Tag: masonry

  • HPH325 : What reduces the performance of insulation? – with Mark Siddall

    HPH325 : What reduces the performance of insulation? – with Mark Siddall

    Mark Siddall explains how thermal bypass – or air movement around insulation layers – might impact a self-build or retrofit project.

    Interview with Mark Siddall

    Mark is a Passivhaus specialist who has been on the podcast before, talking about avoiding the risks of poor ventilation and his ‘forever home lifestyle’ framework.

    His practice LEAP operates from County Durham and Newcastle. He is also a technical adviser to the Passivhaus Trust and the AECB. He has written a paper on thermal bypass risks for the Passivhaus Trust.

    There are many types of performance gap – but energy is often the focus

    For Passivhaus buildings, the focus tends to be energy performance rather than other factors like air quality. Passivhaus projects actually close gaps in predicted performance, which can’t be said for other approaches. The methodology has got better quality assurance processes, which avoids risks that might otherwise arise.

    Insulation has to be specified correctly for it to deliver energy performance benefits

    Dealing with energy performance often means the thermal performance of the building fabric. Three variables influence whether insulation works or not.

    • The material itself.
    • Whether the material is specified sympathetically for the construction method used.
    • Whether the material is installed properly.

    Get those variables aligned and the evidence shows everything works properly.

    An example of an air gap when using blockwork and rigid PIR insulation

    Choosing insulation for cavity walls

    Cavity wall construction is very common in the UK. A Passivhaus designer will question if the usual foam insulation solution is sympathetic to the method of construction.

    Blockwork features mortar joints, and mortar is squeezed during installation. That creates snots which project into the cavity and stop the insulation sitting against the face of the blockwork. The resulting small air gap is enough to completely undermine the thermal performance of the insulation.

    Mortar snots can be cleaned off, but that might not happen all the time. A mineral wool solution is more flexible and capable of dealing with subtle deviations, so it’s a more appropriate insulation for a cavity wall. It’s also used to the full depth of the cavity, which helps to reduce the risk of air movement.

    Mineral wool fully filled cavity at Steel Farm Passivhaus

    Airtightness is about moisture as well as heat loss

    Part L of the Building Regulations deals with heat loss and prescribes a specific level of airtightness. Part C talks about moisture and only says things should be fairly airtight. There’s no numerical target related to moisture, and that’s a problem.

    The Passivhaus standard, and research conducted in Canada, both confirm that airtightness of 0.5 or 0.6 air changes per hour at 50 Pascals is needed to avoid damage to timber structures (such as roofs or framed walls). That’s an air permeability of around 0.5, compared to the Part L target of 8.0.

    Good airtightness alone doesn’t guarantee insulation performance

    From the external side of the wall, wind tightness stops the wind blowing through and around the insulation, which wicks away heat. It’s not something that can be tested on site, however. As a rule of thumb, the quality of workmanship needed for a wind tight layer is similar to that needed for the airtight layer.

    Fully encapsulate insulation between the air and wind barriers

    Convective loops can happen around insulation just from the temperature differences between the warm and cold sides of the wall. We can avoid that by properly encapsulating the insulation between a notional air barrier and wind barrier.

    Using the same cavity wall example as before, a good build-up might be brickwork or stonework on the outside face. Then a 300mm cavity full filled with mineral wool insulation that’s built up in two or three layers. The inner leaf is blockwork, which is plastered internally.

    The plaster acts as the air barrier, and the brick or stone is the wind barrier. The cavity is fully filled, so the insulation is encapsulated and has no air gaps around it.

    Rainwater is the dominant moisture problem to tackle

    Cavities were introduced to walls to act as a capillary break and stop water being drawn through from the outside. Any water getting through the outer leaf drained down the inside face of the cavity and out through a weep hole.

    A very narrow cavity fully filled with insulation carries a risk of rainwater bridging across to the inside of the building. That risk reduces with a wider cavity. Passivhaus design requires wide cavities and, with good workmanship and no mortar snots, any risk from driven rainwater is mitigated.

    Installing the cavity insulation in layers means that if any water gets through one layer, it can still be pushed down and back towards the outside.

    Think about how wall ties affect performance too

    Cavity wall ties help to provide structural stability, but are also a repeating thermal bridge through the insulation layer. Mark specifies Teplo wall ties instead of stainless steel ones. Stainless steel ties have a larger physical dimension and a higher conductivity, whereas Teplo ties are thermally broken.

    Design calculations usually assume perfect installation

    On most projects, architects contact insulation manufacturers for U-value calculations. The manufacturer never asks what quality of workmanship is being specified. Instead, they assume perfect installation, which requires certain tolerances on site.

    When those tolerances aren’t achieved and workmanship is less than perfect, which is the case on every building site, then air gaps are the result. Materials haven’t been specified to work sympathetically with one another and the predicted U-value isn’t achieved.

    Timber frame construction can help to address performance gaps

    From inside to outside, a typical timber frame construction capable of producing good results would be:

    • Plasterboard.
    • Service void, which may or may not be insulated (ideally not).
    • Airtight layer.
    • Engineered I-beam filled with cellulose insulation.
    • Wood fibre insulation on the outside.
    • Wind barrier membrane.
    • Drained cavity, acting as a capillary break.
    • Rain screen on the outside face.

    Compared to this build-up, performance gaps can occur because standard industry timber frames don’t have the wood fibre layer, don’t use engineered I-beams, and are less likely to feature a service void. Services penetrating the air barrier will allow moisture from inside the house to get into the timber frame, potentially causing moisture damage.

    One area they tend to do well in is using 150mm thick insulation in the 140mm frame. Because the insulation is that little bit bigger, it’s compressed slightly and ends up being snugly sandwiched between the air barrier and wind barrier. There’s less risk of convective loops.

    Improvements can always be made to reduce performance gaps

    Research from places like Sweden and Canada is showing that, in the construction described above, moving the wind barrier behind the wood fibre (which might be just 20mm thick) could significantly reduce the risk of condensation.

    The climates are different to the UK, so the conclusion might not be the same here, but it shows there are still refinements that can be done in Passivhaus timber construction to make it even more resilient than it already is.

    Air movement is the issue across all build systems

    All construction technologies need to address the key issues of building physics. With straw bale, for example, a lime or clay plaster on the inside can provide the airtight layer. There are other subtleties and complexities, but it’s a case of limiting air movement through, and within, the wall construction so the building performs as predicted.

    An example of a warm roof (Shepherd’s Barn)

    The same principles apply to roofs…

    …although it depends what type of roof it is. A warm roof construction is very similar to the timber frame walls, just at an angle. The tiles or other roof covering replaces the rain screen.

    A cold roof, with insulation at ceiling level and the attic space above is risky to deal with from a moisture perspective. Information Mark has seen suggests one-third of the moisture that transfers into the roof space could condense on the roof structure. It has to be possible to remove that, using a vapour permeable underlay.

    Ventilation can also be used, but there are reasons why that may or may not be preferable or doable. Then it’s necessary to look at the eaves detail and the risk of wind washing. Air comes into the loft at higher speed, so special details are needed to help protect the insulation at the edges.

    The important advice is to keep things simple

    Details have to be simple to make them buildable. Then they can be replicated from person to person, site to site, and house to house.

    Make sure you have an air barrier and a wind barrier, and that you encapsulate the insulation. Do that and you’re on the right path.

    The ‘Thermal Bypass Risks’ paper on the Passivhaus Trust website provides solutions. It includes tips and tricks for designers and architects to help mitigate thermal bypass. Each section features accessible takeaways that could also be used by self-builders.

    Find out more

    Visit the website of LEAP

    Follow Mark Siddall on Twitter

    Read Mark Siddall’s paper on Thermal Bypass Risks

    Watch the documentary case studies at PassivhausSecrets.co.uk

    Transcript

    Dear Evil Engineer

    Thank you to Stephen Miller in Oxford for sharing this with us. The Institution of Engineering and Technology has a bit of fun from time to time with their Dear Evil Engineer series. Villians write in for advice on their diabolical plans.

    So how many leopards do I need to heat my home? And they even consider homes that are built to Passivhaus standard!

    Please connect with us

    Subscribe, rate and review us on Apple Podcasts

    Rate and review the podcast on Stitcher

    Like our Facebook page

    Follow us on Twitter

  • HPH259 : Constructing the masonry superstructure of Portree Passivhaus – with Mike Coe

    HPH259 : Constructing the masonry superstructure of Portree Passivhaus – with Mike Coe

    Mike Coe has a progress report from Portree Passivhaus, which is now almost watertight. We pick up the story as the groundworks begin and look at some of the challenges as the superstructure has gone up.

    Mike Coe on the roof at Portree Passivhaus

    Interview with Mike Coe

    Mike Coe has been on the podcast a number of times. Our first interview with him was when he completed building the Cropthorne Autonomous House, where we imagined he might stay put for many years. However, with concerns over climate change, he and his partner Lizzie Stoodley decided to move further north to the Isle of Skye in Scotland.

    This meant selling the autonomous house, which was not straightforward, and taking on a second project with well known architects Rural Design.

    A section of Portree Passivhaus
    A visualisation of the finished house

    The sloping site was perfect for upside down living

    Mike’s previous house, the Cropthorne Autonomous House, had bedrooms downstairs, and the living space and kitchen upstairs. Mike prefers this layout and was keen to repeat it.

    That’s why one of the attractions of the site was its slope. The main entrance could be at the top of the house, taking you directly into the living space.

    The dig begins
    ‘Rotten rock’ is discovered

    Rotten Rock provides a perfect base from which to build

    Mike explains that whenever anyone builds on Skye they look for ‘rotten rock’, which is a combination of the normal clay subsoil but with volcanic small rock particles mixed in. This makes a stable foundation that you can build straight onto.

    Although they were digging into the hill, the rotten rock is almost solid enough to dispense with a retaining wall (but not quite!).

    The Cropthorne Autonomous House

    His first self build guided a lot of decisions

    At the autonomous house the heavyweight structure of the building was used as a thermal store, which would build up heat during the summer and slowly give it back over the winter.

    Hence Mike wanted to repeat what he knew worked well. Portree Passivhaus is a masonry building with a cavity wall.

    This is unusual for Scotland which has a lot of timber frame buildings, that are quick to put up in the inclement weather.

    Resilience was another key factor

    The building’s heavyweight structure will also make it a ‘fortress’ for whatever weather is to come.

    I think it’s inevitable that we’re going to get more extreme weather. We haven’t had that much of it in the UK yet, but there’s rarely a week when there isn’t some kind of extreme weather event somewhere in the world which makes it into the news.

    The slab of insulation goes in

    The building sits on a tray of insulation

    Concrete is poured into a tray of insulation to form the lower ground floor slab. The internal concrete block walls then get built onto the edges of that slab, so the internal part of the house is completely isolated.

    The cavity wall is 375mm wide and uses TeploTies for low thermal transmissivity.

    With a large open plan living area, the building requires a steel structure for extra support.

    The first floor is a beam and block floor, and above this there will be a green roof.

    We’ve got a very substantial roof structure in order to take the weight of the soil on which the grass will grow on the roof. But below that, sitting on top of the structural I-beams, there’s another layer of insulation.

    There is no environmentally benign dwelling

    Mike is well informed when it comes to climate change and believes that we, as a world, could be doing so much more to reduce carbon emissions. So why is he building with masonry when more sustainable materials exist?

    There’s undoubtedly embodied energy in this house. How significant it is in terms of global carbon emissions compared to things that could be very, very easily avoided, I don’t know. In use, the house will have a tiny environmental footprint. It’s very energy efficient, it doesn’t have a heating system, it’ll have renewable energy systems as well.

    Although it will be a number of years into the future, Mike says the house will pay back its CO2 debt. And for him it’s not just about preventing climate change, this is a house that’s ready to face the extreme weather events that have been caused by climate change.

    When you look to the future it’s not going to blow down. And the turf roof is part of the resilience strategy.

    Mike installing the ventilation ducting

    Mike gradually took on more responsibility

    Having been very hands-on during his first self build, he had wanted to do less this time. However, he’s found himself being drawn in!

    Due to concerns over finances, he decided to save some money by installing the mechanical ventilation system and doing all the electrics himself.

    But knowing the level of detail required on a project like this, he’s also monitoring quality.

    It’s all about during and post construction quality control. And trying to get across the message that the insulation has got to be kept clean and dry – difficult in this climate – as dry as possible and put in neatly without any gaps – I don’t know why but it’s just proved to be very tough.

    So Mike has spent weekends pulling insulation out, cleaning it, putting it back again. He’s also taken responsibility for some of the trickier details.

    Mike spotted a thermal bridge across the cavity

    With an architect and contractor who haven’t built a Passivhaus before, Mike’s experience has become extremely useful. During construction he noticed that the steel was creating a thermal bridge across the cavity.

    The solution was to shorten the steels and put thermal break pads in. Using stainless steel bolts also helped reduce the transmission across the steel.

    Delays have had an upside

    Mike’s contractor has had to start another project for a local hotel and this has meant a reduced workforce on Mike’s site.

    However, as pensioners, Mike and Lizzie have been able to squirrel away extra cash.

    This gives Mike cautious optimism that he could get towards the end of the project… and even hire decorators (something they’d really like to do).

    Stone cladding begins
    The main living space

    Find out more

    Visit the website of Portree Passivhaus

    Follow Mike Coe on Twitter

    Follow Portree Passivhaus on Twitter

    Transcript

    Please connect with me

    Subscribe, rate and review the podcast in iTunes

    Rate and review the podcast on Stitcher

    Like our Facebook page

    Follow us on Twitter

  • HPH234 : How well did I do on my self build?  – with Ben Adam-Smith

    HPH234 : How well did I do on my self build? – with Ben Adam-Smith

    Having completed his house build this year, Ben Adam-Smith evaluates his own performance as a self-builder.

    It’s sometimes tricky to draw a line and say that you are at end of a self build. While there are lots of little tweaks to decor and a lot of work to do in the garden, our contract has been fulfilled and everything is functional.

    So for the last two podcasts of 2018 I’m going to reflect on my build. Then in 2019 I’ll wipe the slate clean!

    In this podcast I’m going to analyse how well I did as a self-builder. What did I get right and what could have been better.

    Ben Adam-Smith on site

    What went well

    We have created a home that we love

    Until you move into your house you can never guarantee it’ll feel like a home. When we moved in, almost immediately it felt like we’d lived there for years. Our children didn’t even blink when they were introduced to their new bedrooms. The layout is instinctive. We want for nothing.

    We hired a competent team

    From architecture firm to main contractor and interior designer, everyone delivered for us. Sometimes it feels like we got lucky! But I think spending time hiring the right people was one of the smartest moves we made.

    We paid for a full service

    Not everyone can afford to do this, but it was within our means to get all the work carried out by a main contractor with the architecture firm overseeing the project.

    Of course this is not the cheapest way of doing things but with two young kids we did not have lots of time to play with. Also, I think we knew ourselves. In fact I classify myself as a DIY disaster, so it was an obvious choice to let the professionals get on with things. That left us to ‘be the client’.

    We have built to Passivhaus standard

    Right at the top of our brief was to build a house to Passivhaus standard. Although it’s too early to look at the bills our home is certainly comfortable, with the even heat synonymous with Passivhaus. It also has all the other benefits you would come to expect. There’s no condensation on the inside of the windows. We have constant fresh air and the smells created from cooking disappear.

    My wife and I worked well as a team

    We brought different skills to the table, which is always handy. Kay had project managed marketing campaigns before so was comfortable with staying on top of emails, listing priorities and updating budgets. I had the more technical insights as to what we should be doing… and I liked to focus on the big decisions.

    While we probably had momentary disputes, I can’t really remember many of them now! And I even won the odd discussion.

    What could have been better

    There are always things to learn on a project, but I think it must be a good sign that I can’t think of a single clanger.

    The project is not as ecological as I would have liked

    This is probably my biggest regret of the project but I made all these decisions with my eyes open.

    One challenge we had was that my wife did not want to live in a ‘new house’ with a roof full of solar PV! I, on the other hand, was really keen to try not to copy a style from the past. I wanted to build a house fit for the 21st century. That meant we had to find the middle ground.

    So we built a Passivhaus that has traditional form and uses traditional materials.

    We went down a masonry route to keep things cost effective. I was also keen to understand more about building with masonry (as it is one of the main construction methods in the UK).

    So we have no renewables and we are a masonry build. I know why we ended up here, but I do look at other projects and get slightly envious about what they have achieved!

    We increased our budget

    Some people say a budget is the budget. When we went out to tender we got a bit of a shock!

    Plenty of value engineering suggestions were made but we didn’t feel comfortable compromising on what we wanted. Fortunately we were in a position to pay more.

    But the point here is that overall we have spent massively more than we were planning on day one!

    Our cost-cutting didn’t always work!

    After the shock of our tender returns, we had to make some cutbacks. Some of these I wouldn’t even be able to tell you what they were now.

    However there are a few that I would like to revert (as soon as is financially possible). The driveway is top of that list. We changed from a resin surface to shingle. This saved us over £20,000. The downside is we have a noisy driveway, with stones go everywhere and it’s tricky to walk on.

    The shingle driveway is incredibly noisy to drive across

    Following on from this we also got rid of the paving around the house and put shingle down there too. There’s no doubt that this also saved a lot of money. We had always anticipated using this back door most of the time. That doesn’t really happen. We almost exclusively use the front door… and I do wonder whether a large part of that is the surface.

    I didn’t catch the little things in time

    The more you are on site, the more you can spot little things that might be about to go wrong. I was on site every couple of days but it’s amazing how much progress can be made in that time.

    I’ll give you an example. In the guest en-suite bathroom we wanted the following tiling pattern.

    The tiler did not get this information and tiled it horizontally.

    This was his error and we could have got him to redo it. However, it would mean half a bathroom’s worth of tiles would go in the bin and he’d be out of pocket £1000.

    Needless to say the conventional tiling pattern still looks pretty damn good, so we decided to leave it that.

    If I’d been on site when the first few tiles were going up, we could easily have corrected course.

    I got tired by the end of the project

    Self build fatigue is real. As it got towards the end of the project I perhaps got a little casual with some of the furniture purchases. It would have been lovely to dig into the specifications and find out what was in them and where they’d come from.

    Instead we would take a cursory glance and if it looked like it would fit the bill, then we’d go for it!

    Overall, we did really well

    I’m in a fortunate position to get to see lots of eco homes and hear first hand from the self-builders what it’s really been like. As such, I think we’ve got a lot to celebrate.

    Funnily enough the majority of the ‘little niggles’ get forgotten. After all, life moves on.

    Please connect with me

  • HPH233 : How to choose a construction system for a house build – with Mike Hardwick

    HPH233 : How to choose a construction system for a house build – with Mike Hardwick

    Self build consultant, Mike Hardwick, explains the pros and cons of different construction systems.

    Interview with Mike Hardwick

    Mike hasn’t followed a typical path into the industry. He actually worked in the RAF for 26 years, and with all the different postings came many different house moves for him and his family. Deciding to settle in one place they selected a location (based in the middle of where possible future postings could potentially be), bought a plot of land and built their own home.

    Mike often found himself propping up the bar in the Officers’ Mess answering questions about how to build your own home. When he came out of the Services in 2005, he realised that what he would really like to do was get more people interested in building their own homes, and at that point decided to make a business from it.

    The first series of Grand Designs – copyright Channel 4

    Mike’s house build coincided with the first series of Grand Designs

    They bought the land for their self build in 1999, got planning permission in 2000 and in 2002 were able to move in. Doing the build in parallel with the first episodes of Grand Designs often left them able to empathise with the self-builders, pick up a few tips or wonder why they were doing things a certain way.

    Mike credits Grand Designs for redefining the scope of self build, making people realise that it doesn’t have to just be for the very wealthy. Although he does concede that the TV programme “Sensible Couple with Reasonable Budget Build Modest House On-time and On-budget with a Competent Builder” is never going to get commissioned!

    A build system is the structural element of the house

    That is, what it is built from and held up by. “And the confusing bit with a build system is that just because what’s on the outside of a house looks like maybe a brick, it doesn’t necessarily mean that it’s a house made out of bricks structurally.” Most, but not all, houses in the UK are built with a twin-leaf construction, where the inner leaf does the supporting work and the outer leaf makes it look pretty, with timber, brick, tiles etc.

    As well as holding up the structure of the house and being the main material used in the construction, it is what the services run through and are bolted to.

    As such, getting the right system for you is going to be an important decision to make, and generally it’s entirely your choice. Because the building system you use doesn’t usually dictate the external appearance, the planners aren’t interested. So as long as Building Control are happy that it will comply with regulations then you are free to choose.

    Price comparisons aren’t straight forward

    Mike explains that people will always ask him which system is the most cost effective, but drawing a price comparison is actually quite difficult. He does say that there is a fairly narrow band of cost when it comes to the different build systems, and what influences the price most is actually the detailing and the finishes that go on inside.

    What really hikes the price is when you trade in the materials for speed of construction, such as with houses that are pre-fabricated and then erected on site in a matter of days.

    Masonry construction

    Mortgage companies for example will typically ask whether the house you’re buying is of masonry construction with a tiled roof. They like it because it has substance to it, it’s a safe thing to invest against, and will be appealing to potential future purchasers.

    “It’s the way that we’ve trained our builders, it’s the way we’ve been conditioned to think about how houses work, and it’s what we fall back to. So, they’re easier to insure, they’re easier to mortgage against and they’re easier to sell. Which is why people still do it.”

    If you’re working to a modest budget, then using brick and block is generally at the lower end of the cost spectrum, so is likely to be a baseline for constructing your own home. They are quick and easy to build, relatively cheap to buy, and are easy to handle and cut up. They tick the boxes for mortgage companies, insurers and builders.

    Other positives are the strength they provide, that you can put beam and block floors in. The thermal mass provides a stable temperature throughout the house, and the masonry affords you flexibility of design. You can build just about anything you want in masonry, and combined with steels can give you large, open spans.

    Traditional breeze blocks were made out of cement covered cinder. Modern blocks are lightweight and made from pulverised fuel ash, so the detritus from a coal-fired power station mixed with resin and turned into a block. The aerated middle traps air and provides insulation, and also makes them lighter.  In the UK there is currently a shortage as there aren’t many coal-fired power stations remaining, so the raw materials have to be imported.

    Timber frame

    Timber frame basically replaces that breeze block element with a structural framework of timber. It is associated with being environmentally friendly, high quality, accurate off-site manufacture. It is efficient, effective and with the speed of construction it makes for an attractive proposition.

    Whereas masonry has high embodied carbon in the manufacture, timber frame is carbon neutral in that you plant a tree, chop it down and plant another tree. Timber is also a flexible material in that you can build the walls, ceilings, floors, windows, doors, stairs etc from it.

    Mike is keen to point out to people who worry that building a timber frame system might suffer from problems such as termites or rot, that probably around 65% of what we would call a masonry house is actually made from timber anyway, being the roof trusses, stairs, skirtings and so on.

    Mike concedes that, if pressed, he would say timber frame is probably the cheapest way of building the structure of the house. But that would only be if you were doing the most economical and basic timber frame with no frills, and without doing anything to attenuate the acoustics. Most self-builders would want to go above and beyond building regulations and put in good sound-deadening insulation to minimise noise transmitting through the house. When taking into account the extra money on the sound-proofing, you are probably then looking at a more expensive path than masonry.

    “Now, if you want the environmental stuff but you don’t want a lot of noise transmission, timber frame with noise attenuation is a good thing but it’s going to cost you more than it will for a masonry house straight out of the box. This is where you need to start doing your homework and making your calculations about what you actually want, how you’re going to live your life, and what you’re trying to get from the home that you’re building.”

    The thing to remember with timber frame is that it will last well as long as the moisture content in the structure is kept to a minimum, and allowed to escape so that it doesn’t build up. On the inside of the house behind the plasterboard there will be a non-breathable, vapour control layer. This stops any moisture occurring inside the property from getting into the structure. On the external wall, underneath the render or brickwork, is a breathable membrane, allowing any moisture that does get inside to find a way out.

    Insulated Concrete Formwork (ICF)

    These are a type of fire retardant polystyrene foam block. They fit together to create a solid outer wall and a solid inner wall, with the gap in the middle being filled with poured concrete. When the concrete sets and cures, you end up with a waterproof, insulated, monolithic wall which is highly insulated, highly airtight and with the strength and density of a masonry wall. This makes it popular for people building to the Passivhaus standard.

    It also benefits from being very quick to construct, you don’t need to be too skilled to put it together, and being waterproof is a good choice for flood-prone areas.

    Some people aren’t keen on this method because of the perceived embodied carbon being quite high. In reality, Mike says, they are mostly made of air with very little actual structure to them. There are other alternatives, such as Durisol blocks which are much the same in principle but use chopped up timber instead of the polystyrene foam as the insulant.

    Although there is a lot of concrete used, Mike suggests thinking about the amount of energy that the structure saves straight away with its high levels of airtightness and thermal performance.

    It is worth thinking about future use, as putting in more doors or windows for example at a later date is going to be very difficult. Also perhaps a marine ply or a Thermacell type board is advisable for indoors when there might be considerable weight such as cupboards or TVs to be hung from them.

    Structurally Insulated Panels (SIPs)

    These are manufactured off-site and built of two oriented strand board (OSB) sheets that are filled with expanded urethane insulation foam. The panels can be cut, shaped and fixed to other panels to make a complete housing structure. They tend to be accurate, airtight, watertight and put up on site very quickly.

    If you were thinking of using this building method, you would take your designs to a SIPs company whose CAD systems would create the plans to feed into the machines that produce the panels to millimetre perfection. These panels work with the other panels around them, and can even have steelwork in there for covering large spans, to give the structural integrity to the house.

    Mike explains how the success of a masonry constructed home is very dependent on the quality and skill of the bricklayer. With ICF it’s harder to go wrong, as the panels are designed to fit together at 90 degrees, meaning the walls are going to be straight and it will be easier for fitting out afterwards.

    One drawback is that you can’t later decide to move things about or add doors or windows because the structural integrity will be compromised.

    “The advice I would give to anyone contemplating building in SIPs is to spend a really long time thinking about what you want and what’s going to go into your house, and the design of your house, and then say, ‘that’s it, no more changes. We’re happy with this. Go and provide this house.’ Because once it goes into the computer and they pull the handle, then that’s what you’re going to get. If you suddenly say, ‘about that wall there, can we have another one here or another window here? Can we have that door moved to the left?’ that’s going to be expensive, it’s time consuming, you’ve got to start again and recalculate the whole thing in the worst cases.”

    In terms of cost, Mike says ICF and SIPs used to have roughly a 10% premium on them because there were new factories to be paid for, but as they are becoming more common-place the prices are more competitive. Some manufacturers are even assuring that they can produce a house for about the same cost as brick and block.

    Straw bale

    Previously seen as something you wouldn’t consider for mainstream building, nowadays the increased focus on energy efficiency, natural materials and environmentally conscious building has given straw a greater appeal. Mike explains that structural straw bales, as opposed to ones you would buy direct from a farmer, are processed and compacted to form dense blocks.

    “When you encapsulate this within a lime water and plaster that you would normally be using with this build, you’ve got something which has got no oxygen. So, it doesn’t catch fire. It doesn’t. It’s just a really good carbon neutral method, environmentally friendly way of getting all that insulated wall which looks really good as well.”

    Straw bales do mean that you end up with thick walls, but for some people that is a positive feature. The deep window and door reveals combined with the lime plaster make it look and feel like a solid house with a natural, rustic feel.

    Mike concedes that some mainstream lenders and insurance companies might not be keen to deal with these, but others like the Ecology Building Society see the benefits and will lend against them.

    Prefabricated system builds

    Most of these factories tend to be in continental Europe where the prefabricated kit is made and then brought to your plot to be assembled. This method probably won’t suit those on a smaller budget but for projects on a grander scale, or at least a grander budget, they will be rewarded with superb, quality finishes.

    “And for those people who want to be hands-off with the self-build rather than actually getting involved and really worrying about how the bricks go and how the timber frame is constructed, they can sit back and basically say, ‘here’s the house I want. Build me one of those. Here’s where I want it.’ And somebody else goes and does it for you. You pay for the privilege of doing that, but the stress levels are going to be a lot lower than somebody who’s actually project managing their own build all the way through.”

    Again, this is a system where decisions need to be made up front as any changes later are going to be extremely costly.

    Steel frame

    A steel frame self build house wouldn’t be commonplace in the UK. They tend to be more popular in warmer climates. If you have a steel structured house and are trying to stop cold-bridging then you’re starting from a losing position.

    However, recent changes in planning regulations, where permitted development allows people to take farm buildings and convert them into residential dwellings with less of the hassle, has made extensions and renovations of steel-framed farm buildings more common.

    Thin joint

    The masonry industry has recognised some of the problems of building with blocks (weather dependent, speed of construction, reliant on quality of the builder) and come up with a variation on the masonry theme called Thin Join. They use over-size versions of the cinder blocks and instead of using a 10mm sand and cement mortar base, they are held together with a type of glue adhesive.

    “But by taking out things like the mortar bed, you’re taking out two things. One is a passage for air to get through, and when air can get through, noise can get through. So, by taking that mortar bed out, you’re putting better airtightness into it, putting more insulation into the wall and you’re taking away some of the need for skilled construction to put it together”.

    It’s also a cleaner system, using a bucket of adhesive instead of having piles of sand and cement spreading around the site.

    Which system to use depends on what is right for your circumstances

    “So, if low cost is your priority then you need to be looking at the traditional masonry or the timber frame setup. If you’ve got family and you want a bit of peace and quiet, you want some separation of noise, acoustic attenuation, then the masonry end is probably the way you want to be looking at.

    If you want energy efficient, you’re environmentally aware, then you want high efficiency and low running costs. Then timber frame is probably where I’d be looking at. That’s at the lower end of the spectrum on there.

    And as you go up the performance scale, that’s when I’d start looking at the ICFs and the SIPs panels. They might cost you a little bit more to build but again, there’s a trade-off there against the cost of the materials and you need less labour to put it all together.

    At the very top end, if you really are a hands-off builder and you want the sort of quality which just comes with that continental standard, then these system builds that we spoke about, hand over the money and let these guys come and build it. You’ll have a house which will be good enough to feature in the magazines. But you will pay for that privilege.”

    Additional resources

    Build It Magazine

    NaCSBA

    National Self Build & Renovation Centre

    Transcript

    Download a transcript of the interview with Mike Hardwick.

    Please connect with me

  • HPH215 : 10 things I’ve learned during construction  – with Ben Adam-Smith

    HPH215 : 10 things I’ve learned during construction – with Ben Adam-Smith

    Ben Adam-Smith reflects on what he’s learned so far during the construction phase of his self build.

    The project is halfway through and the finished house will meet the Passivhaus standard.

    1. Things move quickly

    If you’re a first time self-builder I’d wager it’s taken you a number of years to get to the build!

    You’ve probably spent time dreaming and then looking for land and then going through the design process.

    For all this work you have nothing physical to show.

    So when it actually gets to the build and you have a team turning up on site every day, the progress is marked.

    Yes, you’ve got this all in a schedule but sometimes things don’t register until you see them!

    I visit site two or three times a week and I’m always amazed what they’ve achieved.

     

    2. Your team is probably bigger than you think!

    Hiring a local contractor may give you the impression that you are hiring a small team.

    However, building a house requires a great many skills. That means your core team will use sub-contractors where they see fit.

    Sometimes this might be for speed. For example, brick-layers were drafted in when the superstructure was going up (even though the core team could have done this).

    Or it could be a specialist skill is required such as electrics, plumbing, laying a screed, etc.

    3. The flow of supplies is half of the progress

    You can’t do anything without the materials. They need to be on site in the right order and ready when needed.

    Sometimes a lot of progress can be made in a single day.

    For me, a great example was when the beam and block floor went down.

    Organising the precast concrete beams and filling in the blocks happened in a short space of time.

    Watching this process you see people with their different roles. One person will be operating the telehandler and just bringing new packs of blocks. Another person might be distributing these blocks, while another person is technically doing all the building (and laying them)!

    4. The quality of the build is a team effort

    Watching the construction phase unfold before you it is clear that everyone is contributing to the finished product. Perhaps more so on a masonry build like mine, because there are so many little elements that come together.

    Whether it’s mixing cement, laying blocks, putting in insulation, or the thousands of other little jobs, everyone must be putting in 100% to have a high quality finish.

     

    5. As a client, you need to keep ahead with the decisions

    When you take on a self build you are aware that a lot of decisions are coming your way.

    The good news is that these don’t come all at once. There are definitely moments when the decision-making intensifies. One of those is during specification. The second peak is during construction.

    As we put a lot of detail into our tender documents we thought there wouldn’t be that many decisions to make during construction. Wrong!

    If you’ve left any PC sums then get to work as soon as possible. Your contractor is not going to want to be delayed and may apply pressure accordingly.

    The whole way through we’ve been asking our contractor what is next, what is next? Thus we have stayed ahead of the curve so far.

     

    6. As a client, there’s a huge benefit to regular site visits

    I try to get to site every two to three days. Why? Well, firstly I love it. I’ve seen so many other houses come to life that I want to make the most of seeing progress on mine!

    It’s also a great way to build relationships. I always aim to know the name of everyone working on site and find out a bit about them. When you’re knee-deep in emails and texts, I like to balance that up with real life contact.

    The other reason it’s useful is that you can often answer questions or pick up on little things.

    Finally these site visits are good for understanding your house. I may have stared at plans for hours but everything becomes clearer when you can see it in practice.

     

    7. Problems that arise can generally be solved

    Throughout a self build issues will arise. At the time it can feel like the end of the world. Of course, with a positive mindset there’s a way through. Normally a bit of discussion and a few decisions can get you back on track.

     

    8. Best-made plans might need to change

    I’ve tried to embrace the philosophy of not changing my mind too much during the construction phase.

    This is sound advice because there can be ramifications to changes (which will translate to delays, additional cost and crushing morale).

    However, some aspects are not set in stone and can evolve without much or any extra work.

    I guess it’s about catching those things in time.

    One example of this on my project was the nagging thought that we’d put too many bathrooms in upstairs! Initially I vowed to live with it. The thing is that it hadn’t happened yet. And the more we thought about it, the more we realised this space could still be useful, just with a different purpose. So, for now it’s for storage. Who’s to say it doesn’t transform as we need it.

    9. Masonry construction feels old-fashioned!

    My build is a masonry cavity wall construction, which is both traditional and popular in the UK.

    It’s often chosen because there’s a solid skill base available and it’s cost effective.

    However, sometimes it does seem quite manual.

    There’s a lot of cement to mix and blocks to arrange. String lines are used . . . the tolerances are not as good as other build methods. Not forgetting there’s a lot of embodied energy wrapped up in this approach

    All that said, it is still the main way we build things in the UK. Who knows how you change an industry?

     

    10. Being a client is a full time job!

    We have hired an architecture firm and have a main contractor. It doesn’t get much easier than this.

    Even so, it’s still been exhausting at times!

    So don’t overstretch yourself. If you’re planning to project manage, for example, make sure this is within your skillset and you realise what you’re taking on.

    I cannot fathom what it would have been like with extra responsibility on my build!

    Please connect with me

  • HPH056 : Which Build System is Best to Create a Low Energy Home? – with Piers Taylor from Invisible Studio Architects

    Piers Taylor from Invisible Studio Architects explains what a build system is, why you would use one over another and whether any are preferable when it comes to creating low energy houses.

    Piers-Taylor

     

    Interview with Piers Taylor

    It was after seeing an inspirational talk by Glenn Murcutt in Sydney that Piers Taylor decided he wanted to become an architect.

    He now runs Invisible Studio Architects as well as helps self builders on the BBC TV show The House That £100k Built.

     

    A Building System is the Method Chosen to Construct the Building

    Piers talks of these in terms of lightweight and heavyweight, and on-site and off-site construction, as most one-off individual homes will fit into these categories.

     

    It is Easier to Achieve a High Quality Finish With a “Lightweight” Timber Building

    When answering the questions of what is most efficient, most economically sound and best environmentally, timber is the material which Piers instinctively selects.

    Timber is a renewable and readily available material, comparatively cheap, very workable on-site and can be used by people with varying degrees of skill and experience.

    With Passivhaus requiring airtightness and quality of workmanship, Piers believes that a stud framed building is ideally suited.

     

    It is Generally More Efficient to Build On-site Rather Than Pre-fabricated

    Piers had laboured under the misapprehension that to build in a factory was the better way to do things, however when the expenses of factory rent, labour and heating are taken into account, when it comes to single buildings he believes that making things by hand on-site is more efficient.

     

    There are Far Fewer Passivhauses Made of Masonry Than of Timber

    While masonry buildings do have the advantage of thermal mass, Piers explains that it is harder to achieve a good quality finish with blockwork and wet trades. He puts this partly down to tradesmen putting them together crudely, with the assumption that someone else will be doing the finishes.

     

    There is a Place for Concrete as an Environmentally Sound Material in Big Span Construction

    Concrete has a smaller carbon footprint than if it were replaced in big span construction by steel for example. The problem is often the amount used, rather than the material itself, with laziness often causing its overuse. Piers doesn’t see a place for it in domestic houses, unless there is a particular desire for a thermal mass in the floor.

     

    SIPs (Structural Insulated Panels) Don’t Have Any Real Advantages in Individual Houses

    The advantages of SIPs panels lie in larger projects where economies of scale are a factor. For a domestic property they are expensive as the factory overheads are included in the cost, they contain all sorts of formaldehydes and glues, and they can’t just be made on-site.

    While SIPs panels appear to be constructed quickly, it could be argued that making a timber frame in a factory would be just as quick.

    Piers summarises that the ideal use for SIPs panels are for buildings with big roof spans, multiple buildings where an application is being repeated and where the walls are required to have a structural capability without the need for beams.

     

    Big Volume House-Builders are Efficient in Terms of Their Construction

    Piers accepts that, whilst we may not like what they build, big volume house builders have honed their methods of construction to be hugely efficient, as they’re making all the component parts on-site, and are therefore not paying factory overheads.

     

    The Passivhaus Standard is Achievable With Any Construction Method But is Largely Dependent on the Quality of Craftsmanship

    As Passivhaus is about achieving a good standard of fit to create building performance, rather than being interested in thermal mass, it is something that is not as easy to achieve with masonry.

     

    Straw Bales May Not be That Efficient But Their Advantage Lies in Being so Locally Produced

    Straw bales are relatively inefficient because they are bulky and not great insulators compared with some other materials. However, they are loved by some as a construction method as they are low tech, available, cheap and usually haven’t had to travel far – something that is sometimes overlooked with timber which, unless it’s come from a local sawmill, can often be shipped from Scotland, Scandinavia or Canada.

     

    A Build System is Invariably Better When it Influences the Look of the House

    Piers’ preference is to have the constructional system visible and legible to show what the different parts are actually doing, rather than the sanitised approach to current construction where everything is hidden behind plasterboard.

    Piers sees a beautiful precision in timber, unlike the less aesthetically pleasing concrete block and steel which invariably have to be covered up because the fit is not good.

    As with SIPs panels, there is often no call for steel frames in a domestic building as the spans don’t necessitate it and it is an expensive option.

     

    Projects are Immeasurably Better if How They’re Made Forms an Early Part of the Building Decision

    An early decision should be made on what is going to be the most appropriate material to use as this will give the building its character. By exploring all sorts of options you can gradually hone in with greater certainty on one thing.

    Part of this early conversation should be focussing on efficiency, in terms of using materials intelligently and sensibly, without being wasteful, and these are things that need to be balanced with what the building is going to look and feel like.

     

    Timber is the Best Material to Use For Keeping it Simple

    Many self-builders will be doing a project for the first time so Piers’ advice is to keep it simple. Timber is quick, efficient, available everywhere, anyone can use it and it doesn’t harm the environment if it is chosen wisely, and with its only real drawback being lack of thermal mass, Piers considers it to be the best system to use.

     

    Find Out More

    invisible studio

     

     

     

     

     

     

     

    Follow Piers Taylor on Twitter.

     

    Transcript

    Download a transcript of the interview with Piers Taylor.

     

    Today in the Comments Section

    Which build system did you use? And what were the pros and cons?

     

    UK Passivhaus Awards 2014

    The shortlist for this year’s UK Passivhaus Awards has been been unveiled. Good luck to all those involved!

    Check out some of last year’s projects.

     