  • HPH151 : When does it make sense to demolish and rebuild? – with Janet Cotterell

    HPH151 : When does it make sense to demolish and rebuild? – with Janet Cotterell

    Architect Janet Cotterell explains why her Buckinghamshire Passivhaus clients changed their minds about refurbishing, and have instead opted to demolish and rebuild.

    Janet Cotterell

     

    Interview with Janet Cotterell

    We spoke with Janet in podcast episode 121 about the kit and system methods of building a Passivhaus. One of her latest projects, Buckinghamshire Passivhaus, uses the PH15 system that she has been developing, and we are following its progress in The Hub. We have taken the opportunity to find out more about the scheme and understand why her clients have decided to knock down the house that they had originally intended to refurbish, and instead build from scratch.

     

    It was originally intended to refurbish the existing dwelling to Passivhaus standard

    Janet explains that the existing dwelling is not particularly attractive, but it is on a very attractive site of around an acre. Her clients originally wanted to retrofit the property to the full Passivhaus standard, so this formed the basis of the first scheme that Janet produced. This initial study looked at how they could adapt it and give them the accommodation that they required. While the accommodation element worked for them, they realised that the complexities of dealing with the existing fabric meant that costs could be better controlled and without the need to make any compromises if they decided to build a new house instead.

    house-front

    dsc_0047

    “And there is always the issue about replacing a house that isn’t at totally the end of its life, but my feeling is it’s so invasive doing a retrofit in any case that the fact that you are then replacing it and building something that will last for a very, very long time, my own position is that generally I would go for replacement dwelling unless there was some particular architectural reason.”

    Another contributing factor in the decision was that being a new build they would be able to claim back the 20% VAT – a considerable economic benefit over a refurbishment.

    proposed-house-elevationsjpg_page1
    Proposed elevations

     

    The brief gave the architect plenty of flexibility in designing the outside spaces

    While the clients had firm ideas about the accommodation they wanted inside the house, they were happy to leave much of the aesthetics and external design to Janet. She has focussed on maximising the best features of the plot by making the most of the sun and the beautiful views. The house will be built in the centre of the plot to maximise the views, and divide the space up to create different sections which will each be treated slightly differently. The design incorporates a long brick wall leading to the house which creates the separation of public and private spaces, and will give a courtyard type feel.

    The external finishes of the house are determined largely by the local council design guide, but Janet was also happy to take on the challenge of creating a Passivhaus which still has the look of a traditional UK home.

    Basement Plan
    Basement Plan
    Ground floor plan
    Ground floor plan
    First floor plan
    First floor plan

    The Passivhaus construction system being used should help bring Passivhaus to more affordable levels

    The aim of Passivhaus Homes is to create a timber frame, Passivhaus compliant, solution, with details that can be passed on to other people. They have created a package of details which they have been tweaking as they go, and believe they are now at the point where most of it is working successfully. Their intention is that if you were to use their timber frame system, and built it in a certain way, the thermal bridge details would already be proved to work. By making this simplification and having standard details already done, it should save considerable money for the client.

     

    The timber frame will arrive as a puzzle of pieces!

    The pieces are being cut off-site by Passivhaus Homes and then delivered to be assembled by contractors at the plot. For Buckinghamshire Passivhaus there are likely to be around 500-600 pieces. The cutting machine they use is able to work out the most economical way of cutting all the pieces with the least amount of waste possible.

    Buckinghamshire Passivhaus timber frame
    Buckinghamshire Passivhaus timber frame – the timber portal frame design with ply plates inserted at eaves and ridge to join the different I-joists together

     

    However, rather than delivering a pile of pieces in one go, they also need to work out a system of delivering them to the builder so they can be unpacked in an order which will make sense, and only need to be unpacked when required. While this does end up creating a little more waste, it is still considerably less than the amount that would usually be generated on site. And with the waste being created at the factory, they are able to ensure it is properly recycled.

    dsc_0067

    dsc_0062

    We’ll be returning to speak to Janet about how the build is going, but you can also follow its progress in The Hub with regular video updates.

     

    Other examples of the PH15 timber frame system

    The orange colour are LVL’s (laminated veneered lumber) which are structurally quite strong, so are used for larger beams. The orange is a coating they put on to give a bit more moisture protection to avoid swelling on site should the contractor allow them to get saturated! The blue is a special insulated triangular lintel which is made up (and delivered ready made to site) to allow the windows to sit right up against the eaves without creating a terrible thermal bridge.

    Akerman Project
    Akerman Project – three terrace houses
    Tring project
    Tring project – detached three bed house

     

    Find out more

    Visit the website of Passivhaus Homes

    Visit the website of CTT Sustainable Architecture

    Follow Passivhaus Homes on Twitter

     

    Transcript

    Download a transcript of the interview with Janet Cotterell.

     

    The Hub update

    If you’re a Hub member you can watch the videos of the build as progress continues.

    If you’re not yet a Hub member and would like to find out more information, you can watch our short video which explains what it’s all about.

     

    Passivhaus Explained

    Here at Regen Media we recently produced a video for Architype, who wanted to create a training / induction aid to help newcomers understand what Passivhaus at Wilkinson School is all about. A big thank you to the four young stars of the piece who we think you’ll agree explain Passivhaus brilliantly!

    Please connect with me

  • HPH144 : What do you do when you can’t find land?

    HPH144 : What do you do when you can’t find land?

    Three self-builders explain their next steps after struggling to find land upon which to build their new homes.

    Interview with Corrine Mitchell

    IMG_4340

    Corrine and her husband first entertained the idea of a self build back in 2005, but put their first offer in on a plot in 2008. The site proved to be problematic with electricity cables running overhead, and they eventually pulled out. It wasn’t until 2013, when they became aware of Graven Hill, that they had finances in place and thought there was a real opportunity. The intention was to use finances in the bank to pay for the land and sell their existing property to cover the costs of the build. They eventually decided that the Graven Hill development wouldn’t be right for them; they wanted to get away from living on an estate, particularly one that could be a building site for the next decade, and it didn’t seem easily suited to building to Passivhaus standard.

    The biggest challenges to finding land in their area have been the high cost and sites ideal for a small house with a garden, garage and workshop, being bought by developers to put two dwellings on. Corrine has also found that local land tends to be sold by sealed bids, a system which she feels disadvantaged and frustrated by.

    Corrine has learned many lessons from her experience of looking for land. The main one has been how to appraise a site: looking for additional factors that might affect the cost and be problematic, and in future if she found a site without planning permission, she would probably hire a planning consultant. She sees her chances of finding land in the future as relying on word of mouth, getting in before anyone else hears about a plot. Eventually Corrine expects that they might move away from the area to where land is at a price that they are happier to pay, but for the time being she wants to remain local to where their friends and lives currently are.

    Corrine’s advice to anyone else looking for land is to be prepared for it to be a time intensive task. You really need to put the work in, registering with estate agents and ringing them all every two or three weeks to see if there’s anything new available.

    “Google Earth does come in very handy. You can walk down roads, have a look around, look at what’s nearby. But when you get there often it’s a bit different to what you expect so you’ve got to go and do the research and you’ve got to go and have a good look. Especially for the issues that might cost you money when you come to build.”

    Land searches for Corrine and her husband are currently on hold while they take on a renovation project instead. They have bought a small terraced house and are taking their time to do it up, using it as a chance to gain valuable experience that they can eventually put into a self build.

    P1100174

    Despite the renovation project, Corrine is still keeping one eye open for land opportunities and says that hopefully next year they will have finished the works, can sell up and start looking for land seriously once again.

    Interview with Nigel Banks

    IMG_1043

    Nigel Banks lives in Leeds with his wife and two children and has had challenges finding a suitable plot within an existing established urban area. Initially he was looking for self build plots in a fairly wide area, but eventually decided to narrow it down to within two miles of their eldest son’s primary school.

    Largely using Google Maps, cycling and walking the streets, they found two or three potentially viable plots. They approached the Diocese of Leeds, who they discovered were the owners of one plot, only to be told they already had plans for it. These plans, Nigel later discovered, involved an application for 14 houses! Another plot they were interested in ultimately had plans for six flats, offices and basement parking, whereas Nigel had just intended to put on a single house with a small garden.

    After two years of searching, Nigel decided to instead build a Passivhaus office in his back garden. Shortly after he started digging the foundations his wife came across a Victorian house, around half a mile away, in need of major renovation. They realised they could refurbish it to near Passivhaus standard and moved in a year ago.

    Had they not gone down the refurbishment route, Nigel thinks one option he might have pursued would have been trying to find other like-minded people locally to set up a cohousing project.

    Having invested a huge amount of time and energy into their new project, and being fairly happy and settled where they now are, Nigel has shelved plans to try and self build. He emphasises however that the dream to build his own home is still there, though it may be another 15 or 20 years before that can become a reality.

    Triple glazed sliding sash windows from Green Building Store 34

    Interview with Rob Rickey

    IMG_2071

    After taking a course in Environmental Design at Cardiff University and later the Passivhaus Designer course, Rob was keen to live in a low energy home.

    They wanted to stay close to their existing community where all their friends lived. This limited the search area and meant that they really only saw a handful of opportunities. One was a barn conversion with planning permission, but this was reflected in the price! They also considered developing another site that had planning permission for four dwellings. By selling or renting three they could fund their own build. However, the location wouldn’t have been that quiet as it backed onto a school.

    Ultimately they decided they couldn’t afford it and so they looked for a property to retrofit. This was much easier as dozens of opportunities came onto the market each week.

    Rob says he’s quite happy in his retrofitted home – where he’s reduced his gas usage by 75% – and has no desire to self build! He can get his fix from his work, designing houses for other people.

    IMG_1228

    Find out more

    Follow Nigel Banks on Twitter

    Visit the website of Rob Rickey Design

    Please connect with us

    Subscribe, rate and review us on Apple Podcasts

    Like our Facebook page

    Follow Ben Adam-Smith on Bluesky

  • HPH105 : How Far Should You Go with a Low Energy Retrofit? – with Bob Prewett from Prewett Bizley Architects

    HPH105 : How Far Should You Go with a Low Energy Retrofit? – with Bob Prewett from Prewett Bizley Architects

    Bob Prewett, a director of Prewett Bizley Architects, shares his approach to low energy retrofits and explains why he sets energy targets on a project by project basis.

    Bob Prewett

     

    Interview with Bob Prewett

    Prewett Bizley Architects specialises in low energy architecture and Bob has a particular interest in retrofit. He explains that housing is responsible for around 27% of the UK’s carbon emissions, so buildings of all ages and styles have a part to play in terms of energy efficiency.

     

    There is a Distinction Between Retrofit and Renovation

    Bob’s partner, Marion Baeli, defines renovation as being smartening things up to make them look good and dealing with the top 3mm of construction. Retrofit on the other hand is about getting under the skin of things and sorting them out at a fundamental, architectural and building physics level.

    Residential-Retrofit-Front-Cover

    What to Consider when Commencing a Retrofit Project:

    • Get advice at an early stage
    • Create a whole house plan which identifies where the energy savings might be, along with the risks associated with tackling them, and how these might be actioned
    • Form a clear strategy of how these will be dealt with, either all at once or as stages over an extended period
    • Be aware that there is no ‘one size fits all’ when it comes to retrofit.

    “It’s not for the faint hearted, either in spirit or in finance”

     

    “Understanding What the Quality of the Building is and Then Designing and Planning Very Carefully to Not Upset That Balance”

    Bob is concerned by evidence of the careless nature of works being carried out to some buildings which, with moisture being allowed in and then trapped, can actually be causing damage. He looks at the example set by Germany on the other hand which takes a more considered approach, doing gradual, quality improvements over time, instead of trying to do multiple houses quickly and cheaply.

    “Germany still have a confidence about the future and progress and a belief that just doing things well now is an investment for tomorrow. “

     

    “We’re Interested in Taking the Building to Where it’s Going to Sit Happily”

    Rather than starting off with a target value in mind, Bob believes that it is important to understand the building as a whole and take it to where it’s going to sit comfortably, and not push it too hard. Some buildings will get to a U-value of better than 0.15 or 15kWh per square metre relatively easily, but for others, such as historic solid wall construction, they are probably not going to want to go there. Bob explains that they are interested in taking the building to where it sits happily, even if those values are a little higher. He would expect most buildings that don’t have insulation or good quality windows to easily achieve a 60% energy reduction, and perhaps even going up to 90% in some cases.

    Significant energy savings will be achieved by using a holistic approach to deal with insulation, airtightness, cold bridges, windows, walls, roofs and floors. It is important to understand the building and how these elements interact and work together.

    “Some buildings will be predisposed to very high energy savings, some will be predisposed to doing a bit less.”

     

    Be Strategic About What You Purchase if You’re Actively Looking to Retrofit

    Bob has purchased a 1960s small terrace house which should leave them with enough money left over to do a good retrofit. He deliberately decided against listed properties and those with planning restrictions as he felt it would be a higher risk approach with energy savings being more difficult to achieve.

    They intend to take advantage while the roof on this property is being done to pass brushes between the cavity walls and give them a good clear out before adding cavity wall insulation.

    Changes being made to the roof at Bob's own house
    Changes being made to the roof at Bob’s own house

     

    Internal wall insulation and airtightness measures
    Internal wall insulation and airtightness measures

     

    New light slot
    New light slot

     

    Airtightness results of 0.6
    Airtightness results of 0.6

     

    Carefully Consider Your Insulation Options

    External Insulation – This can seem like the most simple option. There is potentially very little disruption and you are likely to be able to continue living there while the work is being carried out. You’re cloaking the building, keeping it warm and dry and therefore less likely to suffer moisture problems. The biggest drawback is that it completely transforms the building architecturally, which may not be to yours or the planners liking. In terraced houses you can end up with cold bridges left over through party walls.

    Internal Wall Insulation – This has the benefit that it does not have an impact externally so there aren’t the same planning issues as above. There will be far greater disruption inside however and possibly not be in a livable state. The process can be quite slow and be impacted by various pipes, electrics and other services. There are also cold bridge issues when getting to things like window junctions.

    Cavity Wall Insulation – If you have cavity walls then filling them can be a good option. Bob however advises caution and not always accepting the claims of the installer that it is suitable for the wall, without following up with further questioning. There may be some situations, such as bad pointing or a coastal property with porous bricks, where it might not be an appropriate choice.

     

    The 80% House was a Defining Project

    This was one of Prewett Bizley Architects’ first deep retrofit projects. The client wanted excellence and was prepared to pay to achieve it. During the closing stages of the project, in an extremely hostile winter and before the heating system had been commissioned, Bob would visit the house which maintained a temperature of around 18 degrees. Even though the systems weren’t all running, he was struck by the quality of the environment. Even leaving aside the benefits of energy efficiency, it was the feeling of the house that made a huge and defining impact on him and was the reason why they continue doing these kinds of projects.

    80% House
    80% House

    Hackney 80 per cent house drawing

    Hackney 80 per cent house living room

    Specific Heat Demand
    Specific Heat Demand

    Year 1 Gas Results
    Year 1 Gas Results

    “If you do it really well you just get this amazing quality of environment as a backdrop to our life.”

     

    Find Out More

    PBa logo

     

     

     

     

     

     

    Transcript

    Download a transcript of the interview with Bob Prewett.

     

    International Passive House Days

    As Bob Prewett explains, it’s really about the feel of the house and the quality of the environment, which is why the International Passive House Days are the ideal opportunity to experience it for yourself. Each year Passive House residents fling open their doors and invite people in to have a look around and ask questions. This year they will be taking place around the world on 13-15 November 2015. Keep an eye on the International Passive House Association website to find out which buildings near you will be open to view.