Tag: developer

  • HPH403: From landlord to high-performance developer – with David Bradley-Bowles

    HPH403: From landlord to high-performance developer – with David Bradley-Bowles

    David Bradley-Bowles, Director and Consultant at Pure Spring Meadows, explains his shift from landlord and renovator of Victorian properties to developer of more than 40 new-build Passivhaus homes. He shares hard-won lessons on scaling up, financing sustainable projects, protecting quality on site, and hints as to where the future of high-performance housing might lie.

    Interview with David Bradley-Bowles

    Between 2004 and 2015, David renovated and let Victorian homes, but he grew tired of the endless problems that kept “coming out of the woodwork”. Rather than continuing to patch up ageing stock, he looked at the blueprint side of things — how to build good quality homes first time round that would last for the duration of his business. This eventually led him to Passivhaus.

    Start small to prove your concept before you scale

    David’s journey began with a two-home scheme in South Bradford, valued at less than half a million pounds, before moving on to a twenty-home development and then affordable homes with a community group. This deliberate progression was all proof of concept. Each step roughly doubled the value he was working with, and each step was necessary to convince investors and lenders that his team could deliver. Jumping straight to a large scheme would have exposed him to levels of financial risk and operational complexity he simply wasn’t equipped for. For anyone dipping a toe into development, the message is clear: build your track record incrementally, because every layer of scale brings its own barriers and demands a different set of skills.

    Quality is often lost on site

    David is blunt about where things go wrong: the corner-cutting tends to happen once subcontractors are appointed and come under pressure of programme and cost. Fabric-first design doesn’t fail on paper; it fails when remedial trips aren’t made, when the next phase of works progresses before the fabric is complete, and when nobody is on hand to catch the errors. Insulation can be managed through continuous inspection, photographs and calling people out repeatedly. Airtightness is harder still — a building can pass a test and then be compromised by the next trade that arrives on site. If you’re delivering a high-performance project, budget for rigorous quality assurance as a core activity, not an optional extra.

    You buy control of price by giving up control of quality

    This is one of the sharpest tensions in David’s story. Keep everything in-house — recruit your joiners, train your own team — and you retain control of quality, but you carry all the risk on day rates and hourly rates while your capital is tied up. Move to the conventional construction model, where a quantity surveyor packages up the trades, tenders them competitively and brings the costs down, and you gain control of price but lose control of who actually turns up. Worse, David found that entire subcontracting teams could change over mid-project with nobody telling him, and the new arrivals would be unaware of the attention to detail required.

    Set expectations and build relationships with the team

    When David moved into contracting himself, he learned to embed non-negotiables into the paperwork from the outset: clarity on what’s being built, which details will be insisted upon, that work will be inspected and recorded, and that underperforming teams will be called back. But he’s equally clear that the contractual piece only prevents disputes going anywhere — it doesn’t motivate anyone. The real work is building relationships, supporting subcontractors so they don’t make costly mistakes within their own teams, and making sure that when you do call them back to the agreed specification, it doesn’t come out of the blue. Values have to be trained down through a team at a pace at which it can absorb them, with those conversations happening daily on site rather than surfacing eight weeks in.

    The planning system is still getting to grips with Passivhaus

    High-performance design frequently clashes with planning conventions, as David discovered. His homes were oriented due south to optimise for solar access — until planners asked him to rotate them to sit perpendicular to the road. North elevations had deliberately small windows for thermal efficiency, triggering objections that there weren’t enough windows, until the planners actually counted them and found the same number, just smaller. His argument that the street scene is effectively a utility area — parking, bins, comings and goings — while the garden side deserves the aesthetic attention, takes time to land. The lesson is that you should build time into your programme for educating the people approving your application, and recognise that you’ll win some of these arguments and lose some. Developer-led design autonomy has limits.

    Passivhaus at scale is cheaper than you think — but time is the hidden cost

    David puts numbers on the common assumption that building sustainably costs a fortune. At scale, he says you can build a Passivhaus for between £1,600 and £2,000 per square metre, which is not that much more than a traditional build — and considerably less than self-builds, which typically run upward of £3,000 per square metre. The real cost creep comes from elsewhere: rework, interrupted programmes and call-backs, all while interest charges on your lending continue to mount. Time, not materials, is probably the biggest cost in construction. A scheme that runs smoothly, consistently and without interruptions is what protects your margin.

    One quiet year in the market can sink a build-to-sell developer

    Construction costs have risen around 40% since 2019, interest rates jumped in 2023, land remains scarce and expensive, and landowners often sit on land rather than sell at market value. Against that backdrop, build-to-sell margins are razor thin, and it only takes a slow market to tip a developer over — which is precisely what happened to David’s construction company, which went into administration at the end of a quiet 2025, compounded by high delivery costs on its scheme. The sobering takeaway for anyone eyeing development: model your downside as carefully as your upside. If land is expensive and everything else is a fixed price, “you’ve got nowhere to go.”

    People want these homes — but location is still the biggest driver

    Do buyers actually want high-performance homes? Yes, David says, but with a big caveat. When very few homes are built to this standard, buyers have to weigh the property against where they work, where their family lives, schools and commuter links — and location can trump quality for five practical reasons. Add the “Marmite” factor of unfamiliar design (timber frame, larch cladding, cement wood fibre board, rusted Corten steel, mono-pitch roof loaded with solar, no dormers or bays) and roughly half the market is put off at first glance. Yet David finds perceptions shift once people step inside, where south elevations flood the interiors with light despite social media chatter about the small north windows being “dark and dingy”. Familiarity breeds acceptance, so every unconventional scheme nudges the market along.

    Change will come from social housing and build-to-rent, not the private sector

    David is a strong believer that the industry changes through affordable housing, housing associations and government-led projects. These organisations measure different things — customer satisfaction, homelessness numbers, people housed — rather than a profit-and-loss statement, and they hold stock for decades, so they can afford to spend more than the bricks and mortar are worth. Build-to-rent models are similarly robust because completed homes go straight into occupancy rather than being exposed to market highs and lows. He contrasts the UK, where the big five housebuilders control 80% of output and squeeze subcontractors on price, with Germany, where SME builders make up 80% of the market. For that structural picture to change in the UK, government and local housing policy must do the driving.

    It’s difficult to scale community-led projects

    Schemes like LILAC in Leeds are, in David’s words, amazing — but they take a long time, and they remain niche. Community Land Trusts (such as RUSS in Lewisham) are typically driven by people without the necessary skills at the outset, without a scaling plan or a way to develop and share that skill set commercially. Their not-for-profit, charitable position makes it hard to attract investment, and each new project faces lender scrutiny and has to assemble its own delivery team, effectively starting from scratch. They’re valuable demonstrations of what’s possible, but if you’re hoping to influence mainstream housing, the bigger levers sit with social housing providers and the big housing associations, more of which now have in-house construction arms.

    Buy yourself more time than you think you need

    Asked what advice he’d give himself, David is unequivocal: give a project a lot more time than you think you need. With time, you can revisit engineering and designs, examine your exit routes, rework, and add in training — all without the pressure that causes quality to slip. Time is one of the biggest pressures in the industry, and it interacts dangerously with every other lesson in this episode, because delays inflate interest costs while rework inflates programme costs. Alongside time, David credits his resilience to accumulating experience across every role in the sector — from hands-on renovation and project management to planning, quantity surveying, contracts and financing — so that risks can be spotted early and mitigation planned. You don’t need to master every discipline yourself, but understanding where the cracks appear is what lets you prepare.

    Suggested further reading & resources

    Please connect with us

    Subscribe, rate and review us on Apple Podcasts

    Follow Ben Adam-Smith on LinkedIn

    Follow Ben Adam-Smith on Bluesky

  • HPH307 : Can you have integrity as a housing developer? – with Mike Webb

    HPH307 : Can you have integrity as a housing developer? – with Mike Webb

    Mike Webb explains why he chose to build to high ecological standards even though he could’ve made more money by just complying with building regulations.

    Interview with Mike Webb

    Mike Webb grew up in South East London but had his first taste of construction in Tenbury Wells, where he helped refurbish a 17th century, Grade II listed coaching inn. After selling the hotel he and his wife Audrey started investing in property. Mike has also built his own home and ran his own solar PV company. More recently he took on a major development in Seaton, Devon.

    The Victorian house in Seaton Beach

    Mike moved quickly when he recognised the opportunity

    In 2015 Mike was walking along Seaton Beach promenade when a chance remark from one of his friends alerted him to the potential of a site: “If I win the lottery tonight, I’m going to buy that house.”

    The location was impressive with views straight out to sea but the dilapidated Victorian house was squeezed between two bigger buildings. There were also signs of regeneration in the area with the recent arrival of the Jurassic Coast Visitors Centre, a new Tesco and new housing around the corner. Mike bought the property within seven days.

    Well established relationships helped him secure finance

    After putting together a broad-brush business case for the project which included the value of the plot, the cost of demolition, the cost of the build on a square metre basis and also the best guesses of the values upon selling, Mike approached a long-standing friend and asked to borrow £2.5 million.

    “If you’ve got a friendly banker in your pocket, it’s always helpful. But he did say right at the get-go, “Happy to bank roll this one, but don’t ask again.” So I knew the terms of engagement from day one.”

    As a rule Mike doesn’t normally work with friends but he knew that this was the only way to make this project happen.

    And his ‘banker’ did get all his money back with the profit share… and has even enjoyed some of the accolades that have come to this award-winning building.

    ‘Maximising the planning potential’ freed up money to invest in quality

    Mike explains that in property embracing the old adage ‘location, location, location’ is essential. Blessed with a seafront plot, the next step was gaining consent.

    “We fought hard to get eight individual apartments on there at a relatively cheap cost per plot acquisition basis. So as a consequence, we’d got a little bit in hand. And also I’d got the confidence of a friendly banker with a fairly competitive interest rate for development finance.”

    Clifton Emery in Exeter, were commissioned to come up with an iconic building that would get the planning gain. Although the scheme was refused initially with a little tweaking it was approved 9 months later (but this delay came with considerable additional costs).

    Keep developing your skillset

    At a CPD (Continuing Professional Development) at Coventry University Mike met Emma Osmundsen and learned more about Passivhaus. Her talk about building better struck a chord and had planted the seed for making this a high performance development. Emma later shared some contacts with Mike, notably that of Tomas Gartner, an architect who specialises in Passivhaus and at that time was working with Gale & Snowden Architects.

    Quality sells

    With a strong sales and marketing background Mike is always considering the objections of potential buyers. Doing everything to the best of his ability stacked the deck strongly in his favour.

    “Whilst the location was amazing, we then made it super eco. We made it super safe because for example, we’ve got smoke vents, misting systems, dry-risers, sprinklers in the building.”

    A comprehensive specification helped the tender process

    Having gained planning consent, architect Tomas Gartner took over and adapted the scheme from a standard build to a Passivhaus project. With a full bill of quantities and lots of attention to detail tender documents were produced and sent out to five shortlisted builders.

    Mike believes the biggest risk of the whole scheme was hiring a contractor that couldn’t deliver to the required standard. Classic Builders Southwest were appointed after careful consideration. They weren’t the cheapest but Mike had confidence in them having seen some of their other schemes and he had developed a good relationship with their senior management team. They also could deliver the project in the shortest time.

    External factors caused some costs to rise

    While Mike tried to nail down cost as much as possible, there were certain supply chain issues in light of Brexit and then disruption with COVID.

    Upskilling the team came with multiple benefits

    Mike says one of the best things they did was take the teams from Classic Builders and Fords of Sidmouth for training at WARM in Plymouth. This had been Tomas’ recommendation.

    Collaboration and education

    Training helped the team understand the goals of the project and how they would need to work on site to deliver them.

    Only with buy-in was it possible to achieve these stringent standards.

    Tomas also suggested that Mike train as a Passivhaus consultant so that he had a deeper understanding of the job.

    Where there’s a curve there’s a cost!

    While the original architects were charged with making the building iconic they were not planning to deliver a Passivhaus. So their initial designs left all sorts of challenges for Tomas and the team.

    “In terms of the costs, there was a little bit of a bun fight between ourselves and the QS and the main contractor as to some of the finer points and detailing of this. It took a while to get it done, it slowed the programme down, but I’ve got to say the execution of the project by Classic (Builders), the way they delivered it with their supply chain, the curves are absolutely immense. If I did it again, I probably wouldn’t bother.”

    The structure of the building changes as it gets higher

    There are various reasons why the building uses more than one construction method.

    At the ground the building must be able to withstand flooding. Mike explains that it’s effectively been built on a beach in a flood zone and protected by a sea wall.

    87 concrete piles (13 metres deep) hold up a concrete ring beam, which is insulated from beneath.

    “We start our insulation level well below the finished ground level. We then have a robust concrete box that was poured in situ, and that has external EWI wall insulation on it. We then had a concrete transfer slab that has 20 tons of steel in it and there were about 20 lorries of concrete went into it, but it’s 325 mm thick, and it oversails the footprint of the building. So you can imagine the structural engineering challenges to get that to support the remaining building cantilevered above the concrete box beneath.”

    At this point construction switches to Porotherm clay blocks which are wet plastered on the inside with a parge coat to give you good airtightness detail and rendered on the outside so is a very simple rainscreen cladding.

    Each of the Porotherm floors then support concrete planks that are then suspended off the central spine wall which is again built from a Porotherm block but it’s a solid core, one that’s filled with concrete to give us some thermal mass within the building.

    Structural thermal breaks have been used for the balcony

    Finally ‘a timber frame bungalow’ is perched on the top, which is the penthouse. This was clad in zinc.

    A Bauder EPDM roof went on the very top… with one of Mike’s most complex solar PV installations.

    The view looking down at the roof from a drone

    Have faith in putting the environment first

    Mike concedes that he could have made more money by lowering standards but that’s just not how he wants to operate.

    “We’re not all about the bottom line, we’re all about the quality and the ongoing benefits that that building will give for its lifetime. So yes, we do sacrifice profit for the environment, which is a bold statement for a small company. Me and my wife have a modest existence. We’re not particularly flash rich people, we don’t need to be. We enjoy doing what we do. And as long as we cannot lose money on it, it would be nice to do another one and another one and another one.

    Mike is proud of what he’s achieved

    Pride is perhaps the most interesting measure of this project.

    Mike reflects on the factors that have contributed to these properties selling well and for good money.

    “Would we have sold the whole of the apartments for over £500,000 without the curves? Because of location, probably yes. Would we have sold them for over that sort of figure without the Passivhaus certification? Probably yes. But these are always going to be the known unknowns in this journey of ours. I think looking back on it, it’s a building that me and my team can be suitably proud of delivering. And the curves certainly do set it apart from anything else on the seafront.”

    Seaton Beach is the first multi-block certified to Passivhaus Plus standard in the UK.

    Find out more

    Visit the website of Seaton Beach Developments

    Visit the website of Classic Builders

    Visit the website of Fords South West

    Visit the website of Norrsken

    Follow Mike Webb on Twitter

    Transcript

    Download a transcript of this episode

    International Passivhaus Open Days

    One of the best ways to understand what a Passivhaus is by visiting one. Fortunately the International Passive House Association organises Open Days twice a year, once to understand summer comfort and then again to see how Passivhaus comes into its own in winter.

    Find out who is taking part.

    Please connect with me

    Subscribe, rate and review the podcast in iTunes

    Rate and review the podcast on Stitcher

    Like our Facebook page

    Follow us on Twitter

  • HPH253 : Would property investors buy sustainable homes? – with Rob Bence

    HPH253 : Would property investors buy sustainable homes? – with Rob Bence

    Property developer and podcaster, Rob Bence, advises on what’s needed for undertaking a successful building development project.

    Exploring a new House Planning Help construction project

    For the last 6 years we have been following House Planning Help founder Ben Adam-Smith on his self build journey. Having completed this in 2018 Ben is now beginning a new chapter, to deliver a small scale development of high performance, ecological homes.

    As with his self build, we’ll be sharing the highs and lows right here on the podcast. So in today’s session, we look at whether it would be a good idea to target our development at property investors.

    Interview with Rob Bence

    The Property Hub, that Rob Bence started with Rob Dix, has come a long way from its beginnings producing the weekly Property Podcast. By engaging with their listeners they built a website and forum where they could interact and learn what the needs of the community were, and build their business accordingly.

    Being self-confessed control freaks has helped their business develop!

    The first stage of their business was about sourcing properties, where they often worked with developers.

    The natural next step was setting up a letting agency, enabling them to be in control of the service levels.

    Feedback from the community was that they couldn’t get good tax advice, so a tax business came next, with a mortgage service also later being brought in-house to ensure they had control over the process.

    The development side was almost inevitable:

    “And I think because we’re control freaks, we thought, we’re doing all of the other stuff. If we can build the product and then have it exactly as we want it and build it as we would choose, then we can control the whole process and the whole service journey from start to end.“

    No property will appeal to all investors

    Rob doesn’t believe that building sustainable homes would appeal to all property investors, but some are becoming increasingly interested about offering a better service and product to their clients, rather than just being focused on yield. So while it may not yet be mainstream for a tenant, there is likely to be a greater demand from investors in the future.

    Investors want hassle-free properties

    Ultimately, investors want their properties to be let quickly, and with as few issues as possible. A well-built home should make the latter more achievable.

    They also want the home to be desirable, so the periods where it is standing empty are kept to a minimum. And being a long-term investment, they are looking at capital growth.

    Rob thinks that unique, sustainable homes that are built to a higher standard will perform better from a capital growth point of view than cheaply built homes that will start to look tired after only a few years.

    Ask letting agents what typifies their best performing properties

    As they’re dealing with investors and tenants on a daily basis, letting agents are best placed to understand what makes a property desirable in their local area.

    Often it might come down to proximity to schools, transport links, and other amenities more typically found in the city centre, but actually there is plenty of opportunity to build investment properties in the suburbs.

    “When you look at the rental market in suburban areas where people do want to rent, it’s often people’s homes that they’ve moved out of. They’re not professional landlords, it’s just they’ve moved on. And often those properties are tired and dated, and I think there’s an opportunity for high quality new builds to really stand out.”

    Alternative financing options may be better than banks

    If you already have construction experience then peer-to-peer lending might be an option to finance the development. They like to see a track record, so at the very least work with a team of people who do have experience in order to build your track record another way. If it’s your first project then rates might be a little higher, but they can be flexible, willing to lend and able to allocate the money quickly.

    Beyond that, Rob suggests working with a finance broker (as opposed to a mortgage broker), and always going with recommendations wherever possible.

    Rob advises trying either of these two options to finance the project, rather than using banks. He says banks may lend to you but will want so much security against the development that you may as well fund it yourself.

    There are pros and cons to selling a development upfront

    Rob thought that agreeing a price and selling developments upfront would impress lenders, but he says actually this is not something they are that concerned with.

    What has worked well for them is getting their ‘exit’ out of the way early in the process so they know they have the money.

    What it does mean however is that you’re locked into a price and could fall foul of rising build costs, or miss out on capital growth from market changes.

    “So, it’s great and it’s nice from a security point of view, but there are some downsides. And you make a choice. You can sell them at the end and not have that security but then possibly get more of an uplift, or you can just lock-in today and know what you’re dealing with.”

    It hasn’t all been plain sailing for them so far

    Property Hub Homes made a loss on their first development but were lucky their other businesses were doing well and could absorb that loss.

    They found it a painful experience but learned valuable lessons. Rob says that while they made lots of mistakes, not having the right team of people on the project was the biggest. He recommends paying for the right people, even if they cost a bit more, because they can make the difference between a profit or a loss.

    Scrutinise your budget and plans

    If you work with a development financier or peer-to-peer lender, they will probably have their own quantity surveyor who will check your plan and figures and decide whether the project is viable, or whether you’re just being overly optimistic!

    If you want further reassurance, Rob suggests paying for an independent surveyor. The cost of a mistake or something priced incorrectly, could be more than covered by their fee.

    Rob’s main advice is to have your numbers checked right at the beginning and invite criticism and challenges to your plans, ideas and timeframes. Even if their responses may be disheartening, you should encourage them and investigate their validity. It will be a lot cheaper to investigate it before you get started than doing it later on.

    Build a quality team

    For those just starting out in development, Rob recommends forming a team that has a good estimator, quantity surveyor and someone good at procurement.

    Their own projects these days are significantly larger and their team is now made up of a construction director, senior quantity surveyor, procurement/estimator, site manager and a land buyer. He says the size of team they currently have is probably overkill for what they need, but reflects where they want to be going and prepares them for bigger projects. As he says, the cost of getting it wrong can be so big that he considers the investment to be totally worthwhile.

    www.matthewglloyd.co.uk

    Be clear on your outcome

    Understanding what you want your outcome to be will help you make better decisions at the outset. With so many decisions that will need to be made, knowing what you want from your development will help make that process a lot easier. It will also help you judge at the end whether the project has been a success or not.

    Don’t go too crazy with your first development!

    Rob says that you will learn the most from your first development; what you like and dislike about being a developer, what projects you might be willing to undertake, whether you have the right team, the right business angle, the right model, whether you’re going after the right markets, etc.

    “All those things you can have the answers in theory, but by being a practitioner, by actually doing it on whatever scale will help inform you and then guide you to make better choices moving on from there.”

    www.matthewglloyd.co.uk

    Find out more

    Visit the website of Property Hub

    Follow Property Hub on Twitter

    Follow Rob Bence on Twitter

    Transcript

    Please connect with me

    Subscribe, rate and review the podcast in iTunes

    Rate and review the podcast on Stitcher

    Like our Facebook page

    Follow us on Twitter

  • HPH214 : What self-builders can learn from commercial land buyers – with Rob Wiggans from RMP Property

    HPH214 : What self-builders can learn from commercial land buyers – with Rob Wiggans from RMP Property

    Rob Wiggans shares his expert tips on how to find a plot of land for a self build project.

    Interview with Rob Wiggans

    Rob Wiggans studied for a law degree before entering into a graduate apprenticeship with Taylor Wimpey. It was a two-year scheme where he shadowed people in each department, including production, sales, finance and technical. He chose to move into strategic land, starting off in a commercial role before moving to where he was physically going out and finding land. He now works in property investment with RMP Property (now the Property Hub).

     

    Portfolios had a fairly even split between land for immediate development, and long-term future projects

    Land Teams in each region would consist of no more than 10 people, and would include the Land Director, Land Managers who form the relationships with the agents and negotiate the deals, and an Estimator who crunches the numbers to check whether there will be enough profit to make the project viable.

    Rob explains that in his experience of national house-builders, each region would have between 12 and 18 live sites at any one time. The staff would either work in the Strategic or Immediate Land team.

    Strategic Land – In most of the strategic land cases the house builder doesn’t yet own the land. It has no planning permission but they are progressing it through the planning system and promoting it for development. They are able to progress it by having a long term ‘option agreement’ with the landowner whereby they give an initial payment of, say, £10,000 to promote it through the planning system for 10 years. If it still hasn’t progressed at that time they might offer another £10,000 for a further 10 years, and so on. If they successfully take it through planning and purchase the land they will take a 20% discount, because of the significant costs involved with promoting it through the planning system. It benefits the developer because although they are taking the risk, they save a significant amount of money on the purchase price, and also benefits the landowner who receives a good price for not having to take any risk or have any financial outlay.

    The developers will look for when there might be a new local plan being published and use that window as an opportunity to bring it forward for development. Usually they will look for land on the edge of existing settlements, or follow where the growth is going in terms of new infrastructure, such as link roads or stations being built.

    Immediate Land – This is land that the house builder owns, has planning and is ready to be built on. This often comes their way from agents who approach the national house builders. According to Rob, the network of land and planning professionals in any given area is very small, so when a good land opportunity arises it is known very quickly to them all.

     

    It’s about looking where other people might not be looking

    One tactic Rob uses is to monitor planning applications, and will approach a landowner as soon as a planning decision has been granted. A landowner being approached directly might be keen to proceed if you’re able to demonstrate that you can do a quick transaction and are offering a good land value, instead of putting it on the open market and paying agent fees (typically of 1-3%).  Rob suggests being persistent, not giving up and having the right positive mindset.

    Planning applications vary in quality dramatically so care needs to be taken with the due diligence. Things to look out for are access, ground conditions, ecology, drainage and service connections.

    “It’s a nice, idyllic flat piece of land, but people always say, ‘All the issues are below the ground, not above it,’ and when it comes to land, it’s very true.  It’s about trying to uncover the unknowns.”

     

    Establish a relationship with land agents

    Because the networks tend to be quite small, it is advisable to contact your local agents, who will be part of the network, and build a relationship with them. Rather than High Street estate agents, these might be local land agents or surveyors specialising in land.

     

    Don’t be put off by auctions

    The fear of buying at auction is always that there must be something wrong with the land. While this might sometimes be true it doesn’t automatically mean that it’s not an opportunity to be pursued. It might be at auction because the landowner’s circumstances just require a quick sale, or if there is something wrong with the land, can it be solved and can you get value?

    If you’re interested in something that has a few unknowns and you don’t have the time to do due diligence, if it fails to sell at auction you can approach the owner afterwards, say you’re interested and buy yourself some time to carry out the checks.

     

    Find out who owns the land

    By setting up an account with Land Registry, you are able to find out the owner of any piece of land for as little as £3. So if you’ve seen something you think would make a suitable plot you can approach the owner directly to see if they might be interested in selling.

     

    Trust your instincts

    “I’ve found that when you think to yourself, ‘There’s something not right here,’ and you don’t know what it is, if you don’t know and you still have that feeling, don’t do it.  Trust your gut is probably one of the biggest pieces of advice I could recommend.”

     

    Assemble your team

    Rob advises growing your team from the outset. Even for a single self-build plot he suggests employing a highly regarded and recommended conveyancing law expert, an architect, a planning consultant and a land agent. Even though you will need to pay them all a fee, you might be saving yourself significant problems in the future.

     

    Have an exit plan

    Ensure you have a clear idea of what’s going to happen once you get planning and prepare for how you’re going to build it. Engage with reviewing build costs straight away and understand those costs before you end up spending too much money.

     

    Know when to walk away

    Even if there is an opportunity that you’re really keen on, but something’s not quite working, instead of investing many months of effort then know when is the right time to say enough is enough, and move on. Rob stresses that there are always plenty of other opportunities available if you know where to look.

     

    “In simple terms, don’t see any barriers. Try and think outside the box. How can you get in contact with people for the land that you want?”

     

    Find out more

    Visit the website of the Property Hub

    Follow the Property Hub on Twitter

     

    Transcript

    Download a transcript of the interview with Rob Wiggans.

     

    Please connect with me

  • HPH169 : Embracing contemporary vernacular design – with Clare Nash

    HPH169 : Embracing contemporary vernacular design – with Clare Nash

    Clare Nash from Clare Nash Architecture talks about various responses by small developers in the UK and abroad to the challenges of creating modern communities through better design.

    Interview with Clare Nash

    Clare Nash set up Clare Nash Architecture six years ago. The team operate differently to other architects, working remotely or in co-working spaces and meeting up once a week. Her book, Contemporary Vernacular Design, How British Housing can Rediscover its Soul, naturally followed on from her Masters thesis where she researched the uses of vernacular materials and technologies in modern, sustainable housing in the UK and abroad.

    In the past, houses were inherently green

    Clare says, “Vernacular [design], I think, doesn’t really exist anymore, apart from in developing countries where people are literally just self-building.” Buildings used to be sustainable and varied in their design, using local materials and low energy out of necessity. She adds, “We seem to have lost all these really good ideas in modern housing design.”

    In the UK, there are a few exceptions including Ashley Vale where a group of self-builders actually got hands-on and developed such a strong community that others really want to live there.

    Contemporary vernacular design is a hybrid of old and new

    Clare likens contemporary vernacular design to being a mixture of the best of the old and the best of the new. She cites an architectural ‘taste test’ that was carried out in Holland, where members of the public, architects and design professionals all found this ‘third way’ preferable to super modern or a pastiche of the old.

    The residents Clare interviewed in Europe abroad unanimously liked modern homes, whereas she found people in this country quite suspicious of them. She believes this is because they tend to think of the poor quality housing stock built in the post-war period.

    Incorporating good landscaping encourages people to talk to each other

    Clare talks about contemporary vernacular design as a way to have mass produced housing that retains a sense of identity through the varied design of the homes and getting the landscaping right.

    She cites an example in Holland where a group of architects took inspiration from a Mondrian painting to create different types of good-quality houses dotted around bisecting canals and green spaces. Clare compares how this development felt like home, whereas the new build houses local to her in the UK feel like a toy town, soulless, hence the subtitle of her book.

    Faro Architekten project in Biesland, Holland

    Another case study in Wales had open-ended gardens that led to a lake at the back where residents got to know each other because they often walked there. The design further encouraged interaction by incorporating a shared garage rather than individual drives.

    Great House Farm project in Wales

    Only residents really know whether housing design works

    As well as interviewing architects, designers, housing associations and property developers, Clare made sure to speak to a good selection of the residents at each housing scheme to find out what actually worked.

    While she often heard about teething problems, these resolved themselves and some of the small developers even had the foresight to anticipate and make provision for them. Resident feedback was summarised into four categories:

    1) Comfort – is it warm enough and is it light enough?

    Clare found the levels of insulation and daylighting were better than building regulations dictate. She comments that it’s really important to have bigger windows because seasonal affected disorder could be caused by being inside so much of the time.

    2) Appropriateness – how appropriate is the scheme for the area?

    Good design takes into account culture and context (i.e. the surrounding buildings and landscape, local materials and craftspeople). Therefore you need different types of housing for different types of area. Clare gives the example of a Norfolk development where they rejected the aesthetic of individual suburban plots; the site meant the front gardens were south facing and the architects chose to only separate them minimally with green wire fencing. The result was like a barn in a landscape.

    3) Sustainability – does the design consider the embodied energy as well as the cost of running the home?

    The focus in the UK is to save on energy bills but materials should matter too. Clare found examples such as Sieben Linden in Germany where they built everything out of straw bales and timber frame.

    Sieben Linden eco village in Germany

    4) Improvement – is the housing an improvement on what is currently built locally?

    Clare deliberately sought out developments that she felt did better than the status quo, and found that on the whole residents were really happy with the quality of life afforded by the housing and sense of community. “They were just very happy to live where they lived and they didn’t want to move. Which I think says it all really.”

    The current dominant building culture in the UK restricts progress

    Clare was really excited to meet some progressive and interesting developers who are trying to do things differently with their residents and the planet in mind, but notes that the existing culture prevents widespread expansion of such practices.

    She observes that in the UK six big housebuilders are dominating the landscape and what the edges of our towns and cities look like, adding that everyone she talks to seems equally frustrated with what she calls ‘the standard redbrick box plonked everywhere’. Clare compares this with Europe where individual developments respond to local demand.

    European governments regulate development differently

    In Sweden, no more than 100 houses can be built by any one developer in any one area, which creates a diversity in housing. And in Vorarlberg in Austria, anyone who owns a piece of land can build on it as long as the design (which can be modern) is considered appropriate for the region.

    There are cultural differences on the continent as well. In Germany, people often build together in ‘baugruppen’, and they think long-term so they build very good quality homes typically passed on to the next generation.

    UK decision makers are beginning to value ‘community’

    Historically, councils have gone with the highest bidder when selling land for housing development, and the big companies can outbid the smaller ones. However, councils are now starting to see that a slightly lower bidder can deliver much higher long-term benefits. For example, mixed-use schemes improve the sense of community, making people want to stay and resulting in less maintenance and increasing the scheme’s longevity.

    Gavin Barwell, Minister of State for Housing & Planning, has said that the government is going to make it easier for smaller developers to get land and to start developing. Clare finds this encouraging and hopes it will become easier for self-builders too.

    Self-builders need to register their interest

    At the moment, planning authorities have to find out if there is a need for self-build land and then if there is, they have to provide it. In some cases it’s proving difficult to actually get councils to follow through, but Clare thinks the housing white paper will help to move things forward, saying: “I think it’s quite exciting times now. I’m really hopeful for the future of housing and house building in Britain.”

    Find out more

    Visit the website of Clare Nash Architecture

    Follow Clare Nash on Twitter

    Transcript

    Download a transcript of the interview with Clare Nash

    Please connect with me

  • HPH099 : My New Developer House has No Loft Insulation – with Luke Mahon

    HPH099 : My New Developer House has No Loft Insulation – with Luke Mahon

    It has been almost a year since Luke Mahon took ownership of a new-build developer house, which he soon discovered lacked insulation! He talks us through his experience and the ongoing battle to get the house completed.

    Luke

     

    The Property Location and Size Were Ideal

    The development was in their target area between Heathrow Airport and Reading town centre, whilst also being close to countryside. After being impressed by a show home on a similar development and hearing good reviews from his wife’s grandparents who had been very pleased with their own Taylor Wimpey home, they decided to purchase the property.

     

    Within a Month the House Seemed Unreasonably Cold and Draughty

    The large master bedroom in the eaves had been one of the reasons Luke was drawn to the house, but by the October (within a month of moving in) they were going to bed shivering from the cold and the breezes in the room. On investigating an area of the loft, Luke discovered there was no insulation!

    Uninsulated loft space
    Uninsulated loft space

    The developer agreed to rectify this but Luke was insistent that even after insulation was added to the loft space it was still uncomfortably cold and was convinced it was still lacking in insulation. Luke describes how after much arguing they agreed to cut holes in the walls – and sure enough, found no insulation! After they stuffed some insulation in there and patched up the holes, Luke was desperate to have the work completed before his family arrived at his house for Christmas, and says on the last working day before Christmas he was given paint and a roller to paint the walls himself as all the painters had gone home.

     

    The Snagging List Eventually Contained Over 400 Items

    Initially the list was at around 150 items, but over time they discovered many more. While some were very minor and things they would have expected in a new house, others were significant. The list included: cracks on walls, plasterboard not properly matching, toilets in the wrong place, wrong tiles being laid, windows at an angle, doors needing to be replaced, walls needing to be rebuilt as they had been erected incorrectly / at the wrong angle / wobbly because they didn’t have enough studs in them, air bricks too low to the ground or even underground etc.

    Luke says he had to fight for this door to be straightened
    Luke says he had to fight for this door to be straightened

    Luke Used His Marketing Experience to Get His Voice Heard

    Luke says he was tired of repair works not progressing and his calls for action being constantly ignored. As they live close to the show home he put up posters in his window to alert potential purchasers. This caught the developer’s attention and Luke says for a period of a few weeks there was communication and numerous promises but that he grew frustrated by this only resulting in minor things being attended to, at a slow pace and a poor standard of work.

    After trying unsuccessfully to resolve the issues through the on-site customer services representative, regional office and head office, Luke started his @MyHouseSucks Twitter account. He feels that it is only because of this and the media coverage it generated that he has been able to make any progress.

    Poster in the window of Luke's house
    Poster in the window of Luke’s house

    His House Was Not An ‘Isolated Incident’

    Luke says he had been told by the developer that the other houses had been checked and didn’t suffer from a lack of insulation and that his house was an isolated incident. Through his Twitter account however Luke discovered his neighbours in the development’s first phase were having similar problems and claims that, despite knowing this, they continued to build further houses on the development with no insulation. Tweets he received from owners of homes built by other developers, led him to believe that the “isolated incident” tactic is commonly used to discourage people from talking to their neighbours and uncovering the extent of deficiencies.

    Insulating going into the roof space
    Insulation going into the roof space

    CKNn2cbW8AAlnkt

    A Thermal Survey Was Conducted

    It had not been possible to have a survey of the property before completion of the purchase. Luke says he had requested one but that access was refused as it was an active building site. He pushed later for a thermal survey which uncovered the extent of the problems.

    Rectification works at the house have involved 14 weeks of workmen on site, a further 4 weeks where they had to move into alternative accommodation, and are currently going through another 4 weeks of backfilled soil being removed. In total, Luke estimates these works have probably taken longer than it took to build the house!

    Thermal image after some initial rectification works had taken place
    Thermal image after some initial rectification works had taken place

    Luke Questions the Role of the National House Building Council

    These buildings aren’t signed off by the local council building regulations department, but by the NHBC (National House-Building Council). Upon contacting the NHBC, Luke was told they would have noted the lack of insulation and asked the builder (verbally) to resolve the issue.

    Luke is shocked, that not only did they sign off his property which clearly didn’t meet building regulations, but also those of his neighbours, and all of those that he says the developer knowingly built without insulation after discovering the omission in his own house!

    With the NHBC being funded by the house builders, Luke asks of the situation:

    “These large companies who snap up all the land, build these sub-standard properties, get them signed off by a body that they’re paying for to sign them off, that don’t meet building regulations and that’s all fine?”

     

    A Happy Ending?

    Almost a year after moving in Luke says they are down to around a final 10 items on the snagging list so he can see an end in sight.

    “I’m so far beyond angry now. I was angry, probably a few months ago. I’m beyond that. I’m dispassionate about it now because it’s taken so long, it’s become part of my life.”

    Despite that, Luke foresees that once the works are completed he and his wife will be happy in their home. The reasons why they chose the house will prevail – ie the space, the light, the size of the garden, it’s location backing onto natural parkland.

    “And actually throughout all this kind of arduous year of hell, we’ve really built a really nice community here within this first phase because we’ve all got to know each other as neighbours and it’s a really great community of people here. So because of that it actually does feel like home.”

     

    Find Out More

    Follow Luke Mahon on Twitter

     

    Transcript

    Download a transcript of the interview with Luke Mahon.

     

    Please Connect With Me