    HPH377: Retrofitting a 1950s semi-detached ex-council house – with Toby Cambray

    Toby Cambray talks about the experience of working on his own retrofit project, and the lessons learnt in the process.

    Interview with Toby Cambray

    Toby Cambray co-founded Greengauge building & engineering consultancy in 2010, specialising in sustainable and low energy design. He is a certified Passivhaus Consultant and has completed a PhD on moisture in buildings.

    In the previous episode we discussed moisture risk in buildings and how to assess it.

    There’s no such thing as an ‘easy’ retrofit

    There are always compromises, so how do you best juggle and manage those? Toby bought his house with the idea that it would be relatively straightforward to retrofit. There was nothing (e.g., listed building status) to prevent getting permission to make changes.

    The house had deep eaves, making external insulation easier. It was a question of how to execute that while minimising thermal bridging, getting the windows in the insulation zone, and incorporating airtightness.

    The original bay was a feature Toby decided to remove

    Toby had lots of ideas of what he would like to do. He built an extension and did some minor remodelling first, before starting retrofit work. From a holistic point of view, it would have made sense if the extension had been planned to receive the same external insulation that was added to the house later. The building would have performed better too, as there is a thermal bridge where the extension’s cavity wall meets the new external wall insulation on the main property.

    Living in the home first can provide useful information

    It takes time living in a home to understand what’s best for how you use it.

    There is also thinking about how the home might need to be used in future, and other considerations like whether you’re adding value.

    The floor plan of Toby’s house already worked well, so there was little reason to change the layout. He considered taking out a wall with a chimney. That would have been a major structural challenge, so he prioritised keeping things simple and less expensive.

    Watch an entire retrofit of this mid terrace home in The Hub.

    A truss and fill insulation system can take different forms

    There’s a lot of experience with truss and fill systems, especially within the AECB membership. A timber frame is fixed to the outside of the building, with a thin wood fibre board over it to create a cavity. Any blown insulation can then be installed to the cavity; Toby chose cellulose insulation.

    There are different ways of doing the frame too. Toby used a Larsen truss with 50 x 50mm battens on the wall, then plywood gussets to support an outboard batten. You could equally do it with an engineered joist, or similar.

    There are different ways of finishing the outside. Toby used a 25mm batten cavity with a render-carrying board, and then a render finish. It could also be timber clad. Rendering straight onto the wood fibre is possible but might need more careful thought when it comes to rain robustness.

    A second layer of defence between the outside surface and the insulation is comforting, even if you’re not in a very exposed area for rain. If you have render direct on insulation and the render cracks, there’s a higher likelihood of water passing through to the inside.

    Plywood window boxes were constructed to take the new windows

    The first step was preparing the window openings

    To ensure the new windows were in line with the cellulose insulation, Toby built plywood boxes and installed them in the opening so they cantilevered out. They were fixed through the face of the ply into the edge of the cavity wall masonry, and they allowed the new windows to project into the insulation zone.

    The bay was removed

    New studs for the insulation layer

    The cement board going on

    A cavity acts as a capillary break in the wall build-up

    The cavity in the original wall build-up acted as the capillary break to stop moisture reaching the inside of the building. With the retrofitted wall build-up, Toby made sure the 25mm batten cavity behind the render-carrying board was ventilated and served that function instead.

    Below-ground insulation links the floor to the external walls

    Toby dug a trench around the building, installed moisture-resistant insulation, then backfilled it and used paving slabs to hold the insulation in place. The 200mm timber frame with the cellulose sits on top of that. The below-ground insulation finishes just above ground level to keep the timber clear of ground level. It required a lot of hand-digging and re-doing drains that are close to the house.

    Planning ahead helped with airtightness in the roof

    Toby removed the old insulation from the roof. Some leftover mineral wool from the extension went between the ceiling joists, followed by a vapour control membrane over the joists. He installed cellulose insulation over the membrane – it comes in compressed bales which you open and it expands into loose cellulose.

    When installing the membrane, Toby left plenty of length on it and folded it back under the rafters. When the scaffolding was up and the end of the rafters exposed, he peeled and then slit the membrane so it could fold down between the rafters. It was then a case of taping that all around, first to the rafters and then down onto the existing render. It felt like it was going to be time consuming, but then proved to be okay once Toby got into it.

    To achieve continuity of the roof insulation with the wall insulation, Toby was able to remove just a single row of tiles. He slipped in some insulation that the wall insulation could butt up to. Waterproofing it required some leadwork, which was an unexpected expense, but a nice way to finish it and robust so it won’t let moisture in.

    Following established principles can help keep embodied carbon low

    Toby hasn’t calculated upfront or embodied carbon. Instead, he has followed general principles that he has learnt from other projects, including using very little concrete or steel.

    In terms of concrete, there are small amounts of mortar for repairs and holding the paving slabs in place for the below-ground insulation, plus the 12mm cement board carrying the render. Some stainless steel bars were required as part of a Helifix Helibeam system, which was used to replace a failed concrete lintel.

    Retrofit can make it tricky to accommodate MVHR

    In an ideal world, Toby would have chosen MVHR, but finding a good position for the unit is always difficult in a retrofit. Put it in the loft, and access for maintenance is harder. Put it in a room and you lose valuable utility space. Installing the ducts is also tricky and can involve a lot of compromise.

    Toby chose an Aereco MEV system over MVHR. The system was installed at the time he built his extension, as this was the best time to get ducts running to and from the loft.

    MEV is effectively the extract half of a full MVHR system. There’s one fan in the loft, with a duct to each wet room. Each living space has an inlet through the wall, and on each inlet and outlet is a humidity sensitive material that passively operates like a damper. When someone has a shower, the damper opens a bit more to help clear the elevated humidity. The fan in the middle has a pressure sensor which increases the fan speed when the terminal opens more.

    Decentralised MVHR, with individual room units, could have been an option but Toby’s experience is that it tends to be relatively expensive to do a whole house that way.

    Plan ahead for low carbon heating

    Toby’s home still has a gas boiler, a decision he was comfortable with at the time. He will upgrade to an air source heat pump at some stage, and has the infrastructure and electrical supply in place where the hot water cylinder would probably be positioned.

    The retrofit industry perhaps overlooks the DIY culture of the UK

    Toby has travelled in parts of Europe and recognises the DIY culture we have in this country compared to other places. With motivation, and the right research and guidance (including the House Planning Help podcast!), a proficient DIYer could undertake a retrofit project.

    But it’s also important to be aware that it’s a lot of work, with stress and long hours. Toby was working under floodlights until midnight the day before his cellulose insulation was installed, finishing off taping so there was a cavity ready for the insulation.

    Standard details are a good starting point for DIY retrofitters

    You might have to pay for the information, but it’s less expensive than engaging a consultancy service. If you have building experience and broadly know how a timber frame goes together, or how a masonry wall goes up, then a lot should be fairly obvious. It’s about thinking through the next steps as you work, and coming up with solutions for how X joins to Y.

    Toby understands moisture risk and so designed a window detail himself that others thought was overkill. He was happy with it as a belt and braces approach to keep water away from the cellulose insulation. It’s a case of assessing risks and accepting when there is value in paying for advice. Structural calculations are one area that Toby was glad to have professional support.

    Every project has unique technical challenges

    Toby uses the example of external insulation. There are a host of ways to do it, but you can guarantee that any project will always throw up a detail that no-one has ever come across – or, if they have, that a solution is not well documented. Again, it’s taking time to think about how to do it well using the array of products that are available.

    Budget for and prioritise the ‘big ticket’ items

    The biggest expense on Toby’s project was new triple glazed windows. The next biggest cost was re-roofing the property, as the bituminous underlay needed replacing. The roofer was able to reuse the original tiles, and the roof work was carried out while scaffolding was up already, which helped. The cellulose insulation was a big undertaking, but not necessarily the biggest cost. Toby did a lot of work himself getting the timber frame ready.

    If Toby tried to value the time he has put into the project then it would probably be one of the most expensive retrofits done recently. He has really come to respect the speed at which professional builders work. But he is also interested in the subject, gets enjoyment from doing the work, and can take lessons learnt back to his practice. All of that provides additional motivation.

    Junction details and internal finishes take a lot of time

    A big lesson for Toby was that lots of time, thought and effort goes into the junctions. The timber frame went up in a few days, which really looked like progress. On the other hand, working at the foundations, taping around the rafters, and sorting out the windows all took a long time.

    A lot of functional and structural items don’t have to look nice, they don’t have to be finished. But since Toby has begun to work inside, time has been eaten up finishing window reveals, and sanding and painting so that the finish is to a standard he wants.

    It’s hard to capture in words how much more comfortable a retrofit is

    In conclusion, Toby observes that he knows the physics of why his home feels more comfortable, but he finds it difficult to express how different it feels when everything’s a more even temperature. You can only truly feel it by experiencing a well-insulated house. It’s a feeling that it just … works.

    Find out more

    Greengauge

    Greengauge on Bluesky

    Greengauge on LinkedIn

    Toby Cambray on LinkedIn

    Transcript

    Download a transcript of this episode.

    Please connect with us

    Subscribe, rate and review us on Apple Podcasts

    Follow Ben Adam-Smith on Bluesky

  • HPH376: What is WUFI? – with Toby Cambray

    HPH376: What is WUFI? – with Toby Cambray

    Toby Cambray talks about the risks associated with moisture in buildings, and the modelling techniques – like WUFI® – that can be used to assess those risks.

    Interview with Toby Cambray

    Toby Cambray co-founded Greengauge building & engineering consultancy in 2010, specialising in sustainable and low energy design. He is a certified Passivhaus Consultant  and has completed a PhD on moisture in buildings.

    Condensation on windows is a common sight in British homes

    In buildings, moisture is water in any form

    When we use the term ‘moisture’ it can refer to liquid water, water vapour in the air, or even ice. People might be most familiar with water vapour, and how humidity changes with temperature.

    It’s also important to think about materials – especially historic building materials – and how they interact with liquid water. And when you add insulation to buildings, moisture is something that really needs attention paid to it.

    Moisture movement in buildings is about equilibrium

    In the laws of physics, all things try to minimise their energy. For example, if you have an area of high pressure next to an area of low pressure, the molecules try to ‘even themselves out’ and minimise the total net energy. In a different context, that’s what is happening with moisture. In an area of high vapour pressure with lots of water, the water will try to distribute itself as evenly as possible.

    The potential risks from moisture in buildings are varied

    Organisms that cause mould or timber decay can thrive where moisture is present. Moisture also leads to problems like corrosion, especially of steel. In heritage buildings, it can lead or contribute to deterioration in masonry, through processes like freeze/thaw damage, or salt transport and crystallisation.

    Damp and mould inside a historic building

    The two main moisture strategies are moisture open or moisture closed

    Putting it very simply, you can either manage moisture or block moisture. Most modern buildings are moisture closed, or moisture blocking. Features like damp proof courses and vapour control layers aim to stop moisture getting to where we don’t want it.

    In traditional buildings, when these modern products obviously weren’t available, builders worked with materials in a way that managed moisture – often by absorbing it and holding it, before allowing it to dissipate safely. Porous materials like stone and brick can generally store and transport both liquid water and moisture vapour.

    There is still a lot to be understood about moisture in buildings

    Toby has been carrying out moisture modelling work for over a decade. Any simulation has shortcomings, so he sees it as the responsibility of practitioners to understand as much as possible about the physics of moisture so they can then understand when models are most useful. Toby acknowledges that he still has lots to learn about the physical processes that calculation models are trying to simulate.

    Dew points are not the best way to assess condensation within building structures

    While we want to avoid condensation within the structures of our buildings, dew points are not always a great way to understand potential moisture risks. This is especially true in masonry materials and traditional constructions. A dew point is the temperature at which condensation occurs for air of a given humidity.

    Simpler calculation methods that rely on dew points, like the Glaser method, don’t reflect the full range of real-world conditions. They don’t take account of rain on the outside of the building, or moisture transport and storage in liquid form. Their limited scope might be okay for some situations, but they are not sufficient for making sensible judgements about many structures, including historic buildings.

    For example, you could have a structure that never suffers from condensation, but still gets a serious problem like mould. The calculation method might tell you about the condensation risk, but it isn’t sophisticated enough to calculate that humidity is high enough for mould to form.

    WUFI software is a more complete way to simulate moisture movement

    It’s not perfect, but it is a more complete approach to modelling moisture movement in buildings and modelling how water moves around within porous materials.

    In the software, the user builds up the element to be modelled. They then select a climate file with data about sun, wind, temperature, humidity and rain. Then the internal conditions are inputted, some other parameters are set, and the simulation can be run. And the simulation predicts the temperature and moisture content at any point within the element’s structure. Using the temperature and humidity profiles that it outputs, together with some post-processing tools, it’s possible to assess whether problems like mould could occur.

    Temperature and relative humidity data over time

    There are still uncertainties in WUFI calculations

    As with any software or calculation, nonsense in leads to nonsense out. The WUFI software has a database of several hundred materials. Some are modern products with known performance.

    It also includes porous materials. Because these materials have unique combinations of liquid transport properties and vapour permeability, there can be enormous variation even within a single category of materials. For an existing building, some assessment and measurement of the material is needed to then make an informed selection from the database.

    Other uncertainties include internal conditions. For example, you might not know if you should be accounting for a densely occupied house with poor ventilation. Toby explains that the advantage of modelling is that you can play around with some of these variations and explore the different issues to understand their effect.

    An example of how moisture moves within a wall build-up that has wood fibre insulation

    The simulation is quick to run, but interpreting the output is key

    Toby says his team likes to spend a couple of days on a project, normally. This gives time to go to site, collect material specimens and analyse them. Once the data is available to enter into the software, the actual simulation can take anything from five minutes to a few hours to run, depending on complexity.

    The real value is in the interpretation of the results, and providing a professional opinion and risk assessment. In complex situations, things are much more nuanced than a simple pass or fail. It can often mean going back to a design and altering it to reduce risk further. Toby’s work really comes into its own in more unusual situations with higher risk constructions, perhaps featuring an unusual combination of materials.

    There are lots of good sources for help and advice

    For simpler enquiries, Toby and the team at Greengauge will often direct people to a variety of reputable suppliers who they have built relationships with over time. Examples include Ecological Building Systems, Back to Earth, Natural Building Technologies (now part of SOPREMA), and Best of Lime.

    For WUFI calculations, there are no specific qualifications to look for when engaging someone. There are a small number of training courses, but a lot of it comes down to experience: reading academic papers for background, and looking at buildings on site to understand the difference between simulation and reality.

    The most common use of WUFI is with internal insulation

    A sophisticated modelling tool like WUFI is most suited to applications that have a lot of variables. That’s particularly the case in retrofit, where we have no control over the existing construction and we need to be careful about what we do to the structure to avoid introducing moisture problems.

    In new build construction, we tend to have a good idea of what works, especially if following prescriptive solutions. In that case, there’s no need for complex calculations. BS 5250, the code of practice for moisture in buildings, has guidance about when different calculation methods ought to be used.

    An analysis of water content over time

    A consistent layer of thin internal insulation can help to manage moisture

    Using hygroscopic, capillary active and vapour open materials helps to maintain a wall’s ability to dry to the inside. Generally, the thicker the layer of insulation applied to the inside, the harder it is for that drying to happen. Most people are now using 40mm, 60mm, or possibly 80mm of wood fibre insulation, and that seems to work okay in most places. A continuous layer of 40mm of insulation, with thermal bridges resolved, is much more effective than a thicker layer of insulation that’s hit and miss.

    Our podcast with Martin Twamley discusses this subject in more detail.

    An internal wall insulation strategy from Steico

    Using WUFI can stress test a construction

    Good practice when doing a simulation is to include moisture loads or moisture stresses. This is something WUFI allows the user to do which simpler calculation methods can’t. It’s possible to allow for a certain amount of rain coming in through a crack, or a certain amount of warm air moving out through the airtightness layer.

    Find out more

    Greengauge

    Transcript

    Download a transcript of this episode.

    Please connect with us

    Subscribe, rate and review us on Apple Podcasts

    Follow Ben Adam-Smith on LinkedIn

    Follow Ben Adam-Smith on Bluesky