  • HPH314 : Getting a self build over the finish line, despite setbacks – with Mike Coe

    HPH314 : Getting a self build over the finish line, despite setbacks – with Mike Coe

    Mike Coe gives a final update on his now complete Portree Passivhaus, that has seen budgets stretched, contractors disappear for a year, and a Covid lockdown!

    Interview with Mike Coe

    Mike Coe is a returning guest to the podcast. We have been fortunate enough to speak with him about his previous self build, Cropthorne Autonomous House, and have been following his progress since moving to the Isle of Skye to build Portree Passivhaus with his partner Lizzie. Having been in the house for a year now, we pick up where we left off three years ago, in episode 259 when the house was almost watertight, and find out whether Mike has managed to be as hands-off with this project as he had intended!

    Mike had always intended to do the MVHR installation and electrics himself

    He had started on the MVHR installation as soon as there was enough building there for him to work on. The main ducts that bring the fresh air in and take the exhaust air out, went in almost at the foundation stage, as they were assembled as the wall was being built that the ducts pass through. This way it meant they could be built into the wall, rather than having to cut out a large hole afterwards. He also started channeling out for power points before the concrete blocks were even up to first floor level.

    The specification of the MVHR was important for Mike as he wanted to build this house with no heating system whatsoever. They selected a system made by Nilan, which also contains a micro heat pump. It’s only around 60 or 70 watts, but it effectively aids the heat extraction process and makes it more efficient. It means that in the winter the heat pump comes on when the temperatures dictate it, making the incoming air temperature slightly warmer, and in the summer it provides a very small amount of cooling.

    Their only other source of heating is from a single bar electric fire which they’ve used infrequently, just for the odd hour here and there.

    It maintains a comfortable temperature

    The internal temperature on the night they moved in was just 11 degrees (with a raging storm and a power cut for good measure!) But once Mike got the MVHR up and running a couple of days later, and they had a week or two of sunshine, and with the effect of the two of them living there, it took just a couple of weeks for the temperature to rise to 21 degrees. Since then, they have been pleasantly surprised at how well it keeps a steady and comfortable temperature, even more so than the Cropthorne house, despite its larger form and having been less fastidious in the attention to Passivhaus detail. Mike suspects this is because of using the concrete blocks which, as well as providing the structure of the building, also act as a thermal store. He is conscious that the use of the concrete blocks and steel means it has higher CO2 emissions from the manufacture than that of a lightweight timber structure, but this was primarily dictated by the planning department.

    Mike’s previous Passivhaus experience paid off

    With a contractor and architect that didn’t have experience of building a Passivhaus, Mike found one of his roles on site being that of quality control. When it came to airtightness tape, he was able to show them how the standard builder’s merchant tapes would just tear like paper, yet the Passivhaus airtightness tape was incredibly strong and flexible.

    They didn’t mind and were happy for Mike to take on other pieces of work, such as some of the carpentry, especially as he and Lizzie were on site doing the MVHR and electrics anyway, and it meant the workload for their men was reduced.

    It took twice as long to build as planned

    The original plan was for a 15 month contract build period, but at the 10 month stage the contractor got called away to work on a 25 bedroom hotel extension, leaving just Mike, Lizzie and a freelance bricklayer to carry on with the work. This meant an incredibly frustrating almost year-long wait while the hotel project was finished, which unfortunately then coincided with the first Covid lockdown.

    “So there we were, with another three months added on to the almost year long delay due to the hotel build. The hotel extension was sitting there virtually complete, but they couldn’t open it because of everything was shut down because of Covid, whereas our house was nowhere near complete and nobody could work on it except me.”

    Mike managed to use that time as productively as possible to keep the project moving forward. Without being able to access new building materials as the merchants were closed, he dismantled some of the temporary stairwells that the contractor had put in so he could use the timber for building the stud partition walls. He used all the plasterboard that was laying around that he could, rescued timber that had been thrown out and used that for the stud walls, and also managed to build a new desk. Psychologically he found all this beneficial as it felt like progress was still being made.

    In total, the project took around 30 months to complete.

    Money became very tight

    With the planning department selecting the most expensive option, they always knew that the budget was going to be tight. In addition to the overruns caused by the lockdown, a number of other bills came in that caused them to go over by £34,000. This included £8,000 to install a water pipe from the mains halfway up the hill, rather than being able to connect from the supply of the neighbouring bungalow that they owned and were living in, and £750 for a tree survey to make sure that the pipe wasn’t going to damage any tree roots!

    As they were running out of money and with cash being tied up in the neighbouring bungalow until it was sold, they had to take on more of the work than they had ever intended to do. Mike had been unimpressed with the plumber who had done the first fix, so ended up rectifying some of his work and also did the second fix plumbing. This meant he plumbed the washing machine, kitchen sink, dishwasher, and the fit-out of all the bathrooms.

    With great reluctance, as it is a job he and Lizzie particularly dislike, they also ended up doing most of the decorating themselves.

    One year on, there are problems to rectify

    Having been in the house for a year, they are currently in the snagging period where the contractor will rectify some of the problems that crop up. Their contract allowed them to withhold a small percentage of the total payment, which will be paid once these have all been sorted. However, there are other problems which Mike intends to take on himself.

    The door in the lower ground floor porch was never properly adjusted and would stick and not shut fully. When he got round to looking at why this was, Mike discovered that it was actually causing a serious damp problem. The damp had resulted in the hinges corroding, with the adjustment screws for the doors then being impossible to turn.

    Something else that Mike will need to tackle, is an issue with the windows leaking. As they weren’t a standard specification that the contractor was familiar with, they installed them but weren’t confident to set them up, instead leaving this to Mike to organise. However, with all the other jobs and distractions going on, this got pushed lower down the list. With the driving rains they receive, several of the windows subsequently leak. Thankfully there are no serious structural leaks though, and when all the adjustments to doors and windows have been carried out then hopefully that should be an end to those problems.

    During a period of extremely high winds recently, part of the zinc capping that goes around the roof parapet was torn off. Fortunately it doesn’t threaten the structure of the house in any way and it’s still watertight, but it’s something else to add to the list of jobs.

    He has some carbon-saving projects lined up

    Now that they have freed up their cash by selling the neighbouring bungalow, and once Mike gets over a certain amount of self-builder fatigue, he is keen to make headway on some other projects.

    The first is installing a PV array that will make the house run more efficiently, as it will contribute to hot water and charging their new electric vehicle.

    He is also in the early planning stages of putting a micro hydro generator (a little water turbine) into a stream that runs down through their site. If it works it will likely only generate around 100-150 watts per day, but that will be for 24 hours a day and virtually through the whole of the year.

    He is adamant this will be his last self build!

    Now he and Lizzie are able to reflect on their journey, they are able to say that although lots of things went wrong, they managed to get them corrected. Although they did have the benefit of experience from their previous self build, there were still new problems that this project threw up that had to be dealt with. Overall, Mike says they are pretty happy with the end result, just not necessarily with how they got there.

    Find out more

    Visit the website of Portee Passivhaus

    Follow Portree Passivhaus on Twitter

    Follow Mike Coe on Twitter

    Catch up on previous episodes with Mike Coe

    HPH259 : Constructing the masonry superstructure of Portree Passivhaus

    HPH220 : How to finish a self build when money is tight

    HPH152 : Should you consider the resale potential of your self build

    HPH054 : Building an autonomous house

    Transcript

    How relevant is mass?

    Es Tressider is a guest on the Building Sustainability Podcast, talking about whether adding mass to a building will make it more energy efficient.

    Please connect with us

    Subscribe, rate and review us on Apple Podcasts

    Rate and review the podcast on Stitcher

    Like our Facebook page

    Follow us on Twitter

  • HPH220 : How to finish a self build when money is tight – with Mike Coe

    HPH220 : How to finish a self build when money is tight – with Mike Coe

    Mike Coe provides a progress update on his second self build project, with finances being stretched as construction is set to begin.

     

    Interview with Mike Coe

    When Mike and Lizzie built The Autonomous House in Cropthorne, they weren’t prepared for quite how popular and influential it would become. Although Mike wanted it to be ground-breaking with as few demands on the environment as possible, he was surprised at how it captured so many people’s interest then, and does even now. With The Autonomous House now sold, Mike and Lizzie have moved to Scotland and are ready to embark on their next self build project, albeit this time taking a little more of a back seat role.

    There is less enthusiasm the second time around!

    Mike was very hands-on with the construction of The Autonomous House, expecting to be staying there for the long-term, but by the end of the three years it took he suffered from self-builder fatigue and had just about had enough!

    So when they moved to Scotland they initially looked for a ready-built house that they could move into. Failing to find anything suitable they have instead purchased a plot of land and are preparing to employ contractors to take on most of the work for their new self build.

     

    This build is following a more conventional path

    Mike doesn’t recall signing contracts for the construction of The Autonomous House. Much of the team he used then was based around local networks on ad-hoc and informal bases.

    This time he is using a much bigger architectural practice, Rural Design, who have been instrumental in challenging the traditional white-rendered walls and slate roof vernacular of local dwellings in the Isle of Skye area. The processes have been more formal, with tender documents assembled and sent out to local practices. The original contract period of 12 months has been extended to 15, to enable Mike to take on some of the work, though he hopes not as much as on the previous house!

    The location has provided unique challenges to this project

    Their planning decision was delayed by 4 months because the department had only one officer while another took maternity leave! This had knock-on effects to the programme as building in the Hebrides in the winter can be very difficult and best avoided.

    The house is being built to the Passivhaus standard, so there has been additional design work involved which the local architects didn’t have any particular experience of.

    As well as the absence of a large pool of local tradespeople used to building this way, just the availability and transporting of specialised products is a challenge, with extra expense incurred and some suppliers not even delivering there.

     

    A delay could make the project unaffordable

    Mike and Lizzie built The Autonomous House in a way which reflected their desire to live there for many years, so moving on and selling up only 4 years later has meant that they have lost a considerable amount of money from the sale.

    They decided to proceed with their new project around a year ago when the pricing came back from the quantity surveyor and appeared to be just about affordable. However, when it went out to tender a year later they were shocked at how expensive the sums were being returned, with only one local contractor being any kind of an option to pursue. Mike concludes this has probably been down to a general increase in the price of materials and labour, heavy demand for contractors on the Isle of Skye, the Pound losing value against the Euro and general uncertainty about what will happen after leaving the EU. And with the interest on his savings not keeping up with inflation, the build is suddenly looking a lot less affordable.

    With these factors likely to worsen, and not wanting to be in a position where it becomes too expensive in the future to proceed, Mike and Lizzie have decided to push ahead with the build now.

    Without making a conscious choice to value engineer on the project, Mike thinks it has been built into the whole project anyway. It is however still the house they want to build and are still going to try and build.

    The method of construction is based on The Autonomous House

    Despite being a large plot, Mike and Lizzie haven’t felt pressured to build a bigger house than they need. In fact they intend all of the spaces in the house to be well utilised, with some areas having dual purpose.

    Drawing on their experience of The Autonomous House, this time they have again opted for a high thermal mass house. The structure warms up during the summer and returns that heat to the interior during the winter. It also helps keep temperatures stable in the summer.

     

    Items have been removed from the contract in order to proceed

    After discovering their chosen contractor hadn’t included certain items like floor tiles and kitchen units, they decided to proceed on the basis that as a minimum (and he hopes a maximum), Mike would take on the electrical wiring and installation of the MVHR unit.

    They have also removed a number of items from the contract, not wishing to commit to an amount they couldn’t be sure they could afford. Changes that have been made include the removal of the decorating from the contract, simplifying the plumbing, doing the pipe insulation themselves, and not proceeding with building the garage.

    “Removing all these items got us down to a price where I could say I’ve got that much money. Let’s sign it and proceed from there, and then as we get nearer the end, we’ll see how things go.”

    With no contingency fund, if they hit groundworks issues when they get started shortly then their project will inevitably be prolonged. If necessary they could move into the new house in a barely habitable condition and convert the 1960s bungalow in which they’re currently living on the site into a holiday rental, which could prove lucrative. Taking out a small business loan to do this with reasonable interest rates and flexible repayment terms would mean they wouldn’t be taking money from the budget of the new house.

     

    Find out more

    Mike is putting video reports about his project on his website. There is also a webcam providing image updates every 30 seconds so once construction starts it can be followed in almost real time on a daily basis.

    Visit the website of Portree Passivhaus

    Follow the progress of Portree Passivhaus on Twitter

    Follow Mike on Twitter

    Listen to our previous podcasts with Mike, about The Cropthorne Autonomous House and whether you should consider the resale potential of your self build.

     

    Transcript

    Download a transcript of the interview with Mike Coe.

     

    Please connect with me