  • HPH387: How do you make a Victorian terrace home more comfortable? – with Will South

    HPH387: How do you make a Victorian terrace home more comfortable? – with Will South

    Will South from Etude takes us step-by-step through the retrofit of his Victorian terrace house in Brighton, which has improved the health, comfort and energy efficiency of the property.

    Interview with Will South

    Will is a mechanical engineer, working at Etude to make buildings better through reducing energy consumption and carbon emissions, an approach he has carried over to all the places he’s lived. With his most recent move he had in mind a retrofit project right from the start. He wanted to be in the middle of Brighton, close to the railway station and the coast, in a modest sized home. So he chose a Victorian terrace house, originally a two-up two-down that he could retrofit to the level that would be right for the building.

    Many period properties have common traits

    Will’s house is a classic Victorian terrace design, where there is space for you to take off shoes and coats just through the front door, the stairs are in front of you, then there’s the living area on one side and a kitchen all the way through at the back. Upstairs, there are two bedrooms and a bathroom. Will describes it as a simple layout with a nice flow and high ceilings, even upstairs, which is more unusual.

    Deciding how deep to go with your retrofit is a personal choice

    A big part of Will’s day job is working on Passivhaus projects, but here there was a question around the right level of retrofit for this type of property.

    This project has also made him realise that maybe not all homes need to have as deep a retrofit as he used to think, and that heat pumps are more than capable of heating the majority of homes with few changes. However, he knew he wanted to take it further and make the house as comfortable as it could be. With his experience in ventilation systems, glazing specifications, insulation, etc. nothing was off the table.

    “We’ve done everything: walls, roofs, floor, new ventilation system, new windows, but a lot of it is as an experiment to show how it could be done.”

    Watch an EnerPHit retrofit of this Victorian home in The Hub.

    Decarbonise your heating by moving to a heat pump

    One key move Will wanted to implement to lower his carbon emissions was to switch from a gas boiler to a heat pump. For most homes, some fabric measures may be needed, often topping up loft insulation, improving windows and upgrading radiators. Anything after that will continue to improve comfort levels, reduce bills and increase resilience for the future.

    Create an overall plan for your retrofit

    Will started with his dream end point, irrespective of budget, to come up with an overall plan for the retrofit. For example he has not installed solar PV as part of the project but he has made allowances for it as a future addition.

    With a solid retrofit plan, he then examined the priorities. There was leak in the roof and a rear extension, where the floor and the roof were in a sorry state. Generally, starting with the roof is a good strategy, which for him meant redoing a parapet then making sure the party firewalls and the chimneys were in a good state before he did anything else, so that the building had a good chance to stay dry.

    Having a good ventilation strategy is essential on a retrofit project

    Will tells us that although it took a long time he ended up doing everything in almost one go. If you have to do a phased retrofit, you need to make sure that the building is left in a good working state at the end of each stage. The main risk is around ventilation and managing moisture in the building, and you need to be careful you don’t seal up the building or insulate it in one part without dealing with the ventilation. A ventilation strategy is often a priority and if the end goal is a mechanical system, then get that in early, so you’re already managing the moisture levels.

    SketchUp was used to create drawings for the project

    As a consultant Will knew what was needed but he wasn’t used to doing the drawings himself, so that was a bit of a challenge. He used SketchUp to create a model of the house, including drawings for the existing building and the proposed building. Being in a conservation area, planning permission was needed for replacing windows at the back of the house, and altering the roof-scape slightly to fit the heat pump at the rear, which led to more drawings for the planners. In the end he made a full set of drawings to help him work out what he was going to do and allow him to communicate easily with the contractor.

    Will imagines that in the future there will be templates for every building type, that you would alter to reflect your own situation. There’s already a good website called retrofit.support, which has a pattern book of details that give you a place to start.

    Create a detailed cost plan

    Will paid a cost consultant who specialises in housing to provide him with a full cost plan. This gave him a long list of everything needed, with a starting point for all the prices, giving a good feel for what it would cost if he did everything. This service cost around £400 but was invaluable.

    The costs for construction broadly came in as expected. He imagined that there might be a big cost differential between materials but in actual fact he was dealing with such small areas that the cost was all in the labour.

    Budgeting for the internal finishes was much more difficult as costs varied dramatically, particularly for bathrooms and kitchens. So unless you have an example of the product that you want to use, it can be hard to budget accurately for this stage.

    Different insulation strategies have been used around the house

    Will explains that even though it’s a small building a variety of strategies have been needed to insulate the roof, walls and floors. Initially they planned to live in the house while the retrofit took place. The first phase was going to be the rear return, with the kitchen and the bathroom. The kitchen ceiling was falling in and the bathroom ceiling looked worrying, so both needed attention.

    The building has all sorts of roof types, which is not ideal. There is a small parapet at the front which has got insulation between the rafters and a lead roof. Then there’s the main loft which has mineral wool insulation, the rear return which has Larsen trusses, filled with insulation in the pitch, and a small flat section of fibreglass roof which has got the heat pump on it.

    “Generally, starting with the roof is a good strategy. An old fashioned building has a good hat and good boots.”

    Planning restrictions also had an impact on the insulation strategy

    Being in a conservation area an internal wall insulation strategy was adopted at the front of the building, using 80mm wood fibre board. There is a bonding coat underneath, made by Baumit, which helped create a flat base for the boards to go on to and added an extra 10-20mm of insulation.  

    At the rear of the property they were allowed to insulate externally and have used cork, which was chosen because it deals with moisture better than some other products. The external wall insulation is taken below ground to the foundation with EPS.

    The floor became a bigger project than originally planned

    While Victorian properties are highly desirable today, when they were built they were thrown up quickly and cheaply so there were a few surprises lurking. When they took up the floor, they found slim 3-inch joists sitting on continuous bungaroosh, which was just piled up chalk. As they were able to move out of the house for a few weeks they could tackle the floor in a more significant way.

    It involved taking out all the timber and the dwarf walls, scraping back the chalky base to create the space needed for the floor build-up. EPS was directly put onto the sand blinding, then a plastic DPM, and finally a concrete screed with underfloor heating. It’s a simple build-up as there’s no structure sitting on it. Will would have liked to have reused the original floorboards on top of the screed but was advised against it.

    The sash windows have been improved

    While Will had more freedom at the back of the house, where he installed some triple-glazed units, at the front of the house there were restrictions. He also did not want to get rid of the beautiful period sash windows. So he has replaced the sliding part of the sash and put in vacuum glazing. The boxes are original although he has added a draught strip to improve airtightness. He’s used a foam filled rubber draught strip, a type more often used on a casement window, which is more robust and gives better airtightness, but it makes the windows a bit stiffer. As all the windows are wooden, they will need maintenance and Will suggests to always repaint them just before they look like they need painting!

    Having a continuous airtightness layer was easier said than done

    The strategy at the beginning was to identify where the airtightness line would be for each part of the construction. Will realised that they would be able to achieve it for some parts, but in other areas they wouldn’t be able to get into places to create an air barrier. He estimates that he got around 75% of the way with airtightness and to get any further would probably have meant gutting the whole house and starting again. The intermediate floor and all the internal walls stayed where they were, but the external wall finishes were removed allowing for bonding of the insulation, creating continuous runs to tie into the next airtightness material and into the windows. The damp proof membrane underneath the screed on the ground floor comes up the inside of the wall and is taped on there. In the loft Will put a membrane over the top of the joists, cut it around all the trusses, taped it and then put the loft insulation on top of it. It was very difficult to tie it into the top of the walls right into the eaves where access was limited. The eaves were extended very slightly at the back of the house to accommodate the external wall insulation. This meant the last two tiles were off for a time and Will used the opportunity to do more taping. His approach was to use membranes only where there was timber, and then everywhere else to use a wet lime product.

    Before the sash windows were replaced, Will got an air permeability of 2.1 which is three air changes per hour at 50 Pascals, which he was pleased with and was in fact the number he’d put in his PHPP model. He hopes it will have improved and is going to get another air pressure test and more thermography in the winter.

    MVHR can usually be integrated seamlessly into an existing home

    Installing mechanical ventilation with heat recovery can really improve the indoor air quality in an existing dwelling. It manages moisture in the home, allowing you to do things like cook or dry washing without consequences. And Will believes that there is always a way of designing a system into an existing home and figuring out the duct runs, etc. It just takes careful planning.

    The benefits of MVHR are noticeable even in a leaky home

    Even if the airtightness has not been addressed fully Will feels that installing MVHR will improve the ventilation in a house and because it has 90% heat recovery it will give some energy saving no matter how efficient your building is. If you then improve insulation and airtightness you will continue to see benefits.

    A heat pump is a good choice for a low energy home

    When they bought the house it had a 10-year-old combi boiler, which they could have used for a bit longer, but Will was keen to switch to a heat pump heating system. So when redoing the bathroom he took the opportunity to put a new hot water cylinder where the boiler was, because all the pipe runs link to that point. An extra motivation to get off gas was the massive gas meter that was located in the entrance hallway. He paid extra to get this disconnected and removed.

    In Will’s experience it was difficult to buy the heat pump and difficult to get it installed, a view that other people have also expressed. At the time, it was also difficult to find somebody qualified to install heat pumps. In the end, his builder’s plumber carried out the work, and used it to upskill and get his MCS qualification, which was really positive. On the negative side, he hadn’t known they didn’t have MCS and so he was not able to get the boiler upgrade grant.

    He had assumed that the heat pump manufacturers would know what was needed for a small home, so hadn’t looked into the detail himself. That was a mistake and the whole process got complicated very quickly. They’d assumed he wanted thermostats in lots of different places, and that the radiators and underfloor heating circuit were on different zones. Will ended up having to change things afterwards, which was frustrating. The other eye opener was just how much equipment you end up with inside the house. He had thought about a cylinder, but with unvented cylinders you also have an expansion vessel for the heating, an expansion vessel for the hot water. Then there are two control boxes, two zone valves and they wanted to put in a buffer vessel as well. It really started adding up, with a lot to fit in a small area. He recommends buying a hot water cylinder with a built-in expansion vessel, which is a bit more expensive but saves on space.

    Will’s energy consumption has gone down significantly

    The average temperature within the house has increased to a constant 20 degrees, which is where Will wants it to be. Gas consumption has gone from 158 kilowatt hours per metre squared per year, which was quite high, to zero.

    This has however been replaced with electric heating, with electricity use now around 40 kilowatt hours per metre squared per year. This went up about 20% after the switch over to electric heating, so a much smaller uplift than the reduction in gas. By Will’s calculations his carbon emissions are down by 85%, which is significant. If solar PV was added at a later date they could be net zero.

    Some of this is about how they live, with just two people in the house they don’t have huge consumption and are out a lot of the time. In financial terms their energy costs have more than halved, reducing from £2,500 a year to about £1000 a year.

    Sticking to a budget is tricky!

    Will sees a budget as a good tool to manage costs although he realises this isn’t necessarily what you’re going to spend. Therefore he put aside a significant contingency. For him this takes away the worry about money, which can so often cause problems.

    Buying a smaller house in the first place and securing a bigger mortgage so as to free up the cash was also sensible. They had an inheritance and some savings, which essentially has all been spent on the house. It has come in at around £150,000, but this figure includes a new kitchen, new bathroom, new flooring and a lot of extras.

    Replacing the suspended floor was a gamechanger

    Amongst the takeaways from the project Will feels the hard work and disruption of putting in a solid floor with insulation underneath has really paid dividends. So if you have enough space to play with then this is something Will would definitely do again as it’s made it draught-free and always comfortable to walk upon.

    The installation of the heat pump relied heavily on the plumber

    Will was surprised that even though they had a Vaillant heat pump and used their designs, a lot still rested on the plumber. If he was doing it again Will would take more of it under his control.

    Airtightness is often about doing the best you can

    Will thinks he did a really good job on airtightness, but reflects upon the fact that there is always more that could be done. If he were to do it again he would use more traditional wet materials like lime-based plasters for airtightness when dealing with crumbly brickwork.

    The house is now comfortable all year round

    When they bought the house the structure was worrying with a bendy beam, ceilings falling down and it was very damp, with slugs behind the kitchen cabinets. During the winter they were just heating whichever room they were in and downstairs they were always aware of draughts from under the floor. There is none of that now, it feels homely and is a constant 20 degrees throughout the house all year round.

    Find out more

    Etude

    Transcript

    Download a transcript of this episode.

    Please connect with us

    Subscribe, rate and review us on Apple Podcasts

    Follow Ben Adam-Smith on LinkedIn

    Follow Ben Adam-Smith on Bluesky

  • HPH009 : Retrofitting a Victorian House to Passivhaus Standard #2 – with Alex Rice from Green Tomato Energy

    Alex Rice, Senior Engineer at Green Tomato Energy, explains that there are few technical challenges that remain when retrofitting a period home into a low energy building and it is a case of how you apply those solutions to the given building.

     

    Interview with Alex Rice

    Alex talks about the process of how his clients (often a husband and wife team) get started. He stresses the importance of trying to understand their needs and ideas, as well as discussing what is possible. This enables a clear brief to be written with objectives about which everyone is clear.

     

    Create and Stick to an Energy Target

    In many of projects undertaken by Green Tomato Energy they set targets to reach the Passivhaus (15kWh per m2 per year) or EnerPHit (25kWh per m2 per year) standards. Where listed buildings are concerned the target might be slightly higher due to the constraints. However, it is really important to nail down an energy target, because without knowing what you are trying to achieve in terms of energy it is nearly impossible to make the technical trade-offs that are required. This target guides the decisions that are subsequently made, thus changing your target practically changes the entire design.

     

    Understand the Building Itself

    Each building is unique and so understanding how it was originally intended to work is imperative. Alex highlights how Victorian dwellings function in a very different way from modern buildings in terms of how moisture moves around the building and the way they’re ventilated. Even the way people lived in them was different. In order to take that building as it was designed and make it work in a way that is almost completely different, you’ve got to have a really good understanding of the materials and the methods of construction that were used.

     

    Moisture is Death to a Building!

    Ben confesses he doesn’t really understand about moisture but he knows you don’t want to trap it. Alex explains that nothing kills a building more quickly than it being wet. He illustrates the point by saying a derelict building will stand for ages until the roof falls in and then it will disintegrate very quickly. Moisture causes wood to rot and bricks to undergo freeze-thaw damage. The primary aim of a building is to keep the building materials dry. Controlling sources of moisture from within and outside the building is crucial to the long term survival of any building.

     

    Where is The Moisture Coming From?!

    People are a source of moisture inside the building! They do things like wash and cook. They dry their clothes on radiators and water potted plants, etcetera. Then the other source is water outside the building including rain falling on the walls, water soaking up through the foundations, leaking out of gutters and coming in through faulty roofs.

     

    When Setting an Energy Target, Why Don’t We Always Go For The Best?

    The best target depends on the building and what you’re trying to achieve. For zero energy consumption, your house would be infinitely big which is clearly not possible. Trade-offs have got to be made between how thick your insulation is and what energy sources are available to provide heat. For example, if you have a Passivhaus that has very poor orientation so that you can’t get some south facing windows, then your insulation is going to need to be thicker in order to make up for that. There’s a trade-off between how much energy the building consumes, how expensive it is to build it, how much space it takes up and how costly it is to service the building, so the concept of Passivhaus is that you make the building envelope perform well enough that you can dispense with some of the techie bits of the building – parts of the heating system.

     

    The Passivhaus and EnerPHit standard are carefully selected

    The whole point of 15kWh per m2 per year is that it’s a point of minimum cost for that level of performance. The same principle applies to the EnerPHit standard, because in a retrofit project, getting the insulation in and getting the thermal bridges insulated is more expensive so it becomes cost effective to spend a little bit more on the energy and a little bit less on the building.  Those two points 15kWh per m2 per year and 25kWh per m2 per year were picked carefully as the best level of energy performance but built into those two numbers are assumptions about how much it costs and how difficult it is to achieve those standards, which is why when you go to things like listed buildings that number moves up, because it becomes cost effective and practically achievable to consume a bit more energy a year but make it much easier to build.

     

    Internal Wall Insulation vs Reduction of Floor Area

    It is Alex’s experience that you can put a surprising amount of insulation on the inside of a room and that once it’s all detailed in, you hardly notice it. When you’re putting it on it looks huge, but once it’s detailed in with the plasterwork, it really does disappear. The only exception is where space is already limited and therefore things like beds and wardrobes no longer fit into spaces that they previously did. There are higher cost ways of achieving the same level of insulation performance in less thickness using aerogel, vacuum insulated panels, etcetera. Generally speaking phenolic foam and those types of insulation materials are perfectly adequate and are the most cost effective choice for retrofit projects.

     

    Add Space as Part of The Project

    If you are retrofitting to Passivhaus or EnerPHit, then this is a major undertaking and thus this is the perfect time to extend your property. At this Lena Gardens Victorian terrace, a basement was dug out to provide space for the services and an extension at the rear enlarged the kitchen. So in this case there was more floor area at the end of the project.

     

    The Geometry of Old Buildings Make Insulating More Challenging

    One of the biggest challenges in a retrofit is working around the existing structure of the building. In a new build the walls can be made with the insulation in it already and it’s quite easy to design a thermally bridge free well insulated envelope. In an existing building there are often areas which are geometrically difficult to insulate.

     

    Removing The Timber Bricks!

    A lot of old buildings contain some timber in the walls. It was typical in Victorian construction that if something was brick-sized and brick-shaped then it would be stuck in the wall! This can only be assessed once the plaster is removed. It’s important to make sure the pieces of the building you are covering up are in a fit state to remain covered up behind insulation for the next few decades.

     

    Avoid an Adversarial Culture in Your Team

    Alex emphasises that communication amongst the team is key to the success of the project. The guys on site need to report issues as they arise and not feel that they will get an earful of criticism in return. As Alex can perform many of the tasks himself, he sees this as crucial in building up credibility with the tradespeople.

     

    Tradespeople Want to Work on a Passivhaus Project

    One of the indicators that a tradesperson is going to be good on this type of project is that they have previous experience. Tradespeople are becoming aware of this and they want to do a Passivhaus project because they realise it will be good for them to be known to deliver this level of quality. Passivhaus is becoming a hallmark of quality. Alex describes how after seeing a blower door test for air tightness for the first time, tradespeople often leave the site excited about the new knowledge they have learned.

     

    Alex Inspired By Ken Schaal From CommonWealth Solar in Virginia

    After studying for a degree in new and renewable technology at Durham University, Alex worked at CommonWealth Solar in the United States for Ken Schaal. Ken was part of the passive solar homes movement of the 1970s and had built a geodesic dome (using materials such as foam and concrete) for next to no money that also used practically no energy. Having lived in Victorian properties all his life, Alex describes this as an eye-opener as he always expected low energy buildings to be complex and expensive. Ken taught him that if you make a building well-insulated and airtight, you need the minimum of stuff to make it work.

     

    British Housing Stock is Very Different to America

    In the United States, buildings are often knocked down every 25-50 years to make way for the new designs. In the UK, the average life of a building is often a hundred years or more. Thus retrofitting is a major challenge for the future.

     

    Transcript

    Download a transcript of the interview with Alex Rice.

     

    UK Passivhaus Conference

    Having become more and more interested in a Passivhaus approach over the last few months, Ben Adam-Smith attended the UK Passivhaus Conference in Nottingham. There were some very interesting talks and Ben reveals that he has been taking notes on who he needs to speak to for future episodes!

     

    Is Cladding with Brick Pointless?

    Ben is confused about the options for his own project as he prefers more traditional aesthetics, yet he can completely understand why many Passivhaus buildings are finished with wood (which is far more sustainable) as the external surface. He wonders whether he just has to get used to it, as using an unnecessary layer of bricks on the exterior of a house is a waste of time and resources (even though he still likes the effect).

     

    Voicemail Message from Shauna Wyldeck-Estrada

    Shauna contacts House Planning Help to share information about her renovation of a Victorian house in Catford South. She talks about how she used sheep’s wool insulation in the loft and cellar, and how it has had an amazing effect on reducing her bills. A wood stove provides heat when required, making her central heating system redundant.

     