  • HPH377: Retrofitting a 1950s semi-detached ex-council house – with Toby Cambray

    HPH377: Retrofitting a 1950s semi-detached ex-council house – with Toby Cambray

    Toby Cambray talks about the experience of working on his own retrofit project, and the lessons learnt in the process.

    Interview with Toby Cambray

    Toby Cambray co-founded Greengauge building & engineering consultancy in 2010, specialising in sustainable and low energy design. He is a certified Passivhaus Consultant and has completed a PhD on moisture in buildings.

    In the previous episode we discussed moisture risk in buildings and how to assess it.

    There’s no such thing as an ‘easy’ retrofit

    There are always compromises, so how do you best juggle and manage those? Toby bought his house with the idea that it would be relatively straightforward to retrofit. There was nothing (e.g., listed building status) to prevent getting permission to make changes.

    The house had deep eaves, making external insulation easier. It was a question of how to execute that while minimising thermal bridging, getting the windows in the insulation zone, and incorporating airtightness.

    The original bay was a feature Toby decided to remove

    Toby had lots of ideas of what he would like to do. He built an extension and did some minor remodelling first, before starting retrofit work. From a holistic point of view, it would have made sense if the extension had been planned to receive the same external insulation that was added to the house later. The building would have performed better too, as there is a thermal bridge where the extension’s cavity wall meets the new external wall insulation on the main property.

    Living in the home first can provide useful information

    It takes time living in a home to understand what’s best for how you use it.

    There is also thinking about how the home might need to be used in future, and other considerations like whether you’re adding value.

    The floor plan of Toby’s house already worked well, so there was little reason to change the layout. He considered taking out a wall with a chimney. That would have been a major structural challenge, so he prioritised keeping things simple and less expensive.

    Watch an entire retrofit of this mid terrace home in The Hub.

    A truss and fill insulation system can take different forms

    There’s a lot of experience with truss and fill systems, especially within the AECB membership. A timber frame is fixed to the outside of the building, with a thin wood fibre board over it to create a cavity. Any blown insulation can then be installed to the cavity; Toby chose cellulose insulation.

    There are different ways of doing the frame too. Toby used a Larsen truss with 50 x 50mm battens on the wall, then plywood gussets to support an outboard batten. You could equally do it with an engineered joist, or similar.

    There are different ways of finishing the outside. Toby used a 25mm batten cavity with a render-carrying board, and then a render finish. It could also be timber clad. Rendering straight onto the wood fibre is possible but might need more careful thought when it comes to rain robustness.

    A second layer of defence between the outside surface and the insulation is comforting, even if you’re not in a very exposed area for rain. If you have render direct on insulation and the render cracks, there’s a higher likelihood of water passing through to the inside.

    Plywood window boxes were constructed to take the new windows

    The first step was preparing the window openings

    To ensure the new windows were in line with the cellulose insulation, Toby built plywood boxes and installed them in the opening so they cantilevered out. They were fixed through the face of the ply into the edge of the cavity wall masonry, and they allowed the new windows to project into the insulation zone.

    The bay was removed

    New studs for the insulation layer

    The cement board going on

    A cavity acts as a capillary break in the wall build-up

    The cavity in the original wall build-up acted as the capillary break to stop moisture reaching the inside of the building. With the retrofitted wall build-up, Toby made sure the 25mm batten cavity behind the render-carrying board was ventilated and served that function instead.

    Below-ground insulation links the floor to the external walls

    Toby dug a trench around the building, installed moisture-resistant insulation, then backfilled it and used paving slabs to hold the insulation in place. The 200mm timber frame with the cellulose sits on top of that. The below-ground insulation finishes just above ground level to keep the timber clear of ground level. It required a lot of hand-digging and re-doing drains that are close to the house.

    Planning ahead helped with airtightness in the roof

    Toby removed the old insulation from the roof. Some leftover mineral wool from the extension went between the ceiling joists, followed by a vapour control membrane over the joists. He installed cellulose insulation over the membrane – it comes in compressed bales which you open and it expands into loose cellulose.

    When installing the membrane, Toby left plenty of length on it and folded it back under the rafters. When the scaffolding was up and the end of the rafters exposed, he peeled and then slit the membrane so it could fold down between the rafters. It was then a case of taping that all around, first to the rafters and then down onto the existing render. It felt like it was going to be time consuming, but then proved to be okay once Toby got into it.

    To achieve continuity of the roof insulation with the wall insulation, Toby was able to remove just a single row of tiles. He slipped in some insulation that the wall insulation could butt up to. Waterproofing it required some leadwork, which was an unexpected expense, but a nice way to finish it and robust so it won’t let moisture in.

    Following established principles can help keep embodied carbon low

    Toby hasn’t calculated upfront or embodied carbon. Instead, he has followed general principles that he has learnt from other projects, including using very little concrete or steel.

    In terms of concrete, there are small amounts of mortar for repairs and holding the paving slabs in place for the below-ground insulation, plus the 12mm cement board carrying the render. Some stainless steel bars were required as part of a Helifix Helibeam system, which was used to replace a failed concrete lintel.

    Retrofit can make it tricky to accommodate MVHR

    In an ideal world, Toby would have chosen MVHR, but finding a good position for the unit is always difficult in a retrofit. Put it in the loft, and access for maintenance is harder. Put it in a room and you lose valuable utility space. Installing the ducts is also tricky and can involve a lot of compromise.

    Toby chose an Aereco MEV system over MVHR. The system was installed at the time he built his extension, as this was the best time to get ducts running to and from the loft.

    MEV is effectively the extract half of a full MVHR system. There’s one fan in the loft, with a duct to each wet room. Each living space has an inlet through the wall, and on each inlet and outlet is a humidity sensitive material that passively operates like a damper. When someone has a shower, the damper opens a bit more to help clear the elevated humidity. The fan in the middle has a pressure sensor which increases the fan speed when the terminal opens more.

    Decentralised MVHR, with individual room units, could have been an option but Toby’s experience is that it tends to be relatively expensive to do a whole house that way.

    Plan ahead for low carbon heating

    Toby’s home still has a gas boiler, a decision he was comfortable with at the time. He will upgrade to an air source heat pump at some stage, and has the infrastructure and electrical supply in place where the hot water cylinder would probably be positioned.

    The retrofit industry perhaps overlooks the DIY culture of the UK

    Toby has travelled in parts of Europe and recognises the DIY culture we have in this country compared to other places. With motivation, and the right research and guidance (including the House Planning Help podcast!), a proficient DIYer could undertake a retrofit project.

    But it’s also important to be aware that it’s a lot of work, with stress and long hours. Toby was working under floodlights until midnight the day before his cellulose insulation was installed, finishing off taping so there was a cavity ready for the insulation.

    Standard details are a good starting point for DIY retrofitters

    You might have to pay for the information, but it’s less expensive than engaging a consultancy service. If you have building experience and broadly know how a timber frame goes together, or how a masonry wall goes up, then a lot should be fairly obvious. It’s about thinking through the next steps as you work, and coming up with solutions for how X joins to Y.

    Toby understands moisture risk and so designed a window detail himself that others thought was overkill. He was happy with it as a belt and braces approach to keep water away from the cellulose insulation. It’s a case of assessing risks and accepting when there is value in paying for advice. Structural calculations are one area that Toby was glad to have professional support.

    Every project has unique technical challenges

    Toby uses the example of external insulation. There are a host of ways to do it, but you can guarantee that any project will always throw up a detail that no-one has ever come across – or, if they have, that a solution is not well documented. Again, it’s taking time to think about how to do it well using the array of products that are available.

    Budget for and prioritise the ‘big ticket’ items

    The biggest expense on Toby’s project was new triple glazed windows. The next biggest cost was re-roofing the property, as the bituminous underlay needed replacing. The roofer was able to reuse the original tiles, and the roof work was carried out while scaffolding was up already, which helped. The cellulose insulation was a big undertaking, but not necessarily the biggest cost. Toby did a lot of work himself getting the timber frame ready.

    If Toby tried to value the time he has put into the project then it would probably be one of the most expensive retrofits done recently. He has really come to respect the speed at which professional builders work. But he is also interested in the subject, gets enjoyment from doing the work, and can take lessons learnt back to his practice. All of that provides additional motivation.

    Junction details and internal finishes take a lot of time

    A big lesson for Toby was that lots of time, thought and effort goes into the junctions. The timber frame went up in a few days, which really looked like progress. On the other hand, working at the foundations, taping around the rafters, and sorting out the windows all took a long time.

    A lot of functional and structural items don’t have to look nice, they don’t have to be finished. But since Toby has begun to work inside, time has been eaten up finishing window reveals, and sanding and painting so that the finish is to a standard he wants.

    It’s hard to capture in words how much more comfortable a retrofit is

    In conclusion, Toby observes that he knows the physics of why his home feels more comfortable, but he finds it difficult to express how different it feels when everything’s a more even temperature. You can only truly feel it by experiencing a well-insulated house. It’s a feeling that it just … works.

    Find out more

    Greengauge

    Greengauge on Bluesky

    Greengauge on LinkedIn

    Toby Cambray on LinkedIn

    Transcript

    Download a transcript of this episode.

    Please connect with us

    Subscribe, rate and review us on Apple Podcasts

    Follow Ben Adam-Smith on Bluesky

  • HPH256 : What makes a well designed MVHR system? – with Tom Heywood

    HPH256 : What makes a well designed MVHR system? – with Tom Heywood

    Tom Heywood from Green Building Store explains why we need mechanical ventilation with heat recovery in high performance homes and why it needs to be well designed.

    Interview with Tom Heywood

    Tom studied architectural technology at university and was disappointed not to have been taught anything there about efficient building. So when it came to doing his dissertation he wanted to do something different, and decided to write it on Passivhaus principles.

    Tom is now the MVHR design manager at the Green Building Store.

    Airtight buildings need mechanical ventilation

    Natural ventilation tends to be unreliable. The supply levels might depend on how windy it is, with areas of the building in the path of the wind receiving more than elsewhere. There isn’t a way of delivering a particular amount according to the requirements of a specific area.

    With the increased ability to make buildings more airtight, comes the reduction of natural ventilation through trickle vents and leaky building fabric. At this point mechanical ventilation is required to provide enough fresh air to keep CO2 levels down and prevent dangerous build-ups of volatile organic compounds and other indoor pollutants.

    With a properly commissioned MVHR and an airtight envelope, you can deliver the right amount of fresh air to different spaces, ie more for a double bedroom than a single. The MVHR unit will also extract as much heat as it can from the exhaust air which will in turn drive down the heating load.

    Tom suggests that, as a rough guide, when you get to less than five air changes per hour, that’s when you should start introducing some form of mechanical ventilation, such as Mechanical Extract Ventilation (which is just extracting, not supplying or recovering any heat).

    Once you get down to three air changes per hour an MVHR starts to make sense, because then there’s not as much cooling going on with natural ventilation coming in.

    The MVHR supplies clean, fresh air

    An MVHR unit has two fans – a supply and an extract, and a heat exchanger. Stale, moist air (such as is produced in bathrooms, kitchens and utility rooms) is extracted and goes back to the heat exchanger, which is where the fans are.

    The heat is transferred to the incoming fresh air that is then supplied to the habitable rooms, such as the bedrooms and living areas. The air is also filtered, ensuring a clean, fresh air supply to the rooms.

    Concentrate on getting the design right

    “People often focus mainly on the specification of components, which is right, but at the same time you can spend as much money as you want on the specification of components; if it’s not designed right, they’re not going to work anyway. You’re going to have to turn it off because it will be too loud and it will be inefficient.“

    Rather than someone who provides a schematic of some ducting on a piece of paper, you want someone who is going to design it around the structure to make sure when you get to site that it will work efficiently and that the air supply will actually make it all the way along the ducting route to the required rooms.

    Tom says key information to ask from a designer at the design stage is for sound data and pressure loss data. Pressure loss is the resistance that the duct is providing to the airflow. If pressure loss is too high the fans will have to work harder to push the air through. And when the fans are working harder, it will increase energy consumption and the noise will be louder. Likewise, if you never change the filters, the fans will have to work harder to drive the air through.

    Tom says it’s always good to oversize the unit so that it’s not running too hard.

    He stresses how important it is to get the system designed early. Even as soon as the architects and engineers are doing their drawings you should be getting your plans submitted to a designer to get their opinion on unit location, duct sizing, where they need to run and what sized joists are needed to accommodate them.

    There are branch and radial systems

    Tom likes the branch systems (of rigid ducting) because it’s easier to get a low pressure loss with careful sizing of ducts.

    “A lot of people think that the radial system saves space, but if it’s done properly, instead of having one one-hundred mill. duct to, say, a bedroom, you’d have two ninety mill. ducts. Because those ducts are carrying the same amount of air but they’re smaller, so there needs to be more of them to compensate for that.”

    A radial system, also called an octopus system, has a main manifold at the start which is a box with lots of small spigots on it. The semi-rigid plastic radial ducting plugs into that and goes off to the rooms. Each room would have its own branch (or two or three), all the way from the manifold at the start to the air valve in the room. It is a good system for preventing any cross-talk sound travelling from room to room because the sound can’t make it all the way along the ducts.

    Tom believes radial systems do have their uses, especially in retrofits where the rigid ducts of a branch system would just be too big to get in.

    Whatever system is used, Tom stresses that the component parts should be on site when the joists are being put in place, so they can be installed as the joists are being erected.

    Commissioning a system takes a lot of toing and froing!

    Tom explains the method of commissioning a branch system. The unit is told what it is running at, eg 300m³ per hour on fan speed 2. If the supply to a master bedroom was to be 35m³ per hour then they would go into that bedroom and adjust the damper to allow more or less accordingly until it was at the required amount. An anemometer over the air valve measures how much air is coming out.

    But as that valve is closed down it will drive the air into another air valve somewhere else. So the next room would need to be checked to see if it has been impacted and needs adjusting. Any changes to one mean going back and checking all the others again, as it’s all on one system.

    Carefully consider external vent placement

    Ideally you want the intake and exhaust ducts on the north elevation. That way they’ll be shaded from the sun in the peak summer heat. The system will work more efficiently because you’re bringing in cooler, shaded air.

    You should also avoid placing them right next to a window or facing onto a neighbour’s garden, because they could be blowing quite hard and at audible levels.

    Too close to the ground and they could drag up leaves, debris and animal hairs into the intake duct, which will block up the filters more quickly. Ideally they should be 1.5m above ground level.

    If incoming smoke from neighbouring properties is a problem, then you can get active carbon filters which filter out the smell and smoke even better than the F7 pollen filters would.

    The controls should rarely need using

    The idea of the controls is to have them as simple as possible and generally left running on fan speed 2. They may only really need changing if you’re going to be away from the house for a long time, in which case you could drop it down to fan speed 1. And if you have a large gathering and are going to be doing lots of cooking, then hit the ‘party button’ which increases it to fan speed 3 for 45 minutes, before automatically dropping back down to fan speed 2.

    Generally there would be one main controller which would usually be in the kitchen for convenience to boost it if required. Alternatively you could have the main controller somewhere else with just a remote boost switch in the kitchen. Tom doesn’t recommend having it in a bathroom as boosting the system while showering early in the morning and late at night could become audible in the bedrooms and disturb the occupants. The fan is designed anyway to remove enough moisture whilst showering without the need to boost.

    Only a small amount of maintenance is required

    There shouldn’t really be too much maintenance required, other than changing filters every three to six months (depending on indoor and outdoor air quality, and whether you have children and pets).

    After five years it might be worth unscrewing the air valves in the bathroom and giving them a clean as they could collect dust and towel lint over time.

    And depending on the MVHR unit specified, the extract fan may need very careful cleaning, preferably by someone who has done it before.

    If the unit is turned off for more than two or three days there could be a risk of mould growth in the ducts. There shouldn’t however be any danger of that happening if the system is left on and each branch to each room has air flowing through it.

    Find out more

    Visit the website of Green Building Store

    Follow Green Building Store on Twitter

    Transcript

    Please connect with me

    Subscribe, rate and review the podcast in iTunes

    Rate and review the podcast on Stitcher

    Like our Facebook page

    Follow us on Twitter