Tag: PH15

  • HPH328 : Insulating internally with a thin layer of wood fibre board – with Martin Twamley from Steico

    HPH328 : Insulating internally with a thin layer of wood fibre board – with Martin Twamley from Steico

    Martin Twamley from Steico explains how to use breathable internal insulation, while avoiding the risks of condensation and mould.

    Interview with Martin Twamley

    Martin Twamley is Technical Director of Steico UK. Steico have been producing timber-based materials, predominantly structural timber and insulation materials, since the 1960s and selling them across Europe. Using only pine and spruce they make a number of different products, and will always provide guidance as to what the correct product would be for the required application.

    “Once people start using timber and understanding it, it’s a sort of material that you fall in love with, and you then change your building process.”

    The products have low embodied energy

    Structural products like I-joists were first used in the USA and the motivation was that it was the most sensible use of the raw material. However, as a natural material and one that goes through little processing it also has a low embodied energy, and will even lock up carbon.

    Laminating the veneers strengthens the product

    The I-joists are created from Laminated Veneer Lumber. They are made by peeling a tree, creating 3mm veneers, and then bonding them back together. This means that individual weaknesses are removed and spread across the whole product. The strength-to-weight ratio on engineered timber is then much greater than it is for solid section timber as you’re getting a much stronger product for less raw material.

    There is very little manufacturing waste

    Martin explains that the good thing about producing both structural and insulation products is that there is very little waste. For the structural timber they use the de-barking and peeling process. For the insulation materials they use chipping and milling. Therefore, what they can’t use for the structural timber they can use for the insulation. What they can’t use for the insulation they can use for producing their own pallets. And if they can’t use it for pallets they have a biomass power station where they can use it for electricity generation.

    UK housing stock has a need for internal insulation

    The UK housing stock is some of the oldest in Europe and is in desperate need of retrofitting. With a reluctance to insulate externally and change the appearance of this historic solid wall housing, internal insulation may be a better solution.

    The traditional way of doing this is with systems that try to block the moisture, rather than being able to control it. When you try to block moisture there can be an issue with getting it trapped inside the building instead. This potentially adds risk to the fabric of the building, because of mould and condensation problems.

    The Steico wood fibre internal insulation system allows water vapour in, controls it, holds it, and then lets it out again.

    Standard insulation installations are vapour closed

    These typically are the foil-backed polyurethane type materials that are either on a frame system or dot and dabbed onto brickwork. In theory they don’t let any moisture in, which is a good thing for the fabric. This can however lead to high moisture levels internally, so you might need to consider an MVHR for example. Mould will happen when warm air gets behind the plaster board and hits the cold wall surface. It might not even be until years later that the mould shows itself on the internal surface.

    “When people think about air quality, they generally think about external air, but we spend 90% of our time indoors. It’s the internal air that we’re breathing. So that’s what’s impacting our health.”

    These are the kinds of systems that tradespeople and DIYers are most likely to use, because they’re readily available. Also, homeowners are primarily just thinking about thermal performance in the winter. But actually, when you consider a holistic approach that takes into account all the possible issues, the material choice is incredibly important.

    Internal insulation doesn’t have to significantly impact on the room size

    Martin talks about applying a thin layer, typically an optimum amount of 40-60mm. Even in relatively small rooms that’s an amount that won’t really be noticed.

    What works for one building, won’t work for every building

    What works for one elevation of a building might not even work for a different elevation of the same building, because of different weathering exposure. This is why it is so important to have an assessment done, particularly if you’re looking for a really low U-value. Martin explains that generally speaking a 40mm or 60mm board on standard brick will work in the majority of situations.

    Take the wall system back to bare brickwork if possible

    The wall system should be as breathable as possible. That means that you don’t want anything on the internal side that hinders water vapour movement, such as impermeable layers, cement-based plasters and renders, and paint layers.

    The external face is also important to consider (such as renders and re-pointing), because this is where the majority of the water is coming from.

    With this natural, breathable approach, there is a full bonding layer (typically a lime based product) between the insulation and the wall. This is in contrast to a traditional approach that would have a cavity. The fact that there is no cavity means that there is no collection of liquid water, which is what leads to mould and condensation issues. Instead, any moisture is either passed onto the brickwork and out the front, or it can go back to the inside.

    Pay particular attention to the critical areas

    Window reveals are particularly important. If you have a warm wall surface, then the window reveal will be the coldest area. If you don’t insulate into that reveal then that is where all your condensation will form. Martin suggests that with a 40mm or 60mm on the wall, a 20mm board on the reveal will be fine.

    Another critical area that could be overlooked if somebody is insulating ground and first floor, is the void where the floor joists connect into the wall. These can be cold spots where condensation will be much more of an issue than it was before. To prevent this, you can tape around the junction of the joists to the existing wall. This stops the route for convected airflow into the wall.

    Where you have internal walls connecting with external walls can also be problem areas. If you’re insulating the external wall, then the corner of that internal junction can be quite cold. Steico make a wedge-type product of thinner insulation that can go into the corner to stop the condensation risk.

    There are useful resources available

    Martin makes reference to The Guide for Sustainable Renovation, by The Pebble Trust, as being a valuable resource for anyone taking on a retrofit project. It gives advice with a holistic approach that considers all of the moisture risks involved.

    The carbon storage element of materials is often overlooked

    A frustration for Martin is that in the UK he thinks we tend to be quite product agnostic. It is very much that if you achieve a certain performance level then it doesn’t matter what you use to to get there. He compares this with Bavaria, Germany, that has a new system brought in by local government. They are offering a 500 Euro grant for every cubic metre of biogenic carbon locked up within the fabric of the building. In the UK we have U-value targets, but nothing that looks at the amount of carbon stored within the fabric, or the type of material that is used.

    Find out more

    Visit the website of Steico

    Follow Steico UK on Twitter

    See Steico wood fibre insulation being used on Buckinghamshire Passivhaus (a PH15 project). Join The Hub to access our in-depth video case study.

    Please connect with us

    Subscribe, rate and review us on Apple Podcasts

    Rate and review the podcast on Stitcher

    Follow us on Facebook

    Follow us on Twitter

  • HPH320 : Precision-cut timber frames – with Antoine Costantini from Kithurst Homes

    HPH320 : Precision-cut timber frames – with Antoine Costantini from Kithurst Homes

    Antoine Costantini explains how Kithurst Homes has embraced modern cutting technology to increase efficiency and minimise waste.

    Interview with Antoine Costantini

    With a background in physics and trouble-shooting in the construction industry, Antoine has always loved working with timber. He explains that engineered timber is a great way of using the material responsibly and with less waste.

    There are 4 main types of engineered timber that Kithurst Homes use

    These are:

    • Laminated Veneer Lumber (LVL) – “Like a plywood on steroids”
    • KVH – Finger-jointed soft wood
    • Cross Laminated Timber (CLT) – A cross lamination of timber in opposing directions
    • Glulam – Soft wood glued together

    Automating the process is faster and produces less waste

    Previously they would use a large chop saw to cut frames by hand, which meant manually changing the direction each time a different angle was needed. This would get repetitive and there was the risk of human error so they looked for a way of automating the process.

    The Hundegger machine they now use is a five axis saw which enables them to make cuts at any angle and inclination. It has also reduced the time it takes to cut, mark and pack a 200 square metre frame from two and a half weeks, down to three hours! On top of this there’s now only 3% wastage.

    The Hundegger software reads and cuts from various file types

    One of Kithurst’s customers is Passivhaus Homes with their PH15 method of construction. They send over their completed BVX file of the timber frame design, which gives the machine all the information it needs.

    Get access to our in-depth video case study of Buckinghamshire Passivhaus, a PH15 build, in The Hub

    Kithurst Homes also work from DWGs or can convert a hand drawing into a 3D image that the saw will then read.

    The machine software creates a picking list

    This will tell the operator the amount of I-joists, glulams and LVL that will be needed. These are then manually placed in order of size and fed into the machine.

    The machine is clever enough to recognise the material that is being fed in, and will alert the user if the geometry of the material doesn’t match with what it has been asked to cut.

    Using I-joists is an efficient way of building

    They use less timber than a traditional stick frame approach, and also reduce cold bridges because of their size and geometry. They arrive at the factory in 13 metre lengths, with Antoine estimating that an average frame would use around one kilometre of I-joists.

    The combination of the web of the I-joist with incredible shear strength and the lamination of the flange gives the I joist its strength and load bearing capacity. The regularity of the timber makes it predictable, and that is a good thing in engineering. They know how it will react on strength, density, bending, modulus, and shear.

    If it’s not compostable or recyclable they won’t use it

    Once the timber has been cut, numbered and marked, it is packed together by wall. Steel bands are used to secure them, as these can then be recycled whereas the plastic alternatives can’t. They are then stacked and transported to site by curtain sided trucks. Once on-site there is no need for a skip, as everything fits and there is no wastage. This complies with the company ethos of trying to preserve the environment as much as possible, and not using PU or polystyrene foams for example.

    It just takes common sense and DIY skills to put it together!

    Kithurst Homes will always provide training, whether that be on site or at their factory, in how to construct the frame. With everything being marked, it’s a case of needing to be bound together, and Kithurst Homes provide all the fixings, the screws, the staples, the membranes, the plywood.

    Antoine says that anyone with good DIY skills can put together their flat pack systems. Some of the parts can be heavy so may need extra pairs of hands, but generally because the I-joists use so much less timber they can be quite manageable.

    Their full wall systems however require craning in and a team of carpenters to put together.

    All their timber is PEFC certified

    The timber comes from two or three manufacturers, with Steico in Germany being where they get their wood fibre insulation, LVL and I joists. It is fully certified to European regulations and Kithurst know their suppliers are using the timber properly, with everything on the tree being used and documented.

    Find out more

    Visit the website of Kithurst Homes

    Transcript

    Please connect with us

    Subscribe, rate and review us on Apple Podcasts

    Like our Facebook page

    Follow Ben Adam-Smith on Bluesky

  • HPH266 : How to invest sweat equity into a project while maintaining quality – with Ajay Boardman and Nigel Bowley

    HPH266 : How to invest sweat equity into a project while maintaining quality – with Ajay Boardman and Nigel Bowley

    Client Ajay Boardman and her builder/carpenter Nigel Bowley share their experience of working together on her self build project. In addition to project managing Ajay is labouring for Nigel. We look at why this relationship has worked well and consider how much money she is saving.

    Interview with Ajay Boardman and Nigel Bowley

    Ajay is building a 260m² Passivhaus in the South Downs National Park, using the PH15 build system. Having found Nigel Bowley to build the timber frame, it seemed natural that, being a practical person who didn’t have a job at the time, Ajay herself would take on the role of project manager and labourer.

    Parental support has been invaluable

    A big factor in Ajay being able to take on the project has been the support of her parents who live on a farm next to her and the site. Having plenty of experience helping her dad out with manual work on the farm has stood her in good stead for transferring her skills to the building project.

    Not only has her dad helped out with the labouring when she has needed a break or to concentrate on the project management side, but he also always has the right tools for the job. In addition, Ajay’s mum helping out with childcare has meant that Ajay has been able to put in the extra hours while still having the children close by.

    Nigel and Ajay quickly realised they would have a good working relationship

    A carpenter by trade since joining a YTS scheme in 1986, Nigel has had a varied career working on projects such as house building, extensions, internal renovations, roofing and some commercial work. He is equally used to working on his own or having a small number of sub-contractors and labourers alongside.

    From previous experience of working with labourers, Nigel had his doubts about how successful having Ajay and her dad work with him would be. However, Ajay soon demonstrated that she had a great interest in the building, listened, followed instructions and had good manual coordination and skills.

    Working on a weekly payment basis rather than a contract, Nigel had the ability to walk away if he needed to, but after a successful first week levelling the site they both realised they would be able to work together well.

    They also found that their different skills complemented each other well. Where Ajay’s knowledge of the parts and the process was lacking, her admin and communication skills helped take what was in Nigel’s head and translate it into something that she could work from.

    Breaking the jobs down makes the whole process less overwhelming

    Nigel explains that looking at the entire job and thinking about what needs doing can actually be pretty overwhelming. He tries to keep things more simple by breaking each job down into smaller parts. That way the focus only ever has to be on those few things that are needed over a short time span.

    Doing it yourself gives you control over the quality

    Having been to see a different PH15 house, Nigel was confident about the timber frame aspect and getting it level on the slab. Moving forward they may get an electrician and possibly a decorator in, but the rest of the work they are keen to do themselves. This includes the MVHR and all the taping and joining because they are so aware of the importance of getting it right for the airtightness.

    Ajay and Nigel have found a happy balance in what they each need to control based on their individual skills, without controlling each other. While Nigel is in control of the job, he’s also answerable to Ajay’s quality control. This method has worked for them and hasn’t caused any conflict.

    Nigel’s tips for anyone else in a similar situation would be around communication: listening to each other and knowing your boundaries on what to say and when.

    Quality hasn’t been compromised by the cost savings

    Taking on the role of labourer and project manager has obviously been a cost saving for Ajay, and by taking jobs like sweeping up and placing orders away from Nigel, it means his time can be spent more productively.

    Having a relative novice alongside and working out things like the airtightness has meant that the speed of work has sometimes been slower than on his other jobs. However the quality hasn’t been compromised, with architect and co-creator of the PH15 system, Jae Cotterell, crediting the workmanship being of very high quality and better than a lot of professionals.

    It’s physically very demanding

    Nigel believes that sweat equity can work whether it is a PH15, masonry or other build system.

    “I don’t think it matters on the style or the type of building. It’s just really if you’re prepared to work, properly work. Because I don’t think a lot of people really work that hard when it comes to physical.”

    But doing it themselves has allowed an element of flexibility when it comes to working hours and fitting in around school runs and other responsibilities.

    They are not working to a programme

    Nigel is used to working to a programme, so not having one on this project has been one of the hardest things for him to adjust to. He is used to setting an ambitious timeline in order to keep the labourers motivated.

    “On previous jobs, you can burn your labourers up quite quickly and they become unmotivated and they leave pretty quick. So, you’ve got to really manage their physical abilities, your own physical abilities, and so you kind of have to let the job lead you in that way really. And knowing when that is going to be a physical effort, a mental effort, a slow part of the job.”

    It’s more about the process than the end result

    With a few months left on the project, Ajay is relaxed about how the house will turn out. For her, the greatest satisfaction is the process of making it, though the air quality and comfort that comes with it being a Passivhaus is something she is particularly looking forward to.

    Passivhaus Workshop

    If you’re new to Passivhaus and want to find out more about it, then check out the National Self Build and Renovation Centre in Swindon which is running regular workshops. There will be explanations of the key principles along with case studies and demonstrations.

    Find out more

    Visit the website of Nigel’s South Downs Eco Homes

    Find Nigel on Facebook

    Read more about the PH15 build system

    Transcript

    Please connect with us

    Subscribe, rate and review us on Apple Podcasts

    Like our Facebook page

    Follow Ben Adam-Smith on Bluesky

  • HPH195 : What is cellulose insulation? – with Gordon Lewis

    HPH195 : What is cellulose insulation? – with Gordon Lewis

    Gordon Lewis explains what cellulose insulation is, how it’s applied and why self-builders can benefit from choosing it.

    Interview with Gordon Lewis

    Gordon Lewis has been involved with cellulose insulation for over 26 years. He mainly works installing Warmcel insulation into timber-framed properties.

    Choosing insulation material is important

    Cellulose became known as an insulation product in the early 1980s. Made from recycled newspaper, it is a highly sustainable product. The newspaper is milled down to make the fibres much smaller, then fire-retardants are added.

    Gordon admits that man-made insulation materials are likely to continue in the market but he is optimistic about the alternatives, saying, “Cellulose is slowly creeping back into the marketplace and doing a great job.”

    Paper use has declined but cellulose insulation is still available

    The growth in information technology has meant a decline in the availability of newspaper for recycling. Along with overhead costs, this has resulted in some factories closing. For example, Gordon’s former employer, Excel, the sole UK manufacturer of cellulose insulation, closed down in 2014.

    Sources of newspaper and cellulose insulation do still exist, however. There is one company in Ireland and there are many more manufacturers of cellulose on the continent. Gordon uses a brand called Warmcel, which is made by CIUR in the Czech Republic and shipped to the UK.

    Any timber-framed building can incorporate cellulose insulation

    Cellulose can be used for other build methods, but is ideally suited to timber frame buildings. Because it’s made from paper, it must be fitted in a way that avoids contact with any damp surfaces. There are a number of different materials that can make the “sandwich” containing the insulation; it might be rigid board on both sides, or one side could be a membrane.

    Different boards also have different thermal performances, so it is worth thoroughly researching all the materials involved. This includes speaking to people that have had properties built, architects, builders, or the installers. Gordon says, “Ask as many questions as you possibly can to get on the right foot, to say, ‘that’s the product that I need.’”

    Cost and quantity of insulation are based on location, depth and density

    In order to calculate cost and how much product is needed, Gordon considers where the cellulose insulation’s going, the depth of the space to be filled and the density required. Locations could include internal or external walls, floors, an attic space or a sloping ceiling. Gordon uses formulae to establish how much material is required for that particular build.

    Any moisture issues must be addressed prior to installation

    Generally, before any installation is carried out with cellulose, the building needs to be wind and watertight. Cellulose will dry up and cope with a certain amount of moisture, but not too much. For example a constant leak or rainwater continually getting in to the frame would cause problems. If the doors and windows are not in, those access areas can be masked off with polythene on both sides to stop rain being driven in. Gordon will look out for water or staining on boards from rainwater that may have dried up over a day or two. To inspect for damp before installing cellulose he might drill the wall and test by hand.

    Holes in the wall allow the insulation to be pumped in

    The cellulose needs to fill voids created by the timber frames and rigid boards, and there can be hundreds of them to find. Experience gives Gordon familiarity with typical frame kits so he knows the small gaps to watch out for, and how to access them. He can also identify them from the screw patterns, looking at the drawings, speaking to whoever fitted the boards, or even asking them to mark the boards showing whether or not there’s a gap. If there’s still any doubt, he may drill a small hole to check.

    Special sealing tape is used to maintain airtightness afterwards

    Once a hole has been cut to access each void, and the insulation pumped in, the core is sealed back over the board. To make it 100% airtight, the tape must have no creases. On the job where Gordon and Ben met, the PH15 build had close to 500 holes cut and repaired. The airtightness test showed below 0.01 air changes an hour at 50 Pascal; one of the best results recorded.

    After installation, moisture problems are rare and can be rectified

    In Gordon’s experience, once the insulation’s in, it’s there for the lifetime of the building. He comments, “As long as the fabric and the structure of the building is sound, it’ll be there forever and a day.” He has had few subsequent issues, maybe three or four over 26 years. He believes those failures arose because people didn’t understand the building needed to be wind and watertight.

    If mismanagement does result in a bad leak going into the insulation, it can be replaced once the building is watertight. Gordon explains, “We have to cut a large hole in the board, if it’s not too badly damaged, or the whole board is taken off, and then all that wet insulation is totally removed before it can be replaced.”

    Experience counts but self-builders can get involved

    While Gordon has a lot of expertise in his field he encourages keen self-builders to get involved, saying, “They can get to the point where they can actually install the insulation themselves, if they want.”

    When he’s been on jobs where self-builders have helped, Gordon has supervised everything and made sure the equipment is set up right. Gordon uses a Krendl machine that breaks up the fibre, and then blows it from an airlock through the hose to the delivery point. Knowing that each cavity is full enough is mostly down to experience, but there are tests to check the density and location.

    Cellulose insulation is gaining popularity

    Gordon sees a growth in using cellulose insulation in line with a wider increase in green building techniques. More people are demanding greener products and want the benefits of Warmcel or another cellulose product.

    He sees the market increasing slowly, saying, “People are looking to recycle as much as they possibly can. Whether it be the insulation, the boards, all sorts of things, and sourcing the material as locally as possible.”

     

    Find out more

    Visit the website of CIUR

    Transcript

    Download a transcript of the interview with Gordon Lewis

    Why the location of a self build is an eco consideration

    Ben Adam-Smith reflects on one aspect of his last house that he absolutely loved: its location. It was close to local amenities, and meant that Ben did a lot more walking and only needed one car for the whole family!

    Please connect with me

  • HPH183 : How to achieve an outstanding airtightness result

    HPH183 : How to achieve an outstanding airtightness result

    Buckinghamshire Passivhaus has become one of the most airtight buildings in the UK. As such, we consider what factors contributed towards their exceptional result of 0.08 air changes per hour at 50 Pascals.

    In this podcast we hear from key team members involved in the construction on this energy-efficient home.

    Buckinghamshire Passivhaus timber frame

    Following a PH15 build

    As luck would have it, this is actually our second in-depth video case study for The Hub (the first being Long Barrow).

    I’d got to know Janet Cotterell, author of The Passivhaus Handbook, quite well and been intrigued by the development of the PH15 system.

    So since autumn 2016 every week or so we have been filming progress on site. Now the building is watertight and ready for its preliminary airtightness test.

    The PH15 system aims to make Passivhaus affordable for everyone

    The Passivhaus Homes PH15 system has been developed over time to address many of the challenges of achieving Passivhaus standard.

    The system is manufactured off-site and delivered in packs as needed. With good carpentry skills, it is easy to assemble.

    We spoke to Janet about it in episode 121 – the pros and cons of building with a kit or system.

     

    A team effort helped them achieve an exceptional result

    It’s one thing using a ‘Passivhaus’ system to meet the standard, but an outstanding result like this is only possible with a team effort.

    At the heart of this is the relationship between client, architect and contractor.

    There also needs to be buy in from everyone on the team.

     

    Carpenter Wayne was determined to get an airtightness result of 0!

    Not satisfied with merely meeting the Passivhaus criteria, foreman Wayne Kempster from Jigsaw Construction set himself the ambitious target of achieving 0 air changes per hour at 50 Pascal!

    Despite being impossible Wayne wouldn’t aim for anything else.

    And let’s remember this is Wayne’s first ever attempt to build a Passivhaus.

     

    Air leakage expert Paul Jennings’ best ever result

    With 30 years of experience, Paul knows a thing or two about airtightness. In fact he was the key contributor for the House Planning Help documentary The Future of Housing.

    At Buckinghamshire Passivhaus he recorded a reading of 0.087 air changes per hour at 50 Pascals, his career best.

    Paul points to the PH15 system as well as the team for achieving this result. “Fundamentally it’s a very airtight system. You’ve got airtight boards, good tapes and quality control of people doing the works.”

     

    Simple detailing increases the likelihood of a good result

    Janet says: “If the detailing is complicated, however good the builder is, they’re going to struggle.”

    When it comes to sustainability it’s amazing how often simplicity comes into play.

    The PH15 system is designed in such a way that the airtightness layer is always easily identifiable.

     

    Training before construction is vital preparation

    Janet stresses that proper contractor training is essential in this process.

    While it doesn’t have to be a long session, it’s extremely valuable to see how the system comes together.

     

    The concrete basement contributes to this level of airtightness

    Glatthaar is one of the few basement companies to guarantee Passivhaus performance.

    Paul says: “Having the basement helps because you’ve got a concrete box which is going to be airtight, and it adds to the volume.”

    In episode 163 Andrew McInulty helped us understand what makes an effective basement.

     

    Everything coming together is the only way to get below 0.1

    Buckinghamshire Passivhaus has a simple form and is built with a simple system. Exceptional care has been taken during the construction. There’s a strong team with a lot of experience between them.

    Overall, everything has come together.

    Find out more

    Passivhaus Homes

    Jigsaw Construction

    Glatthaar

    Ready Made Basements

    Please connect with me

  • HPH151 : When does it make sense to demolish and rebuild? – with Janet Cotterell

    HPH151 : When does it make sense to demolish and rebuild? – with Janet Cotterell

    Architect Janet Cotterell explains why her Buckinghamshire Passivhaus clients changed their minds about refurbishing, and have instead opted to demolish and rebuild.

    Janet Cotterell

     

    Interview with Janet Cotterell

    We spoke with Janet in podcast episode 121 about the kit and system methods of building a Passivhaus. One of her latest projects, Buckinghamshire Passivhaus, uses the PH15 system that she has been developing, and we are following its progress in The Hub. We have taken the opportunity to find out more about the scheme and understand why her clients have decided to knock down the house that they had originally intended to refurbish, and instead build from scratch.

     

    It was originally intended to refurbish the existing dwelling to Passivhaus standard

    Janet explains that the existing dwelling is not particularly attractive, but it is on a very attractive site of around an acre. Her clients originally wanted to retrofit the property to the full Passivhaus standard, so this formed the basis of the first scheme that Janet produced. This initial study looked at how they could adapt it and give them the accommodation that they required. While the accommodation element worked for them, they realised that the complexities of dealing with the existing fabric meant that costs could be better controlled and without the need to make any compromises if they decided to build a new house instead.

    house-front

    dsc_0047

    “And there is always the issue about replacing a house that isn’t at totally the end of its life, but my feeling is it’s so invasive doing a retrofit in any case that the fact that you are then replacing it and building something that will last for a very, very long time, my own position is that generally I would go for replacement dwelling unless there was some particular architectural reason.”

    Another contributing factor in the decision was that being a new build they would be able to claim back the 20% VAT – a considerable economic benefit over a refurbishment.

    proposed-house-elevationsjpg_page1
    Proposed elevations

     

    The brief gave the architect plenty of flexibility in designing the outside spaces

    While the clients had firm ideas about the accommodation they wanted inside the house, they were happy to leave much of the aesthetics and external design to Janet. She has focussed on maximising the best features of the plot by making the most of the sun and the beautiful views. The house will be built in the centre of the plot to maximise the views, and divide the space up to create different sections which will each be treated slightly differently. The design incorporates a long brick wall leading to the house which creates the separation of public and private spaces, and will give a courtyard type feel.

    The external finishes of the house are determined largely by the local council design guide, but Janet was also happy to take on the challenge of creating a Passivhaus which still has the look of a traditional UK home.

    Basement Plan
    Basement Plan

    Ground floor plan
    Ground floor plan

    First floor plan
    First floor plan

    The Passivhaus construction system being used should help bring Passivhaus to more affordable levels

    The aim of Passivhaus Homes is to create a timber frame, Passivhaus compliant, solution, with details that can be passed on to other people. They have created a package of details which they have been tweaking as they go, and believe they are now at the point where most of it is working successfully. Their intention is that if you were to use their timber frame system, and built it in a certain way, the thermal bridge details would already be proved to work. By making this simplification and having standard details already done, it should save considerable money for the client.

     

    The timber frame will arrive as a puzzle of pieces!

    The pieces are being cut off-site by Passivhaus Homes and then delivered to be assembled by contractors at the plot. For Buckinghamshire Passivhaus there are likely to be around 500-600 pieces. The cutting machine they use is able to work out the most economical way of cutting all the pieces with the least amount of waste possible.

    Buckinghamshire Passivhaus timber frame
    Buckinghamshire Passivhaus timber frame – the timber portal frame design with ply plates inserted at eaves and ridge to join the different I-joists together

     

    However, rather than delivering a pile of pieces in one go, they also need to work out a system of delivering them to the builder so they can be unpacked in an order which will make sense, and only need to be unpacked when required. While this does end up creating a little more waste, it is still considerably less than the amount that would usually be generated on site. And with the waste being created at the factory, they are able to ensure it is properly recycled.

    dsc_0067

    dsc_0062

    We’ll be returning to speak to Janet about how the build is going, but you can also follow its progress in The Hub with regular video updates.

     

    Other examples of the PH15 timber frame system

    The orange colour are LVL’s (laminated veneered lumber) which are structurally quite strong, so are used for larger beams. The orange is a coating they put on to give a bit more moisture protection to avoid swelling on site should the contractor allow them to get saturated! The blue is a special insulated triangular lintel which is made up (and delivered ready made to site) to allow the windows to sit right up against the eaves without creating a terrible thermal bridge.

    Akerman Project
    Akerman Project – three terrace houses

    Tring project
    Tring project – detached three bed house

     

    Find out more

    Visit the website of Passivhaus Homes

    Visit the website of CTT Sustainable Architecture

    Follow Passivhaus Homes on Twitter

     

    Transcript

    Download a transcript of the interview with Janet Cotterell.

     

    The Hub update

    If you’re a Hub member you can watch the videos of the build as progress continues.

    If you’re not yet a Hub member and would like to find out more information, you can watch our short video which explains what it’s all about.

     

    Passivhaus Explained

    Here at Regen Media we recently produced a video for Architype, who wanted to create a training / induction aid to help newcomers understand what Passivhaus at Wilkinson School is all about. A big thank you to the four young stars of the piece who we think you’ll agree explain Passivhaus brilliantly!

    Please connect with me