  • HPH157 : A contemporary eco home case study – with James Galpin from HazleMcCormackYoung

    HPH157 : A contemporary eco home case study – with James Galpin from HazleMcCormackYoung

    Architect James Galpin from HazleMcCormackYoung shares insights into how Mayfield Passivhaus was designed and built.

    Interview with James Galpin

    James has been an architect since 1999.

    His practice, HazleMcCormackYoung, works primarily on school design but with new build housing as a secondary element.

     

    A strong connection to the garden was at the heart of this project

    This 7-acre site – originally with a bungalow on it – is significant because it has a landscape garden originally designed by Percy Crane.

    The client wanted a new home that was relatively timeless in its design, modern in its layout but primarily connected with this garden.

     

     

    Plans evolved as they considered how they wanted to live in the house

    Initially the client wanted the living room to have the best interaction with the garden, but they realised they actually spend a lot of time in the kitchen – as the client loves to cook and socialise with his family. So this became an important room.

    The house is essentially a three-dimensional Venn diagram because there are two accommodation wings, both with symmetrical pitched roofs. Where the wings overlap is the entrance.

    Finding a ‘forward-thinking’ planner was essential

    The planners favoured a traditional Wealden house on this site.

    James says: “It took me a little while to find the right officer to work with at the planning department because there are forward thinking planners, thankfully, in the area. Once we’d got a good working relationship with that planner, we were on to a more progressive route which everyone would be happy with.”

     

    Creating an abstract graphic of the client’s requirements helped them check they were within budget

    In the development stage of the project James finds out the budget and also what the client needs from each room. Designing proportions room by room, he can get a sense of the floor area and access whether this might be within budget.

    In most cases people want more than they can afford, so at that point they work out where the compromises will be.

    “There were elements of the design that I wanted to work in, which aren’t necessarily the most space effective. So, the square meterage was quite high for the building and the budget was restrictive. We were challenged with delivering for around about £1750 per square metre, which is quite keen.”

     

    The contractor’s desire to deliver their first Passivhaus helped

    James had worked with Richardson and Peat previously on school projects. As a specialist timber frame construction company they were keen to gain Passivhaus experience, and thus were motivated for this project and worked hard to keep it within budget.

     

    Passivhaus made sense for a second home

    Initially the client was not sure whether they would be living in Mayfield full-time or spending some of the week in London.

    James realised this was a great opportunity to say to them that there was a way to deliver a house that would warm on arrival on Friday evening!

    “The house went from being a bungalow that took most of the weekend to warm up, to a house that has very low heating bills – almost no heating bills – that you arrive on that Friday night and it’s warm.”

    Good architecture can still lead the way on a Passivhaus build

    Creating a beautiful design that meets the client’s brief is always how James starts a project.

    He says: “There are choices that I make that aren’t always based on cost. You’ve got to pick your battles and there was a sweet spot of working with timber, working with this house, working with the contractor and we were able to deliver that concept for the price.”

     

    The house is floating on polystyrene!

    Mayfield Passivhaus has a raft foundation which uses the ISOQUICK system.

    Once the bungalow was demolished the site was levelled, the hardcore went down and then they put down the insulating layer of polystyrene.

    “It’s a three-hundred millimetre slab that sits on the concrete, effectively sitting then on a shingle bed. And the mass and the solidity of it holds everything down.”

     

    The clients were taken aback by the comfort of the house

    The clients love their new home and the way it connects to the garden. They say it’s the first house they’ve lived in where every space you go into is equally comfortable. It’s fresh but warm and comfortable.

    In fact they like it so much they decided to leave London and move down full time!

     

    James’ top self build tip

    In the early stage James suggests to gather a collection of ideas of things that make you feel at home.

    Ask questions like: ‘What’s my definition of home? What do I feel is home?’

    If you see spaces that you particularly feel comfortable in, it’s important to sit and think about the space and work out what it is about that space that makes you feel comfortable. For example, it might be a solid wall behind you while you’ve got a good view out into the garden or it might just be the soft furnishings.

    The team and the clients

    Find out more

    Visit the website of HazleMcCormackYoung architects

    Follow James Galpin on Twitter

    Transcript

    Download the transcript of this interview with James Galpin

     

    Please connect with me

  • HPH074 : How a Public Consultation Helped a Rural Self Build – with Alex Baines

    HPH074 : How a Public Consultation Helped a Rural Self Build – with Alex Baines

    Alex Baines talks through the plans for his semi earth-sheltered home, to be constructed to Passivhaus standard, and explains why involving the local community in the early stages was essential in gaining the relevant permissions.

    Alex Baines in his office

     

    Interview with Alex Baines

    Alex Baines’ new home Long Barrow is going to be a contemporary design but with traditional materials. It has had a lot of input from the surrounding community, which Alex’s wife Louise grew up in and where Alex’s mother currently lives.

    This is also a project we will be following at House Planning Help.

    Gaining Early Support From Local Residents Was Fundamental to the Scheme

    Given the planning restrictions in place at the site, Alex knew that it was going to be important to have the support of the locals. With their intention to settle in the location that was already special to their family, they also didn’t want to cause annoyance or be ostracized for creating something that was going to be upsetting to their neighbours.

    The plot where Long Barrow will be built

    The plot is an existing piece of land owned by Alex’s mother

    Public Consultations Were Crucial to Achieving Planning Application Approval

    By using an iterative process of developing the design based on feedback from the public consultations, they were able to present the planners with a design which had a vast amount of local support. Alex credits this as being the reason they were given planning approval, even though the planning regulations in that particular area were against it.

     

    The Final Design Evolved Through the Consultation Process

    By asking people to be more specific about the elements they did and didn’t like, the final design has evolved to be contemporary in form and traditional in the materials used. The quantity and positioning of the glazing was also selected partly in order to minimise the visual impact on the areas that people can see it from.

    A graphic of Long Barrow PassivhausThe final design (south elevation)

    A Design Challenge Was Set for the Juniors at the Architect’s Practice

    Alex likes being experimental and finding new ways of doing things, so gave the juniors the chance to create some original sketches, based literally only on the location and the number of rooms, almost as a type of work experience for them.

     

    Submitting 3 or 4 Designs at a Time Helped the Consultation Process

    By offering multiple options, people were able to point to elements that they didn’t like, and also ones that they did. Towards the end of the process the comments were quite specific, and they were taken on board to produce the final design, which actually ended up being a much cheaper and simpler concept.

     

    The Key Requirements of the Building Were Very Simple

    The family had fairly simple requirements of what they needed from the building, and it came down to the functionality of room functions and sizes. Together with the standard rooms they wanted a boot room, for stopping the spread into the rest of the building of muddy dogs and children!

    Alex works as a Passivhaus consultant so achieving Passivhaus certification was also something that was fundamental to the project. He was able to explain the ecological principles to the locals who were very supportive of the concept, and worked to fit them into the design.

    Long Barrow underground cutaway graphic

    A cutaway graphic of Long Barrow (underground) 

    The Building has Been Designed to Last for Generations and be Flexible for the Needs of any Different Occupants

    It was important for Alex to create something that has longevity and will last for hundreds of years, which is the reason why he will be using ICF for the floor and shell.

    As the external design will not easily accommodate any extensions, he has ensured that the interior has a completely clear span so that any future generations living in the property can adapt the space to their needs.

    From a professional point of view, Alex is also interested in researching the properties of the ICF and seeing how it performs over the year.

     

    The Management of the Project is Being Split, According to the Stage

    The first part of the build is being managed by the ICF manufacturer. Their contract is to manage and deliver the shell of the building. Once that has been handed over, Alex can continue with the management of the local tradespeople before his wife is able to concentrate on finishing the interior.

     

    The ICF System Keeps Things Simple

    They don’t have to worry too much about airtightness with this system and the insulation is effectively already built in, really only leaving the windows to focus on. Although it may be slightly more expensive in ICF because the price of the material, and therefore that part of the build, is known they should be able to stick more closely to their budget.

    A plan of Long Barrow Passivhaus

     

    Getting Enough Natural Light has Been a Concern

    With the whole basement level being underground there was a worry that the rear of the building was not going to get enough natural light. Adding space for a lift was in their plans and by changing the designs to widen the stairs they have created a space where the stairs can wrap around a lift, when the time should come that they wish to add one. In the meantime, the extra space has created a lightwell down through the stair core into the back of the house, meaning it hasn’t been as much of a problem as they thought it might be.

     

    Find Out More

    Follow Alex Baines on Twitter

     

    Transcript

    Download a transcript of the interview with Alex Baines.

     

    See How Green Building Store Retrofitted Stirley Farm

    Regen Media has recently completed this video for Green Building Store. It explains all about a low energy retrofit that they have carried out at Stirley Community Farm.

     

    Please Connect With Me