Tag: National Self Build and Renovation Centre

  • HPH353: 12 tips for a successful Passivhaus project

    HPH353: 12 tips for a successful Passivhaus project

    Speakers from the Passivhaus workshop event at the National Self Build and Renovation Centre in Swindon each share a top tip.

    Ben Adam-Smith caught up with various people who were involved with the Passivhaus workshop event and asked them for a piece of advice that could be applied to a Passivhaus project. These tips are in no particular order.

    1. Put ‘Passivhaus standard’ on the brief on day one

    Anna Carton from Passivhaus Homes recommends integrating the Passivhaus standard as early as possible into your build, preferably pre planning. Passivhaus is a holistic approach and all aspects of the design influence the performance of your home. Anna suggests that it is possible to take a standard design and make it into a Passivhaus design, but warns that aesthetic choices or use of certain materials, etc. might introduce challenges around thermal performance. Therefore, starting with clear intentions from the beginning can lower your costs and save you the headache.

    To find out more about Passivhaus Homes, head over to episode HPH341, where Jae Cotterell debates whether embodied carbon or energy efficiency should be our priority.

    2. Consider the placement of your services early on

    Gordon Bunker, owner of Worcester Renewables, recommends taking some time to work out where best to locate your ventilation, heating and power generation systems. Gordon explains that building services can be overlooked in the design stages or assumed to be smaller than they are, so proper consideration early on will ensure they are allocated enough space and therefore easily accessible for maintenance. Gordon mentions that 3-5% of your total floor space should be put aside to house these systems.

    Join The Hub to access our in-depth video case study of the Kinver retrofit.

    3. Budget for thorough airtightness testing

    Neil Turner, the UK Technical Manager for Ecological Building Systems, highlights the importance of intermediate airtightness testing during a Passivhaus build. Neil suggests undertaking an airtightness test once all of your membranes, tapes and boards are in place to identify if you have missed any areas around windows, doors or pipes. If there are some leaks, address them and test again to make sure the airtightness has improved. Then you can start on your finishes. Doing this will ensure that you seal up any leaks at a point where they are still easy to fix.

    If you’re one of our Hub members we’ve got a live training session with Niall Crosson from Ecological Building Systems. He explains all the important aspects of airtightness.

    4. Be prepared to fully commit to Passivhaus

    Rob Bohm, Head of Energy and Sustainability at CLPM, explains that Passivhaus principles will impact the design of your house so you must be prepared to fully commit. Rob says that Passivhaus projects are “not for the faint hearted and can have severe limitations on what your choices may be”, but if you undertake the journey it will repay you in numerous health, lifestyle and financial benefits.

    5. Keep it simple

    Mike Shufflebotham from 21 degrees highlights that when it comes to high performance windows and doors the simpler the design, the less it will cost and the better it will perform. This is because the glass is a much better insulator than the frame. By introducing mullions and transoms into your window design, you increase the proportion of frame to glass, which as a result lowers the performance, whilst increasing the cost through the additional labour and joinery. The final product performs worse and costs more than the original simple version.

    Embracing simplicity is a common theme in Passivhaus building. We explain why in episode HPH350.

    6. Take a fabric first approach

    Robin Miller, Director of Beco Wallform, explains that “if you get the right fabric, the right quality and the right performance, it makes the rest of the project so much easier”. Through the fabric, you can minimise the energy requirements of your home and create a much more comfortable living environment. Robin therefore recommends taking some time to identify which building material aligns with your self build values and overall goals for your home.

    7. Optimise the form (or shape) of your home

    Alan Budden, Architect and Passivhaus Designer from Eco Design Consultants, advises keeping the overall shape of your house as simple as possible (achieving a good form factor). By doing this, you minimise the heat loss area relative to the floor area, making it perform better and also enabling you to reduce the amount of insulation you need to meet Passivhaus (which in turn makes it cheaper!). This doesn’t mean that the building has to be boring, in fact many classic architectural styles use simple shapes and get the proportions right. The structure is also a blank canvas and you still have the freedom to be creative with materials and internal finishes.

    8. Check your window frames for insulation

    When it comes to high performance components, Vasilis Giannopoulos from Internorm highlights the importance of checking that your window frames are well insulated. For example, if you choose composite windows identify whether there is insulation in between the external and internal layers, rather than just an air gap.

    “When you go into the market for Passivhaus windows, always focus on the frame of the windows. It’s going to be easy for any window supplier to match the performance specifications you have for the glazing units. So please focus on the quality and the performance of the frame.”

    9. Make sure you research your future ventilation system thoroughly

    Ben Collins from Air Flow suggests researching the ins and outs of your ventilation system at the planning stage. From talking to installers to identifying which add ons you may require, you will be able to get a clearer picture of which ventilation system may work best for your future home and offer you the best energy efficiency. There are many bolt on options out there that offer different features and benefits, but they must be brought in and designed during those early stages.

    10. Understand your budget

    Iga Panczyna, Architect and Passivhaus Designer for Allan Corfield Architects, believes that it is crucial that self-builders have a realistic understanding of what they can achieve with their budget. Iga highlights that there are ways to achieve a Passivhaus on a restricted budget, but this relies upon good design and clear planning from the start. Additionally, those whose budgets will not quite get them to Passivhaus standard, can still follow the principles to get the home as close as possible.

    11. Practice any skills you intend to use during your build

    Paul Jennings from Aldas recommends practising your skills ahead of when you will need them for your own build. This is particularly important for insulation and airtightness because there needs to be attention to detail to ensure the finished performance.

    “My top tip is plan ahead, prepare, practice, look at what you’re doing, think about the design, look for joined up-ness, is your airtightness line consistently joined up? Is it practical? If you’re doing any sorts of fancy tapes, you’re doing preformed corners, practice! Don’t practice on your build, practice before you get to your build.”

    A few years ago we made a documentary with Paul Jennings

    12. Don’t mess with the formula

    The final tip from Ben was to not mess around with the tried and tested approach. It can be tempting to go off piste and just do the bits you like, but Passivhaus building is a holistic process and by messing around with one aspect there could be unintended consequences.

    “That’s one reason why I like certification, because it shows that you’ve done all the bits and that it should work at the end of the process, because it’s a quality assurance process.”

    Find out more

    National Self Build and Renovation Centre

    Passivhaus Homes

    Worcester Renewables

    Ecological Building Systems

    CLPM

    21 degrees

    Beco Wallform

    Eco Design Consultants

    Air Flow

    Allan Corfield Architects

    Aldas

    Transcript

    Download the transcript of this episode.

    Please connect with us

    Subscribe, rate and review us on Apple Podcasts

    Like our Facebook page

    Follow us on X

  • HPH124 : A contemporary Passivhaus home, built with SIPs – with Paul Newman from Potton

    HPH124 : A contemporary Passivhaus home, built with SIPs – with Paul Newman from Potton

    Paul Newman from Potton talks through the construction of the UK’s first Passivhaus show home.

     

    Interview with Paul Newman

    Paul Newman is the Self Build Director at Potton. Potton, which recently celebrated their 50th anniversary, have helped design and build over 6000 homes and have a portfolio of over 12,000 different designs. The Potton approach to custom build is to work with landowners to secure outline planning permission on their sites, with design left as a reserved matter. They find customers for those sites who then buy the land from the individual landowners. Potton then work with the customers to provide their normal self build package.

    At their site in St Neots they have a show centre of completed houses, where they are currently adding a Passivhaus. They have been sharing progress of this build with video updates and have also allowed members of the public to experience it being built.

    Potton Passivhaus mock up

     

    Building a Passivhaus show home was an obvious step

    Potton have four complete show homes at their St Neots site and one at the National Self Build and Renovation Centre. Moving with the changing market and increased demand for low energy homes, their last show house was constructed to achieve level 4 of the Code for Sustainable Homes. Wanting to move their business on and offer customers something new, they decided to construct a further show house, with a Passivhaus being the obvious choice.

    Their experience over the last 8 years has been that they’re being asked more and more often about energy efficiency and low energy homes and hope that this Passivhaus and the lessons they have learnt from it will put them in good stead for the future.

     


     

    The design aimed to push the Passivhaus standard hard!

    In coming up with the design Potton were keen to challenge the reputation that Passivhaus buildings sometimes have of being simple, boxy designs. They expect to evolve different design forms based on this Passivhaus, while not necessarily directly repeating it.

    They worked with HTA Design, an external design consultancy, on the plans, and also had specialist help from Passivhaus experts WARM.

    The building form is quite complicated and has a valley roof, so from a thermal bridging perspective the junctions have been tricky to resolve. Paul also thinks their life would have been much easier if they’d taken 18 inches of height off the design!

    Potton Passivhaus cross section

    Something they found encouraging was the use of an innovative self adhesive breathable membrane which has contributed positively to the building’s airtightness. The first airtightness test had a figure of 0.68 but after some alterations they managed to get it down to 0.5.

     

    The SIPs system took a matter of days to install

    The house has been constructed with Kingspan Tek – a product which is certified by the Passivhaus Institute – and Potton have been using it for the last 10 years on both their self build and volume contracting business. It provides a thermally robust solution and can be erected on site very quickly. One consideration, however, is that once installed it is hard to make changes to room layouts, etc.

     


     

    Use PHPP modelling from day one to see how the building is performing

    Paul explains that early modelling in the Passivhaus Planning Package was an important lesson for them when designing the Passivhaus. By doing this, something that showed up early on was that the building had a tendency more than was desirable to overheat. They were able to experiment by changing the overhangs, reveal depths and specification of the performance of the glazed units within the windows to make a considerable difference.

     

    Engage with suppliers early in the process

    There are two main lessons that Paul feels they have learned from the Passivhaus self build process. The first is the need to engage early on with suppliers to make sure they understand what you’re trying to achieve, have the right products available and certifications in place where appropriate. While they did try and engage early with their supply chain, their lesson was that they actually should have engaged even earlier and placed some of their orders earlier too.

    Secondly, Potton worked with sub-contractors who they have used on hundreds of other Potton houses in the past. What they found was more attention to detail was required to achieve Passivhaus performance, and they needed to have their hands held tightly throughout. Paul thinks this is something that won’t be unique to their build, as there just aren’t enough experienced Passivhaus sub-contractors out there.

     

    Find out more

    Visit the Potton website

    Find out more about Potton’s Self Build Academy

    Find out more about Potton’s Self Build Live

    Follow Potton on Twitter

     

     

    Transcript

    Download a transcript of the interview with Paul Newman.

     

    The Hub update

    Our Getting Started module is for absolute beginners who want to know how to research a house build. We’ve laid out a logical route so you can get going.

    In the Long Barrow case study the latest video shows the steel frame going up, and explains the areas where they needed to be careful of thermal bridging as they wanted to attach a balcony and a brise soleil as well.

    Elements of The Hub are free to view, but for full access the price currently is just £45 for the year.

     

    Please connect with me