Author: Lucy Cowell

  • HPH105 : How Far Should You Go with a Low Energy Retrofit? – with Bob Prewett from Prewett Bizley Architects

    HPH105 : How Far Should You Go with a Low Energy Retrofit? – with Bob Prewett from Prewett Bizley Architects

    Bob Prewett, a director of Prewett Bizley Architects, shares his approach to low energy retrofits and explains why he sets energy targets on a project by project basis.

    Bob Prewett

     

    Interview with Bob Prewett

    Prewett Bizley Architects specialises in low energy architecture and Bob has a particular interest in retrofit. He explains that housing is responsible for around 27% of the UK’s carbon emissions, so buildings of all ages and styles have a part to play in terms of energy efficiency.

     

    There is a Distinction Between Retrofit and Renovation

    Bob’s partner, Marion Baeli, defines renovation as being smartening things up to make them look good and dealing with the top 3mm of construction. Retrofit on the other hand is about getting under the skin of things and sorting them out at a fundamental, architectural and building physics level.

    Residential-Retrofit-Front-Cover

    What to Consider when Commencing a Retrofit Project:

    • Get advice at an early stage
    • Create a whole house plan which identifies where the energy savings might be, along with the risks associated with tackling them, and how these might be actioned
    • Form a clear strategy of how these will be dealt with, either all at once or as stages over an extended period
    • Be aware that there is no ‘one size fits all’ when it comes to retrofit.

    “It’s not for the faint hearted, either in spirit or in finance”

     

    “Understanding What the Quality of the Building is and Then Designing and Planning Very Carefully to Not Upset That Balance”

    Bob is concerned by evidence of the careless nature of works being carried out to some buildings which, with moisture being allowed in and then trapped, can actually be causing damage. He looks at the example set by Germany on the other hand which takes a more considered approach, doing gradual, quality improvements over time, instead of trying to do multiple houses quickly and cheaply.

    “Germany still have a confidence about the future and progress and a belief that just doing things well now is an investment for tomorrow. “

     

    “We’re Interested in Taking the Building to Where it’s Going to Sit Happily”

    Rather than starting off with a target value in mind, Bob believes that it is important to understand the building as a whole and take it to where it’s going to sit comfortably, and not push it too hard. Some buildings will get to a U-value of better than 0.15 or 15kWh per square metre relatively easily, but for others, such as historic solid wall construction, they are probably not going to want to go there. Bob explains that they are interested in taking the building to where it sits happily, even if those values are a little higher. He would expect most buildings that don’t have insulation or good quality windows to easily achieve a 60% energy reduction, and perhaps even going up to 90% in some cases.

    Significant energy savings will be achieved by using a holistic approach to deal with insulation, airtightness, cold bridges, windows, walls, roofs and floors. It is important to understand the building and how these elements interact and work together.

    “Some buildings will be predisposed to very high energy savings, some will be predisposed to doing a bit less.”

     

    Be Strategic About What You Purchase if You’re Actively Looking to Retrofit

    Bob has purchased a 1960s small terrace house which should leave them with enough money left over to do a good retrofit. He deliberately decided against listed properties and those with planning restrictions as he felt it would be a higher risk approach with energy savings being more difficult to achieve.

    They intend to take advantage while the roof on this property is being done to pass brushes between the cavity walls and give them a good clear out before adding cavity wall insulation.

    Changes being made to the roof at Bob's own house
    Changes being made to the roof at Bob’s own house

     

    Internal wall insulation and airtightness measures
    Internal wall insulation and airtightness measures

     

    New light slot
    New light slot

     

    Airtightness results of 0.6
    Airtightness results of 0.6

     

    Carefully Consider Your Insulation Options

    External Insulation – This can seem like the most simple option. There is potentially very little disruption and you are likely to be able to continue living there while the work is being carried out. You’re cloaking the building, keeping it warm and dry and therefore less likely to suffer moisture problems. The biggest drawback is that it completely transforms the building architecturally, which may not be to yours or the planners liking. In terraced houses you can end up with cold bridges left over through party walls.

    Internal Wall Insulation – This has the benefit that it does not have an impact externally so there aren’t the same planning issues as above. There will be far greater disruption inside however and possibly not be in a livable state. The process can be quite slow and be impacted by various pipes, electrics and other services. There are also cold bridge issues when getting to things like window junctions.

    Cavity Wall Insulation – If you have cavity walls then filling them can be a good option. Bob however advises caution and not always accepting the claims of the installer that it is suitable for the wall, without following up with further questioning. There may be some situations, such as bad pointing or a coastal property with porous bricks, where it might not be an appropriate choice.

     

    The 80% House was a Defining Project

    This was one of Prewett Bizley Architects’ first deep retrofit projects. The client wanted excellence and was prepared to pay to achieve it. During the closing stages of the project, in an extremely hostile winter and before the heating system had been commissioned, Bob would visit the house which maintained a temperature of around 18 degrees. Even though the systems weren’t all running, he was struck by the quality of the environment. Even leaving aside the benefits of energy efficiency, it was the feeling of the house that made a huge and defining impact on him and was the reason why they continue doing these kinds of projects.

    80% House
    80% House

    Hackney 80 per cent house drawing

    Hackney 80 per cent house living room

    Specific Heat Demand
    Specific Heat Demand
    Year 1 Gas Results
    Year 1 Gas Results

    “If you do it really well you just get this amazing quality of environment as a backdrop to our life.”

     

    Find Out More

    PBa logo

     

     

     

     

     

     

    Transcript

    Download a transcript of the interview with Bob Prewett.

     

    International Passive House Days

    As Bob Prewett explains, it’s really about the feel of the house and the quality of the environment, which is why the International Passive House Days are the ideal opportunity to experience it for yourself. Each year Passive House residents fling open their doors and invite people in to have a look around and ask questions. This year they will be taking place around the world on 13-15 November 2015. Keep an eye on the International Passive House Association website to find out which buildings near you will be open to view.

    International Passive House Days

     

    Please Connect With Me

  • HPH104 : How I Found My Plot of Land – Four Case Studies

    HPH104 : How I Found My Plot of Land – Four Case Studies

    In this podcast we’re speaking to four self-builders from Ireland, England and Australia to see how they managed to find their plots of land.

    Interview with Donal O’Leary – Ireland

    Donal

    Originally Donal had been looking to buy a house rather than a plot. When the sale of a derelict house on a half acre plot came up they realised that if successful with their bid they would probably need to rebuild rather than renovate.

    A process of phone bids via the estate agent ultimately led to them missing out.

     

    ‘If You Don’t Ask, You Don’t Get’

    While Donal continued in his search he made inquiries locally to see if any other sites might be available, and in doing so came in contact with the man who had been successful in the purchase of the derelict house. After a few discussions he agreed to sell Donal part of the site.

    An agreement was reached on price based predominantly on the share of the land, and a joint planning application was submitted. They’re hoping for the planning process to be finalised within the next couple of weeks.

    Donal 2

     

    Tips for Finding a Plot

    Have perseverance, patience, be prepared for the long haul, walk the streets talking to people and be open to considering an overgrown field as a potential site.

    Donal 3

     

    Interview with Nicki Poggi – Australia

    Having lived overseas, Nicki and her family were keen to return to Sydney. After missing out on a few properties at auctions she discovered a house whilst driving. The location was ideal in terms of proximity to the beach and ferry into Sydney, and on speaking to the estate agent they made an offer, being aware that it had previously failed to sell at auction.

    Nicki would suggest that normally you familiarise yourself with an area and investigate what you’re able to do with the property. In her case, they were fortunate in being permitted to knock it down and rebuild, which wasn’t something they initially thought they would be allowed to do.

     

    Interview with Arun Alex – England

    For quite some time it has been important to Arun to build an energy efficient home. He has spent the last 4 or 5 years trawling websites to find a suitable plot. One suggestion he was given was to look at the local council website to see where planning permissions have been granted and to try and make contact with the owners.

    Alex_1

     

    Outline or No Planning Permission with the Plot Enabled Arun to Design a House to Suit His Requirements

    While being able to pick up a plot of land more cheaply, buying a plot either with no planning permission or outline planning permission also meant that Arun had the flexibility to create a design for his house that would suit his family and their requirements.

    After missing out on a couple of plots that had outline planning permission, Arun successfully bought a plot at auction that didn’t have any planning permission attached. While a risky strategy, Arun had a preliminary chat with a planning consultant who thought that if the design and scale were right there was a chance that approval might be given. After researching how to come up with a figure for what the house would be valued at, the offer that Arun submitted was calculated based on rough ideas of the cost of the plot, the cost of the build, the type of construction likely to be used and adding a 20-30% uplift.

    Alex_2

     

    Since recording this interview with Arun he has had his planning application refused. He has since purchased another plot in Glastonbury and is currently awaiting full planning approval.

     

    Interview with Glenn Graney – England

    During the economic downturn, Glenn purchased a commercial rental property with a flat upstairs and several garages, with the hope of being able to build a house behind the commercial unit. The advice from a retired chief planning officer was that there was a 50/50 chance of obtaining planning permission. As it happened the council gave planning permission without any problems and Glenn and his girlfriend were able to live in the flat above the commercial unit while the build progressed.

    Glen 4

    Glen 1

    Glen 3

    An opportunity arose following the death of a neighbour to purchase an additional piece of land which made a considerable difference to the size of their garden.

    Glen 2

    Glenn’s advice for plot seekers is to look for houses in poorer areas that have large gardens with the potential to be knocked down and the site divided into two, as buying land is at such a premium.

    Hide House Cullinan Studios
    Hide House Cullinan Studios
    Hide House Cullinan Studios
    Hide House Cullinan Studios

     

    Find Out More

    Find out more in Donal O’Leary’s blog

     

    Transcript

    Download a transcript of the interviews.

     

    Please Connect With Me

     

  • HPH103 : Is Building a Passivhaus Expensive? – with Geoff and Kate Tunstall

    HPH103 : Is Building a Passivhaus Expensive? – with Geoff and Kate Tunstall

    Geoff and Kate Tunstall explain how they were able to create a fantastic Passivhaus in Denby Dale with a budget of around £150,000.

     

    Interview with Geoff and Kate Tunstall

    When Geoff and Kate decided to self-build and downsize for their retirement, their first idea was to build a dormer bungalow with a conservatory. Following a conversation with Green Building Store, they were encouraged to explore Passivhaus as an option.

    Geoff_Kate

     

    Back in 2008 there weren’t any examples of Passivhaus in the UK that they could visit, so they travelled to Austria. After visiting two properties there which had temperatures of 20/21 degrees, despite outside temperatures of -4 degrees, they made the decision that if they could afford it, this was how they wanted to build.

     

    Paying a Ransom Strip Demand Used Up Their Contingency Budget

    The plot for their build was at the bottom of the garden of their existing house. Unfortunately a builder had bought the plot of land behind this and, based on the value of the plot, demanded £30,000 for a six inch ransom strip that they needed to provide them with access from their building to the road behind. After a year of fighting this, and the builder realising that the money was their contingency so it was this or nothing, they eventually agreed to pay a total of £18,000, which used up their contingency before the build had even started.

    During that year however, the designs for the house were all researched and finalised to the extent that as soon as the ransom strip issue had been resolved they were able to progress straight away with the build.

     

    Making a 3D Model Helped Their Understanding of the Scale and Spaces

    Originally they wanted to build a bungalow but the plot size didn’t make this feasible. Kate found it useful to create a 3D model out of balsa wood to get a better idea of how well furnishings would fit and how comfortable the spaces were likely to feel. They also found using the model was a helpful way of explaining their ideas to the building team throughout the process.

    Kate's-model-of-Denby-Dale-Passivhaus

     

    An Important Feature was to Have Light and Warmth Throughout the Fabric of the House

    Particularly because their last property was a dark and draughty cottage, Geoff and Kate were keen to build a warm and contemporary home with lots of natural light. They had to abandon their original conservatory idea after running it through PHPP, but instead they remodelled it to feature a two-storey solar space which beams the light throughout the house.

    Denby Dale 2

    Denby Dale 1

     

    Using Kate’s 3D model they realised that one of the bedroom windows seemed uncomfortably small. Again using PHPP the design could be changed to accommodate a larger window by adding higher performance floor insulation to compensate.

     

    Keeping Within Budget was a Collaborative Process

    From the outset, everyone knew the budget was only around £140,000. With regular meetings between themselves and the design team throughout the design process and the build, they were able to keep on top of what was happening, when, and how much things were going to cost.

    Living on site was a help because they were able to spot any little details that needed changing before the build progressed too far and became too expensive to amend.

    Geoff explains that on a Passivhaus there are certain non-negotiable things that need to be budgeted for and for which there are no short cuts, such as triple glazing and the ducting for the MVHR. Where they saved money was by spending time researching things like inexpensive lighting and kitchen units.

    Denby Dale 3

    Denby Dale 4

     

    “But it was a good discipline for the Green Building Store and ourselves to actually work to a figure, a limited figure, because it proves that Passivhauses can be built to a reasonable budget. And the budget for our house isn’t a lot for what we’ve got.”

     

    The Build Wasn’t Without its Challenges!

    One of the biggest challenges they faced was building throughout one of the coldest winters in a generation. It was too cold to use the paint they had planned, mould spores started showing on the clay plaster and they had to put up a screen so they could continue working in the howling gales and snow.

    A further challenge was the corner windows of the solar space, both from a Passivhaus point of view but also a structural one. They needed to make sure there wouldn’t be too much solar gain, and also ensure that the structural support would be inside the thermal envelope.

    Denby Dale 5

     

    The House Exceeds Expectations

    Geoff and Kate have been living in their house for around five years. They wanted a house that could be kept clean easily, that would provide warmth when needed, that would be energy efficient and not amass big fuel bills during their retirement. It has achieved all of these and something which Kate hadn’t focussed on before they started was how important it is to have a healthy house. She describes it as being a calm, tranquil and healthy place which will benefit them in their old age!

    One of the Passivhaus buildings they visited in Austria had some underfloor heating so Geoff and Kate assumed they should put it in their kitchen and bathroom. In hindsight they didn’t need to as it’s actually never been used.

    Geoff is adamant that anyone embarking on a self-build project should go and visit a Passivhaus. Once they’ve experienced it he’s quite sure that’s how they will then go on to build. He says that even if the initial outlay is a little more expensive, it will pay for itself within three or four years, and be future proofed against rising fuel prices.

    Denby Dale 6

     

     

    Find Out More

    Find out more about Denby Dale in the Green Building Store blog.

     

    Transcript

    Download a transcript of the interview with Geoff and Kate Tunstall.

     

    Please Spread The Word!

    If you’ve listened to our podcasts and enjoyed what you’ve heard, we’d love you to share the message with others. We’ve made it really easy for you too – just go to www.houseplanninghelp.com/share to send a pre-populated tweet that will recommend our podcasts to others. Thank you!

     

    Please Connect With Me

  • HPH102 : How to Set Up a Community Energy Scheme – with Matthew Black from Fintry Development Trust

    HPH102 : How to Set Up a Community Energy Scheme – with Matthew Black from Fintry Development Trust

    Matthew Black explains what was involved in setting up a community energy scheme, and how the community are benefiting from it.

    wind-turbine-grass

    Interview with Matthew Black

    Matthew Black

    The Fintry Development Trust Was Set Up in 2007, Following Negotiations with a Wind Farm Developer

    The local community were approached back in 2003 by a developer that was looking to set up a wind farm in the area and was seeking local support. After years of negotiations the community agreed to the wind farm on the proviso that they install an extra turbine on the site, for the Fintry community. The wind farm developer paid for the additional turbine, which the community are gradually buying back over 15 years, together with paying maintenance, interest and land rental costs.

    The Fintry Development Trust was set up to manage the remainder of any income from the turbine. With wind energy being very intermittent it is difficult for them to predict the income that they are likely to earn, and which is paid to them twice a year.

    It is important to note, that while the developer paid for a 15th turbine, the community don’t own a specific turbine but instead approximately a fifteenth share of the site.

    There are a Number of Reasons why a Turbine May Not be Turning!

    In response to Ben’s curiosity about why you’ll often see one turbine in a windfarm not turning, Matthew explains that it could be for different reasons. It could be for maintenance, to limit the amount of energy they’re delivering to the grid in order to match lower demand at that given time, or to give preference to a nearby turbine so that output can be maximised based on the wind conditions.

    The Village Itself is Not Wholly Powered by Wind

    The electricity generated by the windfarm goes straight to the grid. The village then gets its electricity from the grid, so in practice it is not wholly powered by wind.

    The Objectives of the Fintry Development Trust are to Make the Community a More Sustainable Place

    The Trust manages the income from the turbine, and their objectives are primarily around the environment and renewable energy. Matthew gives examples of some of the projects which they have been involved in:

    • Providing £500 grants to households to help them improve the energy efficiency or renewable energy generation of their homes
    • Free cavity wall and loft insulation for households
    • With the village being off the mains gas grid, they provide energy advice to help people choose cheaper and lower carbon technologies for their homes, such as biomass boilers, ground source heat pumps, solar hot water systems etc
    • Installed a biomass boiler, solar panels and insulation at the local sports club which is at the hub of the community
    • Installed solar panels on the local school and insulation at the local pub
    • Created a community garden
    • Set up a local wood supply chain to provide free firewood
    Community Garden
    Community Garden

    Be Opportunistic and Persevere!

    Matthew’s advice to other communities that are keen to start something similar:

    “It’s really about focusing on the potential of the community and investing in that.”

    He also highlights the need to be opportunistic – being aware of the grants available and the opportunities that are there – and not giving up. He suggests finding new ways to engage with the community and being open to people’s views.

    A lesson that Matthew learned however was about managing expectations! He explains that sometimes he would be so excited and involved in a project that he had told everyone about it and raised their expectations, only for one reason or another the project to not be viable.

    Transparency and Clarity of Outcomes are Crucial

    The Trust were set up as a charity, with 7 board members bringing their different experiences to oversee the Trust, and other staff to develop the projects. Matthew thinks that this approach sets a good example in terms of providing transparency and being very clear about their outcomes.

    Find Out More

    Find out more about Fintry Development Trust

    Follow Fintry Development Trust on Facebook

    copy-FDT-logo-web1

    Watch “Wind of Change – Fintry Community Renewable Energy Film”

    This 15-minute documentary explains how the people of Fintry embraced a community energy scheme.

    Transcript

    Download a transcript of the interview with Matthew Black.

    Please Connect With Me

    International Passive House Days

    Each year Passive House residents fling open their doors and invite people in to have a look around and ask questions. Keep an eye on the International Passive House Association website to find out which buildings near you will be open to view.

  • HPH101 : 5 Common Traits of Self-Builders – with Dr Michaela Benson from Goldsmiths

    HPH101 : 5 Common Traits of Self-Builders – with Dr Michaela Benson from Goldsmiths

    Following a recent exhibition of her research project, sociologist Michaela Benson talks us through the traits that self-builders commonly have.

    Michaela_Benson

     

    Interview with Dr Michaela Benson

    Michaela Benson is a Senior Lecturer in the Department of Sociology at Goldsmiths, University of London. She has spent the last three years working on a research project called ‘Self-Building – The Production and Consumption of New Homes From the Perspective of Households’. She wanted to understand the diversity of the houses people build, their motivations for doing it and their experiences of the process. Her interviews with twenty individual self-builders and five group projects during that time have led her to notice characteristics that these people share. She explains five of them to us.

    Exhibition 1

     

    1. Having Two Different Skill Sets – Practical and Organisational

    Michaela explains that this could be within one individual self-builder or shared within a couple where one person has the practical abilities and the other has the organisational skills. Many of the people in the study were engineers, while often they also had experience of managing other people too.

    Self-awareness of their organisational skills was often a reason why people chose to project manage the process themselves, and to try and save money. Michaela stresses however that the size of this challenge shouldn’t be underestimated, as it’s not just about managing the budget, but also about having your procurement and tradespeople lined up at the right time. The times when this worked most successfully were when the self-builder already had experience of the construction process, usually from working in related professions.

     

    2. Acquired Knowledge Through Previous Projects

    In many cases, the self-builders had built up their knowledge by undertaking extensive renovations or extension projects. Michaela particularly noticed this in a number of the 50+ age group, who had worked their way up the housing ladder by taking on properties which had needed considerable work. “So they built up their property assets that way, but they’d also built up their practical experience of working on houses.”

    From a sociological perspective it highlights the role that property assets play in self-build. Michaela states that it is very difficult to embark on the self-build process unless you already have significant property assets or savings, perhaps explaining why it can be more difficult for younger generations. She often came across people who, not through being unrealistic about their budget, had periods of financial difficulty throughout. This was more to do with having a cash flow available at the same time as being needed for procurement. “It’s to do with the fact that the cash flow on a project often requires more money at a point in time than you actually have in the bank at that moment, because of the draw downs on the mortgage.”

     

    3. A Heightened Level of Involvement and Understanding of Their Project

    Michaela explains that for many people there was a fascination in knowing exactly how things worked and proudly demonstrating it to others. Being so heavily involved in their build they would tend to have a keen attention to detail.

    “It’s not just building a house, it’s actually a learning process that they’re engaging in.”

    And for some, it was learning on a professional level that would assist in their careers. Michaela tells of one self-builder who was a planner wanting to become a consultant in energy-efficient buildings. For her the project was about building a house for herself, but also developing her professional identity and learning through her own experience so that she could help to advise others.

    Many of the buildings operated at a high level of energy efficiency, with some motivated by a desire to be conscious about the planet, while for others it was more future proofing their house against higher energy bills.

    Exhibition 2

     

    4. High Levels of Determination and Motivation

    A lot of the people in the research project were very highly motivated. And they needed to be! Without their constant pushing to drive their builds forward they wouldn’t get to the end. Michaela explains that even with sufficient time and funds the process can be extremely challenging and demotivating, and a lot of emotional support is required.

    Michaela feels that something a lot of people underestimated in their self-builds was the importance of managing social relationships, within families and also with the management of people coming onto the site.

    “You can understand if you’re building your own house you’re building your home, you’re highly invested in that and when a series of little things go wrong it’s quite painful.”

    The custom-build sector can offer some of the support by taking away many of those people management jobs from the self-builder. Michaela explains that some of the people working in that sector have experience of community projects so have had to learn to maintain relationships with the wider community in the past.

     

    5. A Keenness to Trace Back The Routes of Their Skills and Ambitions

    Michaela explains that often people would trace back the desire to build their own house stemming from having an interest since childhood, whether that be through building Lego or Meccano houses, or drawing their dream home.

    Also she would hear people describe how they learned practical skills from their family members while growing up, bringing them to the point where eventually they would self-build.  In both cases, they were very clear that their interest in self-building related back to something.

    Exhibition 3

     

    The Process can Taint the Outcome

    Some of the people in the research had been exhausted by their self-build experience and felt that moving in was an anti-climax. While being pleased with their house they had been unhappy with elements of the process. Some talked of having decision-making fatigue. Generally they were building houses that they were happy to live in, though perhaps because of their involvement and in-depth knowledge of the projects they sometimes came across with negativity about some aspects.

    “But overall I think that people are quite positive about the houses, if not the experience.”

    Exhibition 4

     

    Find Out More

    Follow Dr Michaela Benson on Twitter

    Read Dr Michaela Benson’s Blog

     

    Transcript

    Download a transcript of the interview with Dr Michaela Benson.

     

    Please Connect With Me

  • HPH100 : Constructing Long Barrow Passivhaus – with Alex Baines

    HPH100 : Constructing Long Barrow Passivhaus – with Alex Baines

    We catch up with Alex Baines, a Passivhaus consultant who you may remember from episode 74. We spoke to him then about how gaining support for his semi earth-sheltered rural self-build from his local community helped him achieve the necessary planning permissions. Almost a year on we spoke with him again to see what progress he has made on the build so far.

     

    Long Barrow Proposed Elevations
    Long Barrow Proposed Elevations

     

    Excavation Work Took Almost a Month

    Being semi earth-sheltered to comply with planning restrictions, a very large hole was always going to be needed! Over the winter it took 4 people, a 20 tonne excavator, an articulated truck and a roller to dig down 5 metres. They actually dug out around twice the volume they needed to prevent the sides from collapsing. Their ethos is to try not to throw away anything on site so everything they excavated will be utilised, whether that be earth for backfill or turning the rock into fixtures and fittings for the house.

    IMG_0085

    FullSizeRender

     

    Digging Below the Water Table Has Meant Extra Precautions Were Taken

    Digging up to 3 metres beyond the ground water level, Alex had been expecting the hole to fill up constantly but that hasn’t been the case. Instead it’s had a dribble of water occasionally going into it in two corners, although a fair amount is trapped in after rain. To get them through the construction phase they bought a £100 pump to remove water from the hole, though it hardly needed to be used during the summer months.

    There is a double layer waterproof DPC membrane going the whole way around the ground perimeter. On top of that they’re also using waterproof concrete under ground.

    51110720-1024-4BA0-8EF0-4532EBFEF0D4

     

    The Stages So Far:

    • A layer of hardcore to get a level base
    • Poured a very thin blinding layer of cement-concrete
    • DPC
    • Waterproofing line laid
    • Insulation
    • Base poured
    • Steels in and east, west and north walls built out of ICF (Insulated Concrete Forms) and filled with concrete, followed by the south side
    • Roof on

    IMG_0175

    IMG_0141

     

    The Building is Designed to Make the Living Spaces Easily Adaptable

    While there is a lot of concrete going into the building, Alex feels justified because he is creating a home that should last for centuries and be flexible to the changing needs of its occupants. The steel and concrete support the structure and there are no internal load bearing walls. The result is that internal dividing walls can easily be added or removed to reconfigure the space according to the needs of the owners and styles of the time. The other benefit of the concrete is its absorbency of heat, which they hope to retain throughout the winter. Researchers from the University of Loughborough are installing monitoring equipment to see what the effect of an ICF system is in terms of the latent heat in the building.

    IMG_0162

    FullSizeRender (2)

     

    Alex Wouldn’t Ever Recommend a Client Use as Much Glazing as he is on the South Elevation!

    They are not having glazing on the east and west sides, and very little on the north. They are using the glazing on the south to try and take in heat and light to be retained in the concrete core.

    “From a passive nature I’d much rather design the windows to be the right size that you don’t actually need any external blinds or any improvement to the actual glazing in terms of improving its g-value for solar glare control. But here we do have the views, we do have the space and we do have the height. And architecturally and from being on the site it didn’t make sense to restrict the window size.”

    With slight changes to increase the height of the windows they are still working on calculations for how best to install the external shading.

    There will however be areas at the back and downstairs of the building that will not get much light, however these have been designed to be the rooms which would need it least and Alex is not concerned that this will be a problem.

     

    Work is Likely to be Delayed Until Further Finances are in Place

    Generally the finances have been on track, apart from early additional costs at the excavation stage. Extra time was spent on the equipment hire to try and break through the rock, and they were advised to reinforce the concrete to avoid the effects of heave in the ground.

    Alex left his work 3 months ago and the savings that they hoped would see them through to the windows in / watertight stage are unlikely to stretch that far. They have the details and spec sorted for most of the remainder of the house so once Alex is back in work the mortgage should be agreed and they can move to progress works quickly.

    Borrowing money from family is not an option that Alex would consider. He believes it could be detrimental to relationships and he wouldn’t feel comfortable with the situation.

    IMG_0166

     

    While the Design has Caused Additional Costs, They Would Not Have Got Planning Permission to Build a Standard House

    Alex bought the land from his mother. As it is in a rural area they were bound by very strict regulations and had to work hard to achieve planning consent. Building a standard house would never have been an option that would have been approved. The result of planning approval is that the land has now increased in value from £16,ooo to around £300,000. Alex describes a situation where they could have built a standard house for a lot less money in a village setting, however the majority of their funds would then have been spent on the land purchase, leaving very little for the build.

    FullSizeRender (5)

     

    Personally and Professionally the Build Has Been Massively Rewarding

    Professionally Alex has learned a huge amount from being on site every day and seeing things that as a consultant you just don’t get to see. He has broadened his knowledge by speaking to experts on site and working through problems – all skills that will be useful for future client builds, not just his own.

    On a personal note, Alex enthuses about being around to have the opportunity over the last few months to spend time with his young children and see defining moments in their development that he would otherwise have missed. While the delays on the building are frustrating, Alex wouldn’t have changed the situation, saying “actually there are things that I’ve gained out of it that I actually don’t want to give back.”

     

    Find Out More

    Follow Alex Baines on Twitter

     

    Transcript

    Download a transcript of the interview with Alex Baines.

     

    Please Connect With Me

  • HPH099 : My New Developer House has No Loft Insulation – with Luke Mahon

    HPH099 : My New Developer House has No Loft Insulation – with Luke Mahon

    It has been almost a year since Luke Mahon took ownership of a new-build developer house, which he soon discovered lacked insulation! He talks us through his experience and the ongoing battle to get the house completed.

    Luke

     

    The Property Location and Size Were Ideal

    The development was in their target area between Heathrow Airport and Reading town centre, whilst also being close to countryside. After being impressed by a show home on a similar development and hearing good reviews from his wife’s grandparents who had been very pleased with their own Taylor Wimpey home, they decided to purchase the property.

     

    Within a Month the House Seemed Unreasonably Cold and Draughty

    The large master bedroom in the eaves had been one of the reasons Luke was drawn to the house, but by the October (within a month of moving in) they were going to bed shivering from the cold and the breezes in the room. On investigating an area of the loft, Luke discovered there was no insulation!

    Uninsulated loft space
    Uninsulated loft space

    The developer agreed to rectify this but Luke was insistent that even after insulation was added to the loft space it was still uncomfortably cold and was convinced it was still lacking in insulation. Luke describes how after much arguing they agreed to cut holes in the walls – and sure enough, found no insulation! After they stuffed some insulation in there and patched up the holes, Luke was desperate to have the work completed before his family arrived at his house for Christmas, and says on the last working day before Christmas he was given paint and a roller to paint the walls himself as all the painters had gone home.

     

    The Snagging List Eventually Contained Over 400 Items

    Initially the list was at around 150 items, but over time they discovered many more. While some were very minor and things they would have expected in a new house, others were significant. The list included: cracks on walls, plasterboard not properly matching, toilets in the wrong place, wrong tiles being laid, windows at an angle, doors needing to be replaced, walls needing to be rebuilt as they had been erected incorrectly / at the wrong angle / wobbly because they didn’t have enough studs in them, air bricks too low to the ground or even underground etc.

    Luke says he had to fight for this door to be straightened
    Luke says he had to fight for this door to be straightened

    Luke Used His Marketing Experience to Get His Voice Heard

    Luke says he was tired of repair works not progressing and his calls for action being constantly ignored. As they live close to the show home he put up posters in his window to alert potential purchasers. This caught the developer’s attention and Luke says for a period of a few weeks there was communication and numerous promises but that he grew frustrated by this only resulting in minor things being attended to, at a slow pace and a poor standard of work.

    After trying unsuccessfully to resolve the issues through the on-site customer services representative, regional office and head office, Luke started his @MyHouseSucks Twitter account. He feels that it is only because of this and the media coverage it generated that he has been able to make any progress.

    Poster in the window of Luke's house
    Poster in the window of Luke’s house

    His House Was Not An ‘Isolated Incident’

    Luke says he had been told by the developer that the other houses had been checked and didn’t suffer from a lack of insulation and that his house was an isolated incident. Through his Twitter account however Luke discovered his neighbours in the development’s first phase were having similar problems and claims that, despite knowing this, they continued to build further houses on the development with no insulation. Tweets he received from owners of homes built by other developers, led him to believe that the “isolated incident” tactic is commonly used to discourage people from talking to their neighbours and uncovering the extent of deficiencies.

    Insulating going into the roof space
    Insulation going into the roof space

    CKNn2cbW8AAlnkt

    A Thermal Survey Was Conducted

    It had not been possible to have a survey of the property before completion of the purchase. Luke says he had requested one but that access was refused as it was an active building site. He pushed later for a thermal survey which uncovered the extent of the problems.

    Rectification works at the house have involved 14 weeks of workmen on site, a further 4 weeks where they had to move into alternative accommodation, and are currently going through another 4 weeks of backfilled soil being removed. In total, Luke estimates these works have probably taken longer than it took to build the house!

    Thermal image after some initial rectification works had taken place
    Thermal image after some initial rectification works had taken place

    Luke Questions the Role of the National House Building Council

    These buildings aren’t signed off by the local council building regulations department, but by the NHBC (National House-Building Council). Upon contacting the NHBC, Luke was told they would have noted the lack of insulation and asked the builder (verbally) to resolve the issue.

    Luke is shocked, that not only did they sign off his property which clearly didn’t meet building regulations, but also those of his neighbours, and all of those that he says the developer knowingly built without insulation after discovering the omission in his own house!

    With the NHBC being funded by the house builders, Luke asks of the situation:

    “These large companies who snap up all the land, build these sub-standard properties, get them signed off by a body that they’re paying for to sign them off, that don’t meet building regulations and that’s all fine?”

     

    A Happy Ending?

    Almost a year after moving in Luke says they are down to around a final 10 items on the snagging list so he can see an end in sight.

    “I’m so far beyond angry now. I was angry, probably a few months ago. I’m beyond that. I’m dispassionate about it now because it’s taken so long, it’s become part of my life.”

    Despite that, Luke foresees that once the works are completed he and his wife will be happy in their home. The reasons why they chose the house will prevail – ie the space, the light, the size of the garden, it’s location backing onto natural parkland.

    “And actually throughout all this kind of arduous year of hell, we’ve really built a really nice community here within this first phase because we’ve all got to know each other as neighbours and it’s a really great community of people here. So because of that it actually does feel like home.”

     

    Find Out More

    Follow Luke Mahon on Twitter

     

    Transcript

    Download a transcript of the interview with Luke Mahon.

     

    Please Connect With Me

  • HPH098 : An Off-Grid, Earth-Sheltered Passivhaus– with Christina Snyder (Passive House)

    HPH098 : An Off-Grid, Earth-Sheltered Passivhaus– with Christina Snyder (Passive House)

    Architect, builder and Passivhaus Consultant, Christina Snyder shares the story of the experimental zero-energy Passivhaus self-build that she and her husband have undertaken in Michigan, and explains why they are in no rush to complete it.

     

    Interview with Christina Snyder

    While this is Christina’s first self-build, she has been involved in projects since childhood when she helped her father to make solar renovations on the family home. In high school she won a design competition for a solar house and, after graduation, began teaching students how to design zero-energy homes. After being beaten in a competition by a team specialising in Passivhaus, she decided to do the training and become a Passivhaus consultant.

    Photo by Jim Deigart
    Photo by Jim Deigart

    The House is on the ‘Bleeding’ Edge of Technology!

    The project is innovative and experimental in the features that it is bringing together into a single house:

    • It will be both Passivhaus and zero-energy
    • It will be powered with a nickel-iron battery system
    • It will use solar and wind power
    • The surplus energy from the solar hot water system in the summer will be stored to provide domestic hot water and heating through radiant floors in the winter
    • There will be a composting toilet
    • There will be grey water and rainwater storage

    Plans

    4 Years In, and Possibly Another 16 Remaining!

    With so many experimental ideas it is not something they would have wanted to try out on a client house. Christina and her husband however are happy to throw all the ideas together and take their time, possibly even over a couple of decades, to complete the house. They aim to do the project in phases with results being tweaked as they go.

     

    Good Solar Exposure was Fundamental to Finding the Right Plot

    Requiring sunshine from 9am to 3pm all year round in order for their energy needs to be met meant that they used satellite images and solar pathfinders to help locate suitable plots. Benefiting from the economic downturn they were able to source a rural plot from a farmer.

     

    Progress of the Build so Far

    The house has 3 storeys on the south elevation and 2 on the north, one of which is below ground level. Retaining the hole which was 14 feet below ground level on the north, and 3 feet below on the south, was particularly challenging throughout a very wet year.

    The construction below ground level uses 16inch thick structural insulated panels made from EPS beadboard and coated with glass fibre reinforced concrete. This is also the weather barrier, and on the inside acts as the air barrier. They selected this method as it provided the insulation levels required, would give the necessary strength and had less CO2 emissions than insulated concrete forms would have had. Spraying the concrete onto the Styrofoam walls was a gruelling process that needed several hours continuous spraying at a time to ensure the concrete didn’t set in the hose.

    Cleaning up after the first spraying of GFRC over the 12” insulated EPS foam floor with red radiant floor PEX tubing over the continuous structural basement foundation slab.
    Cleaning up after the first spraying of GFRC over the 12” insulated EPS foam floor with red radiant floor PEX tubing over the continuous structural basement foundation slab.

     

    Being largely self-taught, this method took a lot of experimentation and they’re still not in a position where they would use it on a client’s house.

    The wooden walls, made of I-joists, have been erected and filled with cellulose insulation, the roof is in place and all but 2 windows have been fitted.

    A mock-up of the 2x4 wall framing on the interior of the plywood air barrier (which has grey tape sealing cracks and fastener holes) shows how the electrical wiring can run in the thermal break in the wood sill plate to get by the picture window.
    A mock-up of the 2×4 wall framing on the interior of the plywood air barrier (which has grey tape sealing cracks and fastener holes) shows how the electrical wiring can run in the thermal break in the wood sill plate to get by the picture window.

     

    The build has been ongoing since 2011 and they hope to move in in around a year.

     

    Root Cellars Will Provide the Right Climate for Different Food Types

    There will be a total of 3 rooms that will each have different combinations of temperature and humidity to ensure that different foods are kept in the right conditions. Being below the frost line they should remain cool all year round.

    The challenges of the build have been testing on their relationship at times but Christina is confident they’ve got what it takes to see things through.

    Christina's-Passivhaus-windows-in

    Find Out More

    Find out more about Michigan’s first earth-sheltered Passivhaus

    Christina is Principal of Equilibrium Energy Spaces and member of CertiPHIers Cooperative

    Transcript

    Download a transcript of the interview with Christina Snyder

     

    Watch the Videos from Self Build Live

    Potton is currently building a new Passivhaus show home. And they are welcoming visitors to site near St Neots, UK, as part of Self Build Live.

    However, if you’re too far afield you can keep up with the progress on their blog as well as watch videos every step of the way.

    Video produced by Regen Media

     

    Please Connect With Me

  • HPH095 : The Saskatchewan Conservation House – with Harold Orr

    HPH095 : The Saskatchewan Conservation House – with Harold Orr

    Harold Orr reflects on why the Saskatchewan Conservation House was a landmark on the road to high performance buildings.

    Harold_Orr

    Interview with Harold Orr

    Following his father and grandfather, Harold trained as a carpenter. From the age of 12 he had already spent a lot of time on building sites learning about the industry. After a 2 year spell reading mechanical engineering at university he met his future wife, dropped out of university and returned to carpentry. However, an opportunity arose to forge a career in architecture for a few years before returning to Saskatoon to complete a degree and then masters in mechanical engineering.

     

    Air Barriers Were the Subject of Harold’s Thesis

    At the time, it was possible to calculate heat loss in houses through the walls, ceilings, windows and doors, but there was no available way of calculating air leakage. Harold used helium as a tracer gas and developed an instrument that measured the percentage of helium lost in the helium / air mixture. The assumption was that the helium would be lost at the same rate as air, however it does not behave that way, leading to artificial measurements.

    Completing his masters and taking employment with the National Research Council, Harold continued to work on the problem and found that by changing the tracer gas to sulphur hexafluoride they were able to gain much more accurate readings, but it wasn’t a practical system for doing a number of houses because of the time involvement, equipment and processes required.

    By the late 1960s / early 1970s Harold’s work had led to the development of the blower door, and inspired one company to start manufacturing them.

     

    The Arab Embargo on Oil in the 1970s Prompted Research Into Solar Housing

    The Saskatchewan government asked their research arm, the Saskatchewan Research Council, to build a solar house appropriate for Saskatchewan. Harold was part of the committee that was formed to work on the challenge. Given the lack of solar availability between November and April, hot water was going to need to be stored over from the summer time, meaning more energy would have to be put in than they would ever get out!

     

    The Logical Solution was to Reduce Energy Consumption

    The committee looked at ways to reduce energy consumption and one of the first considerations was the amount of insulation to use. Harold’s suggestion was to avoid having a basement (which often led to problems), and use R30 insulation in the floor, R40 in the walls and R60 in the ceiling.

    Harold and a colleague installed the air barriers themselves which resulted in the Saskatchewan Conservation House being the most airtight building in the world at that time (with a reading of 0.5 air changes per hour at 50 Pascals).

    Photo: Harold Orr
    Photo: Harold Orr

     

    While the Committee Designed and Produced a Conserving House, the Government Still Wanted Solar!

    They subsequently modified the design to incorporate a solar hot water system, including an 18ft high tank that was insulated to R100. The cost of materials and labour for the house had been $60,000. The materials for the solar system were $65,000! This was combined with a first year maintenance cost of $10,000 to provide the equivalent of $45 worth of heat with oil. It was no surprise when the house was sold that the new owner removed the solar system!

     

    Such a Pioneering Project had Many Challenges and was a Steep Learning Curve

    At the time there was nobody manufacturing triple glazed windows. Instead they decided to put shuttering on the windows, which didn’t perform as they’d hoped, and with electronic operating switches on each individual one, they were never used! In at attempt to recover heat from grey water, the barrel system they developed had congealed waste soap from the baths and showers once the water had cooled down. And with such an airtight house, the airlock entry for the front and back doors proved to be ineffective.

    The elements which did perform were the insulation, airtightness and ventilation system.

     

    The Major Component of Heat Loss is Air Leakage

    Harold stresses that people think they’re doing the right thing by adding extra inches of insulation to their property, but without addressing airtightness they’re not going to realise a substantial saving in their energy consumption.

    As a rule, if building new houses, “build tight, ventilate right”. And if retrofitting, “make it tight and then ventilate right”.

     

    Related Articles

    The Saskatchewan Conservation House

    Saskatchewan Conservation House precedent honored at Passivhaus conference

    Harold Orr, Passive House pioneer, gets recognition in his own home town 40 years later

    Forgotten Pioneers of Energy Efficiency

    Transcript

    Download a transcript of the interview with Harold Orr.

     

    A Documentary on Airtightness

    Last year we made a documentary on the importance of airtightness. The aim was to explain the concepts in the simplest terms possible and hammer home the message.

    If you haven’t seen it yet, then we would encourage you to take a look.

     

    Please Connect With Me

  • HPH094 : 10 Insulation Types and When to Specify Them – with Brian Murphy from Green Building Encyclopaedia

    HPH094 : 10 Insulation Types and When to Specify Them – with Brian Murphy from Green Building Encyclopaedia

    Brian Murphy from Green Building Encyclopaedia runs through the most common types of insulation and explains why they each have strengths and weaknesses.

    BRMShoulders

    Interview with Brian Murphy

    Brian has spent 40 years in the industry, as an architect and as a specification writer. In that time he has specified over £2400 million worth of work, so knows a thing or two about insulation!

     

    Insulations Can Be Categorised Into One of Three Groups, According to How Heat is Transmitted

    These groups are conductivity insulation, convection insulation and radiation barriers. They each have different characteristics, and for this reason there might be a need to use more than one type for a situation.

     

    Brian talks us through the characteristics, and pros and cons of 10 of the most common types of insulation.

     

    1. Glass / Rock Mineral (Stone Wool) Insulation

    Usually the lowest priced, this tends to be the most widely used insulation. Its main use is for conductivity thermal insulation. It also rejects water and is fairly versatile in where it can be used, though it isn’t ideal for timber roofs or timber frame. Stone wool is often used when fire resistance is needed, and glass wool in an acoustic performance situation. Enormous amounts of energy are used to make the glass or stone wool products, for example to melt stone and then blast it with air to turn it into a fibre.

     

    Glass wool
    Glass wool
    Rock wool
    Stone wool

    2. Polystyrene and Other Plastics

    The plastics all have different characteristics, formats and some have different gases within them, and legislation over time has made those gases less harmful to the environment. The gases inside produce the bubbles, which is what makes the material insulating.

    They are versatile in that they can be blown in, sprayed on, expanding, applied as a solid material and cut to a concertina, etc. Some are water resistant and durable and can be used under floor slabs, in roofs and others used in Structural Insulated Panels (SIPs). The SIPs panels have very little of the radiant protection from solar gain but a lot of the required characteristics for conductivity thermal insulation, so heat that gets in is slowly let out and could risk overheating.

    Polystyrene foam
    Polystyrene foam

     

    3. Cellulose Fibre

    This is recycled paper or magazine waste which has been flaked and is blown into open or closed timber framed cassette cavities, either in a wet or dry method. It is blown in powerfully in order to reach every corner of the cavity. Blown in methods reduce the risk of heat loss or condensatioin the imperfection gaps created by cutting insulation boards and batts to fit frames.

    CelluloseFibre

     

    4. Sheep’s Wool

    As well as being hygroscopic and effective in terms of moisture buffering, Brian says that some research has found sheep’s wool strangely warms up when wet and cools down when dry.

    It’s eco credentials are challenged however by some quarters focusing on the high methane levels from the sheep! Historically, also, UK sheep have been dipped, leaving chemicals in the wool which have needed to be processed out. Modern farming practices have moved on.

    Brian explains that another issue is that sheep’s wool can be squashed whilst packed, though some products on the market have plastic fibre added in to bounce back to full thickness. Sheep’s wool is used in timber framed construction and roofs.

    SheepsWool

     

    5. Cellular Glass

    Brian explains that this is versatile but can be more expensive than many other insulation materials. It is fire resistant, rot resistant, animal and rodent resistant. It has vapour resistance and is watertight but should always be encapsulated with water resistance to avoid frost damage. It has conductivity resistance, and has radiant heat barrier properties.

    It is ideal in roof, gutter, basement and foundation construction. Because of the cost, Brian recommends using it where you can afford to, with damp places being ideal.

    FoamGlass

     

    6. Dense Wood Fibre

    This is extremely versatile and comes as a rigid, soft or combination material. It has acoustic, conductivity and radiant barrier performance, and can be used in or on timber frame or roof and for external insulation with render or rainscreen weatherboarding.

    It is also ideal for retrofitting old properties with solid wall construction which need to be able to breathe inwards or outwards. Exceptionally one manufacturer has developed a version for partial ventilated cavity masonry walls; not normally recommended.

    Dense and soft wood fibre
    Dense and soft wood fibre

     

    7. Aerogel

    This is a silica based product that was invented by NASA. It can be very thin and exceptionally high conductivity performance and is popular when used with other materials for dry lining walls. Comparing it in price to some of these other materials it can be expensive and therefore Brian suggests again using it only in the places where it is needed; such as at thermal bridges that risk condensation and mould. Examples include: at door and window surrounds and where rainwater and soil pipes interrupt external wall insulation and below DPC; but they need specially developed weather and ground water protection to survive.

    Aerogel+Boards

     

    8. Calcium Silicate

    This is a very lightweight material that was designed for historic buildings. It is low impact, high performance with good moisture transport characteristics allow in solid walls to breathe.

    CalciumSilicate

     

    9. Vacuum Insulating Panels

    Air is sucked out of a silica ball filled, aluminium foil wrapped panel to create a vacuum. They’re ideal for a modular design where things don’t have to be cut to size. In a retrofit situation they would probably need to be combined with another material, such as aerogel or dense wood fibre; but bespoke sized panel services are also available.

    These panels would need to be used in areas where there would be no risk of someone accidentally nailing or drilling a hole into them!

    vacuum_insulating_panel

    10. Insulating Render

    This is a fairly new material to the UK market, and is a render which is insulating throughout its thickness. It’s applied like a render and doesn’t need vapour barriers or special membranes. It is a mixture of special earth and other ingredients, such as a cork aggregate, which would need to be applied to a thickness of around 100mm or more and can accommodate an uneven existing surface.

    DiathoniteInsulatingRender

     

    Find Out More

    Untitled

    Follow Brian Murphy on Twitter

    Transcript

    Download a transcript of the interview with Brian Murphy.

    Please Connect With Me