Tag: Passivhaus Trust Awards

  • HPH326 : Is it worth upskilling your knowledge of Passivhaus? – with Simon Bell

    HPH326 : Is it worth upskilling your knowledge of Passivhaus? – with Simon Bell

    Landscape Architect and Director of HLM Architects, Simon Bell, explains why he decided to upskill when it came to building his own house.

    Interview with Simon Bell

    HLM Architects are an award-winning practice with offices in England, Ireland, Scotland and Wales. As a Director, Simon was familiar with one of the projects designed from their Glasgow studio – Tigh na Croit – and knew that he wanted the same architect (Ross Barrett, who is also a friend of his) to design his own home.

    Copyright HLM Architects

    A Passivhaus doesn’t need to be a simple box

    Something that Ross proved with the L-shaped design of Tigh na Croit, is that a Passivhaus doesn’t have to take on the simplest form. Yes, it can be at its most efficient as a straightforward box, but it is also possible to create buildings with architectural merit and beauty as well, it just might take a bit more effort to make the standard work.

    The panoramic beauty of the site created Passivhaus challenges

    Based in the centre of Northern Ireland, the stunning site is near a small village called Broughshane, close to Ballymena. They are up in the hills, with fantastic views to the east and west, and also panoramic views to the south. This meant they were always going to be faced with the challenge of balancing those out with solar gain, shading and window ratios, and is why they now have framed views of the landscape, rather than a huge expanse of panoramic glass.

    The value of an architect is to bring a different vision

    Having given Ross a brief around how they wanted to live in and use the house, it naturally lended itself to a long house type arrangement, which would have been far simpler from a Passivhaus perspective. With further design iterations they found that it wasn’t quite going to work as they would like. Ross then presented a new design where the walls weren’t parallel. It widened out as it got to the centre of the house, and then narrowed down at the ends. This was the design they decided to move forward with.

    He wanted to be an informed client

    Being the kind of person that likes to learn and understand how things work, and know the right questions to ask, when it came to the design and build of his own Passivhaus Simon was keen to develop his knowledge further. He took inspiration from Tomas O’Leary who had a similar background as a landscape architect, and has gone on to be internationally respected in Passivhaus circles with MosArt. This gave him the confidence to take on the Passivhaus Designer course himself, which he found to be intense and challenging, but also appealed to him with its methodical processes and attention to detail. Doing the course at the same time as working on the final stages of his own house design, meant that he was able to experiment in PHPP and take a lot more time to test things out for himself and understand the impacts that various changes made.

    Quality control and education became part of his on-site role

    In resisting his desire to be a hands-on self-builder (which he accepted fairly early on was going to be unrealistic if they wanted to be living in a house within 5 years!) Simon decided he wanted to take on the role of informed client, and work very closely with everyone on the team. Building through covid restrictions meant that he took on much more of the site role, as Ross wasn’t able to be present as often as he would have liked. Simon was able to educate everyone that came to work on the site about Passivhaus, and how things that seemed insignificant would actually be important to the overall performance of the finished building.

    Contractor attitude was more important than Passivhaus experience

    When it came to selecting a main contractor, they found that there was a very limited number that had Passivhaus experience. Instead, they focused on their attitude, attention to detail on other builds, and evidence of where they had gone above and beyond building regs before.

    They established a no-blame culture

    Due to the pandemic restrictions, Simon ended up being more hands-on that he had originally intended. Living nearby meant that he could visit the site daily and be there to highlight issues or anything that needed particular care. This included setting up a no-blame culture, so that if anything was damaged they would all be informed, affording the opportunity to rectify it, rather than having it covered up and becoming a bigger problem later on. The contractor responded well to this and had come into the project wanting to learn and understand, and deliver it to the best of their ability.

    Having a live project helped his understanding of the course

    Even with the Passivhaus training course, Simon found that so many things you just have to learn about on the job. This was true for him particularly around the detailing, and finding the optimum solution for a heating system.

    Trust in your consultants

    Although it isn’t necessary for clients to take the Passivhaus training course that Simon did, he does recommend that they do some reading to get a good understanding of the standard and how it works. The Passivhaus Trust has plenty of guidance available which is ideal for this and is pitched at different levels. Simon also believes that it’s important to put your trust in your consultants too, and give them a degree of freedom to come up with the solution.

    “Perhaps not get too involved in some aspects and more involved in focusing on how they’re going to use the building and communicating that, but not necessarily getting too hung up on the actual technical solutions.”

    The pandemic presented the biggest challenges

    The main concern for them was getting the required level of airtightness, but the Covid pandemic brought about the greatest challenges. It impacted on materials, getting people to site, and causing delays and knock-on effects to the programme. It left the structure open for longer than they would have liked, which again had further implications.

    Each build presents a learning opportunity

    It’s about good design, good practice and attention to detail. Simon’s advice is to embrace upskilling and have the confidence to do it, whether you’re a client, designer or contractor. And when a project has been delivered, go back and review what could have been done better, and what do you need to upskill in the future.

    “It’s a continuous process. We’re always learning, we always need to learn, and that should be the mindset rather than trying to maintain a status quo where we always do things the way we’ve always done them. Let’s challenge ourselves to always improve and do better.”

    Find out more

    Visit the website of HLM Architects

    Follow HLM Architects on Twitter

    Transcript

    Video of HLM’s Tigh na Croit

    Please connect with us

    Subscribe, rate and review us on Apple Podcasts

    Rate and review the podcast on Stitcher

    Like our Facebook page

    Follow us on Twitter

  • HPH305 : Building a Passivhaus with cross-laminated timber – with Mick Woolley

    HPH305 : Building a Passivhaus with cross-laminated timber – with Mick Woolley

    Mick Woolley explains how the use of timber was a key element of his award-winning Passivhaus bungalow.

    Interview with Mick Woolley

    For the last two years, Mick Woolley has been living in his Larch Corner Passivhaus which was the Small Projects winner in the 2021 UK Passivhaus Awards.

    His self build journey began following the loss of his wife. He had long held an interest in self building and took the attitude “what could possibly go wrong!”

    To watch the documentary about Larch Corner go to PassivhausSecrets.co.uk

    He broadened his search area

    Initially beginning his search in the south east of England to be closer to his two sons in Surrey, Mick found a lovely plot, surrounded by a vineyard, and just 30 miles away from them. But despite the proximity, it had taken an hour and a half to get there and was £450,000 before he’d even knocked the existing bungalow down. It was at that point he decided to abandon his search in the south east and opened up to looking at sites as far afield as North Wales and Cornwall.

    They made changes to the planning designs

    Mick saw a plot on RightMove, that seemed to be in a pleasant village location at the northern tip of the Cotswolds. Close to a National Trust garden and Stratford upon Avon, he felt he would be able to find enough to do in the area and was surprised when he managed to purchase it for around the guide price at auction. It came with planning permission for a single storey Passivhaus with a design that he admits probably didn’t appeal to everyone, and is why he thinks there wasn’t more competition in the bidding.

    Although not put off by the design, he was sceptical of its Passivhaus credentials and enlisted Mark Siddall of LEAP to re-work the plans. He did however want to keep it a bungalow to make it accessible for a family member who uses a wheelchair, but also because it future-proofed it for him too.  

    The original design had a lot of corners so they removed some of these and also had to raise the roof to ensure there was adequate head height for insulation. They swapped the entrance hall and study around to ensure a better flow into the house, and took out the many corner windows from the plans. Mark instead designed an arrangement of windows that came in 2 sizes: smaller ones for the bathrooms and bedrooms, and larger windows with seating elsewhere.

    Timber was an important element of the design

    Mick wanted to build using Cross-Laminated Timber (CLT), as much for the visual impact it provided inside as for its structural qualities. The bungalow uses 17 sections of spruce timber, which have 6 layers, are edge-glued, and don’t require an airtight membrane around the outside.

    The roof came with a cassette of insulation in it so the structure went up in two days, and had an airtight wrap over the top by the end of the third day. The walls are made of an I-frame structure with blown-in wood fibre, giving a thickness of around 600mm and a U-value of 0.1.

    The exterior of the bungalow has larch cladding.

    The foundations were pre-cut to size

    The building has a Jackon XPS foundation which was pre-cut to the required size and slotted together, with an XPS upstand that locked into the perimeter. This created its own formwork for the concrete pour.

    The flat roof has a camber of around 5 degrees for shedding water. On top of the insulation is a cold roof section of ply and bitumen that provides the finishing structure on which to put the green roof. Mick says he checks up there from time to time just to check that seedlings for trees and other unwanted plants haven’t blown in and taken root!

    He was keen to be hands-on

    With Mick being on-site throughout the build process he was keen to get involved in any way he could, so one task that he took on was the airtightness taping. His top tip for getting it into the corners is to ideally bend the tape in two in order to push it in and get good contact right the way through the junction.

    The straight lines of the 17 sections of CLT only took an hour to do, but all the other joints around the doors and windows took a lot longer!

    Mick employed Alan Clarke as his M&E engineer and he carefully designed the ventilation system so it could go through cupboards and be kept out of the way, but still accessible if needed. The full design with all of the MVHR kit was supplied as a single delivery, and Mick took on the installation of the pipework himself. Not having any experience of doing something like that, he did find it took him a very long time to put together!

    There is around 140 square metres of floating floor, which was designed to be laid to flow through without any junction strips at doors. His builder Andy took time to work out the geometry to ensure that boards were centred and wouldn’t end up with slivers at the edges, which Mick was then able to lay.

    Always make space for storage!

    Although Mick was adamant that he wanted to use CLT, he now realises that he could have been more efficient with materials and created the timber finish that he was looking for by using large sections of three-ply timber.

    If he were to do the build again, he would probably opt for a two-storey building, though still keeping a downstairs bedroom. He says that the UK housing stock is generally fairly deficient in terms of providing for the elderly and those with mobility problems, so designing at least one bedroom downstairs is really important.

    Mick says that going for a two-storey design would improve the form factor and use a lot less insulation. It is also more efficient in having less foundations and roof.

    Lack of storage space is often a real problem in typical new build homes, but Mick is delighted at the amount of space they designed into his home, including a large storage wall. He also has a double garaged sized shed, although this is currently housing lots of off-cuts of CLT and three-ply materials that are waiting to find a home!

    He emphasises why it’s always a good idea to build into the loft as that’s also potential space that can be used for storage.

    Images copyright Mark Siddall LEAP

    Find out more

    To watch the documentary about Larch Corner go to PassivhausSecrets.co.uk

    Check out the website of LEAP

    Follow Mick Woolley on Twitter

    Follow Mark Siddall on Twitter

    Please connect with me

    Subscribe, rate and review the podcast in iTunes

    Rate and review the podcast on Stitcher

    Like our Facebook page

  • HPH145 : An urban infill that embraces simplicity – with Bernard Tulkens from Tectonics Architects

    HPH145 : An urban infill that embraces simplicity – with Bernard Tulkens from Tectonics Architects

    Architect Bernard Tulkens tells us about his award-winning Lansdowne Drive Passivhaus.

    DSC_0030

    Interview with Bernard Tulkens

    Bernard has been running his own architectural practice for the last 12 years, with a focus mainly on residential projects. He recently won the 2016 UK Passivhaus Trust Award – Urban category – for his Lansdowne Drive Passivhaus, the first Passivhaus he had designed, and for which he was the client.

    Lansdowne Drive_Tectonic Architects

    Being a small, urban infill site led to many constraints

    Bernard bought a house in 2004 in Hackney, East London, with a garden that had been extended by a previous owner. It made an ideal, small infill plot and he decided to build something to keep himself, rather than for sale. Although his parents-in-law now live there, he initially designed the building without a particular client in mind.

    There were multiple constraints on the site. Being in a conservation area there were considerations around the massing, appearance, privacy of neighbours, light for neighbours, etc. The planners made the “suggestion” that it be half sunken, which was something Bernard could appreciate, although it cost him an additional £100,000! He is grateful that they allowed him to build something unique, despite being in an area of Victorian terraces. Planning permission was finally granted in 2010.

    1.0 fromlandsdowne

    Groundworks added additional expense

    The commencement of the project was delayed following the 2008 financial crisis, with banks being unwilling to lend to finance the project, particularly with Bernard having no experience of development.

    Initially his plan was to build two smaller units with the intention of selling one and keeping the other, but that brought complications with the extra funding required and the council not being keen on the additional development. Bernard thinks they probably under-developed the site but is ultimately pleased with that decision as it has meant they haven’t had the financial obligation to sell.

    The cost of building the shell was in line with Bernard’s predictions, though he had to spend an additional £80,000 on groundworks, excavating and enabling the site before construction started.

    5.retaining wall and excavation 3

    A small house with large spaces

    Having to dig down meant that to a certain extent there were technical constraints about some of the materials that could be used on the house. Bernard explains that the idea of the construction and the idea of the space are intertwined. His vision was for it to be a small house with large spaces, and the use of cross-laminated timber offered the possibility of exposed construction. They are big elements that are installed in a simple way, are good environmentally and have low air leakage. The decision to use exposed concrete was partly financial and partly aesthetic, and came naturally when the materials were being assembled.

    10.Isoquick3

    16.eurban5

    The Passivhaus element actually came quite late in the process.  As the scheme developed Bernard realised that this way of building was allowing him to create good airtightness, be able to insulate well and eliminate all the cold bridges.

    16.eurban9

    “And that’s what takes time on a project, to make sure that the various choices you make all end up pointing in the same direction rather than having conflicts between the different choices.”

    Although a Passivhaus, it has no south-facing glazing

    Initially Bernard was told by people that he spoke to that the site wouldn’t be suitable for building a Passivhaus. A couple of years later he met Peter Rankin, a Passivhaus Designer, who took on the challenge. The structure benefited from being very straightforward with continuous lines of insulation and no thermal bridging. By looking at the materials Peter was able to calculate their properties and found a balance between a lot of insulation in the walls and letting more sun in, using a more transparent glazing, from the west.

    “That’s what I love about Passivhaus is that you can decide how you achieve it, all you’ve got to do is feed the properties of the material and the calculations into the planning system.”

    So far the building has performed very well. The windows have roller blind shades that have micro-perforations that cast shadows while still giving views of the outdoors. The properties of the wood fibre mean it performs better than extruded polystyrene in terms of thermal inertia and thermal mass. Bernard will also be putting sedum on the flat roof which will help the protection on very hot days.

    Keep it simple and supervise every step

    Bernard stresses that Passivhaus requires a greater attention to detail, but by keeping the detail simple it will be easier to make.

    Bernard was in the fortunate position that his office was next door so he was able to be on site sometimes up to 3 times a day which was a great help for supervising the works. Instead of using a general contractor, he would have a trade come in to do their job, analyse it, and then move on to the next.

    The construction works took a year to complete

    Once construction work started, the whole build was actually quite quick to complete. The concrete works took 6 weeks, followed by a two-day installation of the cross-laminated timber, window installation and wrapping the building in an airtightness layer, which took 2 months in total.

    18.windows taped1

    The internal fit-out took slightly longer because Bernard was waiting for individual trades, but in total the whole construction took a year to complete.

    Lansdowne Drive_Tectonics_4

    Summary

    In summary, Bernard shares his main lessons learned from the project:

    • A positive experience that he would do again.
    • The decision to expose materials on the inside was determined more by finance and not having a particular client, but while lovely, may not suit everyone.
    • Use natural materials: “You can feel it when the building is finished, and that’s a great lesson.”
    • Managing to get lots of light into the building and keeping the rear garden makes it feel like a house, rather than an infill development.
    • Be patient!

    Find out more

    Check out the Passivhaus Trust website