  • HPH246 : Self build mortgages that promote sustainable living – with Paul Ellis from Ecology Building Society

    HPH246 : Self build mortgages that promote sustainable living – with Paul Ellis from Ecology Building Society

    Paul Ellis, Chief Executive of Ecology Building Society, explains their approach to mortgages that reward energy efficiency and sustainability.

    Interview with Paul Ellis

    Paul Ellis was an early investing member back in 1981 when Ecology Building Society was formed, and has been Chief Executive since 1995.

    Founding members had a shared interest in environmental causes

    The ten founders had met through their involvement with the Ecology Party; the forerunner of the Green Party, and had a shared interest in self-sufficiency and low-impact living.

    They were individuals looking to buy properties to renovate to reasonable energy efficiency standards, and without doing too much work. What they found was lenders were very restrictive and uninterested in providing support. They would demand certain works such as ripping out stone floors and putting in damp-proof courses that weren’t really needed, but that they felt would minimise their risk.

    “So, they’d often say they’d lend the money, but only once all the work is done, which wasn’t the point because everybody wanted to do their own work, be self-sufficient and learn building skills. So, they would be forced immediately into trying to get others to do the work and they were probably not going to have those kinds of funds available.

    So, the building society was setup to really encourage that ability to take properties and bring them back into good use to a reasonable standard, but not to provide expensive kitchens.”

    They are the youngest building society

    At the time they decided to set up a building society, there hadn’t been another done for quite a while beforehand, and they are still the youngest in the country. Paul believes a change in the regulations is the reason for this. In 1981 they only needed ten investors with a maximum of £5,000 to actually start the building society. The authorities caught wind of it and changed the rules to increase that amount. Luckily they managed to get the paperwork signed with five minutes to spare before the rules came into enforcement!

    Building their own premises seemed a natural step

    With the business growing it was necessary to find new premises, and after considering renovation they decided that building their own offices would be the best way forward. It could incorporate some of the techniques they were asking their borrowers to consider, and be a bit of a test to see what the issues were. And while the building has largely been successful, there are certain things they would now do differently.

    The building dates back to 2003, before Passivhaus was well-known in the UK. If they were to do it again, or when they extend it, they would use Passivhaus concepts.

    Paul says they were fortunate at the time to have the advice of eminent energy efficiency experts, although they had to compromise some of the ideas slightly to create a warm, welcoming space to live and work in.

    There are two distinct elements to the building. One part focuses on long-term energy use, with large amounts of concrete but highly insulated and built to a good level of airtightness.

    The meeting room area of the building was entirely constructed from straw bales, with a clay plaster render on the inside. Some of their members even came along to help with the construction while learning the techniques of building with straw.

    Throughout the building they have tried to make as much use as they can of recycled, reclaimed and other materials that have low embodied energy.

    Get early advice

    Paul would encourage anyone at the beginning of their self build journey to take a look at their website or give them a call to discuss their plans. While they wouldn’t immediately be able to give approval, they might comment on their ideas of budget and whether they think it could be viable for what is being proposed.

    In some cases they can be communicating with people for years who haven’t yet found their plot, but the majority of time people will already have a deposit and a plot.

    “For us to make a decision, we have to be sure that there is something here which is going to work in terms of energy efficiency or wider environmental considerations, and so it’s hard for us at the outset to give more than a rough picture of what we can contemplate because we don’t know the nature of the building.

    For us as a lender, the actual nature of the building, the finished product, is quite important to us. For other lenders, it would be more of a focus on the finances. For us, it’s what the building will achieve.”

    During initial discussions they would ask about the techniques and materials the borrower plans to use, and take a view on whether or not they think it’s a project that will work, by getting an understanding of whether the individuals understand those techniques and whether it will work in practice against their budget.

    Paul says that a good development has been more borrowers these days employing architects who have a strong knowledge of these techniques.

    Payment stages are flexible

    Typically, their projects will have staged payments, although they aren’t set at a predetermined, fixed stage. Instead the borrower contacts them to say they’ve done a certain amount of work, at which time they will get it valued and release money against that.

    “That introduces a certain level of flexibility. Obviously, internally, we do track and monitor the progress of the building to make sure that it’s remaining on track. And that’s because we’re looking after our members’ money. We’re making sure they’re secure. But within that, we can be quite flexible when those releases will happen to suit the circumstances of the borrower. And that might be that they’re tying into other financial resources as well. They might have monies that are not quite available or whatever, so we’ll take that into account.”

    Understand your plot

    Paul advises buyers to know their site well, to avoid unexpected costs and delays. Understanding issues with boundaries, hidden structures and general groundworks will be an advantage.

    He also recommends a budget contingency of ten percent, which is something they will look for in the costings.

    Renovation projects are encouraged

    Ecology have a varied client base, but not too many first-time buyers. Those they do get tend to have been gifted a plot or had help with their funding, and more commonly are carrying out renovations.

    While Ecology like to support renovation projects, which was mostly their emphasis in the early days, the tendency now has been for more self builds.

    “And you can see why, in some respects, because there’s been a lot of development in green building techniques, in products, and you can start with a blank sheet and design in energy efficiency from the start.”

    From an environmental point of view, Paul sees the need to improve the existing housing stock. They are working with companies, cooperatives and government departments to find a way they can create models to encourage more people into taking on renovations and retrofits, by providing systems of support and information, and making it easier for people to engage.

    Their self build clients tend to already be fairly well informed and have carried out research and engaged with organisations like the Passivhaus Trust or AECB. And for those less well versed they might question certain aspects, for example, whether they need all the renewables when they haven’t really considered insulation.

    Another form of construction they are keen to encourage are kit homes that are semi-constructed off-site. They often come with some guarantee of energy efficiency and avoid many of the pitfalls that can occur on site.

    Financial benefits for the most energy efficient

    Ecology provide discounts for the full term of the mortgage, based on the property’s standard of energy efficiency upon completion, with Passivhaus giving the maximum discount.

    Progress is being made

    Paul believes in their early days they were lone pioneers, but gradually now they are seeing advances in the green building components industry, with exciting new products and more companies trying to do the right thing.

    “So, it’s almost like despite the drift of government policy, business, companies, individuals, cooperatives are leading the way on this because they know it’s not only good for the planet, it’s good for society, it’s creating sustainable jobs, and it is beginning to happen.”

    He is also seeing a push on the Green Finance Initiative, looking at ways to increase the flow of funds to green investment products.

    Something that Ecology are doing to assist with this is they’re working on a project to create an energy efficiency mortgage model that would be available across Europe. It would enable more mainstream organisations to create preferential financing for mortgages on properties that are making a difference to our carbon footprint.

    Find out more

    Visit the website of Ecology Building Society

    Follow Ecology on Twitter

    Transcript

    Please connect with me

    Subscribe, rate and review the podcast in iTunes

    Rate and review the podcast on Stitcher

    Like our Facebook page

    Follow us on Twitter

  • HPH223 : What is it like to self build at Graven Hill? – with Dean Scott

    HPH223 : What is it like to self build at Graven Hill? – with Dean Scott

    Dean Scott takes Ben on a tour of the Graven Hill development, and of his own energy-efficient self build.

     

    Interview with Dean Scott

    When we last spoke with Dean, he and Hannah had expressed an interest in a plot at Graven Hill and were making preparations to push ahead with the purchase. That was nearly two years ago and Ben recently returned to find out how much progress they have made and, particularly, what has been unique about building at the Graven Hill development.

     

    As well as new homes on site, the infrastructure is changing too

    With all the construction and infrastructure work going on, some roads are being closed off while others are being opened up. This can make following directions quite challenging (as Ben discovers)!

     

    Proximity to other houses under construction can influence schedules

    Some houses are being built with a metre distance of neighbouring plots. So with just a two metre gap between buildings, and scaffolding for each being a metre wide, there can be a problem with sequencing.

    Their direct neighbours had their scaffolding up before Dean and Hannah were ready, which meant that they couldn’t dig their service trenches down the side of the house, so this has had to be put on hold.

    With the scaffolding needing to be tied together, they’ve had to use the same lift heights as their neighbour, as will the neighbours that follow on the other side.

    With three or four different scaffolding companies being used and joining onto each other, Dean thinks it probably would have made more sense to have used a single one. He is unsure about whether there might be issues when they start being taken down, particularly if one neighbour is ready before the other.

     

    Planning requirements might depend on what your neighbours are doing

    “I think there are some planning requirements we have to go through, but because everyone’s developing at different rates, it sort of depends on what your neighbours do.”

    Dean and Hannah submitted their designs before their neighbours did, so there were no planning restrictions because of their house. This means they haven’t had to use frosted glass on some windows where otherwise they might have needed to.

     

    The house follows a cube design

    Dean has taken 3 months off work to concentrate on the build and be on site as much as possible. Two months in, and construction work has so far brought about an almost weather-tight shell, with the Cross Laminated Timber frame, cladding, windows, doors and roof installed.

    With the plot being eight metres wide, and the building spread over three storeys to get the floor area they wanted, Gresford Architects came up with the concept of a cube design for the house. The windows are all square and Dean is currently working on the detail of the front door, to try and follow the square theme around the rectangular frame. The cube shape also allows for two areas of double height space, for the sense of drama.

    The windows they are using are from the Idealcombi Futura+ triple glazed range, and open inwards. They are tilt and turn, so Dean is hoping they won’t be awkward and get knocked. Despite them being large he has found the mechanisms to work efficiently. They shouldn’t have any overheating in the house, but to be sure, they are installing external roller blinds on the windows.

     

    Do what’s needed to move in, then treat it as a long-term project

    Dean and Hannah are looking to move in as soon as they can. They are currently renting a home so are keen to divert those funds into this house. Some of the decoration may have to wait, but the big things that still need doing for Building Control will be flooring on the upper floors, fire doors, fire treatment on the inside of the walls, window reveals, service runs, electrics, MVHR, gas boiler etc.

    Dean is unsure how he will define ‘finished’ on this project but expect they will move in before all the decoration work has been completed. They may for example get the family bathroom done, but leave the en-suite until later.

    This does have to be balanced against the VAT reclaim. What they don’t want to do is move in and then buy lots of things they’re unable to reclaim the VAT on.

    “I think I’m definitely prepared to relax what I feel is a finished state, just to be able to live here and just to get on with life again.”

     

    They under-budgeted, rather than over-spent

    Dean and Hannah think they are probably around 8-10% over their budget, or as they prefer to think of it, they under-budgeted by 8-10%. They haven’t spent more on luxury items, it’s just been the cost of delivering what was planned.

    “I think ultimately what it means on the budget is that gone are the dreams of any sorts of luxuries, essentially. It’s just barebones basics to get in and then we’ll develop it over the next two, three years or whatever it takes. But as long as we get in and it’s comfortable, which I’m sure it will be, then we can just get on as a family and we can take it on from there.”

    It does mean they may have to take on more of the work themselves and be cautious with remaining quotes. A trickier issue for them currently is cash flow.

    They have been using Ecology Building Society for their mortgage and found them to be brilliant. They have had three revaluations as they have gone along, to then be able to have funds released. And on occasions when they have been caught out by an invoice, they have emailed asking for another release of funds and the money has been in their bank account later that day.

    “So, we’ve got value still to release, which is good. That money is there. And that’s the good thing. We have built the value. We’ve not got ahead of ourselves. So, the building is worth what we’ve spent on it, if you like, which is good news.”

     

    Despite the hard work and stress, he hasn’t fallen out of love with the house

    Dean is hesitant to say that he has actively enjoyed the self build process, but he does get joy from entering the house and being in the spaces they have created. He says it feels more like he’s working on someone else’s house, and that it doesn’t yet really feel like it’s theirs. But as contractors finish up and they’re able to start tidying up inside, it’s starting to feel more like a home.

     

    Images of the Graven Hill Development

    One of the things that stands out at the Graven Hill Development, is the diversity of houses being built. These images show some of the self build, custom build and affordable housing being built in the first phase on the site.

     

    UK Passivhaus Awards 2018

    The shortlist has recently been announced for the 2018 UK Passivhaus Awards. Among those listed are Ruth Butler’s Hampshire Passivhaus.

    Read Lloyd Alter’s take on the nominees.

     

    Talkselfbuild.com

    In the last few days we have launched our new Facebook page, www.talkselfbuild.com. This group is a place to discuss the challenges you might be facing, get fresh input on your ideas, share resources and inspire each other through what can be a roller-coaster ride. Although it’s free it is a closed group so please do take a look and join.

    For those that would like access to more resources, video case studies, step-by-step modules, and monthly progress calls, then join our community at The Hub. In fact, Dean Scott was our first member!

     

    Find out more

    Check out Dean and Hannah’s blog

    Follow Dean and Hannah on Twitter

    Find out more about Graven Hill

     

    Transcript

    Download a transcript of the interview with Dean Scott.

     

    Please connect with me

  • Financing an Ecological Build – with Jon Lee from Ecology Building Society

    Have you taken a serious look at the finances of your build?

    Are you being realistic with how much money you have and how much you will be able to borrow?

    In this article, I’m going to get an introduction to financing a low energy build with some help from Jon Lee, Business Development Manager at Ecology Building Society.

    Ecology-Building-Society-Logo-web

    I must admit that the House Planning Help blog has almost entirely been consumed by design issues and working out what could be built. None of that has got realistic and considered cost but I’m hoping to change that now. Nobody wants to be the person who runs out of money and options, so where is that sweet spot of getting the finances just right?

    ebs-wall-1

    Talk to a Number of Potential Finance Providers

    This advice would make sense for any service one would hope to procure but it’s relevant here because there are various types of self build mortgage and it does depend on your own financial situation as to which route will be best to go down. Jon Lee says: “Some lenders will provide funds only at a time when you’ve already bought the plot and you’re actually improving the value of the site by physically building. Other lenders will be more comfortable helping towards the financial purchase of the land as long as it’s got planning consent.”

     

    Payments Made Against Increasing Value of the Plot

    As with any financing the lender will need security. In this case it is a plot of land, which will change in value at various stages throughout the build. “In those interim phases where actually you’re doing quite a lot of work on a self build, it doesn’t necessarily correlate with spend against improved value. There’s quite a curve there and as you get towards the end of the build you tend to add a lot of value for not much more spend.”

    After kitchens and bathrooms (and so on) have gone in, it becomes a much more marketable asset.

    ebs-doors-1

    Generally Stage Payments are Drawn Down in Arrears

    Once you have an approved mortgage, there will be certain milestones where the interim value of the site is calculated. At these points your lender will work out how much of your retention can be drawn against that and a tranche payment is made in arrears of the work. However, some lenders offer an ‘accelerator’ mortgage which would provide funds in advance, so effectively giving you the money to do the next phase of works and then having the revaluation done. As this is more risky for the lender, ultimately it costs more.

     

    Ideally You Would Have Equity to Borrow Against

    Jon outlines a simple situation that shows why you would want to have a good sum of your own money invested in the project. Consider a plot that’s going to cost £100,000. If you needed to borrow £80,000 of that, the lender might look at your income and the scheme and think it looks interesting. Even though your plans for the plot may suggest that the finished project will be worth £250,000 if you’re borrowing £80,000 on day one you would have to consider where the funds are coming from for the rest of the build. At the Ecology Building Society the maximum loan to value is 90% on the residential mortgage, which would mean there’s only really another £10,000 available to help you proceed with the building work (unless you’ve got other capital or help from the bank of Mum and Dad, etc.).

    In this scenario an accelerator mortgage would be most appropriate, but it would be more expensive in terms of interest fees and arrangement fees. Plus if the budget got out of hand or a contractor let you down, you may be sailing very close to the wind!

    Architectural project

    Ecology Building Society Like to Work with Valuers Who Understand Low Energy Builds

    Jon stresses that it’s an important part of the process that both the valuer and the lender understand the type of construction, the materials being used and what the expected costings might be. Jon says: “We’d always ask the valuer to pass comment on whether they think the costings are realistic for what’s being proposed as well as taking on board the expertise or otherwise of the borrower themselves. They may well be serial self-builders. They could be people who have a background in building or architecture and so on and so forth. All of these things get taken into account.”

     

    Don’t Over-Stretch Yourself

    You may have read case studies of where multiple difficulties have led to the self or custom builder being unable to borrow any more. A good lender will be accessing the risk in the early stages. Jon explains: “Certainly the net book value of what is being mortgaged is inevitably a primary consideration as well as making sure that the borrower is not being over-stretched in terms of their ability to cover interest payments during the build phase, especially if they’re having to take a sabbatical from their day-job to see the project through.”

     

    Don’t be Put Off if You Haven’t Been Through the Process Before

    While it’s always preferable to have as much detail as possible about the cost of a build and quotes to back it up, Jon admits that some of the best schemes he’s seen have been from people who openly admit they haven’t got a formal business plan and are working their way through.

    ebs-during-build-1

    Not Being a Volume Lender Allows for a Much More Personal Service

    Ecology Building Society underwrites about 20 to 25 mortgages a month. As they are not a volume lender they are more able to cope with projects on an individual basis. This is particularly relevant when that don’t necessarily fit the normal system.

     

    Best Discounts For High Energy Efficiency

    Clearly as the Ecology Building Society aims to support a more sustainable future, it offers its best discounts for projects that either benefit the environment or the community. Buildings that meet the Passivhaus standard are rewarded with the top of the range discount off their standard variable rate. Find out more about their C-Change discounts, which run from Passivhaus down to Code for Sustainable Homes Level 4 or properties that achieve at least a B-rating on an Energy Performance Certificate (EPC).

     

    Underwriters Want to See Investment in the Building’s Envelope

    As ecological construction is fundamental to their business, it falls to the underwriters to make decisions on granting these discounted mortgages. Jon continues: “Our staff are well trained to be able to look at, not only the projected EPC which any property needs to have [in the UK] but also to look in more detail at the materials that have been used. For example, we don’t lend on new builds even if they do achieve the required level if the borrower is putting in UPVC windows and doors. We’d be looking for other clues that sustainable materials were at the heart of the build so things like a good standard of glazing, decent levels of insulation, natural materials and where possible locally-sourced materials.”

    They will also not rule out other options – such as a kit home that’s been sourced and shipped from Sweden – so as long as it’s still using sustainable materials.

     

    Talk to Your Finance Provider Early on

    As with most members of the construction team, it makes sense for your finance provide to be involved from the initial stages. In other words, don’t wait until you’ve bought the plot before you begin to look for finance. Lenders like to take everything into account at the early stages. Jon highlights why this is a good idea: “We can maybe advise them as to how much deposit they should be considering putting forward at the land purchase stage, how much they need to hold back for some of the works and work out the project with them in partnership so that you’ve got a really clear timeline and stress-tested cash flow. We can then see what happens if there’s a bit of a move in interest rates, if there’s a bit of a move in property prices, if heaven forbid costs start to rise, so that we can see what the sort of risk appraisal is and advise on the project in a very hands-on way to try and mitigate against nasty surprises.”

     

    Expect Some Challenges During the Build

    All projects will have aspects that change. Jon cannot remember any project that has gone exactly as planned where the budget has been spot on. Of course sometimes that can be in your favour and savings can be made on what you thought you were going to borrow. Assuming that a 10% contingency will get you out of all problems could be a mistake.

     

    Stress-Testing is to Help Not Hinder

    Applying a stress-test on a project and considering different eventualities makes sure that both the borrower and the lender have got a good understanding of what’s going to happen. It brings clarity over who’s going to be doing what and how things will be certified.

     

    Develop a Personal Relationship with Your Borrower

    Jon’s final bit of advice is to get to know your lender and to have a personal relationship where ever possible. Going through a broker will put you at arms length from whoever is providing the finance. As well as adding an extra layer of cost, you don’t get that rapport to be able to tackle problems that may crop up during the build.

     

    Ecology-Building-Society-Logo-web

     

     

     

    Visit the Ecology Building Society for more information and case studies.

    Follow Ecology Building Society on Twitter

     

    How are you going to finance your build? Have you got a healthy contingency planned?