Chieveley Passivhaus was an old water tower which was one of 6 assets being sold by Thames Water at a Savills auction. He did a planning study for each of the 6 and identified this as being the one most appropriate for development.

    DSC_9571

    However, there are never any guarantees in development! Tom gives an example of a site he purchased in Staines. Because it was on a flood plain they fought to try and get planning permission for 2 years and went to appeal, before deciding to sell the plot on. Tom thinks there will also be people willing to pick up these pieces of land, as they may have different intentions for its use.

     

    You should always go into an auction with a limit!

    Tom says that you should always decide in advance what the maximum you are prepared to pay will be. Without that you may end up paying considerably more than the land is worth. You should go in having an idea of the land’s value, so if you had to exit the deal you would know how much you could expect to get back on it.

    Deciding what price you’re prepared to pay may also be dependent on your motives for buying. If you’re buying it to build your own home then you may be willing to pay more than if you’re buying it as a development opportunity. Tom does say that the majority of people at these auctions are professional investors, but that you can always spot who are the self builders!

    “There’s no rule of thumb and you never know who you’re going to come up against, how deep their pockets are and what they might be thinking on the day.”

     

    Buying at auction is an incredible adrenaline rush

    Tom has lost out on far more bids than he has actually won, but says there can be an incredible adrenaline rush, particularly if there are quite a few people bidding. He tends to wait for a while before starting to bid, and is always clear with himself what level he is prepared to go to. He says if for example you get to that limit and there are still 3 other people in the bidding for it then you know you’re not going to win and just have to walk away.

     

    Try to remain aloof and detached

    While it can be a thrilling experience, Tom advises caution in getting carried away because it can be a real emotional rollercoaster. That is particularly likely to be the case if you’re buying the site to build your own house.

    “You wouldn’t choose to buy somewhere if you didn’t want to live there, but then the very fact you want to live there will mean you’ll get emotionally attached to the idea.”

    Trying to remain aloof and detached is a good way of helping you to bid in a sensible manner, and also help you deal with the emotions of potentially not having the winning bid, which statistically you are unlikely to have.

     

    The brief for Chieveley Passivhaus was based on an imaginary family

    Because there was no client for this build, Tom had to imagine a scenario around which to design. They worked on knowing what tends to be popular, which is a 4 bedroom house, the master bedroom having an en-suite, a family bathroom and then a downstairs toilet. Their imaginary family were interested in modern design and were concerned about the environment and low energy living.

    FullSizeRender

    IMG_1121

    IMG_1123

    When the house was put up for sale they received 3 sealed bids from 3 sets of people with very differing profiles. None of them previously had an interest in Passivhaus but saw it as a massive advantage.

    “We were showing that you could build beautiful modern houses in the Passivhaus way.”

    They went down a construction management route of procurement so Tom believes that despite it being a Passivhaus it probably cost the same as most people would build a standard house. If you used the same procurement method but not built to Passivhaus then it would have been cheaper because there are elements such as the blinds, triple glazed windows, MVHR etc that totalled around £15,000, that you don’t have on standard buildings.

    With the house being west facing to take advantage of the views, they have used manual blinds to take advantage of winter solar gain without having the problems of overheating in the summer.

    IMG_1125

    “It’s just a really good house. A really good, well designed, beautiful, comfortable to live in house…It demonstrates that you can live a really comfortable life with having absolutely minimal impact on the environment and the dwindling resources that we have to face up to.”

     

    Transcript

    Download a transcript of the interview with Tom Gresford

     

    Find out more

    Visit the website of Gresford Architects

    Follow Tom on Twitter

     

     

    The Hub update

    The Hub draws on our experience of video and audio production to bring you more in depth information to help with self build projects.

    Our current video case study is following Alex Baines’ Long Barrow Passivhaus project, which is an insulated concrete formwork, semi earth sheltered construction. We’ve worked our way up from the basement to the first floor ICF walls and soon we’ll be going into the roof.

    We also have our private Facebook networking group and we’re coming up to the first of we what we hope will be quarterly progress calls, where we can get together and discuss how our projects are going, trying to help with any problems, and we might even bring in a guest or two from time to time to help with any queries.

    If you want any more information then check out our video which will give you an overview of what you can find in The Hub.

     

    Please connect with me

  • HPH134 : A new build cavity wall Passivhaus – with Angie and Paul Dallas

    HPH134 : A new build cavity wall Passivhaus – with Angie and Paul Dallas

    Angie and Paul Dallas explain why they opted for a Passivhaus, and the benefits of getting involved with the build.

    Certification photo1

    Interview with Angie and Paul Dallas

    Angie and Paul had been looking to build a comfortable, energy efficient house that they could retire in. There was no issue with finding land as their existing house had enough land available, albeit with its own planning challenges.

    duskback

    It took 5 years to be granted planning permission

    Angie says that the planners weren’t necessarily against their plans, but the Highways department had to consider the problem of access because of the limited number of houses that could be on their unadopted road. The house is in a conservation area so that presented its own challenges, and there were a number of trees in their garden which had preservation orders on them.

    After initially having their application rejected, they won on appeal in London.

    A planning consultant helped with the process but in hindsight they think they should have appointed him earlier and benefited from his expertise in areas where their architect was struggling.

    The decision to build to Passivhaus standard was taken after planning permission had been granted

    It was on a trip to look for triple glazed windows that Paul started chatting with one of the directors of the Green Building Store who explained the differences that Passivhaus had from normal building practices. Coming away from that meeting Paul was convinced that, even if they didn’t strive for the full Passivhaus standard, he wanted the building to at least use the principles of high design quality.

    Deciding to pursue this approach meant some design changes to their original plans. The amount of glazing had to be adjusted together with the orientation, but the actual size and construction wasn’t altered.

    Being involved in the construction had its benefits

    It had always been important to Paul to be actively involved in the construction of his house, however once the decision had been made for Green Building Store to take on the project to Passivhaus standard he was unsure what his role would be because his knowledge of the area was limited.

    Cavity wall replacement image

    Whether Paul would be able to assist with the labouring was a decision for the building team, and Paul was careful to take his time and show that he could muck in and not be a pushy owner. Eventually he was invited to join the team and he relished learning on the job and taking their instruction.

    One of the greatest challenges that Paul found was working on the site throughout the British winter. If the roof could have gone on during the summer months it would have been a much easier build.

    IMG_0827

    A key benefit of Paul being on site was that if a problem arose or a decision needed making, he understood what was going on and could make the choice straightaway.

    Paul found the camaraderie of being on site extremely enjoyable and believes the pride in the house afterwards far outweighs the efforts of doing it.

    “And to be honest I don’t think I’ve ever laughed as much during a job ever. I thought it was great fun.”

    The comfort of the house has lived up to their expectations

    The temperature of the house remains fairly constant and the mechanical ventilation heat recovery system means that the air quality is good everywhere. Angie also notes that it seems to stay cleaner and that since having pollen filters put in she has also seen health benefits compared with their old house.

    golcar51619

    panorama1

    golcar51582

    Take time to appoint your design team

    Their first architect, although designing a great scheme, didn’t have the time to take it from there. Paul and Angie wish they had taken time to research, interview and appoint a replacement architect but instead they appointed someone on recommendation, who professed to be an architect but actually wasn’t. He claimed that the original plans couldn’t be built, but it took Angie and Paul several months (and £6,000) to have the courage to dismiss him and get somebody else. Thankfully the next architect they appointed confirmed that they would be able to build to their original plans. Paul emphasises the importance of researching specialists and finding someone that you feel comfortable with.

    “If you’re building a Passivhaus you want somebody with experience of Passivhaus or at least is willing to learn and look at the differences between that and a normal house and take those on board.”

    Deciding to use the services of an interior designer they were fortunate to have them involved at an early stage to assist with the layout of the interior and pick up on areas, such as space for hanging curtains, which would have been difficult to rectify after the construction work had been completed.

    Green Building Store provided them with knowledgeable and skilled builders who Angie and Paul both say were a pleasure to work with. They used their own electrician and were also happy with the services of the plumber.

    Paul stresses that it’s important to take your time at the stage of getting your team together. They were thankful that their whole team worked well together and that they enjoyed working with them.

    “And it’s people you can work with as well. It’s not just a good track record but if you’re not comfortable with those people then it’s going to be a problem down the line.”

    compback

    porch1

    Find out more

    Visit the website of Green Building Store

    Check out the shortlist for the 2016 UK Passivhaus Awards

    Please connect with me

  • HPH133 : Building automation and KNX – with Paul Foulkes from Echohouse

    HPH133 : Building automation and KNX – with Paul Foulkes from Echohouse

    KNX consultant Paul Foulkes explains how building automation systems work, and the advantages of using the KNX standard.

    paul2_edited

     

    Interview with Paul Foulkes

    Paul Foulkes has a background in engineering and also worked as an electrician before developing an interest in building automation systems. When a client’s system failed within 2 years of installation and with the system becoming redundant due to the manufacturer no longer supplying parts, he began looking at the alternatives and in 2003 became a qualified KNX installer.

     

    Building automation operates systems within a house in a more efficient manner

    A building automation system can incorporate:

    • Controls for ventilation, heating, shutters, security, lighting, etc
    • Monitoring of temperatures, heat gains, solar gains, VOCs (Volatile Organic Compounds), CO2, heat detection, smoke detection etc.

    intelig_2

     

    Take a holistic view before construction starts

    A self build house is the ideal opportunity for installing a building automation system. Consideration should be given from the outset, and looking into the future, as to how the house is going to be heated, ventilated and lit, to ensure that the correct cabling is in place.

    There will always be the fundamental needs for sockets and lighting in each of the rooms, but then there will be a constant layering of other systems (ie heating, ventilation, air quality monitoring) on top of that to bring them all together, rather than looking at them as separate systems and installations.

    “You need to be looking at all of this now and saying I can put in a system that will control all of this the most efficiently.”

    Panel 2

     

    Monitoring is an effective way of saving energy

    In Paul’s own house he has installed a detector in each room which monitors absence and presence, so can be set to control lighting or heating when someone enters or leaves a room.

    Monitoring information can be displayed in whatever way you choose, for example Excel spreadsheet or something more graphical, and by monitoring the amount of energy being used you can see the points at which it is being wasted.

    If linked wirelessly to a personal device you can also access this information remotely, ie check cameras, switch alarms off or view the monitoring information.

    Paul believes the future of energy billing will change dramatically over the next few years, with considerably higher prices at peak times. By monitoring and understanding your energy usage, and with battery storage, you can take back control of the energy that you use.

    KNX_Update_building_control-large

     

    KNX is a non-proprietary protocol

    KNX is not a company that manufacturers a piece of kit. Instead it is a protocol, a standard that is accepted worldwide. There are over 400 manufacturers worldwide so there are always replacement parts available. It has been available for 26 years and new parts that are made today will still integrate with original systems.

    KNX isn’t a smart home system or a heating control system, it is a building automation system. It is fully scalable so can be used in domestic situations, and all the way up to stadiums and airport terminals.

    It uses an addressable bus system, whereby every input and output into the system (ie a switch is an input, an actuator that controls an immersion tank is an output) is a point within the system that can be addressed and linked together.

    “The advantage with a bus system is that it can be star wired, it can be Christmas treed, as long as the piece of kit is connected to the bus by two wires then you can address that piece of kit. So as long as you’ve got your wire to any position that you want an input or an output, you can hang what you like off that.”

    The flexibility of the system means that it has implications for care of the elderly and assisted living, where the technology can be used to adapt the house to you, rather than you having to adapt to the house.

    Gira G1

     

    Help may be required to commission the system

    A self builder might be able to lay the cabling ready, as any other cabling would be installed, but it is advisable, and probably cheaper, to have an expert commission the system for you. That involves using a piece of software which they can even do remotely. If any additional switches are required, for example other kit such as a ceiling fan needs adding to a 4 point switch, the person that commissioned the system can programme the kit and post the new 6 point switch for you to install.

     

    Passivhaus doesn’t need KNX, but you might still want it!

    Passivhaus addresses the heating energy usage and thermal loss within a building, but Paul says what KNX can do is address the lighting, hot water and ventilation to a degree, which make up a massive percentage of the energy being used. By using KNX monitoring and controls you can add the same level of energy efficiency and make savings to those.

    Paul also says that with so many Passivhaus buildings being constructed and decorated with such a high quality finish, the KNX system can be a more aesthetically pleasing alternative to traditional switches.

    sy-knx-p07-prion

    sy-knx-p07-comfortpane-abb

     

    Smart home apps are an alternative for monitoring energy but have their disadvantages

    Paul explains that one of the problems with smart home alternatives is that they tend to be provided either for heating or lighting etc and not as an overall approach.

    “So straight away you’re already talking about multiple layers. You’re adding in complication and the idea of all of these systems is really to simplify your life. So do you really want your house run by 12 different apps, different systems, or do you want it run by 1 different app?”

    Paul also uses the examples of the Apple home care kit and Google’s Nest product. His personal view on their business strategy is that they want you to buy new, or upgrade, products on a 2 or 3 yearly basis. An additional problem with this is if you have a system which they decide to stop supporting you could be left with kit that is completely redundant.

    KNX_PARTNER_RGB

     

    Transcript

    Download a transcript of the interview with Paul Foulkes.

     

    Find out more

    Visit the website of Echohouse

    Find out more about KNX

    Follow Echohouse on Twitter

     

    The Autonomous House for sale

    Owners of The Autonomous House, Mike and Lizzie, are thinking of selling their ultra low-energy eco-build house in Worcestershire. The house was designed to the exacting Passivhaus standard, though is not certified. They also took their project a step further and decided to live off-grid and aren’t connected to the mains water or sewage.

    It’s an incredible and rare opportunity to buy such a house. So if you’re interested and would like more information while avoiding the estate agents, then let us know and we can put you in contact with Mike and Lizzie.

     

    The Hub update

    Our latest episode of the Long Barrow Passivhaus story takes the opportunity to look at why Alex Baines was keen to use Insulated Concrete Formwork on his project.

    We also have a new module on roofing which looks at the different types available, the support required underneath, cold roofs, warm roofs, etc.

    If you’re not yet a Hub member, then take a look at this video we have made, which tells you everything you need to know about what we can offer, and shows a sneak peak inside.

     

    Please connect with me

  • HPH132 : What is modular design and how does it work? – with Peter Schneider

    HPH132 : What is modular design and how does it work? – with Peter Schneider

    Peter Schneider explains how modular homes are built, and why they are an ideal replacement for traditional manufactured mobile homes.

    Peter Schneider

     

    Interview with Peter Schneider

    Peter Schneider is a senior consultant at Efficiency Vermont and the Vermont Energy Investment Corporation (VEIC), a non-profit organisation which aims to reduce the long term and immediate costs of energy.

    6 years ago he began looking to achieve the Passivhaus standard in modular homes built at a local factory.

    Exterior_edit2 copy

     

    Modular homes can be made from single or multiple boxes

    They work with 16ft wide modules of varying lengths and have an exterior thermal envelope which houses the insulation, air barrier and weather barrier siding.

    017

    Multiple boxes on the same floor level are typically connected by an uninsulated wall with interior door openings, or just open spaces to move from one box to the next.

    For boxes that fit on top of one another, there is a ceiling and floor system that connect together which provides rigidity when transporting and lifting the modular homes into place.

    The boxes are built in a factory and transported on a flatbed trailer and delivered to the site where they are lifted by crane and set onto a foundation. The boxes are then moved together, fastened, fixed to the foundation and to themselves.

    A series of detailing with regards to airtightness, the weather barrier, and the siding needs to be done on site, but typically the houses can be delivered, installed and made airtight and weathertight within a single day.

     

    More complicated forms will have cost implications

    Designs aren’t limited to four sided boxes but in order to take advantage of the modular build process with regard to cost and performance they generally do use the simple geometry of putting boxes together.

    Peter says that any forms can be built with this system, but there are cost advantages to getting as much built in the factory as possible as it will minimise the amount of work needed on site, which is typically where extra costs will occur.

    “The simpler the number of boxes, the less work that needs to be done on site, the better cost optimised the modular approach is.”

     

    Modular homes traditionally have a stigma of not being as good quality as custom houses built on site

    This is something the industry is working to change and Peter believes that builders, home owners and architects are beginning to see the value of working with modular manufacturers.

    A benefit of factory building is that they are being made within a climate controlled environment, and aren’t susceptible to the problems of delays and trying to keep materials and equipment protected from weather on site. This results in a faster build process, and with a very close eye on attention to detail in a lot of factories, is producing homes which Peter says are exceeding the quality, creativity and performance of custom built houses on site.

     

    The width is restricted by transport legislation

    Rules vary according to State, but in Vermont the maximum width allowed to travel down the road is 16ft. Length can be unlimited with homes typically being delivered of around 70ft length, which incorporating the truck means a full length of around 100ft. There may however be limitations in transporting something of that size when it comes to corners and inclines, so the route from the factory may determine the length that can be delivered.

    With a 16ft width restriction it wouldn’t make sense to choose an 18ft or 20ft model, as the cost implications would mean that you wouldn’t be taking advantage of the modular construction.

    Because of the stresses of transport and being lifted by crane, there can be structural implications to modular homes, where certain things that might work well on houses built on site, therefore wouldn’t be applicable to modular.

    IMG_7774
    Feature Image

    As well as potential width and geometry limitations, an area that could be compromised is the attention to detail on site. There must be clarity with the user manual and instructions from the factory to ensure that the boxes are tied together properly, the airtight and weathertight barriers are installed correctly and in the way that the factory intended. Something more factories are doing is sending their own crews to finish the homes on site, ensuring everything is done the way they intended, and even warrantying the houses themselves and providing any follow up maintenance.

     

    Modular homes can be an answer to an affordable home shortage

    Historically, affordable housing has been concerned with initial cost price. However, lower cost homes tend to come with the drawbacks of worse insulation, poor windows, doors and airtightness. These aspects of lower cost construction result in higher maintenance costs and rising energy prices, making it difficult for lower income residents to build wealth. Additionally these types of homes can even depreciate in value.

    These types of homes traditionally have been manufactured mobile homes. They’re delivered and remain on a steel chassis and while they may be very low cost up front, the poor air quality, ventilation, product choices and energy usage are costly to the residents.

    “We’re not quite 1 out of every 10 homeowners in the country living in a manufactured home, but we’re not far under that. So we have a lot of people living in these manufactured homes and they’re burdened by living in a home that’s losing asset value over time, and a home that’s very hard to build wealth and actually get out of. So we have a lot of residents who will be in these homes 20/30 years until they’re really uninhabitable. “

    Instead, Peter says they are looking at life cycle costs and how they can help homeowners and tenants to have better, healthier housing, with an opportunity to reduce maintenance and operation costs, while also helping them build wealth.

    “Right now we’re showing that in the lowest income sector, that is sort of our mobile homeowners, we can deliver a home that on a monthly basis is going to cost less than the alternative home that is a manufactured home, mobile home, it’s going to cost less month one. That is its energy plus mortgage cost. And this doesn’t even factor in all the non-energy benefits like the health implications that you have living in a home with poor ventilation and high off-gassing materials.”

    VERMOD

    IMG_2808_edit

    image5_edit

     

    Transcript

    Download a transcript of the interview with Peter Schneider.
     

    Find out more

    Find out more about Vermont Energy Investment Corporation

    Visit the website of VerMod

    View a VerMod presentation

     

    National Self Build and Renovation Centre Summer Show

    Ben Adam-Smith will be speaking at this event on Friday 17th June on the subject of “Behind the scenes of self build”, looking at the lessons he has learned in trying to build a house. Tickets are only free if purchased in advance online.

    Even if you can’t make this session it is worth checking out the NSBRC website to see when their next event is happening.

     

    The Hub update

    This month we have added another chapter in the Long Barrow Passivhaus story. The house uses an Insulated Concrete Framework construction method, and in this chapter we’re looking in greater depth at it’s pros and cons, the role it plays, and why there’s a lot of steel on this project.

    For more information about the group Facebook page, the quarterly progress calls and to see everything else it has to offer, check out The Hub.

     

    Please connect with me

  • HPH130 : A Passivhaus barn that embraces contextual design – with Lisa Jackson

    HPH130 : A Passivhaus barn that embraces contextual design – with Lisa Jackson

    Planning consultant Lisa Jackson talks us through her Fox Barn Passivhaus self build project.

    Lisa Jackson 4

     

    Interview with Lisa Jackson

    Lisa has been running her planning consultancy business for the last 7 years. She also trained as an assessor for the Code for Sustainable Homes, which is what started her interest in energy efficiency and thinking about building in a different way. Her husband has a background in construction and is a town planner, so their combined skills in sustainability, construction and planning, all proved invaluable when it came to taking on their own self build project.

     

    RICS Red Book was used to get a valuation of the potential plot

    Originally Lisa and her husband had bought the house next door as a DIY project. It was the worst house in the village and they realised they couldn’t afford to develop it the way they hoped, but it was on a really good plot. So they approached their neighbour who agreed to sell half of his plot for them to build their house. Lisa and her husband owned the access and the neighbour owned the frontage. After getting the plot professionally valued via the RICS Red Book it was determined to be a 50/50 split. They came to a formal arrangement, whereby should planning permission be granted the neighbour would give them the option to purchase the land.

    Lisa Jackson 3

     

    Don’t be afraid to revise your planning application

    The house needed to be relatively low key and contextual in terms of design, as it was an infill plot between a thatched cottage and a one and a half storey bungalow, and was replacing a single storey agricultural barn style of building. They achieved planning consent for a 4-bedroom house.

    However, after more research, Lisa and her husband decided they wanted to build to Passivhaus standard. With the help of timber frame specialists Touchwood Homes they were able to adapt the designs relatively easily. They worked on increasing the insulation and reducing the amount of glazing on the north elevation.

    They then submitted a section 73 application with the changes and were issued with a new consent.

    Lisa points out that if you’re looking to buy a plot of land which has already been granted planning consent, you shouldn’t feel coerced into using that design. She says that there’s every opportunity, if it stays within the constraints, to make changes using the section 73 application for the interior and even some of the external features.

    Lisa Jackson 2

     

    “Don’t make a planning application for what you want, make a planning application for what you’ll get consent for”

    This is advice that Lisa gives to her clients. She suggests looking at all the guidance (in terms of conservation areas, village design statements and character studies) and making sure that your application is policy compliant. She thinks it can be easy to get carried away with designing the house that you desperately want to build, but if it doesn’t pay any regard to its context then the application is likely to fail.

    From her own experience as a planning officer, Lisa advises careful consideration of how drawings are presented in the planning application. She often found CAD drawings to not fully reflect how the building would look, have little light and shade, and no feeling of the materials. In comparison, hand drawings would often bring it to life more effectively.

    “So presentation to my mind is everything and winning over the hearts and mind of that planning officer, because that’s what you’ve got to do and they’ve got to love it like you do.”

     

    People want certification if they’re buying a house without radiators!

    Lisa’s decision to go for Passivhaus certification was partly based on being a sensible business decision to enable her to persuade clients to go for certification. Having the certification also helps with the re-sale, because it demonstrates to potential purchasers that while it may not yet be the conventional approach, it actually does work.

    Lisa Jackson 1

     

    Live nearby to your plot during construction

    After selling their old home to release equity to finance the project, they decided to rent a nearby house. Lisa fully recommends that anyone doing their own self build.

    During the construction Lisa’s husband was diagnosed and treated for cancer. As Lisa says, the silver lining was that he was able to spend his recovery period on site project managing the build, which actually aided his recovery and gave her the time to concentrate on running her business.

     

    Certain jobs fall between trade skills

    The house was made from Touchwood Homes’ ‘light and tight’ timber frame which was pre-cut off-site, and insulated with Warmcel recycled newspaper.

    They used a local team of tradespeople who they were very pleased with, but still found that they ended up doing some of the work themselves where certain jobs fell between skills and there was no one else to do it.

     

    A good mortgage broker can really help if you need to re-finance

    During the winter of 2011 they realised that there was a gap in their finances of £60,000. They managed to borrow some of the money from a relative, but also had to extend their mortgage – a process which Lisa says was made more difficult by the providers’ lack of knowledge about what’s involved in the self build process. She does however credit her mortgage broker with being a huge help and making a big difference.

     

    Take professional advice where possible

    When they moved in 3 years ago it still felt like a building site, but completing the landscaping after the first year made a huge difference. Also, creating happy memories in the house turns it more into a home.

    Lisa recommends taking good professional advice where possible and she suggests that if you’re looking for a good planning consultant go through the Royal Town Planning Institute or look at the Planning Portal to see who’s managed to get planning permissions in your area.

    She also feels in hindsight they should have employed the services of a lighting designer, as they slightly over-specified on lighting.

    Above all she thinks you need to be brave and prepared to put in the hard work. She says her husband thinks it took him a couple of years to really recover from the whole experience, however he is already talking about the next one!

    Lisa Jackson

     

    Transcript

    Download a transcript of the interview with Lisa Jackson.

     

    Find out more

    Visit the website of Jackson Planning

    Follow Jackson Planning on Instagram

     

    NSBRC Summer Show

    The National Self Build and Renovation Centre are holding their summer show on June 17th to 19th. There will be exhibitors, seminars and a variety of experts and self builders taking part, including Ben Adam-Smith! Ben will be talking at 1pm on Friday 17th June about the Passivhaus standard. Throughout his time on this podcast he has visited over 30 certified Passivhauses and is keen to share the experiences and advice he has been given along the way.

    Following Ben’s talk there will also be a meet-up for Hub members, so he’s looking forward to seeing you there!

     

    Please connect with me

  • HPH129 : Setting up a cohousing scheme – with Chris Wilson from K1

    HPH129 : Setting up a cohousing scheme – with Chris Wilson from K1

    Chris Wilson explains what has been involved in setting up the K1 cohousing scheme in Cambridge.

    Group Photo

     

    Interview with Chris Wilson

    Chris first became aware of the potential cohousing scheme in 2012 after seeing information on the Cambridge City Council website.

    He had worked for a consensus based non-profit company and knew of people who happily resided in another cohousing group, and so after attending the initial meeting he decided to get involved. Being part of a wider community and having a safe environment in which his kids could grow up were among the key benefits.

    Chris has since been elected Chair of the group and is also a director of the Limited Company that has been set up to oversee the financial matters.

    ©Town
    ©Town

     

    The land is owned by Cambridge City Council

    The land allocated for the K1 scheme is part of the Orchard Park development in Cambridge and is owned by Cambridge City Council. Originally the site had been allocated to a developer, but when they pulled out, consultants who were working with the council encouraged them to use the site for a cohousing project instead.

    They agreed that instead of using the marketing budget they’d had for selling the land to a commercial developer, they would use it to facilitate the formation of a cohousing group, and to find a developer to buy the land and build the houses on it.

    The planning application has been approved for 42 houses on the site.

     

    Consultants have been providing valuable support

    Chris says they were lucky to have the council marketing budget to help get them started, together with the support of the two consultants who were working with the council.

    In 2012 the consultants organised a series of workshops to help the group get to know each other and identify what they wanted to do. Together they produced a client brief setting out what the group wanted to use the site for, roughly how many houses there would be, what shared facilities they wanted and the layout of the site.

     

    The design is almost complete

    Cambridge Architectural Research created the first draft site layout which incorporated 37 houses, a common house and some shared parking and gardens.

    After appointing TOWNhus as their developer and Mole as their architect, the designs were gradually honed through workshops and a consultation process.

    The external appearance is fixed by the planning permission, and the internals are going through a detailed design process for the next 15 weeks. When that has been completed the order will be sent to Sweden for the structural panels to be made.

    The client brief had wanted the houses to be built to the Passivhaus standard, however the TOWNhus system couldn’t provide Passivhaus at an affordable level to make it feasible. Instead they will be using their standard climate shield system which has high levels of insulation and energy efficiency at 75-80% better than building regulations.

    They plan to have no gas on site but use renewable energy for heating, hot water and power. Food will also be grown in the gardens and a car club will be set up.

    ©Town
    ©Town

     

    Ongoing maintenance costs are an important part of the budget

    Lawyers are currently working on the lease and contract between the City Council, the developer and the cohousing group.

    While the group is refining the budget for the build they are also considering the ongoing maintenance of the project and all its shared areas. This includes costs for consultancy, professional support, equipment for the common house and common areas, gardening and management.

     

    Members are still being recruited

    A Limited Company has been set up to manage the financial matters, for which any of the members can stand to be a director.

    Members are encouraged to join at least one of the working groups which have delegated authority to make decisions and plan various aspects of the project. The working groups include Legal, Community, Membership and Publicity.

    With 42 houses due to be on the site, the group currently have 25 members who have reserved places, and 21 members who are still considering it. The group are still actively recruiting to try and get as many of the 42 as they can.

    Each of the members have invested a £250 non-refundable membership fee, and a refundable investment fee of between £1,000 and £5,000 into their company (CCL) which is used to pay for professional services. They anticipate the total amount all members will need to invest by the end will be between £2,500 and £5,000.

    25 of the members have also paid a reservation fee of £1,000 to the developer. They expect to exchange contracts and pay a deposit of 10% later this year, which will be in the region of £25,000 and £40,000 depending on the house.

    The slow pace of the project has led to some members pulling out

    The group have worked hard to maintain a variety of unit types and prices and they hope to attract people with a range of skills and abilities. Attracting members has been challenging and the lengthy timescales of the project have meant that valued members of the community have dropped out because they needed a house sooner than the scheme could provide.

    Chris explains that people are the most important resource. A cohousing project needs people who are enthusiastic, committed, flexible and motivated. There will be challenging times and difficult decisions to make, particularly when it comes to financial matters, but it is ultimately a very rewarding experience.

    ©Town
    ©Town

     

    Transcript

    Download the transcript of the interview with Chris Wilson.

     

    Find out more

    Visit the website of K1

    Follow K1 on Twitter

     

    Other links

    UK Cohousing Network

     

    The Hub update

    This week we have produced a video walk-through to show you what The Hub is all about. You can check it out at houseplanninghelp.com/join 

     

    Please connect with me

  • HPH128 : Closing the performance gap – with Helen Brown from Encraft

    HPH128 : Closing the performance gap – with Helen Brown from Encraft

    Helen Brown from Encraft explains the ‘performance gap’ – what it is, why it happens and how we can avoid it on our projects.

     

    Interview with Helen Brown

    Helen has been working at Encraft for nearly 9 years and is currently head of their building physics department. When she started she was interested in renewable energy and micro generation, but she gradually became drawn to low energy construction in new build housing, with Passivhaus being a particular focus.

     

    Encraft are renowned for their research projects

    Previous research projects have included:

    Warwick Wind Trials – Funded by Pilkington Energy Efficiency Trust and BRE Trust, this looked at the performance of building-mounted micro wind turbines.

    Retrofit for the Future – The programme announced by Technology Strategy Board (now Innovate UK) aimed to achieve deep cuts in carbon emissions by retrofitting existing homes.

    OWLs – A project using Beattie Passive TCosy system to refurbish a block of 6 flats.

    I-LIFE – A current project funded by Innovate UK, to develop an insurance product that would guarantee a home’s energy performance.

    A possible future research project, likely to take several years in order to obtain a meaningful and large enough dataset, would be looking at the indoor air quality in homes by considering the effectiveness of different ventilation systems.

     

    ‘Performance gap’ is the difference in actual energy consumption compared to the designed intent

    The range can be from as little as zero gap, which means the house is performing exactly as intended, to as much as 200% where the house is actually consuming double the energy that was expected.

    DSCF2669

     

    The main performance gap causes:

    As identified by Zero Carbon Hub –

    • Quality of workmanship on site
    • Quality in the design stages
    • Lack of skills, knowledge or understanding either in the design stages or during construction
    • Using the wrong materials and products, not following the specification or not having a clear enough specification from the outset

     

    Effective monitoring is required to assess how well a building is performing

    Most new buildings aren’t properly monitored to see how well they’re performing, so clients aren’t well informed about how the in-use performance relates back to the design stage targets.

    If monitoring is to be performed effectively, it requires someone to review the data and feed the results back to the occupants, builders and designers.

    In the case of Encraft’s insurance product idea which sets out to guarantee a home’s energy performance, monitoring would be required in order to verify that the performance targets are being met.

    DSCF1717

     

    An airtightness test is an easy way to see if a building is performing according to its design intentions

    All buildings will have an airtightness target, though not all homes are required to have an airtightness test. In large developments it may be only 10% of them that are tested.

    DSCF0618

    Encraft have found that there is a correlation between airtightness and construction type. In situ concrete is an inherently airtight construction method which seems to consistently meet or exceed its airtightness targets, whereas masonry construction is much more likely to fail the airtightness targets that have been set.

     

    In situ U-value measurements can be compared to performance targets

    Testing whether insulation has been well installed can be achieved by measuring the temperature gradient across a wall and calculating its U-value.

    Encraft have been looking at this data from the Building Performance Evaluation programme which shows a clear performance gap between the target U-value and the actual measured U-value in the houses that it studied. Their data included Passivhaus and non-Passivhaus developments and found that the performance gap within the Passivhaus subset was much smaller than the performance gap measured across the wider dataset.

    DSCF2245

     

    ‘People factor’ affects the correlation between airtightness and total energy consumption

    Encraft have found that when they’ve tried to map airtightness with total energy consumption they’ve found no correlation, which seems like it should be wrong because in terms of building physics there should be a direct correlation.

    The reason why there is no correlation is purely down to the building occupants, which drives the variation from home to home in terms of energy use. Encraft would like to be able to somehow normalise the data to eliminate the affects of occupancy, because the people factor is the most complex and difficult to account for, while having the biggest influence on total energy consumption.

     

    Transcript

    Download the transcript of the interview with Helen Brown.

     

    Find out more

    Visit the website of Encraft

    Follow Helen Brown on Twitter

     

    The Hub Update

    Something new that we’re going to be offering our members is a quarterly progress call. This will be a private conference call for any members that want to be involved, to provide encouragement, share and resolve challenges, and perhaps even bring in a guest or two to give us some extra inspiration.

    The progress call will join our existing offerings, which include our video case study of Long Barrow, monthly modules – the latest of which is about sweat equity – and access to our Facebook group.

    The price is just £99 for the year and this is a lock-in price for as long as you stay a member. Find out more.

     

    Please connect with me

  • HPH126 : When is it right to demolish and rebuild? – with Simon Sturgis from Sturgis Carbon Profiling

    HPH126 : When is it right to demolish and rebuild? – with Simon Sturgis from Sturgis Carbon Profiling

    Architect Simon Sturgis explains the circumstances around whether it’s best to retrofit or rebuild.

     

    Interview with Simon Sturgis

    For the last 8 or 9 years, Simon Sturgis has been looking at the issue of carbon in construction. This followed a period of doing a lot of retrofit work where it seemed that huge amounts of only partly used materials were wastefully being thrown away. They decided their challenge was to be whether this could be quantified, which developed into the idea of carbon valuing: a valuation using carbon as a currency of sustainability.

     

    “To make anything takes up energy, and depending on where it’s made, it determines the sort of energy”

    People were already familiar with measuring energy usage in buildings, but Simon explains they were keen to come up with something equally familiar that related to materials, and the problems around the negative aspects of how they’re made.

    Where the material is made will determine the kind of energy that is used to make it. For example in Norway it would probably have been made using hydroelectric energy, however in the UK it would more likely have been using gas and oil.

    “So it’s really understanding that and trying to redirect our ability to make things away from, if you like, damaging carbon intensive technologies.”

     

    Ensure any new building has the ability to be recycled and re-used

    Simon discusses what you should consider if you’re thinking about demolishing a run-down old building to replace it with something new. He says that if it’s falling apart then it’s probably better to take it down and dispose of and recycle it as best you can, but build something in its place that fulfills the durability factor that the previous building didn’t have.

    In your new building, consider whether it is capable of easy recycling or adaptability and re-use. If you’re constructing it from brick then you might be confident it will last a couple of hundred years, but if you’re using timber you might say that it’s not going to last as long but at least it can be adapted, re-used or moved to do other sorts of things with it.

     

    A change of mind-set is needed

    People need to change their way of thinking to a ‘circular economy’. Simon explains that in the City of London office buildings have an average life expectancy of around 17 or 18 years, which clearly is going to have a huge carbon investment. He believes that there should be planning at the outset for a building’s eventual disposal, and with the expectation that when you’ve finished with the building it can be taken apart and the elements distributed to be re-used in other buildings, not necessarily in the same place.

    If you intend to re-use things you need to consider right at the beginning how they will be put together, in order to make it possible to dismantle and re-use them, i.e. using a lime mortar that can easily be removed from bricks, instead of cement mortar.

    Simon uses the example of a two-storey office/shed type building where, because of its steel bolt and aluminium construction, they were able to help a client to take it apart, move it to a more suitable location, and re-build it, while tidying it up as they went along. They were able to re-use around 70% of the materials and along with significant carbon benefits, it cost 25%-30% less than a new building of the same size.

     

    The cost of recycled products can be prohibitive

    This may seem counterintuitive at a glance, but it’s cheaper to buy new bricks than old ones. Largely this comes down to the cost of cleaning up the bricks from a dismantled building is high.

    However Simon suggests that if the process of cleaning the bricks was paid for through social value, for example being done by people who might otherwise be in prison, then not only could the recycled brick be bought for the same price as a new one, but you’re also contributing to social issues and turning the demolition process into a positive one.

     

    You can’t necessarily demolish any building

    If thinking about demolition, consider the following:

    • Whether it has listed building consent or is in a conservation area.
    • Possible health and safety issues if the building you’re demolishing is next to a sensitive site or railway line, etc.
    • Whether there are issues to be resolved due to party walls.

     

    A high standard of retrofit may have the lowest carbon impact

    Sturgis Carbon Profiling produced an article looking at carbon emissions over a period of time in 3 different scenarios.

    The first scenario was the carbon cost of maintaining an existing Victorian terraced house – principally in heating and energy use.

    The second scenario looked at taking that same Victorian terraced house and upgrading it to a high standard. While that does take a lot of material going into the building, it does make a huge difference to the performance and requirement for heating.

    The third scenario looked at building an entirely new Passivhaus, with its high levels of insulation and airtightness.

    Their analysis considered both the carbon emissions from the materials used, together with carbon emissions from day-to-day use. What they found was that, based over a 60 year period, it was better to retrofit the existing terraced house to a high standard than it was to build the new terraced house. The reason for this is because there is so much energy used in producing bricks and other materials for the new build.

    “So it’s not necessarily the case to say you should demolish Victorian buildings if you want to get a highly efficient carbon outcome. You need to make them work better… And in a sense we’re doing society a good service by re-using things rather than flattening them.”

     

    Transcript

    Download a transcript of the interview with Simon Sturgis.

     

    Find out more

    Visit the website of Sturgis Carbon Profiling

    Follow Sturgis Carbon Profiling on Twitter

     

    The Hub update

    The Hub is an extra learning and networking resource, tying together everything we’ve learnt from our podcasts, together with extra information and interviews. We have video case studies and currently have a number of short videos showing the different stages of the Long Barrow Passivhaus project that we’ve been following. We’ll also soon be confirming details of our second case study.

    Each month we’re also adding a new module which lays out different parts of the self-build process in simple steps.

    Our current beta launch price of £45-a-year, which is a lock-in price that you will keep every time you renew, is going to expire at 9pm GMT on 30th April 2016. After that the price will go up to £99-a-year. Find out more.

     

    Please connect with me