Tag: off site

  • HPH351: Creating affordable, high quality, low carbon homes – with Linda Farrow

    HPH351: Creating affordable, high quality, low carbon homes – with Linda Farrow

    Linda Farrow from Agile Homes explains how their prefabricated panelised system can deliver high quality and truly affordable homes that are good for the planet.

    Interview with Linda Farrow

    Linda Farrow and her partner Craig White set up Agile Homes in 2019 to address the need for better housing in the UK. They aim to deliver low-cost homes without sacrificing on quality, and each of their buildings is low carbon, energy efficient and has the ability to be disassembled easily (at the end of its life cycle).

    Timber panels with straw in-fill are made off site

    Linda explains that at the core of an Agile Home is their Modern Methods of Construction (MMC) panelised system. These panels are prefabricated in a factory and then assembled quickly on site, giving you a watertight structure within a day or two. The use of natural materials like timber and straw ensures that the homes have an extremely low embodied carbon and the panelised nature of the system mean it can be easily customised to meet the client’s needs. This makes it incredibly versatile and can be used for a variety of projects, from a block of flats to a one bedroom bungalow.

    Their housing model aims to overcome common challenges

    Linda explains that as part of their mission to make good quality and affordable housing accessible in the UK, they needed to identify the current barriers in the construction industry and come up with creative solutions to overcome them.

    There is a cultural wariness of adopting renewable materials

    England has a romance with brick and block construction that is proving tricky to shift. Even our children’s stories have perpetuated this message by telling us that a house made out of brick will be sturdy whereas a house built from straw and sticks will leave us vulnerable to attack.

    This cultural mindset shift will take time to change but as more projects are completed it will keep demonstrating how well natural materials can work.

    There is a lack of affordable land to develop

    The price of land is currently a major barrier for affordable housing projects and often takes up a large proportion of the budget.

    By collaborating with councils, housing associations and charities, Agile Homes works to unlock land at low or no cost for social value. This can quickly reduce the delivery cost by around a third.

    It needs to be easier to finance and insure sustainable projects

    It can still be a challenge to finance or insure ecological projects because they are deemed higher risk.

    So Agile Homes has invested time in developing relationships with companies such as the Ecology Building Society and they are now an approved supplier.

    They also gained BOPAS (Build Off-site Property Assurance Scheme) accreditation which is recognised by mortgage lenders as providing the necessary assurance that properties that use modern methods of construction (MMC) will be readily mortgageable for a minimum of 60 years.

    Gaining planning consent is not always straightforward

    Getting planning permission for a project can be quite involved and take time, which is why Agile Homes have developed a modular solution called TAM which complies with the Caravan Act. This generally means planning permission will not be required because they are moveable rather than permanent structures.

    TAM (Transportable Accommodation Module) is a rapid response housing solution

    TAM is a prefabricated, rapid-response housing solution.

    The modules can be transported ‘flatpack’ to site and assembled quickly, leaving you with a watertight shell in a day or two and operational within a few weeks. Depending on the site and the needs of the client, TAM can also be umbilical to an existing building, using the same power, water and drainage systems without the need for planning permission.

    “We’re not quite there yet, but one of our aims is to make it as easy for individuals and community led organisations to buy into our system as if they were going to a car showroom, and they can sign the finance agreement and drive away in their car. So in the same vein, they could sign a finance agreement and have their TAM delivered to their site”

    Delivering a ‘turnkey’ solution helps to maintain quality

    The larger the development the more likely it is that different companies and sub-contractors will be delivering different aspects. Inevitably this can lead to mistakes or inconsistencies. So at Agile Homes, where possible, they like to control the whole process.

    “In essence it’s about control, and making sure that we can deliver the quality of product to the client. If you use a conventional procurement method where you’ve got the design and then you transfer over to a main contractor, the main contractor is incentivised to find all manner of ways to reduce their costs and increase their margin. And that’s not a criticism, that’s just the way the system is set up. We are a values led organisation and our board scrutinises everything that we do carefully. So I think it is about aligning everything that we do with our core value of respect for people and planet. It’s about control throughout the process to make sure that we can deliver to that time after time for our clients.”

    LILAC in Leeds

    Prefabrication can take place at a ‘pop-up’ factory

    The panelised system has been designed so that it can be put together with high end power tools. In certain circumstances – such as at the request of a community led project – they can bring the manufacturing closer to site and create a pop-up factory in empty barns or industrial units. This has the added benefit of upskilling communities who are interested in sustainable building.

    The Agile team

    The best collaborators have respect for people and planet

    “The ideal client would be someone whose values align with ours, so respect for people and planet, someone who has access to substantial amounts of patient capital, who is like us, genuinely interested in providing as many people as possible with homes that are affordable in perpetuity. Because having an affordable home, a safe civil space to be in is the foundation stone, in our view, for sustainable regenerative communities. And climate change is quite rapidly going to be a question of water and food crisis. So there are many, many immense challenges on the horizon for society. We want someone who, like us is very focused on helping society to put in place the foundation stone for us to then have the capacity to deal constructively with all the challenges that are yet to come.”

    Inter-governmental policy is needed to be able to deliver widespread affordable housing

    Linda explains that the biggest challenge for Agile Homes is access to patient capital and limitations caused by a lack of inter-governmental collaboration on housing policy.

    “Governments have a duty in between terms and outside of party political allegiances to look after human beings and the planet. There are some policies that should be negotiated and agreed as being inter governmental.”

    The natural materials contribute to a calm environment

    Agile Homes has carried out work for local authorities, housing associations and charities, and quite a lot of their residents are vulnerable. This can range from physical disabilities, mental health issues to learning disabilities. So some key feedback they have received is that the natural materials and quality design have created a calm atmosphere which can be of great comfort to anyone but particularly to those with special needs or mental health challenges.

    Agile Homes are committed to sustainability from their build system to their business model

    Linda explains that Agile Homes aims to create a business model for affordable housing by looking at a wide range of resources which promote sustainability and social value:

    The Agile Homes team is also in the process of finalising their Carbon and Social Value Tokens, which will allow people to offset their carbon emissions in local, sustainable, social developments.

    “We’ve been thinking a lot about how to we evidence and generate revenue from the carbon storage that we’re achieving in our buildings and also in the social value that we’re creating. So we’ve been doing work behind the scenes to build calculators and we’re just about to go live with what we call carbon and social value tokens that can potentially be traded. What that means is that we have found clients who are interested in actually buying and paying for the stored carbon and the generated social value as part of their ESG governance systems and processes. So rather than offsetting their carbon footprint by paying for X 1000 trees, in a plantation 1000s of miles away, they’re choosing to buy the carbon that we can evidence is being stored for a minimum 60 year design life in our buildings and I think that’s very exciting. We have plans to use that methodology to generate revenue that can then further reduce the costs of some of our schemes for our most vulnerable clients. We’re really excited about that extension to the model and that rethinking of how do we generate value and revenue in a truly regenerative economy?”

    Find out more

    Visit the website of Agile Homes

    Transcript

    Download the transcript of this episode.

    Please connect with us

    Subscribe, rate and review us on Apple Podcasts

    Like our Facebook page

    Follow us on X

  • HPH304 : What are digitally manufactured houses? – with Bruce Bell from Facit Homes

    HPH304 : What are digitally manufactured houses? – with Bruce Bell from Facit Homes

    Bruce Bell, founder of Facit Homes, explains why digital manufacturing has a lot to offer in the future of house-building.

    Interview with Bruce Bell

    Bruce Bell’s working life has been spent at the intersection between the digital side of construction and architecture. He originally studied industrial design but then went on to work for Norman Foster’s architecture practice in London. He then returned to his studies at the Royal College of Art in London and did a masters degree that focused on digital fabrication. He then ran a traditional architecture practice with a couple of friends. However, all the time, he was drawn to the potential of using digital manufacturing for building homes.

    In 2008 he set up Facit Homes to develop these ideas.

    Diana Woodward‘s home, built by Facit Homes, featured on Grand Designs back in 2012.

    Digital information is used directly to make components and assemblies

    Construction is overwhelmingly analogue. And there’s very few projects, or relatively few projects, that I would classify as being digital.

    Buildings have been designed on computers for years. The big difference here, however, is that the digital information is then used directly to make components, parts or assemblies. So it’s that direct translation from the 3D computer model into physical parts by computers or computer controlled machines that is digital fabrication.

    This is not to be confused with pre-fabrication, which in some instances can even be carried out by hand.

    A CNC cutter

    Digital manufacturing creates jobs that people want to do

    The construction industry suffers from a skill shortage where there are not enough people to all the physical work. This is a product of building in a traditional way, but it could be different. Bruce believes that embracing digital manufacturing would move people into different positions and create more jobs for educated and professional people.

    There is consistency because they control the whole process

    Facit Homes has become a turnkey provider, doing everything from the concept, design, planning, manufacturing, construction, construction management, all the way through to handover to the customer.

    This is to get around the fragmented nature of construction.

    Bruce reflects on his years of running a small architectural practice where there would be consultants, engineers, M & E, specialists suppliers, a contractor and of course the customer.

    Who’s really controlling the situation? It could be very much influenced by any one party’s interests. So maybe the contractor has issues or maybe the client wants to take control too much, or maybe the architect is trying to push themselves around. It’s not a very solid structure.

    In manufacturing one company will take responsibility and put their name to the product, even if they don’t do everything themselves.

    This means there’s a single point of contact for the customer and a better experience all round.

    Digital manufacturing is more flexible than prefabrication

    Digital manufacturing is flexible because it is based on digital tooling rather than physical tooling. Prefabrication generally relies on a physical space and an assembly line.

    You might have wall modules being put together, or roof modules or maybe even whole rooms. And they’re very reliant on the physical setup that allows you to make it. And that means they’re very standardized.

    When it comes to housing no two homes (or sites) are the same and therefore the customer is always looking for a bespoke solution.

    Digital manufacturing can deliver on these requirements no matter what the conditions.

    A suite of core products simplifies the process

    Bruce explains that they’ve worked hard to develop core products within the business. For example, every house will have the same heating system, one of two different foundation systems, the same timber frame chassis, the same roofing detail and the same window system.

    This consistency of products throughout each property allows Facit Homes to deliver the projects for a fixed price, on time and fulfil the customer’s brief.

    Costings are considered much earlier than a traditional project

    The first few steps of Facit Homes’ customer journey are not too dissimilar to what you might expect working with a traditional architecture practice. There’s a site appraisal and a customer appraisal. They will look at the constraints of the site and the customer’s brief, and try to marry those things together.

    We have some data-sets and tools that allow us to establish costs at a very, very early stage so that we can develop the brief with the customer and we can make sure that the house is the right size, and it’s something that they can afford.

    Facit Homes only makes money through construction so it’s in their interest to get comprehensive costings and make sure the customer can afford the completed home.

    3D visualisation is a key tool

    A team of architects design the house, taking into consideration the brief and understanding the light, the access, the views, and so on.

    Each step of the way, from concept to working out the layouts in more detail, they get reviewed with the customer.

    Because we build everything in 3D, naturally as part of our design process, we have a real time rendering application which allows us to walk through with light and shade and sunshine and materials, and understand how the building will look and feel. And that’s great for both us, the design team, and obviously also for the customer. So they really understand what it is they’re getting.

    They take a holistic approach to sustainability

    Facit Homes have considered everything from embodied energy to the manufacturing process, transport, as well as the operational energy use of each house.

    They are always looking for materials with a low embodied energy. Interestingly Bruce describes one situation where they had to switch away from using a cellulose (plant-based) fibre to a petrochemical product because it was hard to get a consistent standard of installation with the ‘blown in’ fibre.

    However, of the two choices of petrochemical insulations on the table, there was a huge discrepancy in embodied energy.

    What the choice came down to for us was between polyurethane insulation and polystyrene insulation. So polystyrene insulation uses only about 5% of the energy that polyurethane insulation uses in its creation. So that really helped inform the choices for all of the products that we use.

    The graphite treated polystyrene bead they now use has a much better flow rate and fills volumes better. Plus it has a slightly better thermal performance.

    The building envelope is environmentally optimised

    The buildings are all super-insulated and score well in terms of airtightness (normally between 1.2 and 2.2 air changes per hour at 50 Pascals).

    However, Bruce believes the additional investment to achieve Passivhaus standard levels of airtightness is hard to justify.

    To get full Passivhaus certification, you very much have to be designing your home as a Passivhaus from the start. And it really affects the way that the building is orientated and the size of the openings and all sorts of things. And quite frankly our buildings already have enough constraints. They are quite often in urban situations where we’re responding to all sorts of different design parameters. So it’s just not realistic, I don’t think.

    They are keeping an eye on battery technology development

    They often review their core products to make sure they are still the best choices. So they have installed a few more air source heat pumps recently.

    They are also looking at photovoltaic panels again. With feed-in tariffs so low now, a key consideration is always whether that energy will be used. So when home battery technology gets better then it will be a great advance to make use of power that you’ve generated over a longer period of time.

    Connectivity is the big change that is needed

    Building information modelling has become a fairly standard tool in the construction industry, but connecting all this information directly to the supply chain is non existent.

    Bruce explains how this gap could be filled.

    For example, there are window manufacturers components on the internet, and you can go and download them. But they’re not built very well, they are inconsistent, they don’t really have all the design options. So you have to rebuild it from scratch with all the information, all the parameters that you need. And then we’ve built systems so that we can exchange data with a window manufacturer… So for the wider industry to adopt these kind of techniques, that gap needs to be filled. Or alternatively, you’re going to see companies who are disruptors, like us, who do everything themselves.

    Facit Homes is digitally manufacturing on site again

    When Facit Homes featured on the Grand Designs programme back in 2012 they demonstrated digital manufacturing on site using their mobile CNC machine. Since then they have been manufacturing in a factory.

    However, deeply understanding the pros and cons of each set-up, they are now returning to site.

    You can see people or companies who are heavily investing in modular off site construction, which will grow, but it still will only ever end up being maybe 10% of the market at most, and the other 90% of the market who are building things on site. And for me, that’s a really exciting area because it’s unexplored, you know, nobody’s ever really said. What can we do with this? So for me, that’s the most interesting bit is traditional construction, how we can change it.

    Flower House

    Find out more

    Visit the website of Facit Homes

    Follow Facit Homes on Twitter

    Transcript

    Please connect with me

    Subscribe, rate and review the podcast in iTunes

    Rate and review the podcast on Stitcher

    Like our Facebook page

    Follow us on Twitter