Tag: Alan Clarke

  • HPH305 : Building a Passivhaus with cross-laminated timber – with Mick Woolley

    HPH305 : Building a Passivhaus with cross-laminated timber – with Mick Woolley

    Mick Woolley explains how the use of timber was a key element of his award-winning Passivhaus bungalow.

    Interview with Mick Woolley

    For the last two years, Mick Woolley has been living in his Larch Corner Passivhaus which was the Small Projects winner in the 2021 UK Passivhaus Awards.

    His self build journey began following the loss of his wife. He had long held an interest in self building and took the attitude “what could possibly go wrong!”

    To watch the documentary about Larch Corner go to PassivhausSecrets.co.uk

    He broadened his search area

    Initially beginning his search in the south east of England to be closer to his two sons in Surrey, Mick found a lovely plot, surrounded by a vineyard, and just 30 miles away from them. But despite the proximity, it had taken an hour and a half to get there and was £450,000 before he’d even knocked the existing bungalow down. It was at that point he decided to abandon his search in the south east and opened up to looking at sites as far afield as North Wales and Cornwall.

    They made changes to the planning designs

    Mick saw a plot on RightMove, that seemed to be in a pleasant village location at the northern tip of the Cotswolds. Close to a National Trust garden and Stratford upon Avon, he felt he would be able to find enough to do in the area and was surprised when he managed to purchase it for around the guide price at auction. It came with planning permission for a single storey Passivhaus with a design that he admits probably didn’t appeal to everyone, and is why he thinks there wasn’t more competition in the bidding.

    Although not put off by the design, he was sceptical of its Passivhaus credentials and enlisted Mark Siddall of LEAP to re-work the plans. He did however want to keep it a bungalow to make it accessible for a family member who uses a wheelchair, but also because it future-proofed it for him too.  

    The original design had a lot of corners so they removed some of these and also had to raise the roof to ensure there was adequate head height for insulation. They swapped the entrance hall and study around to ensure a better flow into the house, and took out the many corner windows from the plans. Mark instead designed an arrangement of windows that came in 2 sizes: smaller ones for the bathrooms and bedrooms, and larger windows with seating elsewhere.

    Timber was an important element of the design

    Mick wanted to build using Cross-Laminated Timber (CLT), as much for the visual impact it provided inside as for its structural qualities. The bungalow uses 17 sections of spruce timber, which have 6 layers, are edge-glued, and don’t require an airtight membrane around the outside.

    The roof came with a cassette of insulation in it so the structure went up in two days, and had an airtight wrap over the top by the end of the third day. The walls are made of an I-frame structure with blown-in wood fibre, giving a thickness of around 600mm and a U-value of 0.1.

    The exterior of the bungalow has larch cladding.

    The foundations were pre-cut to size

    The building has a Jackon XPS foundation which was pre-cut to the required size and slotted together, with an XPS upstand that locked into the perimeter. This created its own formwork for the concrete pour.

    The flat roof has a camber of around 5 degrees for shedding water. On top of the insulation is a cold roof section of ply and bitumen that provides the finishing structure on which to put the green roof. Mick says he checks up there from time to time just to check that seedlings for trees and other unwanted plants haven’t blown in and taken root!

    He was keen to be hands-on

    With Mick being on-site throughout the build process he was keen to get involved in any way he could, so one task that he took on was the airtightness taping. His top tip for getting it into the corners is to ideally bend the tape in two in order to push it in and get good contact right the way through the junction.

    The straight lines of the 17 sections of CLT only took an hour to do, but all the other joints around the doors and windows took a lot longer!

    Mick employed Alan Clarke as his M&E engineer and he carefully designed the ventilation system so it could go through cupboards and be kept out of the way, but still accessible if needed. The full design with all of the MVHR kit was supplied as a single delivery, and Mick took on the installation of the pipework himself. Not having any experience of doing something like that, he did find it took him a very long time to put together!

    There is around 140 square metres of floating floor, which was designed to be laid to flow through without any junction strips at doors. His builder Andy took time to work out the geometry to ensure that boards were centred and wouldn’t end up with slivers at the edges, which Mick was then able to lay.

    Always make space for storage!

    Although Mick was adamant that he wanted to use CLT, he now realises that he could have been more efficient with materials and created the timber finish that he was looking for by using large sections of three-ply timber.

    If he were to do the build again, he would probably opt for a two-storey building, though still keeping a downstairs bedroom. He says that the UK housing stock is generally fairly deficient in terms of providing for the elderly and those with mobility problems, so designing at least one bedroom downstairs is really important.

    Mick says that going for a two-storey design would improve the form factor and use a lot less insulation. It is also more efficient in having less foundations and roof.

    Lack of storage space is often a real problem in typical new build homes, but Mick is delighted at the amount of space they designed into his home, including a large storage wall. He also has a double garaged sized shed, although this is currently housing lots of off-cuts of CLT and three-ply materials that are waiting to find a home!

    He emphasises why it’s always a good idea to build into the loft as that’s also potential space that can be used for storage.

    Images copyright Mark Siddall LEAP

    Find out more

    To watch the documentary about Larch Corner go to PassivhausSecrets.co.uk

    Check out the website of LEAP

    Follow Mick Woolley on Twitter

    Follow Mark Siddall on Twitter

    Please connect with me

    Subscribe, rate and review the podcast in iTunes

    Rate and review the podcast on Stitcher

    Like our Facebook page

  • HPH202 : Designing the ventilation, heating, and hot and cold water systems for Ben’s house – with Alan Clarke

    HPH202 : Designing the ventilation, heating, and hot and cold water systems for Ben’s house – with Alan Clarke

    Building Services Engineer Alan Clarke explains how he has designed and specified the ventilation, heating, and hot and cold water systems for Ben’s new house.

    Interview with Alan Clarke

    We first spoke with Alan Clarke back in 2015 where he helped answer our question of whether a Passivhaus needs a heating system. Alan’s role is to engineer the design of the plumbing, heating and ventilation within a house, and in this podcast we focus on the designs he has created for Ben’s Passivhaus self build.

    Alan’s aim is to hand over a specification that is as short and easy to follow as possible. On one hand it will act as a shopping list for a contractor to price from, but also provide basic instructions on things to be installed in particular ways, such as pipe size, thickness of insulation, types of terminals for the ventilation unit etc. It will be a comprehensive list of all of the kit required, the instructions on how to get it commissioned, and what flow rates to commission the ventilation system to.

    Start by getting the ventilation system right

    Firstly the design must make physical space for the required services, and make them work well. Alan will develop the ventilation scheme by looking at the plans and understanding the airflow, establishing which are the supply rooms and which they will need to extract from. At this early stage he will feed the information into the PHPP energy analysis programme, along with heat loss information which will help when it comes to working out the heat load details for the heating system design.

    The ventilation systems Alan uses are all Passivhaus certified. Using a certified unit tends to be cost effective as their efficiency is tested under the methodology that fits in with the energy calculation in PHPP. Some non-certified units tend to shut down the supply air in sub-zero temperatures, but the certified units have frost protection. They also have the commissioning controls to allow you to set them up in a properly balanced way, so you’re not wasting heat through unbalanced supply and extract.

    Ventilation Ground Floor Layout
    Ventilation First Floor Layout

    Larger ducts can produce a more efficient system

    With very little ceiling space the ducts can be made flat to be squeezed in unobtrusively. The downside to these is that more fan pressure is required to push the air through the narrower ducts. More fan power requires greater energy and more noise is generated at the unit. It also tends to be a system which doesn’t come with well sealed junctions in the duct work.

    The alternative approach is to use slightly bigger, round ducts which are inherently easier to make airtight junctions. This approach tends to produce quiet and efficient systems, but does require thinking more cleverly about how to make space for them all.

    In Ben’s house the ducts are spread around easily on the lower floor because there are open web floor joists which are engineered joists with a metal zig-zag, giving plenty of space to fit services through.

    Upstairs there is a truss rafter roof. In a Passivhaus they make the air barrier the base of the trusses. Lots of insulation goes on top and Alan wouldn’t want to be putting lots of ducts through that air barrier and into the cold loft space. Keeping them inside the warm, airtight envelope means that there needs to be a dropped ceiling somewhere to run the ducts through. They will be lowering the landing ceiling to accommodate the ducts, by virtue of it connecting the rooms together and not having windows so there will be no loss of window head height. The ducts stop at the bedrooms where there is a step up in ceiling height.  Here they will use a wall mounted, side throw air terminal to push the air into the rooms.

    Ben will be using a Zehnder Passivhaus-Certified MVHR

    It has a fairly large capacity so is ideally suited for family houses. It has been designed with integral airflow measuring inside the unit, meaning that whatever the conditions it will maintain the selected ventilation rate without losing performance.

    A change to the size of the kitchen and utility areas has meant that the MVHR will now be outside of the thermal envelope and inside the garage. It will be on the house wall of the garage to make the ducting run as short as possible, and the ducts will be insulated to reduce the heat losses.

    The house will have a mainstream boiler

    Alan is seeing more projects using air source heat pumps, which although they have a high capital outlay do benefit from low running costs. Using specialist imported systems can create problems when there is a fault, with a lack of qualified tradespeople available to fix them. A mainstream boiler won’t have those problems when it comes to parts and technical support.

    The hot water will have a flow restriction

    The system is designed to get hot water to the taps as quickly as possible without circulating hot water that is losing heat to the rest of the house.  Entering information into PHPP on pipe sizes and how they will match up with the flow rates and available pressure will help calculate the heat loss.

    Ben does have a concern about how the restricted flow will actually feel in the shower pressure, so it will be important to select a shower head that has been designed to work in conjunction with flow regulation.

    Hot and Cold Water Ground Floor Layout
    Hot and Cold Water First Floor Layout
    Plumbing Schematic

    Radiators have been installed to complement the flexible spaces

    Alan has considered the design of the house and how it will be used, to conclude that there will be radiators in most of the rooms. For example, one bedroom has three external walls and a balcony door so a radiator would seem sensible to accommodate people’s different comfort levels. Another spare room might have different temperature requirements depending on whether it is being used as a guest bedroom or a study.

    Heating Ground Floor Layout
    Heating First Floor Layout

    Underfloor heating wouldn’t be cost effective

    Alan explains that it is inherently a high output system, with the whole floor available to heat the space. By virtue of it being a Passivhaus the heating demand will be reduced by a factor of ten, so paying full rate to cover the whole floor with underfloor heating doesn’t seem logical.

    Find out more

    Follow Alan Clarke on Twitter

    Transcript

    Download a transcript of the interview with Alan Clarke.

    Please connect with me