Tag: timber frame

  • HPH325 : What reduces the performance of insulation? – with Mark Siddall

    HPH325 : What reduces the performance of insulation? – with Mark Siddall

    Mark Siddall explains how thermal bypass – or air movement around insulation layers – might impact a self-build or retrofit project.

    Interview with Mark Siddall

    Mark is a Passivhaus specialist who has been on the podcast before, talking about avoiding the risks of poor ventilation and his ‘forever home lifestyle’ framework.

    His practice LEAP operates from County Durham and Newcastle. He is also a technical adviser to the Passivhaus Trust and the AECB. He has written a paper on thermal bypass risks for the Passivhaus Trust.

    There are many types of performance gap – but energy is often the focus

    For Passivhaus buildings, the focus tends to be energy performance rather than other factors like air quality. Passivhaus projects actually close gaps in predicted performance, which can’t be said for other approaches. The methodology has got better quality assurance processes, which avoids risks that might otherwise arise.

    Insulation has to be specified correctly for it to deliver energy performance benefits

    Dealing with energy performance often means the thermal performance of the building fabric. Three variables influence whether insulation works or not.

    • The material itself.
    • Whether the material is specified sympathetically for the construction method used.
    • Whether the material is installed properly.

    Get those variables aligned and the evidence shows everything works properly.

    An example of an air gap when using blockwork and rigid PIR insulation

    Choosing insulation for cavity walls

    Cavity wall construction is very common in the UK. A Passivhaus designer will question if the usual foam insulation solution is sympathetic to the method of construction.

    Blockwork features mortar joints, and mortar is squeezed during installation. That creates snots which project into the cavity and stop the insulation sitting against the face of the blockwork. The resulting small air gap is enough to completely undermine the thermal performance of the insulation.

    Mortar snots can be cleaned off, but that might not happen all the time. A mineral wool solution is more flexible and capable of dealing with subtle deviations, so it’s a more appropriate insulation for a cavity wall. It’s also used to the full depth of the cavity, which helps to reduce the risk of air movement.

    Mineral wool fully filled cavity at Steel Farm Passivhaus

    Airtightness is about moisture as well as heat loss

    Part L of the Building Regulations deals with heat loss and prescribes a specific level of airtightness. Part C talks about moisture and only says things should be fairly airtight. There’s no numerical target related to moisture, and that’s a problem.

    The Passivhaus standard, and research conducted in Canada, both confirm that airtightness of 0.5 or 0.6 air changes per hour at 50 Pascals is needed to avoid damage to timber structures (such as roofs or framed walls). That’s an air permeability of around 0.5, compared to the Part L target of 8.0.

    Good airtightness alone doesn’t guarantee insulation performance

    From the external side of the wall, wind tightness stops the wind blowing through and around the insulation, which wicks away heat. It’s not something that can be tested on site, however. As a rule of thumb, the quality of workmanship needed for a wind tight layer is similar to that needed for the airtight layer.

    Fully encapsulate insulation between the air and wind barriers

    Convective loops can happen around insulation just from the temperature differences between the warm and cold sides of the wall. We can avoid that by properly encapsulating the insulation between a notional air barrier and wind barrier.

    Using the same cavity wall example as before, a good build-up might be brickwork or stonework on the outside face. Then a 300mm cavity full filled with mineral wool insulation that’s built up in two or three layers. The inner leaf is blockwork, which is plastered internally.

    The plaster acts as the air barrier, and the brick or stone is the wind barrier. The cavity is fully filled, so the insulation is encapsulated and has no air gaps around it.

    Rainwater is the dominant moisture problem to tackle

    Cavities were introduced to walls to act as a capillary break and stop water being drawn through from the outside. Any water getting through the outer leaf drained down the inside face of the cavity and out through a weep hole.

    A very narrow cavity fully filled with insulation carries a risk of rainwater bridging across to the inside of the building. That risk reduces with a wider cavity. Passivhaus design requires wide cavities and, with good workmanship and no mortar snots, any risk from driven rainwater is mitigated.

    Installing the cavity insulation in layers means that if any water gets through one layer, it can still be pushed down and back towards the outside.

    Think about how wall ties affect performance too

    Cavity wall ties help to provide structural stability, but are also a repeating thermal bridge through the insulation layer. Mark specifies Teplo wall ties instead of stainless steel ones. Stainless steel ties have a larger physical dimension and a higher conductivity, whereas Teplo ties are thermally broken.

    Design calculations usually assume perfect installation

    On most projects, architects contact insulation manufacturers for U-value calculations. The manufacturer never asks what quality of workmanship is being specified. Instead, they assume perfect installation, which requires certain tolerances on site.

    When those tolerances aren’t achieved and workmanship is less than perfect, which is the case on every building site, then air gaps are the result. Materials haven’t been specified to work sympathetically with one another and the predicted U-value isn’t achieved.

    Timber frame construction can help to address performance gaps

    From inside to outside, a typical timber frame construction capable of producing good results would be:

    • Plasterboard.
    • Service void, which may or may not be insulated (ideally not).
    • Airtight layer.
    • Engineered I-beam filled with cellulose insulation.
    • Wood fibre insulation on the outside.
    • Wind barrier membrane.
    • Drained cavity, acting as a capillary break.
    • Rain screen on the outside face.

    Compared to this build-up, performance gaps can occur because standard industry timber frames don’t have the wood fibre layer, don’t use engineered I-beams, and are less likely to feature a service void. Services penetrating the air barrier will allow moisture from inside the house to get into the timber frame, potentially causing moisture damage.

    One area they tend to do well in is using 150mm thick insulation in the 140mm frame. Because the insulation is that little bit bigger, it’s compressed slightly and ends up being snugly sandwiched between the air barrier and wind barrier. There’s less risk of convective loops.

    Improvements can always be made to reduce performance gaps

    Research from places like Sweden and Canada is showing that, in the construction described above, moving the wind barrier behind the wood fibre (which might be just 20mm thick) could significantly reduce the risk of condensation.

    The climates are different to the UK, so the conclusion might not be the same here, but it shows there are still refinements that can be done in Passivhaus timber construction to make it even more resilient than it already is.

    Air movement is the issue across all build systems

    All construction technologies need to address the key issues of building physics. With straw bale, for example, a lime or clay plaster on the inside can provide the airtight layer. There are other subtleties and complexities, but it’s a case of limiting air movement through, and within, the wall construction so the building performs as predicted.

    An example of a warm roof (Shepherd’s Barn)

    The same principles apply to roofs…

    …although it depends what type of roof it is. A warm roof construction is very similar to the timber frame walls, just at an angle. The tiles or other roof covering replaces the rain screen.

    A cold roof, with insulation at ceiling level and the attic space above is risky to deal with from a moisture perspective. Information Mark has seen suggests one-third of the moisture that transfers into the roof space could condense on the roof structure. It has to be possible to remove that, using a vapour permeable underlay.

    Ventilation can also be used, but there are reasons why that may or may not be preferable or doable. Then it’s necessary to look at the eaves detail and the risk of wind washing. Air comes into the loft at higher speed, so special details are needed to help protect the insulation at the edges.

    The important advice is to keep things simple

    Details have to be simple to make them buildable. Then they can be replicated from person to person, site to site, and house to house.

    Make sure you have an air barrier and a wind barrier, and that you encapsulate the insulation. Do that and you’re on the right path.

    The ‘Thermal Bypass Risks’ paper on the Passivhaus Trust website provides solutions. It includes tips and tricks for designers and architects to help mitigate thermal bypass. Each section features accessible takeaways that could also be used by self-builders.

    Find out more

    Visit the website of LEAP

    Follow Mark Siddall on Twitter

    Read Mark Siddall’s paper on Thermal Bypass Risks

    Watch the documentary case studies at PassivhausSecrets.co.uk

    Transcript

    Dear Evil Engineer

    Thank you to Stephen Miller in Oxford for sharing this with us. The Institution of Engineering and Technology has a bit of fun from time to time with their Dear Evil Engineer series. Villians write in for advice on their diabolical plans.

    So how many leopards do I need to heat my home? And they even consider homes that are built to Passivhaus standard!

    Please connect with us

    Subscribe, rate and review us on Apple Podcasts

    Rate and review the podcast on Stitcher

    Like our Facebook page

    Follow us on Twitter

  • HPH320 : Precision-cut timber frames – with Antoine Costantini from Kithurst Homes

    HPH320 : Precision-cut timber frames – with Antoine Costantini from Kithurst Homes

    Antoine Costantini explains how Kithurst Homes has embraced modern cutting technology to increase efficiency and minimise waste.

    Interview with Antoine Costantini

    With a background in physics and trouble-shooting in the construction industry, Antoine has always loved working with timber. He explains that engineered timber is a great way of using the material responsibly and with less waste.

    There are 4 main types of engineered timber that Kithurst Homes use

    These are:

    • Laminated Veneer Lumber (LVL) – “Like a plywood on steroids”
    • KVH – Finger-jointed soft wood
    • Cross Laminated Timber (CLT) – A cross lamination of timber in opposing directions
    • Glulam – Soft wood glued together

    Automating the process is faster and produces less waste

    Previously they would use a large chop saw to cut frames by hand, which meant manually changing the direction each time a different angle was needed. This would get repetitive and there was the risk of human error so they looked for a way of automating the process.

    The Hundegger machine they now use is a five axis saw which enables them to make cuts at any angle and inclination. It has also reduced the time it takes to cut, mark and pack a 200 square metre frame from two and a half weeks, down to three hours! On top of this there’s now only 3% wastage.

    The Hundegger software reads and cuts from various file types

    One of Kithurst’s customers is Passivhaus Homes with their PH15 method of construction. They send over their completed BVX file of the timber frame design, which gives the machine all the information it needs.

    Get access to our in-depth video case study of Buckinghamshire Passivhaus, a PH15 build, in The Hub

    Kithurst Homes also work from DWGs or can convert a hand drawing into a 3D image that the saw will then read.

    The machine software creates a picking list

    This will tell the operator the amount of I-joists, glulams and LVL that will be needed. These are then manually placed in order of size and fed into the machine.

    The machine is clever enough to recognise the material that is being fed in, and will alert the user if the geometry of the material doesn’t match with what it has been asked to cut.

    Using I-joists is an efficient way of building

    They use less timber than a traditional stick frame approach, and also reduce cold bridges because of their size and geometry. They arrive at the factory in 13 metre lengths, with Antoine estimating that an average frame would use around one kilometre of I-joists.

    The combination of the web of the I-joist with incredible shear strength and the lamination of the flange gives the I joist its strength and load bearing capacity. The regularity of the timber makes it predictable, and that is a good thing in engineering. They know how it will react on strength, density, bending, modulus, and shear.

    If it’s not compostable or recyclable they won’t use it

    Once the timber has been cut, numbered and marked, it is packed together by wall. Steel bands are used to secure them, as these can then be recycled whereas the plastic alternatives can’t. They are then stacked and transported to site by curtain sided trucks. Once on-site there is no need for a skip, as everything fits and there is no wastage. This complies with the company ethos of trying to preserve the environment as much as possible, and not using PU or polystyrene foams for example.

    It just takes common sense and DIY skills to put it together!

    Kithurst Homes will always provide training, whether that be on site or at their factory, in how to construct the frame. With everything being marked, it’s a case of needing to be bound together, and Kithurst Homes provide all the fixings, the screws, the staples, the membranes, the plywood.

    Antoine says that anyone with good DIY skills can put together their flat pack systems. Some of the parts can be heavy so may need extra pairs of hands, but generally because the I-joists use so much less timber they can be quite manageable.

    Their full wall systems however require craning in and a team of carpenters to put together.

    All their timber is PEFC certified

    The timber comes from two or three manufacturers, with Steico in Germany being where they get their wood fibre insulation, LVL and I joists. It is fully certified to European regulations and Kithurst know their suppliers are using the timber properly, with everything on the tree being used and documented.

    Find out more

    Visit the website of Kithurst Homes

    Transcript

    Please connect with us

    Subscribe, rate and review us on Apple Podcasts

    Like our Facebook page

    Follow Ben Adam-Smith on Bluesky

  • HPH309 : Keeping costs down by embracing simplicity – with Kirk Rushby and Polly Upton

    HPH309 : Keeping costs down by embracing simplicity – with Kirk Rushby and Polly Upton

    Architects Polly Upton and Kirk Rushby explain how they used their expertise to deliver a striking, high performance home for a very reasonable budget.

    Interview with Polly Upton and Kirk Rushby

    Having worked at top sustainable architecture practice Architype for many years, Kirk Rushby and Polly Upton were well placed to tackle a Passivhaus project, but bided their time for the right opportunity.

    Keeping their cost base low gave them a head-start

    Buying a house that they could easily afford in their early years at Architype meant that as their salaries increased their costs did not and so they were able to save money each month. Ultimately this put them in a strong position with cash to hand.

    They never stopped considering the opportunities

    Even though most plots they found were beyond their financial reach they didn’t give up, instead considering various opportunities and thinking that maybe in 5 years or so things might slot into place. Thus anything they learn about the process or sites now might help them down the road.

    However, this persistence paid off sooner than they imagined.

    They were prepared to take on a plot with challenges

    After looking at a few sites they came back to one that had been on the market a while. On the edge of a village, it afforded views to the hills beyond… but there were some drawbacks. The key challenge was access, which was via a low tunnel under the railway. This would make bringing materials to site tricky.

    Also being down a private road there were numerous potholes and there was going to be some noise from the railway line.

    While this might have been putting other people off, Polly and Kirk felt they could address these challenges. For example, just building to Passivhaus standard would have big acoustic advantages inside the house and eliminate most of the noise from the railway line.

    Reducing the floor area helped them keep to budget

    The site came with outline planning consent which was perfect for them, as architects, because they could design their own house.

    With a fixed budget they had to make sure they had enough money for the project and could see it through. This is where their architectural background came into its own. They started with a rough cost per square metre figure and then went into more detail of how they were going to build it and what each of those elements would cost.

    When they couldn’t afford it, they reduced the house size and started again

    “We designed a 160 square metre house and then we realised that we probably couldn’t afford that. And then we realised that maybe we didn’t even need it. So we shaved about 30 square metres off and didn’t really feel like we lost anything.”

    This refinement was an ace up their sleeve. They reached a natural point where if they made the house any smaller then it would become difficult to make the space planning work.

    ‘Upside down’ living was an easy choice

    Sharing a similar work experience the core decisions were easy. They wanted to have bedrooms on the ground floor and the living space above (where the views would be better). They planned to use timber frame, which was familiar to them and would also be more practical for delivering to site.

    It was the smaller decisions like choosing the wall finishes that prompted more discussion!

    The house has a ‘warm’ roof

    Where some people might have a cold loft space, Kirk and Polly opted to keep the top ‘half storey’ of the house within the thermal envelope, giving them more usable space. This is where there office is situated and also where you get the best view.

    Each window opening was carefully considered

    Polly and Kirk wanted a window arrangement where each window was just the opening.

    This meant balancing up daylighting, views, solar gains and cross ventilation (through the openings on the east and west) while also trying to avoid complexity.

    On the south side they decided to have a couple of larger windows which would not open. This would be cheaper, as well, plus they didn’t need these windows for cross ventilation purposes.

    With the main view out to the west they came up with a manual shading strategy for their big door involving roller shutters.

    Justifying the cladding choice was the main planning hurdle

    Getting full planning permission was fairly straightforward. In fact the main discussion with the planner was over the corrugated metal cladding for the walls and roof.

    “We had to convince the planner about the detailing and provide some precedents to show it wasn’t going to look like a big agricultural, clunky shed and it was going to be quite refined.”

    The non-concrete foundation worked well

    With the constraints of the site they wanted to avoid the stress of a concrete delivery. So they took advice from Passivhaus specialist Nick Grant and structural engineer Andrew Collinson about using a compacted gravel foundation.

    They weren’t afraid to pull in favours

    Initially Polly and Kirk didn’t know their neighbours or have friends in the area but as time went by they felt more comfortable with getting support when they needed it. Whether it was paying the farmer to help with his telehandler or asking the local builders’ merchants to receive a timber deliver, it made life easier and kept the costs down.

    Polly’s brother Matt built the house

    Enlisting a family member to be your builder can be fraught with danger, but both Polly and Kirk felt Matt was right for the job. Polly knew he was a hard worker, who plans well, knows the building industry and is cheeky when negotiating with suppliers. His ‘can do’ attitude also goes a long way.

    This was to be his first full house build although he’d done a large extension before.

    There were nightly meetings!

    As Matt didn’t live nearby he stayed with Polly and Kirk during the week. That meant that there’d be intense discussions about what was going to happen the next day, the next week or the next month.

    Polly’s dad and a couple of Matt’s friends were the only other workers through the project.

    Getting services connected took ages

    The build took 15 months and during most of this time Matt was without power.

    “We started trying to get the ball rolling the summer before we started building. And we didn’t get the last telephone line in until we’d already moved in so it took a long, long time.”

    Kirk believes the utilities companies don’t have the same sense of urgency that you do. Plus there were agreements with third parties to arrange, which all takes time.

    Luckily Matt was able to crack on under battery power and using an extension cable from a friendly neighbour. This was yet another advantage of a dry construction method.

    Supply chain issues impacted on some decisions

    Building through the pandemic there were some big supply chain issues. This meant that they had to think on their feet. Fitting out the interior was subject to what was available at the time so being flexible really helped.

    The design of the house helps avoid overheating

    The house has been really comfortable through their first summer. Even when it got up to 31C outside, at the top of the house inside it was only 25C. So the design of the house, with its roof overhang and shutters, does the work.

    Polly comments: “You learn that at about one o’clock, you need to close the shutters on the big west door.”

    The programme is subject to real life

    Kirks suggests that amongst the things he’d like to do differently would be to make the programme more straightforward. However, the reality of it is that there are delays with some things and you have to fill the time with other jobs you can do.

    Find out more

    Visit the website of Architype

    Follow Polly Upton on Twitter

    Transcript

    Download a transcript of this episode

    Please connect with me

    Subscribe, rate and review the podcast in iTunes

    Rate and review the podcast on Stitcher

    Like our Facebook page

    Follow us on Twitter

  • HPH302 : A contemporary Passivhaus home in a rural context – with Martin McCrae and Mhairi Grant

    HPH302 : A contemporary Passivhaus home in a rural context – with Martin McCrae and Mhairi Grant

    Mhairi Grant and Martin McCrae share their self build journey. Their contemporary home seems to have it all, from striking design and great ecological credentials to high quality finish and value for money… but Martin and Mhairi had to work hard for it!

    Interview with Martin McCrae and Mhairi Grant

    Mhairi and Martin met back in 1997 when they both studied at the Mackintosh School of Architecture. Together they co-founded Paper Igloo, the architectural practice that they run from their home in Kippen, Scotland.

    They increased their land budget to find a suitable plot

    As speclialists in low energy design, and having lived in a beautiful but thermally uncomfortable flat in Glasgow, they made the decision to look for land and build a Passivhaus.

    After a couple of years of searching they realised that the £100,000 budget they had originally set aside for land wasn’t going to get them the plot they wanted: they were either too small, too remote, or not a suitable orientation for a Passivhaus. By upping their budget to £135,000 they were able to find their picturesque, slightly sloping, semi-rural plot that afforded them views onto open fields.

    The plot already had planning consent for a traditional house, but they submitted new plans for their contemporary cube which were approved following a little bit of resistance.

    View of the plot

    With a budget of £250,000, they knew sweat equity would be needed!

    Mhairi admits that they probably weren’t aware quite how much sweat equity would be involved, but she considers the learning from it to be all part of the journey and not something they regret!

    “Building a Passivhaus isn’t as daunting as some people make it out to be. I think it’s just a matter of doing things correctly in the correct order and rigorously looking at the detailing.”

    – Martin

    Initially, Martin took 12 weeks off from their business in order to get the build underway, working with two joiners to erect the timber frame. As it’s just the two of them in their practice, this did mean a drop in income for a time, and one of the reasons the project took so long was because they had to balance their finances by earning money as they went in order to finance the build.

    What they originally thought might take two or three years, actually took six! And this was at the expense of their social life over that period as much of their free time was spent working on the house.

    They had strategies for managing the challenge

    At the halfway point they were thinking it was starting to drag, so keeping their energy up was challenging. Taking the cladding as an example of one particularly wearing period, they did it themselves over the space of four years, with each elevation taking an entire summer to complete.

    Mhairi says it was important to keep reminding themselves of what it was they were trying to achieve, and that it would be worth it in the end. In the same way they would approach any dauntingly large task, they broke it down into smaller tasks, tackling each one before moving on to the next.

    Martin adds that it is a technique they use for coping with stress at work too, and it helped get them through the long build process. He also says that being in it together made a difference.

    Supplier issues and design decisions were interlinked

    Their plan was to create a simple and clean design that would allow them to easily meet the Passivhaus standard, but also sustainability gold and technical standards in Scotland. That incorporated a further set of criteria to do with water-saving and acoustic performance.

    They knew that they wanted to use a timber frame, but struggled to find a supplier who could provide a Passivhaus-ready or kit solution. That was why they ended up stick building the frame, and why Martin says that decisions like that can lead you to design decisions.

    The pace of building slowed once the frame had been completed

    They employed someone to do the groundworks but installed the Isoquick EPS raft foundations themselves, with the help of friends over a weekend.

    After the concrete was poured they were able to start on the stick frame.

    Once the joiners had finished the frame, Mhairi and Martin took over the workload. They spent the next four months taking as many days off work as they could, plus evenings and weekends, working on the wall installation, hand-cutting, and fitting the wood fibre batts.

    They tried to be resourceful, not wasteful

    Martin and Mhairi were careful to minimise the amount of waste that left the site. They were able to relocate the excavated earth to other areas of the garden, and in doing so were able to create a flatter garden with drop-down terrace towards the barn.

    They were also very diligent about buying materials with as little packaging as possible. Plastic was recycled where possible, pallets were broken up into firewood for Mhairi’s dad, and off-cuts of wood fibre insulation were stacked rather than having to use new pieces. They were rigorous too about how to cut and use the plasterboard in order to minimise waste, and were left with only four A3 sized off-cuts from the whole build. With such little waste, they were able to just take it to the tip, rather than needing a skip. This also had cost savings, though they do agree that it did mean it all took a bit longer.

    MVHR Ducts

    Living in a caravan was incentive to keep the project moving!

    Having sold their flat, they rented a couple of different places in the village before finally moving into a caravan for the final nine months. Living in a two-berth van, with the water freezing over the winter and an electric bar heater on permanently to try and stay warm and dry, in what was also their office, did focus their minds to crack on and get moved in as soon as possible! They managed to get one room ready first where they could sleep and work while they finished the rest of the house. At the point when they moved in, they had their electrical completion and were plaster boarded in most of the house, but were using a sheet of OSB as a kitchen worktop. They didn’t have their linoleum or timber flooring down upstairs either and were just at the acoustic flooring stage.

    The double-height space adds impact

    Right from the beginning, they wanted to incorporate a large, double-height space into the design, and this meant a change to the wall construction at the double-height area compared to the single-height area. With Passivhaus, most things are ratified against the floor area, so the decision to have a double-height space can impact on your insulation and window specification for example.

    Rainwater has a visual journey through the garden

    Part of the sustainability gold section in the technical standards in Scotland is about water-saving measures. To meet this criteria, they have used low-flow fixtures and fittings on all their taps and showers. They attenuate about 40% of the rainwater from their sedum roof, and only have one rainwater pipe for the whole of the flat roof area.

    That takes the water on a journey down off the building and into a catch-pit of stones, along a trough and into a rain garden – an elevated planter in the garden with plants that are suited to being saturated or very dry. The overflow from that goes to the barn at the bottom of the garden.

    Renewables have been incorporated

    The 1.5kW array of PVs on the roof is enough to run the dishwasher and washing machine, and pays for itself. A solar thermal array makes a massive contribution to their hot water needs, and almost more than they need in the summer.

    Infrared panels are on the ceilings of the living room, kitchen and one bedroom, and also at the top of the double-height void. They radiate heat down onto surfaces like the concrete slab, which then themselves release heat.

    Passivhaus comfort levels have exceeded their expectations

    In fact, Mhairi and Martin say it is so amazing to live in that they have spoiled themselves, because they really don’t want to live in anything else now that they have done this!

    They also find it very easy to live with too, with very little interaction with the technology.

    Being a Passivhaus they had been very careful about how much window they designed on each elevation. They knew they had a higher risk of overheating in their bedroom, which has a fixed, large, west-facing window and then a smaller opening window. As they were going to be the end users they decided they were happy to interact with the building in order to keep the design they wanted and prevent overheating. During the summer they do purge heating at night by opening the shower-room roof light, open the bedroom window on tilt and leave the en-suite door open. They also have opening windows in the upstairs and downstairs halls for cross-ventilation during the day.

    Their experience of building and living in their own Passivhaus has led to them making a commitment in 2020 that Paper Igloo will only design their new builds to the Passivhaus Classic standard as a minimum.

    Make sensible decisions at every turn

    Maintaining a spreadsheet was helpful for Mhairi to keep control of the budget. Every week she would take the bank statement and rigorously check what things had cost against what they had predicted they would cost, and then adjusting how much they had left to spend.

    Martin’s tip for anyone doing some of the building themselves, or if the budget is limited, is to get someone else to make the shell wind and watertight as quickly as possible. This will mean the building won’t start to deteriorate from the weather, and you’re free to take your time with the rest.

    And finally, do as much research as you can. This applies in terms of funding, materials, construction options, etc. There are generally lots of options out there so there is no need to go for the first thing you come across. Then make sensible decisions at every turn, as even the small amounts add up.

    Find out more

    Visit the website of Paper Igloo

    Follow Paper Igloo on Twitter

    Transcript

    Please connect with me

    Subscribe, rate and review the podcast in iTunes

    Rate and review the podcast on Stitcher

    Like our Facebook page

    Follow us on Twitter

  • HPH294 : Using a package supplier to deliver an ecological home – with Adrian Reith

    HPH294 : Using a package supplier to deliver an ecological home – with Adrian Reith

    Adrian Reith explains why the joined up design, engineering and quality of a Baufritz home appealed to him.

    Interview with Adrian Reith

    Adrian considers himself to be a creative person and, following a career in advertising, he was inspired to re-train and become a business coach.

    He and his wife Judy live in the centre of Cambridge, where the opportunities to purchase self build plots are few and far between.

    His persistence paid off

    Over the years Adrian has been very active on the Land Registry website, paying a small amount to find out who owns various sites.

    He used to live over the road from this particular plot, which at that time accommodated a number of small garages, not built for modern sized cars.

    Every year, he would write to the owner and ask if they would be willing to sell, and each year he would receive a letter of rejection back. On his sixth year of making the request, they replied that they would be interested in talking to him about it.

    The land was owned by one of the Cambridge colleges, and at that meeting, Adrian emphasised how they had roots in the area, loved Cambridge, and were looking to build a family home. His initial offer of £350,000 was rejected. He immediately increased the offer to £450,000, which was put to the college committee and accepted the following day.

    The plot didn’t have planning permission but Adrian sought advice from a planning officer before making his offer, who thought it had potential to get planning. It was nevertheless a risk to buy what could just have ended up being some very expensive garages!

    Adrian says that he is a creative person and believes in holding onto your dreams, which is something he thinks probably helped in his pursuit of the land. He also thinks he was fortunate that the plot never came onto the open market as he knows of other people who had also been keen to purchase it.

    Planning permission wasn’t a foregone conclusion

    The site has 16 adjoining properties so they were quite concerned at their prospects of getting planning permission.

    Having lived in the vicinity for a number of years already, Adrian and Judy worked hard to communicate with their neighbours about what their plans were. They even managed to have a number of letters of support for their project, which is quite unusual.

    The application went to committee as there were a couple of objections from people who hadn’t engaged with them in the process. The committee were hugely positive, understanding of the eco-credentials, and granted them permission to build.

    The location had access constraints

    The house is hidden from view from the road, which is made up of mostly large, Edwardian villas, and is approached by the side of two mock-tudor style semi-detached houses.

    The site is roughly the size of two double tennis courts, and Adrian thinks that a developer would have put quite a few houses on there. When considering their options they did contemplate building two houses, one to rent out and one to live in, but decided on just a generous four bedroom house for themselves.

    The groundworks were carried out by a separate company, which was particularly challenging, given the narrow access down the lane and a tree in the way! Being a timber-framed house the foundations had to be extremely flat and accurate.

    The Baufritz approach had great appeal

    Adrian and his wife are well connected in the area and were keen to build a home that would enable them to welcome people into it. They wanted it to be ecologically responsible and easy to look after as they move into older age.

    From his previous experience of having architect designed, experimental glass extensions on the backs of big Victorian houses, that weren’t executed all that well or comfortable to live in, he was keen to go for something that wouldn’t be causing them problems later on.

    The Baufritz approach of joining up the issues of design, engineering, materials, function, execution and low maintenance, was something that had appealed to them for quite some time already, after researching them for a previous project which hadn’t gone ahead.

    He also liked their emphasis on it being not just an eco house, but a healthy house, making sure that there’s no PVC, VOCs and glues. The fact they’ve built many of these houses before, with tradesmen working together and not against each other, meant they weren’t dreaming up a house from scratch, hoping it was going to work.

    The design developed during a visit to the Baufritz HQ in Germany

    The first step for Adrian and Judy was to write down lists of all the things they liked or disliked in previous houses, including room dimensions. That formed their brief which the architect gave to Baufritz to cost.

    Once they had planning permission they spent a week in Germany at the Baufritz headquarters, where they were given an office for the duration, and were able to bring their ideas together.

    They were then taken through a series of checklists during the week, covering flooring, bathrooms, toilets, doorknobs, stairs, windows etc. They loved the experience but were glad of the advice of a former customer that they knew, who had suggested doing a reccy some time before where they had time to take stock without any pressure.

    A novel approach for them was that the factory had movable components, where they could wheel sinks, toilets, baths etc around to end up with the actual physical layout they would have in their own house.

    Ultimately, Adrian is pleased with the decisions they made, although, being a perfectionist, he was bound to have some things he wished he had done differently. Having been in the house for five years now, and making the decisions about it seven years ago, times have moved on and he wishes he had opted for an electric car charging point for example. He also says it was difficult to visualise quite where things were going to go inside the house, as to where electrical sockets would need to go, and how many of them would be needed. He thinks this is something he probably underestimated.

    The factory-built approach gives quality of workmanship

    What they liked about the factory build approach, was that the house components are put together in ideal conditions. So for example, a window is sealed into the wall, in ideal conditions, using ideal tools, and not by someone in the rain on a Friday afternoon plugging a gap with some expanding foam!

    Theirs is a timber frame house with walls filled with a wood shaving waste product. There is plasterboard on either side of the walls to keep the insulation in, with a void before another plasterboard layer to run the services in. On the exterior there is another void before the external covering on the outside of the house.

    There were logistical challenges in getting the house components to the site

    Once the foundations had been signed off, they had the go ahead for the house to be built in the factory, and Adrian and Judy were given a date for delivery.

    Adrian negotiated with a local airfield to have a crane stationed there, for lifting the loads off the six, 20 metre trucks, onto a smaller truck to shuttle back and forth to the site. Once at the site, two cranes lifted the pieces of the house over the tree.

    The house is around 26 metres long, and the facade arrived in only four pieces with the triple glazed windows pre-installed. The first wall was swung over on the Tuesday lunchtime, and by the time the sun was going down on the Thursday, the roof was on and the house was watertight.

    The internal works, such as the underfloor heating, screeding, taping, decorating, plumbing, wiring, kitchen and bathroom installation etc, took a further five months to complete. That work was also done by Baufritz, and they actually moved in ahead of the estimated time, and on budget.

    “This is a modern house with soul”

    This was how one of their friends described the finished house, and Adrian believes it does have a human quality about it that speaks to you. He thinks the oak flooring and doors contribute to this, and give it a sense of calm.

    Image copyright Joakim Borén
    Image copyright Joakim Borén

    Something they particularly enjoy is returning to the house after a period of time away and finding that the MVHR keeps the house still smelling fresh.

    Image copyright Joakim Borén

    The house has an upstairs laundry room, with zoned, controllable heating. They hardly use heating anywhere else in the house, except for in this room where the clothes are washed and hung up to dry. The hot, moist air is extracted from the room, with the heat being recycled and the clothes drying quickly.

    The landscaping will give them privacy

    Adrian and Judy spent time with their architect to understand the light and work out which aspects to look out onto. From the office at the top of the house they look over the mature gardens of their neighbours, and downstairs they face across their own garden.

    Image copyright Joakim Borén

    To create privacy for themselves and their neighbours they planted 30 small hornbeam trees, which will create a high level hedge for screening and leave them feeling less exposed than they currently do.

    Image copyright Joakim Borén

    In hindsight, Adrian would have imported a few tonnes of topsoil for the grass, as he wishes he had sought advice on that from a gardener and not a builder!

    Image copyright Joakim Borén
    Image copyright Joakim Borén

    It is at the premium end of housebuilding

    Adrian accepts that it is not a cheap house, and all the convenience does come at a price. However, its central Cambridge location means that it warrants the investment as they would get their money back should they ever wish to sell.

    He very much enjoyed the process of having a menu of options, and tinkering around with their choices to see what impact that would have on the price. One example was they decided during the planning stage to enlarge the hallways and staircase, even though they knew this would have a heavy cost impact with extra roof, foundations, floor, ceiling, wall etc.

    They are happy to share their ideas

    Adrian and Judy have opened their house to hundreds of visitors over the years as part of Cambridge Open Eco Homes.

    “As a creative person, everybody needs their inspiration, everyone needs to steal ideas. That’s the best way, not to come up with your own ideas but to take someone else’s and adapt it. That’s the best thing. So, I’m delighted to show people around and to help them see a vision of how they can do something that they want to do in their own place.”

    Image copyright Joakim Borén

    They recently published “Act 3”

    Building the house in their 50s is evidence of their attitude towards life and, during the lockdown period, Adrian and Judy published a book that links into their work as life coaches.

    They found themselves repeatedly meeting people of a similar age and stage in their lives where they were thinking about their roles and responsibilities to themselves, their families and the world.

    Their book, Act 3: The Art of Growing Older, is designed to be a framework for helping people answer those questions, based around the ideas of looking at your values, what’s important to you, finding purpose, and sorting out your key relationships. It is their belief that starting with those fundamentals will make the rest much easier to work out.

    Find out more

    Visit the website of Act 3

    Find out more about Baufritz

    Transcript

    Please connect with me

    Subscribe, rate and review the podcast in iTunes

    Rate and review the podcast on Stitcher

    Like our Facebook page

    Follow us on Twitter

  • HPH290 : Being resourceful to bring down the cost of a build – with Colin Rice

    HPH290 : Being resourceful to bring down the cost of a build – with Colin Rice

    Self-building an annexe in an area of coastal erosion meant a low-cost but high-performance build was a priority for architect Colin Rice.

    Interview with Colin Rice

    Colin is a partner at Cullinan Studio, but one of his first jobs after graduating in 1980 was working with Lyall Addleson. Lyall was well-known for his “Handbook of Building Failures”, and Colin worked with him on his investigations into building defects, and subsequent book “Performance of Materials and Buildings.” The time spent having Lyall as a mentor has shaped how Colin has approached architecture throughout the rest of his career.

    Colin has spent three years applying principles he learned during that time to his own self-built annexe at his Green Tiles coastal home.

    Five principles guide how Colin designs

    These are principles that came out of Colin’s work with Lyall and which he has always kept in the back of his mind since.

    First is the constraint which he calls high to low. This applies whether you’re thinking about rainfall or structure and the force of gravity from high to low, but also to things like air pressure and thermal gradients that affect the building envelope.

    Separate lives is his second constraint. He says that lots of buildings suffer defects from ignoring the fact a building is a process, and understanding how the different thermal and moisture properties of the materials will work together or against each other over time.

    The third principle is the objective of continuity, and particularly the continuity of performance. To use the example of a Passivhaus where there is a greater extreme between inside and out, there has to be continuity of all kinds of things, including the air barrier.

    “You’re trying to manage a much greater differential between high and low and you have to do it by thinking very carefully about continuity in the face of the challenge of separate lives.”

    The objective that you’re trying to do is to hold that in balance, which is the fourth principle.

    And finally, creative pessimism is the fifth principle. It could also be thought of as ‘whatever can go wrong at some point will’. By thinking ahead to what could go wrong, Colin says you can come up with smart solutions more creatively.

    Colin’s home is in an area affected by coastal erosion

    Colin’s Green Tiles home is backed by sand dunes along the coastline of Norfolk. It is an area where the cliffs are being eroded at a phenomenal rate, which is only expected to worsen further with the predicted changes to sea levels caused by climate change and global warming.

    Being somewhat unwise to therefore invest huge amounts of money in the project, applying the five principles to his project also helped with keeping the costs down.

    The annexe provides a warm overflow space

    The existing house on the site is a timber frame building of around 6m x 8m, which they have owned since 1998. There was also a 6-berth caravan adjacent to the building which they used as a playroom and then a workshop, before it went into a state of disrepair.

    With the existing house being very cold during the winter months, they managed to get planning permission for a self-contained annexe in which they could stay comfortably during the colder periods and also use as overflow space for accommodating guests.

    Think of planning as being part of the work

    With Colin doing all the work himself, he would use alternate weekends for planning and carpentry at home, and then being on site. While he stresses the importance of careful planning it shouldn’t be at the expense of allowing yourself to make changes and improvements.

    A circular economy style of re-use requires storage space

    As the caravan was in too bad a state of repair to use as a workshop, Colin purchased a shipping container as a replacement. He dismantled the caravan and salvaged components where he could, and used the container for storage.

    A flood strategy was needed for planning consent

    Being situated in a low-lying area at the bottom of a hill, which can have standing water for several months, they were unable to use traditional foundations. Instead, they have used damped down crushed aggregate with railway sleepers on top. The timber frame, which Colin simplified by planning around standard timber sizes, is strutted off the sleepers to allow any floodwater to flow underneath.

    Prioritising performance doubled his initial budget

    Originally Colin had a budget of just £12,000 for his build, but that was before he made the decision to prioritise performance and apply for building regulations approval.

    Taking that decision meant an increase in costs of glazing and insulation so his final spend was just under £25,000, which works out at slightly less than £850 per square metre, including VAT and all the internal fitting out.

    Colin built the annexe himself at weekends

    He spent £2,000 on the double glazed units, which he designed on a “drip dry” principle where the sheet of glass overhangs the wall below, and is overhung by the wall above.

    Rather than using off-the-shelf I-studs, which would have weighed 90kg and cost £90 each, Colin made his own C-studs weigh 60kg and costing £60 each. He says they wouldn’t be strong enough for a multi-storey building, but for his single-storey dwelling they are perfectly adequate, thermally efficient and light enough to handle more easily when doing the construction yourself.

    The roof and walls are insulated by filling the cavity with Warmcel cellulose insulation. The roof joist insulation is held in place with plasterboard and a thin layer of OSB on the underside.

    The cold roof has a deck which carries the waterproof membrane. It is designed to be cold because it has a ventilation space underneath it. It relies on air movement through the cavity to clear moisture and things that can cause decay of the timber.

    Being thrifty can be fun!

    Colin has tried to reuse as many materials as possible in the construction and fit-out of the annexe, even down to the microwave glass plate fixed into a hole in the wall to make a window into the bathroom!

    He never throws things away as they might be useful someday, and says he is also an opportunist. He has utilised off-cuts of wood from Cullinan’s previous office and among other things has taken apart an old bench sander to use the cogged rubber belt drive on a drop-down window in the annexe.

    Reused features in the Annexe

    Ask the question “If I take this apart, will I be able to use it again?”

    Colin’s tips for tackling a high performance project on a small budget are:

    • Use eBay and similar sites for sourcing materials
    • If you have the space, use a shed or container for storage
    • Plan on a modular basis for avoiding waste
    • Design in a way that doesn’t rely on glues and sealants

    Find out more

    Visit Cullinan Studio’s website

    Follow Colin on Twitter

    Transcript

    Please connect with me

    Subscribe, rate and review the podcast in iTunes

    Like our Facebook page

    Follow us on Twitter

  • HPH281 : What’s it like to be an owner builder? – with Tully Gallagher

    HPH281 : What’s it like to be an owner builder? – with Tully Gallagher

    Tully Gallagher of Beartooth Passive House, explains what it was like to take a leap of faith in swapping a desk job with building a ‘forever home’ for his family.

    Interview with Tully Gallagher

    Tully had been working as an engineer in Denver for ten years when he and his family decided to move back home to Montana.

    “We went from having a very stable income, stable benefits, a pretty consistent life, to moving back home, not having jobs, living in rental houses.”

    With intentions to return and build their “forever home” for his family that would be a healthy and comfortable place to live, Tully had originally selected a builder to achieve their high performance house. When that fell through in 2017, and with the chance of finding an alternative that had even heard of Passivhaus, let alone built one, being fairly unlikely, it seemed the natural decision to take on the project themselves.

    Tully took on the house building project full-time while his wife found work at the local school to keep an income coming in.

    Passivhaus Builders’ Training gave him confidence and connections

    With his construction experience amounting to limited remodels of previous accommodation, Tully took the Passivhaus Builders’ Training in 2017. With that came access to highly knowledgeable people that he could lean on for tips and feedback during the planning phase.

    Keeping it simple was crucial

    From the outset when they decided to build the house themselves, they opted to keep the form very simple: a two-storey rectangle with engineered roof trusses.

    Emu Systems, who delivered the Passivhaus training, were trying to standardise construction methods for different climate zones and were looking for partners to pilot their system. It was a good fit with what Tully was looking for so they worked together on the construction system, building science, wall details, window installs etc.

    The remote location brought its own challenges

    Located about four miles from the town of Red Lodge (population of around 2,000), their site was relatively flat at the top of a hill in a sparsely populated area. One of the biggest problems about the location was the absence of any major DIY store; the closest being an hour and a quarter away.

    The location for the house was based on a transformer being a couple of hundred feet away so they could connect electricity without a problem.

    For waste water they had a septic system installed, and for incoming water they hired a company to drill a well. A pump runs from the well and is connected to a line that runs into the house, with a pressure tank supplying the pressure to the house and holding a reserve of the water.

    They used a pre-determined build system

    Partnering with Emu meant the construction system was already determined, which was a Passivhaus double stud wall system. Overall wall thickness is around 20 inches, incorporating mineral wool batt insulation, interior finishing and exterior siding.

    With the house being a basic rectangle shape the airtightness strategy didn’t pose any problems. The only junction that took more consideration was at the second storey floor system and how to get the air barrier out and around the floor joists.

    “But it was definitely something that we thought of early on and we picked the materials that we used for that air barrier specifically because they were really easy to work with and they were really strong and robust. They could stand up to if somebody accidentally bumped into them or something accidentally hit it and ripped it. It was pretty easy to repair and get it back to air-sealed.”

    They have moved in while finishing the interior

    Tully and his family moved into their home during November 2019. It isn’t yet finished but the pace of work has only slowed a little now that they’re in and are working on finishing the interiors. Interior doors are due to arrive soon, then it will be finishing the window trim and putting a lime plaster on all the interior walls. The bathroom installation is currently underway which Tully sees as a fairly big undertaking because of its size and his lack of experience.

    Make time to have a break

    A particularly difficult part of the build was the roof, which he saw as his nemesis and was one of the times he wished he was back at his desk job! Although not afraid of heights, he doesn’t particularly love them and with the ridge of the house being around 30 feet off the ground even getting the sheathing up there was difficult.

    He remembers one specific heart-sinking day where they had stapled all the underlayment down when it started getting very windy. Looking up from where he was having lunch at his parent’s house nearby he could see it starting to billow in the wind before a big length of it gave way and started flapping about. They ended up putting a metal roof on the house, with Tully admitting that the first couple of panels while they were figuring it out weren’t the prettiest and were put at the back of the house where they wouldn’t be seen!

    The biggest challenge Tully faced was knowing when to walk away and take a break.

    “I was wanting to get things built and it got to the point where coming out every day, I started to become a little bit more easily agitated and I just needed a break. That’s something that was a struggle for me all the way through building, knowing that I want to continue making progress so that we can move in, but at the same time I needed to take a break so that mentally and physically I could recover.”

    Take your time in the planning stages

    Tully says that although it’s been hard and taken a long time, if they hadn’t first gone through such a detailed design and planning stage it would have been a lot more difficult.

    “So, from a design phase and early implementation phase, that’s the time where it doesn’t cost you really much more money to take another month or two months to really get things lined out and understood. So, that was a big learning experience for me.”

    From a teaching perspective going forward, he would like to specialise in high performance building envelopes and the installation of that system, including the air barrier, insulation and windows. He would also like to explore the possibility of doing that in a pre-fabricated manner where the walls, floors and roof can be made into panels that can be trucked to the site and installed within a matter of days.

    It’s been a stressful but satisfying experience

    Tully’s advice to anyone taking on something similar, is to be prepared for it to take a very long time, especially if you’re doing it yourself. Spend time planning and thinking everything through as it’s a lot better to make the mistake during the planning stage than when you’re actually building it.

    Tully spent a lot of time doing 3D modelling in SketchUp, using it to model every single framing member before cutting any timber at all. He found it helped him to think through all the different junctions and how it would all work together.

    He also says to be prepared for it to cost a lot more than you are expecting.

    “So, if a budget constraint comes up and you have to choose between having really nice counter tops or spending the money to put in an additional X amount of insulation and focus on airtightness, I would say really consider that airtightness and insulation piece because you’ll probably never do that again or never have the opportunity to do that again. But you can save up for a year and upgrade your kitchen counter tops really easily.”

    “It’s stressful. I’d like to say that I’ve had way more stress in the last year-and-a-half than I had in the previous eight years probably combined. But I think I’ve also lived more and experienced more in the last year-and-a-half both in emotion and physical, actual achievement, than I had in previous years.

    I’d had an office job for the most part. I did a little bit of fieldwork. But when you go in and you’re on a computer, you can build some really cool spreadsheets or do some cool stuff in software but it’s not the same thing as being able to go to work, work hard all day, then leave and look at a forty foot long, nine foot tall wall that you built and stood up that day.”

    Find out more

    Visit the website of Beartooth Passive House

    Follow Beartooth Passive House on Instagram

    Transcript

    Please connect with me

    Subscribe, rate and review the podcast in iTunes

    Like our Facebook page

    Follow us on X

  • HPH278 : A beginner’s guide to self build – with Geoff Stow

    HPH278 : A beginner’s guide to self build – with Geoff Stow

    Having worked on his own hands-on group self build project, and site managed others, Geoff Stow shares his experience on where to start when it comes to self build.

    Interview with Geoff Stow

    Geoff’s involvement with self build started years ago when he worked with a community arts project in south London, making a video with a group of self builders who were promoting their scheme in Lewisham. So when Lewisham decided to do another scheme he put his name down, chairing and being part of a group of 13 that built their own houses on a Walter Segal project. From there, his involvement continued with working as a site manager for other group self build schemes, including the Hedgehog project in Brighton.

    “My background isn’t as a builder really but I think in some ways that’s quite interesting because it’s actually coming at it as a novice. I’m sympathetic with people who are trying to get a scheme off the ground.”

    Geoff also runs courses on timber frame self build, and self build project management at the Centre for Alternative Technology in Wales.

    Hope Wharf
    Hope Wharf

    It’s likely to be harder than you’re expecting!

    Geoff says he’s never met anyone who said they wished they hadn’t done it, but does stress that you should be prepared for a lot of hard work. He thinks there is actually very little in place to make things easier, with the majority of things at the beginning like planning and finding out how to connect services, being geared up to failing.

    Whereas most people spend their time at the beginning sketching designs for a plot they don’t yet have, he recommends instead taking that time to research and understand the issues involved. That could be around planning, environmental issues, insulation, ventilation etc.

    Take the opportunity to go to the exhibitions to grow your understanding and help you talk the same language as the experts, but bear in mind that a lot of it is sales focused.

    Understand the issues around claiming back the VAT, and get yourself organised with a good accounting system so you can keep track of staying within budget.

    Build your knowledge by checking out some of the self-build books around, like Mark Brinkley’s Homebuilder’s Bible. They’re worth reading for finding out about things like health and safety requirements, working out how you’re going to organise your project, whether you might be able to site manage it yourself, and understanding what the relevant issues around that might be.

    Use your suppliers by asking for detailed information, and if they can’t provide it then don’t use them. Geoff gives the example of a window supplier, where you should be providing wall designs and asking what’s the best way of fitting them.

    Have a sensible budget

    Keep in mind that things rarely come in under budget or ahead of schedule, so have a sensible budget that is based on real costings, not just how much you’d like to spend or how much other people have spent. Be wary of the figures that people quote when they say their house cost X amount per square metre, as you never quite know what has been included and what has been omitted.

    Budget high for all of the initial stages. Things like the foundations, services and access roads can have plenty of unknowns and it’s much easier to price up more accurately for the above ground works. Add on a good contingency once you get quotes in as this should free up money later on.

    In addition to budgeting for the overall cost of the build, if you’re using a self build mortgage you will need to consider your cash flow. They work by releasing money once a stage is finished, so although you might have enough money in total, you might find the project grinding to a halt if you do not have it available at the right times.

    Finding land will probably mean making compromises

    Geoff’s key piece of advice for finding land is to be flexible, as there’s not that much of it around. He thinks it best to spend time in the area where you’re looking as quite often word of mouth can be helpful.

    Take the time to understand your site

    Geoff estimates that, depending on your skill base and level of organisation, around a year is a good length of time to spend on your research. As part of this he recommends spending time on your site and understanding how to place the house so you can get the best out of it. This will include things like orientation, window placement and learning how the sun falls on the site at different times. During this period you can also be going to exhibitions and talks, doing courses, going on Passivhaus open days and speaking to other people that have built their own homes.

    Focus on getting the fabric of the building right

    Geoff says you’re never likely to hear someone say that they wish they’d put in cheaper windows or used less insulation! So concentrate on getting the insulation, windows, detailing of doors, heating systems etc right, and getting it to the best quality that you can afford. It doesn’t necessarily have to be the perfect house straight away, and you can always retrofit your dream kitchen or build a second stage later when finances allow.

    Speak to other people for advice

    Get as much information as you can from suppliers and manufacturers about their products and their detailing. Also speak to builders’ merchants who might be able to suggest alternative products that you might not have come across.

    Geoff follows a couple of Facebook groups which he says, if you filter through a lot of the rubbish and sales pitches, can actually have really good information and experience that people are willing to share.

    “There’s no right way of doing it…what there are is a lot of wrong ways!”

    Geoff stresses that there is no right build system to use, and the method that you choose will be based on a lot of criteria. Whatever method you do choose, just make sure that it’s of the highest quality you can afford.

    A lot of it will be down to personal preference, and whether you like timber, stone, brick etc.

    Geoff’s preference is for timber frame, partly for the accuracy and speed which it affords. He personally would also avoid very innovative systems by very small companies as there can be a question of whether or not they can actually deliver.

    Also consider what kind of products you want to be using. Some people might want high performance foam insulation, whereas others will want to go as natural as possible and use sheep’s wool or Warmcel type insulation.

    “Whatever building method you go with, you just need to really understand what the issues and the criteria are. The good points and the bad points. And ignore what people say about their method being the best, it’s modern or it’s developed by NASA or something ridiculous. Just understand what the issues are with all of them and base it on real costs.”

    Decide how much involvement you’re going to have

    As a client there are options as to how involved you will be on the project, ranging from paying huge sums of money to a building company who will do everything for you, to getting hands-on and doing practically everything yourself.

    Probably the biggest deciding factor is thinking about what skills you have, but not necessarily assuming that because you can do something yourself it will necessarily be quicker or cheaper.

    “So, if a job that a skilled person can do quickly and well and you can do fairly well and take a long time over, that might mean that it’s longer before you move in and you’ve got more mortgage repayments, more insurance, if you’re renting a house then there’s the rent that you’re paying while you’re doing it. So, you might think you’re saving some money but actually, are you really?”

    You might also find that by doing a job yourself and taking longer about it, you might be holding up the next trade that can’t come in and do their job until you’ve finished. Instead there might be jobs that you can do which won’t involve holding anyone else up, like prepping and putting up cladding for example.

    When it comes to managing the project, you have the choice of paying someone else to do it, or doing it yourself. Obviously doing it yourself in theory should save you money, if done well, but consider whether you have the expertise to: keep things on track and on budget, get prices and employ subcontractors, nudge people when needed, make sure the work is being done to a high standard, check health and safety standards are being adhered to, keep neighbours on side etc.

    Do it on the terms of what you can afford, what skills you have and what you want your level of involvement to be.

    Being too fixated can be a common pitfall

    Geoff sees people that might become completely fixated on building a straw house for example, when actually the site they have might not actually be ideally suited.

    “It’s just understanding the issues around those sorts of things and not necessarily getting very fixated on one thing where you end up making your build really complicated because you’ve got this one fixed idea that you saw somewhere on television that you want.”

    He also says that no matter what you do there will be people saying that you shouldn’t have done it that way. And maybe even you yourself will look back and think you might have done it differently, but just try to get as much right as you can based on the knowledge and research at the time.

    People always say they want to be in by Christmas!

    Geoff suggests when it comes to how long a project will take, that if you’re planning to do a lot of the work yourself then try and avoid it going over two winters, as the second is always particularly tough (especially so if you’re living in a caravan!) Realistically you could be looking at 12 to 18 months on site, but less than that if you have builders.

    He also recommends trying to get as much finished as possible before moving in, even if that means throwing money at some good contractors to speed things up. Finishing off works once you’re living there is much harder to do and becomes less likely to ever get done.

    To help keep on track with the budget and schedule, try not to make changes as you go along. You can make minor changes but you don’t want to be deciding to change window placement or move walls once work is on site.

    Work with an architect who is on your wavelength

    Keep a scrapbook of ideas and images that you like and can show to a designer or architect, and make sure you work with someone who is going to design the sort of thing you want.

    Although it’s not necessary to employ an architect, having a good one on board that is sympathetic to your ideas can elevate your plans and give you a wow factor, rather than simply being a series of rooms joined by a corridor.

    Having an architect involved could just be paying someone for a simple check over your plans and offering advice, to a full package of designing the house, getting it through planning and building control, and seeing the whole project through to completion and sign-off at the end.

    A key consideration in choosing who to work with is finding someone who is on your wavelength that you feel you can work with. Ask for proof that they really understand the issues that matter to you, as some might claim to be providing a sustainable and energy efficient building just because it complies with current building regulations.

    Participants on a timber frame course

    Find out more

    Visit the website of the Centre for Alternative Technology

    Join House Planning Help’s Facebook group

    Transcript

    Please connect with me

    Subscribe, rate and review the podcast in iTunes

    Rate and review the podcast on Stitcher

    Like our Facebook page

    Follow us on Twitter

  • HPH266 : How to invest sweat equity into a project while maintaining quality – with Ajay Boardman and Nigel Bowley

    HPH266 : How to invest sweat equity into a project while maintaining quality – with Ajay Boardman and Nigel Bowley

    Client Ajay Boardman and her builder/carpenter Nigel Bowley share their experience of working together on her self build project. In addition to project managing Ajay is labouring for Nigel. We look at why this relationship has worked well and consider how much money she is saving.

    Interview with Ajay Boardman and Nigel Bowley

    Ajay is building a 260m² Passivhaus in the South Downs National Park, using the PH15 build system. Having found Nigel Bowley to build the timber frame, it seemed natural that, being a practical person who didn’t have a job at the time, Ajay herself would take on the role of project manager and labourer.

    Parental support has been invaluable

    A big factor in Ajay being able to take on the project has been the support of her parents who live on a farm next to her and the site. Having plenty of experience helping her dad out with manual work on the farm has stood her in good stead for transferring her skills to the building project.

    Not only has her dad helped out with the labouring when she has needed a break or to concentrate on the project management side, but he also always has the right tools for the job. In addition, Ajay’s mum helping out with childcare has meant that Ajay has been able to put in the extra hours while still having the children close by.

    Nigel and Ajay quickly realised they would have a good working relationship

    A carpenter by trade since joining a YTS scheme in 1986, Nigel has had a varied career working on projects such as house building, extensions, internal renovations, roofing and some commercial work. He is equally used to working on his own or having a small number of sub-contractors and labourers alongside.

    From previous experience of working with labourers, Nigel had his doubts about how successful having Ajay and her dad work with him would be. However, Ajay soon demonstrated that she had a great interest in the building, listened, followed instructions and had good manual coordination and skills.

    Working on a weekly payment basis rather than a contract, Nigel had the ability to walk away if he needed to, but after a successful first week levelling the site they both realised they would be able to work together well.

    They also found that their different skills complemented each other well. Where Ajay’s knowledge of the parts and the process was lacking, her admin and communication skills helped take what was in Nigel’s head and translate it into something that she could work from.

    Breaking the jobs down makes the whole process less overwhelming

    Nigel explains that looking at the entire job and thinking about what needs doing can actually be pretty overwhelming. He tries to keep things more simple by breaking each job down into smaller parts. That way the focus only ever has to be on those few things that are needed over a short time span.

    Doing it yourself gives you control over the quality

    Having been to see a different PH15 house, Nigel was confident about the timber frame aspect and getting it level on the slab. Moving forward they may get an electrician and possibly a decorator in, but the rest of the work they are keen to do themselves. This includes the MVHR and all the taping and joining because they are so aware of the importance of getting it right for the airtightness.

    Ajay and Nigel have found a happy balance in what they each need to control based on their individual skills, without controlling each other. While Nigel is in control of the job, he’s also answerable to Ajay’s quality control. This method has worked for them and hasn’t caused any conflict.

    Nigel’s tips for anyone else in a similar situation would be around communication: listening to each other and knowing your boundaries on what to say and when.

    Quality hasn’t been compromised by the cost savings

    Taking on the role of labourer and project manager has obviously been a cost saving for Ajay, and by taking jobs like sweeping up and placing orders away from Nigel, it means his time can be spent more productively.

    Having a relative novice alongside and working out things like the airtightness has meant that the speed of work has sometimes been slower than on his other jobs. However the quality hasn’t been compromised, with architect and co-creator of the PH15 system, Jae Cotterell, crediting the workmanship being of very high quality and better than a lot of professionals.

    It’s physically very demanding

    Nigel believes that sweat equity can work whether it is a PH15, masonry or other build system.

    “I don’t think it matters on the style or the type of building. It’s just really if you’re prepared to work, properly work. Because I don’t think a lot of people really work that hard when it comes to physical.”

    But doing it themselves has allowed an element of flexibility when it comes to working hours and fitting in around school runs and other responsibilities.

    They are not working to a programme

    Nigel is used to working to a programme, so not having one on this project has been one of the hardest things for him to adjust to. He is used to setting an ambitious timeline in order to keep the labourers motivated.

    “On previous jobs, you can burn your labourers up quite quickly and they become unmotivated and they leave pretty quick. So, you’ve got to really manage their physical abilities, your own physical abilities, and so you kind of have to let the job lead you in that way really. And knowing when that is going to be a physical effort, a mental effort, a slow part of the job.”

    It’s more about the process than the end result

    With a few months left on the project, Ajay is relaxed about how the house will turn out. For her, the greatest satisfaction is the process of making it, though the air quality and comfort that comes with it being a Passivhaus is something she is particularly looking forward to.

    Passivhaus Workshop

    If you’re new to Passivhaus and want to find out more about it, then check out the National Self Build and Renovation Centre in Swindon which is running regular workshops. There will be explanations of the key principles along with case studies and demonstrations.

    Find out more

    Visit the website of Nigel’s South Downs Eco Homes

    Find Nigel on Facebook

    Read more about the PH15 build system

    Transcript

    Please connect with us

    Subscribe, rate and review us on Apple Podcasts

    Like our Facebook page

    Follow Ben Adam-Smith on Bluesky

  • HPH233 : How to choose a construction system for a house build – with Mike Hardwick

    HPH233 : How to choose a construction system for a house build – with Mike Hardwick

    Self build consultant, Mike Hardwick, explains the pros and cons of different construction systems.

    Interview with Mike Hardwick

    Mike hasn’t followed a typical path into the industry. He actually worked in the RAF for 26 years, and with all the different postings came many different house moves for him and his family. Deciding to settle in one place they selected a location (based in the middle of where possible future postings could potentially be), bought a plot of land and built their own home.

    Mike often found himself propping up the bar in the Officers’ Mess answering questions about how to build your own home. When he came out of the Services in 2005, he realised that what he would really like to do was get more people interested in building their own homes, and at that point decided to make a business from it.

    The first series of Grand Designs – copyright Channel 4

    Mike’s house build coincided with the first series of Grand Designs

    They bought the land for their self build in 1999, got planning permission in 2000 and in 2002 were able to move in. Doing the build in parallel with the first episodes of Grand Designs often left them able to empathise with the self-builders, pick up a few tips or wonder why they were doing things a certain way.

    Mike credits Grand Designs for redefining the scope of self build, making people realise that it doesn’t have to just be for the very wealthy. Although he does concede that the TV programme “Sensible Couple with Reasonable Budget Build Modest House On-time and On-budget with a Competent Builder” is never going to get commissioned!

    A build system is the structural element of the house

    That is, what it is built from and held up by. “And the confusing bit with a build system is that just because what’s on the outside of a house looks like maybe a brick, it doesn’t necessarily mean that it’s a house made out of bricks structurally.” Most, but not all, houses in the UK are built with a twin-leaf construction, where the inner leaf does the supporting work and the outer leaf makes it look pretty, with timber, brick, tiles etc.

    As well as holding up the structure of the house and being the main material used in the construction, it is what the services run through and are bolted to.

    As such, getting the right system for you is going to be an important decision to make, and generally it’s entirely your choice. Because the building system you use doesn’t usually dictate the external appearance, the planners aren’t interested. So as long as Building Control are happy that it will comply with regulations then you are free to choose.

    Price comparisons aren’t straight forward

    Mike explains that people will always ask him which system is the most cost effective, but drawing a price comparison is actually quite difficult. He does say that there is a fairly narrow band of cost when it comes to the different build systems, and what influences the price most is actually the detailing and the finishes that go on inside.

    What really hikes the price is when you trade in the materials for speed of construction, such as with houses that are pre-fabricated and then erected on site in a matter of days.

    Masonry construction

    Mortgage companies for example will typically ask whether the house you’re buying is of masonry construction with a tiled roof. They like it because it has substance to it, it’s a safe thing to invest against, and will be appealing to potential future purchasers.

    “It’s the way that we’ve trained our builders, it’s the way we’ve been conditioned to think about how houses work, and it’s what we fall back to. So, they’re easier to insure, they’re easier to mortgage against and they’re easier to sell. Which is why people still do it.”

    If you’re working to a modest budget, then using brick and block is generally at the lower end of the cost spectrum, so is likely to be a baseline for constructing your own home. They are quick and easy to build, relatively cheap to buy, and are easy to handle and cut up. They tick the boxes for mortgage companies, insurers and builders.

    Other positives are the strength they provide, that you can put beam and block floors in. The thermal mass provides a stable temperature throughout the house, and the masonry affords you flexibility of design. You can build just about anything you want in masonry, and combined with steels can give you large, open spans.

    Traditional breeze blocks were made out of cement covered cinder. Modern blocks are lightweight and made from pulverised fuel ash, so the detritus from a coal-fired power station mixed with resin and turned into a block. The aerated middle traps air and provides insulation, and also makes them lighter.  In the UK there is currently a shortage as there aren’t many coal-fired power stations remaining, so the raw materials have to be imported.

    Timber frame

    Timber frame basically replaces that breeze block element with a structural framework of timber. It is associated with being environmentally friendly, high quality, accurate off-site manufacture. It is efficient, effective and with the speed of construction it makes for an attractive proposition.

    Whereas masonry has high embodied carbon in the manufacture, timber frame is carbon neutral in that you plant a tree, chop it down and plant another tree. Timber is also a flexible material in that you can build the walls, ceilings, floors, windows, doors, stairs etc from it.

    Mike is keen to point out to people who worry that building a timber frame system might suffer from problems such as termites or rot, that probably around 65% of what we would call a masonry house is actually made from timber anyway, being the roof trusses, stairs, skirtings and so on.

    Mike concedes that, if pressed, he would say timber frame is probably the cheapest way of building the structure of the house. But that would only be if you were doing the most economical and basic timber frame with no frills, and without doing anything to attenuate the acoustics. Most self-builders would want to go above and beyond building regulations and put in good sound-deadening insulation to minimise noise transmitting through the house. When taking into account the extra money on the sound-proofing, you are probably then looking at a more expensive path than masonry.

    “Now, if you want the environmental stuff but you don’t want a lot of noise transmission, timber frame with noise attenuation is a good thing but it’s going to cost you more than it will for a masonry house straight out of the box. This is where you need to start doing your homework and making your calculations about what you actually want, how you’re going to live your life, and what you’re trying to get from the home that you’re building.”

    The thing to remember with timber frame is that it will last well as long as the moisture content in the structure is kept to a minimum, and allowed to escape so that it doesn’t build up. On the inside of the house behind the plasterboard there will be a non-breathable, vapour control layer. This stops any moisture occurring inside the property from getting into the structure. On the external wall, underneath the render or brickwork, is a breathable membrane, allowing any moisture that does get inside to find a way out.

    Insulated Concrete Formwork (ICF)

    These are a type of fire retardant polystyrene foam block. They fit together to create a solid outer wall and a solid inner wall, with the gap in the middle being filled with poured concrete. When the concrete sets and cures, you end up with a waterproof, insulated, monolithic wall which is highly insulated, highly airtight and with the strength and density of a masonry wall. This makes it popular for people building to the Passivhaus standard.

    It also benefits from being very quick to construct, you don’t need to be too skilled to put it together, and being waterproof is a good choice for flood-prone areas.

    Some people aren’t keen on this method because of the perceived embodied carbon being quite high. In reality, Mike says, they are mostly made of air with very little actual structure to them. There are other alternatives, such as Durisol blocks which are much the same in principle but use chopped up timber instead of the polystyrene foam as the insulant.

    Although there is a lot of concrete used, Mike suggests thinking about the amount of energy that the structure saves straight away with its high levels of airtightness and thermal performance.

    It is worth thinking about future use, as putting in more doors or windows for example at a later date is going to be very difficult. Also perhaps a marine ply or a Thermacell type board is advisable for indoors when there might be considerable weight such as cupboards or TVs to be hung from them.

    Structurally Insulated Panels (SIPs)

    These are manufactured off-site and built of two oriented strand board (OSB) sheets that are filled with expanded urethane insulation foam. The panels can be cut, shaped and fixed to other panels to make a complete housing structure. They tend to be accurate, airtight, watertight and put up on site very quickly.

    If you were thinking of using this building method, you would take your designs to a SIPs company whose CAD systems would create the plans to feed into the machines that produce the panels to millimetre perfection. These panels work with the other panels around them, and can even have steelwork in there for covering large spans, to give the structural integrity to the house.

    Mike explains how the success of a masonry constructed home is very dependent on the quality and skill of the bricklayer. With ICF it’s harder to go wrong, as the panels are designed to fit together at 90 degrees, meaning the walls are going to be straight and it will be easier for fitting out afterwards.

    One drawback is that you can’t later decide to move things about or add doors or windows because the structural integrity will be compromised.

    “The advice I would give to anyone contemplating building in SIPs is to spend a really long time thinking about what you want and what’s going to go into your house, and the design of your house, and then say, ‘that’s it, no more changes. We’re happy with this. Go and provide this house.’ Because once it goes into the computer and they pull the handle, then that’s what you’re going to get. If you suddenly say, ‘about that wall there, can we have another one here or another window here? Can we have that door moved to the left?’ that’s going to be expensive, it’s time consuming, you’ve got to start again and recalculate the whole thing in the worst cases.”

    In terms of cost, Mike says ICF and SIPs used to have roughly a 10% premium on them because there were new factories to be paid for, but as they are becoming more common-place the prices are more competitive. Some manufacturers are even assuring that they can produce a house for about the same cost as brick and block.

    Straw bale

    Previously seen as something you wouldn’t consider for mainstream building, nowadays the increased focus on energy efficiency, natural materials and environmentally conscious building has given straw a greater appeal. Mike explains that structural straw bales, as opposed to ones you would buy direct from a farmer, are processed and compacted to form dense blocks.

    “When you encapsulate this within a lime water and plaster that you would normally be using with this build, you’ve got something which has got no oxygen. So, it doesn’t catch fire. It doesn’t. It’s just a really good carbon neutral method, environmentally friendly way of getting all that insulated wall which looks really good as well.”

    Straw bales do mean that you end up with thick walls, but for some people that is a positive feature. The deep window and door reveals combined with the lime plaster make it look and feel like a solid house with a natural, rustic feel.

    Mike concedes that some mainstream lenders and insurance companies might not be keen to deal with these, but others like the Ecology Building Society see the benefits and will lend against them.

    Prefabricated system builds

    Most of these factories tend to be in continental Europe where the prefabricated kit is made and then brought to your plot to be assembled. This method probably won’t suit those on a smaller budget but for projects on a grander scale, or at least a grander budget, they will be rewarded with superb, quality finishes.

    “And for those people who want to be hands-off with the self-build rather than actually getting involved and really worrying about how the bricks go and how the timber frame is constructed, they can sit back and basically say, ‘here’s the house I want. Build me one of those. Here’s where I want it.’ And somebody else goes and does it for you. You pay for the privilege of doing that, but the stress levels are going to be a lot lower than somebody who’s actually project managing their own build all the way through.”

    Again, this is a system where decisions need to be made up front as any changes later are going to be extremely costly.

    Steel frame

    A steel frame self build house wouldn’t be commonplace in the UK. They tend to be more popular in warmer climates. If you have a steel structured house and are trying to stop cold-bridging then you’re starting from a losing position.

    However, recent changes in planning regulations, where permitted development allows people to take farm buildings and convert them into residential dwellings with less of the hassle, has made extensions and renovations of steel-framed farm buildings more common.

    Thin joint

    The masonry industry has recognised some of the problems of building with blocks (weather dependent, speed of construction, reliant on quality of the builder) and come up with a variation on the masonry theme called Thin Join. They use over-size versions of the cinder blocks and instead of using a 10mm sand and cement mortar base, they are held together with a type of glue adhesive.

    “But by taking out things like the mortar bed, you’re taking out two things. One is a passage for air to get through, and when air can get through, noise can get through. So, by taking that mortar bed out, you’re putting better airtightness into it, putting more insulation into the wall and you’re taking away some of the need for skilled construction to put it together”.

    It’s also a cleaner system, using a bucket of adhesive instead of having piles of sand and cement spreading around the site.

    Which system to use depends on what is right for your circumstances

    “So, if low cost is your priority then you need to be looking at the traditional masonry or the timber frame setup. If you’ve got family and you want a bit of peace and quiet, you want some separation of noise, acoustic attenuation, then the masonry end is probably the way you want to be looking at.

    If you want energy efficient, you’re environmentally aware, then you want high efficiency and low running costs. Then timber frame is probably where I’d be looking at. That’s at the lower end of the spectrum on there.

    And as you go up the performance scale, that’s when I’d start looking at the ICFs and the SIPs panels. They might cost you a little bit more to build but again, there’s a trade-off there against the cost of the materials and you need less labour to put it all together.

    At the very top end, if you really are a hands-off builder and you want the sort of quality which just comes with that continental standard, then these system builds that we spoke about, hand over the money and let these guys come and build it. You’ll have a house which will be good enough to feature in the magazines. But you will pay for that privilege.”

    Additional resources

    Build It Magazine

    NaCSBA

    National Self Build & Renovation Centre

    Transcript

    Download a transcript of the interview with Mike Hardwick.