  • HPH136 : 6 observations from 6 Passivhaus projects – with Ben Adam-Smith

    HPH136 : 6 observations from 6 Passivhaus projects – with Ben Adam-Smith

    Ben Adam-Smith shares what he’s learnt from visiting 6 self build projects, each shortlisted for the UK Passivhaus Awards 2016.

    Regen Media produced 6 video inserts for the ceremony and this gave Ben the opportunity to visit these homes. Now he reflects on each project and the key takeaways.

     

    1. Passivhaus can quickly get under the skin of a building team.

    Having completed Denby Dale Passivhaus and Stirley Farm retrofit, Green Building Store are onto their third Passivhaus project with Golcar Passivhaus.

    What’s interesting on this one is that Bill Butcher has been able to step back somewhat and let his team get on with it.

    Foreman Jude Wilson says: “As we’ve been doing these big projects, it is evolving and becoming more natural. The processes that we’re doing, we’ve learnt them, and so it’s second nature just to get on and do it.”

     

    2. Contractors who are new to Passivhaus can do it if they have the right attitude

    On the Lime Tree Passivhaus project, they engaged a contractor who had never built to Passivhaus standard before. However, the contractor embraced it wholeheartedly, taking the entire team through the Certified Passivhaus Tradesperson course.

    Architect Chris Parsons from Parson + Whittley says: “Choosing contractors to deliver Passivhaus is still difficult because there are very few that have got the experience but my mantra is have they got their attitude? Are they really interested in delivering the performance and understanding that that’s delivered simply through close attention to detail and quality? So no, I don’t think experience is the necessary factor, it’s the right cultural approach.”

     

    3. While a compact form is always a good idea, it is not essential to achieve Passivhaus standard

    Tigh Na Croit is an ‘L’ shaped bungalow, which is clearly not the most efficient form. However, this form is a response to the site. The bedrooms face east and the main living spaces face south, and thus there was a good architectural reason for going down this route.

    Again, it’s an illustration of how great architecture can be created that still complies with the Passivhaus standard.

     

    4. Embracing simplicity pays dividends

    Lansdowne Drive Passivhaus is a modest but striking Zinc clad building in the heart of East London. Architect Bernard Tulkens is also the client here and, as such, could do things that he never gets a chance to do! He wanted the building to be flexible and with a simple palette of materials.

    Bernard says: “When you realise that by reducing the elements you use, not having to choose finishes, you avoid a whole set of traps. I thought, why, if I’m building a building for myself would I start lining up a timber construction with plasterboard and worry about shadow-gaps or skirting boards or recessed lighting. No. I just decided that timber was going to be nice enough as a finish.”

    Simplicity, as we’ve heard many times before, can really come up trumps.

     

    5. Determination is fundamental to building your own home

    Chiswick Eco Lodge was a 7-year project! Right from the word go they were up against it. The plot was a garage infill and, as such, demanded that a large proportion of this house would be underground. What’s more, everything that came onto site had to negotiate a tree (with a Tree Preservation Order on it)! They also had a 3-year battle with planning.

    All that said and done, they achieved a remarkable contemporary urban dwelling which slots beautifully into its streetscape.

     

    6. A shell-only contractor can simplify the build process

    At the Old Water Tower they ran into few difficulties during the build because of how the work packages were assigned.

    Project manager Mike Jacob says: “I think that we were in safe hands with the timber frame specialist. One of the lessons that we’ve learned from the past is to try and go for easy wins and there are companies out there now who will take control of delivering a guaranteed, thermally bridge free, airtight, super insulated box and they can do that very quickly.”

     

    Find out more

    UK Passivhaus Awards

     

    Please connect with me

  • HPH134 : A new build cavity wall Passivhaus – with Angie and Paul Dallas

    HPH134 : A new build cavity wall Passivhaus – with Angie and Paul Dallas

    Angie and Paul Dallas explain why they opted for a Passivhaus, and the benefits of getting involved with the build.

    Certification photo1

    Interview with Angie and Paul Dallas

    Angie and Paul had been looking to build a comfortable, energy efficient house that they could retire in. There was no issue with finding land as their existing house had enough land available, albeit with its own planning challenges.

    duskback

    It took 5 years to be granted planning permission

    Angie says that the planners weren’t necessarily against their plans, but the Highways department had to consider the problem of access because of the limited number of houses that could be on their unadopted road. The house is in a conservation area so that presented its own challenges, and there were a number of trees in their garden which had preservation orders on them.

    After initially having their application rejected, they won on appeal in London.

    A planning consultant helped with the process but in hindsight they think they should have appointed him earlier and benefited from his expertise in areas where their architect was struggling.

    The decision to build to Passivhaus standard was taken after planning permission had been granted

    It was on a trip to look for triple glazed windows that Paul started chatting with one of the directors of the Green Building Store who explained the differences that Passivhaus had from normal building practices. Coming away from that meeting Paul was convinced that, even if they didn’t strive for the full Passivhaus standard, he wanted the building to at least use the principles of high design quality.

    Deciding to pursue this approach meant some design changes to their original plans. The amount of glazing had to be adjusted together with the orientation, but the actual size and construction wasn’t altered.

    Being involved in the construction had its benefits

    It had always been important to Paul to be actively involved in the construction of his house, however once the decision had been made for Green Building Store to take on the project to Passivhaus standard he was unsure what his role would be because his knowledge of the area was limited.

    Cavity wall replacement image

    Whether Paul would be able to assist with the labouring was a decision for the building team, and Paul was careful to take his time and show that he could muck in and not be a pushy owner. Eventually he was invited to join the team and he relished learning on the job and taking their instruction.

    One of the greatest challenges that Paul found was working on the site throughout the British winter. If the roof could have gone on during the summer months it would have been a much easier build.

    IMG_0827

    A key benefit of Paul being on site was that if a problem arose or a decision needed making, he understood what was going on and could make the choice straightaway.

    Paul found the camaraderie of being on site extremely enjoyable and believes the pride in the house afterwards far outweighs the efforts of doing it.

    “And to be honest I don’t think I’ve ever laughed as much during a job ever. I thought it was great fun.”

    The comfort of the house has lived up to their expectations

    The temperature of the house remains fairly constant and the mechanical ventilation heat recovery system means that the air quality is good everywhere. Angie also notes that it seems to stay cleaner and that since having pollen filters put in she has also seen health benefits compared with their old house.

    golcar51619

    panorama1

    golcar51582

    Take time to appoint your design team

    Their first architect, although designing a great scheme, didn’t have the time to take it from there. Paul and Angie wish they had taken time to research, interview and appoint a replacement architect but instead they appointed someone on recommendation, who professed to be an architect but actually wasn’t. He claimed that the original plans couldn’t be built, but it took Angie and Paul several months (and £6,000) to have the courage to dismiss him and get somebody else. Thankfully the next architect they appointed confirmed that they would be able to build to their original plans. Paul emphasises the importance of researching specialists and finding someone that you feel comfortable with.

    “If you’re building a Passivhaus you want somebody with experience of Passivhaus or at least is willing to learn and look at the differences between that and a normal house and take those on board.”

    Deciding to use the services of an interior designer they were fortunate to have them involved at an early stage to assist with the layout of the interior and pick up on areas, such as space for hanging curtains, which would have been difficult to rectify after the construction work had been completed.

    Green Building Store provided them with knowledgeable and skilled builders who Angie and Paul both say were a pleasure to work with. They used their own electrician and were also happy with the services of the plumber.

    Paul stresses that it’s important to take your time at the stage of getting your team together. They were thankful that their whole team worked well together and that they enjoyed working with them.

    “And it’s people you can work with as well. It’s not just a good track record but if you’re not comfortable with those people then it’s going to be a problem down the line.”

    compback

    porch1

    Find out more

    Visit the website of Green Building Store

    Check out the shortlist for the 2016 UK Passivhaus Awards

    Please connect with me

  • HPH025 : The Myths of Passivhaus (Passive House) – with Elrond Burrell from Architype

    Elrond Burrell from Architype helps bust some of the common myths that surround the Passivhaus standard.

    Elrond 1

     

    Interview with Elrond Burrell

    Elrond is originally from New Zealand, which is also where he trained as an architect, but in 1998 he moved to the UK. After working on various sustainable projects he then joined Architype in 2006 and became more aware of the Passivhaus standard.

     

    The Passivhaus Standard was Developed to Close the Performance Gap

    Passivhaus is a performance standard for a building that is not specific to the type of building. It was developed over 20 years ago by professors Bo Adamson and Wolfgang Feist, who were looking into why buildings didn’t perform as well as they were predicted to do. By carrying out lots of careful analysis they established that in order for a building to be comfortable and energy efficient, it needs to be airtight, well insulated and have good ventilation.

     

    Understanding Passivhaus with Coffee!

    Elrond gives an example of two ways that you could keep your coffee warm. In the first situation there is a hotplate, where energy is continually put in so that it keeps bubbling and at temperature. In the second scenario the hot coffee is poured into a thermos flask and kept warm by screwing the lid on. Passivhaus works in the same way. Some warmth must be provided initially, be it through solar energy from the sun, occupancy heating (movement) or cooking, etc. But, by having the building built correctly and well insulated that heat is kept in so that you are not losing it.

    thermos-vs-hotplate

     

    Mechanical Ventilation with Heat Recovery Provides Fresh Air Without Losing the Warmth

    Instead of throwing out all the warm air and bringing in fresh cold air which then has to be heated, mechanical ventilation with heat recovery allows fresh air to be brought into the house and the old air to be expelled but importantly the heat is retained.

     

    The Myths of Passivhaus

    This episode is slightly different from any that we’ve done in the past. We put out a message on Twitter asking Passivhaus builders and designers to tell us what common misconceptions they hear. Now we discuss the items that cropped up the most.

     

    A Passivhaus Heats Itself – MYTH

    This is not factually correct, because nothing heats itself. A Passivhaus needs to get the heat from somewhere, but a Passivhaus building retains the heat (as discussed above).

     

    You Can’t Open the Windows in a Passivhaus – MYTH

    This may be easy to buy into but in a Passivhaus there is nothing to stop you from opening the windows. Elrond says that it really depends on the time of the year and what you want as to whether you open the windows. In summer (UK) it is likely that the mechanical ventilation would not be running anyway, so natural ventilation would be important and that means opening the windows. In winter there’s probably no need to open the windows because there’s enough fresh air and it doesn’t feel stale or stuffy. In a traditional buildings that’s why people tend to open the windows in winter because it’s stuffy, which is essentially the CO2 levels getting a bit high, whereas in a Passivhaus there’s constant ventilation in the background and there just would not be the need.

     

    The Aesthetics of a Passivhaus are Not Good – MYTH

    Elrond suggests that many of the first buildings to meet the Passivhaus standard were located in Germany and Austria, and so had a continental aesthetic. As these buildings attracted a lot of publicity it is no great surprise that there is the perception that a Passivhaus will look a particular way. Also, many of the initial attempts at doing Passivhaus may have mimicked these buildings as designers were grappling with a new challenge. However, as time goes on, Elrond believes we are seeing more buildings in the local vernacular styles.

    Having worked on three certified Passivhaus schools, Elrond is proud that Architype achieved a similar aesthetic to their non-Passivhaus schools.

    Architype-school

     

    A Passivhaus Must be Built with Sustainable Materials – MYTH

    Elrond finds this one interesting because he hears the other argument, that Passivhaus doesn’t put enough emphasis on encouraging use of natural materials. At Architype they have always had an interest in using healthy materials that don’t emit noxious fumes, so that there is no knock-on impact with occupants suffering from conditions such as asthma.

    The choice of which materials to use in a Passivhaus will normally be determined by the designer or client’s preference. When it comes to insulation there are also complexities in balancing how much carbon might be involved in the materials, for example using polystyrene, and how much carbon is being saved due to the energy saving attributed to a good insulating material.

     

    Building a Passivhaus is Too Expensive – IT DEPENDS

    Elrond says there’s quite a lot of published data which shows that Passivhaus buildings can cost more than non Passivhaus buildings. However, when designing a Passivhaus building it’s a quality assurance standard, so what gets built has to match what gets designed and it has to meet the appropriate standard of workmanship on site with the finishes, etc. Thus, comparing that with a building that only reaches standard building regulations (in the UK), there’s very little quality assurance that a finished building matches what was designed at the outset. This means there is an issue of comparing like for like, because if that building was constructed exactly as it was designed it would probably cost slightly more than it did.

    Another factor that increases cost is when existing plans are adapted to go down the Passivhaus route, which of course will add extra cost. The best way to approach Passivhaus is to have it as an objective from the very beginning. Take the budget and prioritise how the money will be spent. For example, in order to meet the standard there will need to be triple glazed windows, etc. This way, once the essentials have been priced up, there will be an amount of money with which to work. The building may need to take on a simple but elegant form but it will allow the overall budget to be balanced.

     

    The Air is Too Dry in a Passivhaus – IT DEPENDS

    Elrond says that this issue is more complex than it might seem on the surface. For an in-depth answer he suggests reading a paper on Passivhaus ventilation that Mark Siddall wrote for the AECB. However, most occupants are used to living in buildings that don’t perform very well and perhaps have more moisture than would be ideal (which may lead to environments that encourage mould growth and in turn can cause occupant respiratory difficulties such as asthma). In buildings which are built right – high levels of insulation, airtight, well ventilated, etc. – the humidity will definitely be lower in certain circumstances than traditionally constructed buildings. That’s not necessarily a bad thing because a drier building will tend to be a healthier building. If things are not balanced properly or something is not quite right, then it may feel slightly drier than is comfortable.

     

    MVHR is Too Noisy – IT DEPENDS

    Careful design and installation should mean that noise from MVHR is not an issue. In a Passivhaus building the MVHR should be in a separate area (like plant room or cupboard) but it can even be outside the building (providing good acoustic separation).

    The Passivhaus standard also requires that background noise from MVHR should not be greater than the World Health Organisation‘s recommended noise levels for people to sleep comfortably. It’s also worth noting that the fans are running at an incredibly low speed so there should be very little noise coming from them.

    Where there might be the possibility of sound travelling through the ducts from one room to another, there needs to be acoustic attenuation built in, which will eliminate the problem.

     

    MVHR Costs More to Run Than the Energy it Saves – MYTH

    Clearly when you move from a house without MVHR to one that does have MVHR, there is a new cost to pay. However, as discussed earlier, it is often difficult to compare like for like between a Passivhaus and a non Passivhaus.

    But, so long as the airtightness of the building reaches a certain level (approximately 1.5 air changes per hour), it’s been proven that the amount of energy saved and the cost of that energy saving is much greater than the cost of running the MVHR.

     

    Mechanical Ventilation Has to be Running All the Time in a Passivhaus – MYTH

    Elrond quickly shoots this one down by saying that at Architype they design their buildings to use natural ventilation in the summer and MVHR just for the winter months.

    It should be easy to tell when to switch off the MVHR. When opening the window, if it feels dramatically colder outside than indoors then a lot of heat energy is being lost and there’s also a cold draught coming in. This would be when you would want the MVHR to be on. Alternatively, when opening the window if the fresh air coming in feels comfortable and there’s no cold draught, then probably you don’t need to have the MVHR running.

     

    Mechanical Ventilation is Too Complicated to Use – MYTH

    Elrond argues that this is a myth because the controls are simple to understand with a small amount of training. Most people can operate a boiler, switching off the heating for the summer, for example. Mechanical ventilation is no more taxing.

     

    You Can’t Have a Woodburner in a Passivhaus – MYTH

    This is more a case of there’s no need to have a woodburner in a Passivhaus. People often desire them for emotive reasons because it’s nice to sit around a fire or to feel heat emanating from something.

    Having a woodburner in a Passivhaus is generally discouraged for a couple of reasons:

    • It would only be used for a very short time of the year
    • A lot of heat will be generated and that heat will be retained

     

    Passivhaus Will Only Work on a Sunny Site – IT DEPENDS

    Passivhaus does optimise the solar gain so as to make the most useful benefit of the heat from the sun. With a small building on a site that gets little sunlight it would be more of a challenge and would really have to be addressed on a specific case by case basis as to whether it was viable or not. As a building gets bigger the parameters change slightly. Elrond uses Architype’s schools as an example. Having more people in a building means there’s more heat energy being generated and so there’s less of a need for using heat from the sun.

    school-interior-arch

     

    Passivhaus is Best Suited to a Domestic Market – MYTH

    Elrond wonders whether there might be some confusion in the word Passivhaus (or passive house). One of the reasons the German word is the preferred form is that the literal translation of ‘haus’ means building. In other words a Passivhaus can be any type of building.

     

    Elrond is All Over Twitter!

    Follow Elrond Burrell on Twitter

     

    Transcript

    Download a transcript of the interview with Elrond Burrell.

     

    UK Passivhaus Awards

    Ben shares the exciting news that his production company, Regen Media, is producing video inserts for the UK Passivhaus Awards. This means that very soon you’ll be able to find out why the following projects have made it to the shortlist:

    Private Housing (sponsored by Ecology Building Society)
    • Crossway, Hawkes Architecture Ltd.
    • Plummerswood, Gaia Architects
    • Totnes Passivhaus, Passivhaus Homes Ltd.

    Social Housing (sponsored by Kingspan Insulation Ltd)
    • Ditchingham Passivhaus, Parsons & Whittley
    • Lancaster Cohousing Project, Eco Arc Architects
    • Racecourse Passivhaus Bungalows, Gentoo

    Non-domestic (sponsored by Munster Joinery)

    • Green Base, Simmonds Mills Architects
    • Canolfan Hyddgen, JPW Construction
    • Interserve Office, Interserve

     

    ArchiHaus Granted Planning Approval to Build 150 Passivhaus Homes

    Ben also has more good news. In episode 24 he interviewed Jonathan Hines about ArchiHaus and Architype‘s proposal to build 150 houses in Kingstone. Well, not long after the episode was published they received the go-ahead!

     