Tag: ground source heat pumps

  • HPH203 : Putting craftsmanship at the centre of your eco build – with Will Anderson

    HPH203 : Putting craftsmanship at the centre of your eco build – with Will Anderson

    Author and self-builder Will Anderson talks about realising his self-build dream not once but twice!

    Interview with Will Anderson

    Will describes himself as “a writer, actor, builder and craftsman”. His account of his first self-build was published in The Independent newspaper and is now available to buy as a book. His previous work has included writing and contributing to other publications with an environmental angle.

    A tree inspired a house with high environmental standards

    Around the year 2000, Will Anderson and his partner snapped up a rare South London plot. The very big tree it housed inspired the name and design of Tree House: a house that would work like a tree. Wanting to do their very best for that plot meant building a house that was not only wonderful to live in, but had the very best ecological performance.

    Will says any extra costs were justified by long term savings, adding, “If you built a house that had the very best environmental performance, it would also, hopefully, be the very best for you.”

    Technology helped Tree House achieve its ambitious goals

    Will was interested in the Passivhaus standard and had even contacted Wolfgang Feist, but in 2004 it wasn’t an established approach in the UK. So Will worked with his architect, Peter Smithdale of Constructive Individuals, to deliver a house that was self-sufficient in energy and “zero carbon”. To manage this meant combining a fabric first approach with “quite a lot of technology”.

    The high-performance house included a PV cell array, and a hot water panel. Furthermore, a ground source heat pump was installed in boreholes in the small plot. Will says this tried and tested technology continues to work very well, explaining, “They’re quite simple bits of technology compared to boilers.”

    Will built with the plot next door in mind

    Tree House was detached, but they knew that eventually it would become semi-detached, as there was a plot next door. Thinking ahead, Will avoided putting windows on the northern elevation that would become a party wall.

    The people who owned the garden in question appreciated the consideration and gave him first option when they decided to sell the land. He took the chance to build his second house, The Orchard.

    Where the two houses meet

    Will had to overcome issues of planning and party walls

    Building onto a detached property presented some challenges. For example, the render board had to be removed from Tree House and another timber frame wall built and filled with insulation. Furthermore the two walls couldn’t be attached (apart from some metal ties at the very top) to ensure acoustic isolation.

    Getting the right design and gaining planning permission took a long time too, but one of the biggest problems was the party wall agreement. Will advises getting a really good party wall surveyor and paying attention to the detail of the party wall award, adding, “You need to just make sure you’re properly protected.”

    The Orchard has an improved fabric but less technology

    Will wanted The Orchard to use less technology but still be very comfortable. This meant improving the fabric of the house in order to cut out the heating system. Contractors and materials were more familiar with Passivhaus principles by then and The Orchard benefitted from a purpose built external airtight layer.

    The Orchard is ventilated non-mechanically, a deliberate decision on Will’s part. He is very pleased with their Ventive passive heat recovery ventilation system, commenting, “We’ve got a completely draft free, stable interior temperature, but we still have good air quality without having all the business of mechanical ventilation.”

    Heat-recovery ventilation cowls

    Will wanted to get more hands-on second time around

    Helping finish the building of Tree House gave Will enough confidence to get more involved the second time around, although he says, “You need to know your limits, obviously”. So, even though he had done a bricklaying course, he called on an experienced bricklayer when he lost confidence on the garden wall after the tenth course of bricks.

    Some subcontractors will have their own helpers and will want to do all their work on their own terms. But Will says there are others who won’t mind you joining in. For example, given Will had some experience, the frame company, Touchwood Homes were very happy for him to lend a hand.

    The Arts and Crafts Movement inspired Will’s labour of love

    As part of the house building process, Will made his own workbench. That it has remained part of the main room says much about Will’s love of handmade items. The Orchard is inspired by the Arts and Crafts Movement and its architects, many of whose houses he has visited. What he likes so much is “the handcrafted approach, the delight in materials and in a kind of clean but very rich design.”

    Although he started without any craft skills, Will learnt a lot of trades to build The Orchard, including ceramics, even making tiles from their excavated foundations clay. To find the right course Will recommends trying out what’s local. He found one reasonably nearby in Croydon, where he learnt joinery, bricklaying and plastering. He went further afield for the more specialist skills: cabinet making in Kent and stained glass making at the Working Men’s College in North London.

    Learning skills had to be balanced with designing and building

    At the design stage, Will was already thinking about how to incorporate these crafts aspects, meaning careful planning was needed. He admits it was tricky to move between design, doing courses and starting on site and keep it all going at the same time.

    For example, the open-plan kitchen in the main living space had to be part of the overall design to make sure it would fit in: it was built long before the house! Likewise the two-storey, triple-glazed, staircase window, finished with stained glass, was always part of the design.

    Self-builders need support and patience, and to understand the industry

    Will says that self-building with no experience isn’t so hard if you get the right people to do the right jobs and you have enough patience. Understanding how the building industry works is important too. For example, Will advises being flexible rather than getting frustrated if builders don’t start when they said they would. “In the building industry, that’s absolutely standard. Not because builders are unreliable, but because people’s timetables and schedules are always shifting,” he explains.

    New technology can help with using reclaimed materials

    Will has used reclaimed materials in both houses. For example the parquet flooring uses African, Australian and Asian woods that would be impossible to source sustainably today. Modern glues can “recharge the bitumen”, so it didn’t need to be removed. This made the process easier but it was still labour intensive, especially as each room used a different wood and a different pattern.

    The blocks of wood had to be cleaned then set out properly. Will’s method was to build out from a long spine of blocks down the middle of the room. Care was needed to avoid the pattern going wonky and having to cut blocks to fit them in. Next everything was sanded down to a new surface and then oiled. Will reflects, “A massive, massive amount of work that was. But I absolutely love it.”

    Careful planning has paid off

    As the name suggests, Will wanted to build an urban orchard. He knew he wouldn’t get big machinery to the back of the house after it was built, so before he started building he replaced a lot of the poor soil with “really good quality muck”. Now the front and back gardens are densely planted with fruit trees and outside the thermal envelope are a larder and a conservatory where Will grows more tender fruit.

    As so much of the house is hand made it has been a long project, but all the work and planning was worthwhile. Will says, “We’ve taken a long time over it. But we’re going to be here forever, so that’s okay.”

    Links

    Diary of an eco-builder

     

    Transcript

    Download a transcript of the interview with Will Anderson

     

    Please connect with me

  • HPH202 : Designing the ventilation, heating, and hot and cold water systems for Ben’s house – with Alan Clarke

    HPH202 : Designing the ventilation, heating, and hot and cold water systems for Ben’s house – with Alan Clarke

    Building Services Engineer Alan Clarke explains how he has designed and specified the ventilation, heating, and hot and cold water systems for Ben’s new house.

    Interview with Alan Clarke

    We first spoke with Alan Clarke back in 2015 where he helped answer our question of whether a Passivhaus needs a heating system. Alan’s role is to engineer the design of the plumbing, heating and ventilation within a house, and in this podcast we focus on the designs he has created for Ben’s Passivhaus self build.

    Alan’s aim is to hand over a specification that is as short and easy to follow as possible. On one hand it will act as a shopping list for a contractor to price from, but also provide basic instructions on things to be installed in particular ways, such as pipe size, thickness of insulation, types of terminals for the ventilation unit etc. It will be a comprehensive list of all of the kit required, the instructions on how to get it commissioned, and what flow rates to commission the ventilation system to.

    Start by getting the ventilation system right

    Firstly the design must make physical space for the required services, and make them work well. Alan will develop the ventilation scheme by looking at the plans and understanding the airflow, establishing which are the supply rooms and which they will need to extract from. At this early stage he will feed the information into the PHPP energy analysis programme, along with heat loss information which will help when it comes to working out the heat load details for the heating system design.

    The ventilation systems Alan uses are all Passivhaus certified. Using a certified unit tends to be cost effective as their efficiency is tested under the methodology that fits in with the energy calculation in PHPP. Some non-certified units tend to shut down the supply air in sub-zero temperatures, but the certified units have frost protection. They also have the commissioning controls to allow you to set them up in a properly balanced way, so you’re not wasting heat through unbalanced supply and extract.

    Ventilation Ground Floor Layout
    Ventilation First Floor Layout

    Larger ducts can produce a more efficient system

    With very little ceiling space the ducts can be made flat to be squeezed in unobtrusively. The downside to these is that more fan pressure is required to push the air through the narrower ducts. More fan power requires greater energy and more noise is generated at the unit. It also tends to be a system which doesn’t come with well sealed junctions in the duct work.

    The alternative approach is to use slightly bigger, round ducts which are inherently easier to make airtight junctions. This approach tends to produce quiet and efficient systems, but does require thinking more cleverly about how to make space for them all.

    In Ben’s house the ducts are spread around easily on the lower floor because there are open web floor joists which are engineered joists with a metal zig-zag, giving plenty of space to fit services through.

    Upstairs there is a truss rafter roof. In a Passivhaus they make the air barrier the base of the trusses. Lots of insulation goes on top and Alan wouldn’t want to be putting lots of ducts through that air barrier and into the cold loft space. Keeping them inside the warm, airtight envelope means that there needs to be a dropped ceiling somewhere to run the ducts through. They will be lowering the landing ceiling to accommodate the ducts, by virtue of it connecting the rooms together and not having windows so there will be no loss of window head height. The ducts stop at the bedrooms where there is a step up in ceiling height.  Here they will use a wall mounted, side throw air terminal to push the air into the rooms.

    Ben will be using a Zehnder Passivhaus-Certified MVHR

    It has a fairly large capacity so is ideally suited for family houses. It has been designed with integral airflow measuring inside the unit, meaning that whatever the conditions it will maintain the selected ventilation rate without losing performance.

    A change to the size of the kitchen and utility areas has meant that the MVHR will now be outside of the thermal envelope and inside the garage. It will be on the house wall of the garage to make the ducting run as short as possible, and the ducts will be insulated to reduce the heat losses.

    The house will have a mainstream boiler

    Alan is seeing more projects using air source heat pumps, which although they have a high capital outlay do benefit from low running costs. Using specialist imported systems can create problems when there is a fault, with a lack of qualified tradespeople available to fix them. A mainstream boiler won’t have those problems when it comes to parts and technical support.

    The hot water will have a flow restriction

    The system is designed to get hot water to the taps as quickly as possible without circulating hot water that is losing heat to the rest of the house.  Entering information into PHPP on pipe sizes and how they will match up with the flow rates and available pressure will help calculate the heat loss.

    Ben does have a concern about how the restricted flow will actually feel in the shower pressure, so it will be important to select a shower head that has been designed to work in conjunction with flow regulation.

    Hot and Cold Water Ground Floor Layout
    Hot and Cold Water First Floor Layout
    Plumbing Schematic

    Radiators have been installed to complement the flexible spaces

    Alan has considered the design of the house and how it will be used, to conclude that there will be radiators in most of the rooms. For example, one bedroom has three external walls and a balcony door so a radiator would seem sensible to accommodate people’s different comfort levels. Another spare room might have different temperature requirements depending on whether it is being used as a guest bedroom or a study.

    Heating Ground Floor Layout
    Heating First Floor Layout

    Underfloor heating wouldn’t be cost effective

    Alan explains that it is inherently a high output system, with the whole floor available to heat the space. By virtue of it being a Passivhaus the heating demand will be reduced by a factor of ten, so paying full rate to cover the whole floor with underfloor heating doesn’t seem logical.

    Find out more

    Follow Alan Clarke on Twitter

    Transcript

    Download a transcript of the interview with Alan Clarke.

    Please connect with me

  • HPH062 : Does a Passivhaus Need a Heating System? – with Alan Clarke

    HPH062 : Does a Passivhaus Need a Heating System? – with Alan Clarke

    Building services engineer Alan Clarke explains what factors should be considered when choosing a heating system for a low energy home.

    Alan Clarke

     

    Interview with Alan Clarke

    Alan Clarke has been involved in energy and buildings his whole career. He’s worked on a variety of projects, from schools to housing developments and individual self-builds.

     

    N.B. In this episode we are talking about heating systems relevant to the central European climate. In hotter climates you will be focused on cooling rather than heating!

     

    A Passivhaus is Likely to Have Fewer Radiators than a Traditionally-Built House

    When it comes to looking at heating systems for a Passivhaus there are a couple of key differences to consider.

    Compared to a traditionally-built house it is not necessary to heat every little corner (as the heat loss from each room is a lot less).

    There are also no cold surfaces. So, in a Passivhaus (where thermal bridges have been eliminated, etc.) it will not be necessary to put radiators under the windows.

     

    The Amount of Heat a Building Needs Comes Down to the Heat Loss!

    In simple terms, the heating requirement of a house will be determined by the heat loss of all the elements of the fabric and the ventilation.

    The total heat load will clearly be affected by the size of the building, but then it comes down to the insulation value of the wall, the windows, the ventilation system and so on.

     

    Even in a Passivhaus You Can’t Dispense Completely with Heating

    Working with Passivhaus specifications and including heat recovery ventilation very low levels of heat might be needed but there’s no expectation that we can do without heat completely.

     

    The Snag with Solar Gains and Internal Gains is How Variable They Are

    Alan gives an example of why it’s a good idea not to do away with a heating system.

    He says: “You could have a sunny day when it’s -5ºC and with the right house no heating is needed. It’s great. Then a week later it could be raining, it could be 3ºC, completely overcast and actually it would get a bit cold.”

     

    Good Temperature Control is Essential

    In a Passivhaus it’s no longer simply a case of it’s winter we need heat: some days you need a lot and some days you might not need any.

    So good temperature control based on the temperature inside the house is important.

    Generally, if you’re using gas heating you’re trying to throttle down a boiler which is really too big for the job. So controls that are able to lower the temperature that it runs at are a good option. They effectively reduce the power of the radiators by reducing the temperature at which they run, as well as increasing the boiler efficiency.

     

    Reducing Energy Demand is Always the First Step

    Alan does not advocate moving away from gas as a fuel in situations where there is already a connection to the gas main.

    The reason for this is that the emphasis of a Passivhaus building is always to think about energy first and reducing the energy demand. So to some extent it is less important where that energy comes from afterwards because one source of energy is often convertible to another. The key point is to use less.

     

    Find Out More

    Follow Alan Clarke on Twitter

     

    Transcript

    Download a transcript of the interview with Alan Clarke.

     

    Join the AECB

    For building professionals in the UK, the AECB is a fantastic organisation that shares knowledge and aims to promote sustainable construction.

    Their yearly conference is also an opportunity to be invigorated by like-minded individuals.

    They have just hosted their 2014 conference in Bristol but this video from 2013 sums up what people get out of it.


      Video produced by Regen Media

     

    Please Connect With Me

  • HPH017 : Can a Ground Source Heat Pump Make an Old House Energy Efficient? – with Justin Broadbent from isoenergy

    HPH017 : Can a Ground Source Heat Pump Make an Old House Energy Efficient? – with Justin Broadbent from isoenergy

    Justin Broadbent from isoenergy explains what a ground source heat pump is and how it could be used as a solution to make a period property energy efficient.

    Justin Broadbent

     

    Interview with Justin Broadbent

    Justin founded isoenergy 14 years ago after he sold his software company. An engineer by trade, Justin was keen to reduce the running costs of his period home and also get rid of his dependency on oil. As his father-in-law was a part owner in a Swedish manufacturer of heating systems, he began to discover more about Sweden’s approach to low energy buildings with very high levels of insulation and soon realised that the UK had a lot to learn about energy efficiency.

     

    Before Plugging in Something Mechanical, Reduce Your Heat Losses

    Justin started out as a consultant and as things grew he begun to import the machinery, too. This soon led to doing the installations as well. Even though isoenergy designs and installs renewable energy systems, a fabric first approach is always the starting point. The most expensive heat that you put into your house is the heat you’re putting in the second, third or fourth time, and so on, because you’ve lost it the first time.

     

    A Heat Pump Compresses Energy

    Justin explains how a heat pump works, using a bicycle pump as an example. As you inflate the tyre you may notice the end of the pump starts to get warm. This is because, as you compress the gas from the ambient air pressure (1 bar) through to the pressure you’re putting into the tyre (say 5 bar), the molecules get excited and so they get warm. Thus while the bicycle pump is running, it is a heat pump.

     

    Fridges are Heat Pumps

    A fridge takes the ambient air pressure out of the kitchen, which is perhaps at 18 or 20 degrees, compresses that heat and radiates it out at the back of the fridge. That is why the back of a fridge feels warm, normally at about 40 degrees. In engineering there’s always an equal and opposite to everything, so as heat is generated, so is cold. With a fridge freezer, the cold is kept but the heat is thrown away. In this case that doesn’t matter because you probably want to heat the kitchen anyway. A ground source heat pump works in the same way, using the heat for heating the house and putting the cold back into the ground.

    Refrigerator

     

    A Heat Pump Can Reduce Running Costs by up to Two Thirds

    In Justin’s experience most people become interested in reducing their energy usage because of the cost. He has had clients with heating bills of up to £80,000 a year and typically they can reduce running costs by two thirds.

     

    Even in a Period Property You Can Improve The Fabric of a Building

    Insulating the loft is often a very good starting point and sometimes insulating the cellar is an option, too. Most Grade I listed buildings nowadays have shutters built in, which are extremely good insulators when used. Stopping draughts can make a big difference.

     

    Use Old Buildings as They Were Originally Designed

    If you’re in a big house, there may be part of the house that can be sealed off when not in use. Use the fireplaces. Some chimneys draw very well and don’t create any draughts in the house.

    18th-century-house

     

    Secondary Glazing is Effective and Barely Noticed

    Justin has leaded light windows with wooden frames, but in front of the old oak frames there is a single pane of glass with a very thin oak frame going round it. In this case it is the size of the whole window area, but most people don’t even realise it is there, because you think you’re looking at the original windows. This not only drastically reduces heat loss but also acts as a sound buffer.

     

    The Cavity Wall is Left Uninsulated

    Even though Justin’s property has a cavity wall, he refuses to insulate it. This is because he has an oak-framed house with beams that have stood for hundreds of years. If any damp bridging occurs the wood could rot within in a decade. So Justin chooses to use an extra 20% on heating his house so that he knows that the walls remain secure.

     

    The House Stays at a Constant Temperature with Weather Compensation

    The difference between this and traditional heating systems is that a stable temperature, in this case 20 degrees, is maintained all year round. That means that the walls are also at 20 degrees. Even if the outside temperature is -6, the inside walls stay at 20 degrees and actually act as a radiator. This therefore takes advantage of the thermal mass, which is a good quality. Around the time when the house was built, it would have been run in the same way. A fire would have been kept going throughout the day and temperatures would be fairly constant, even if significantly colder than how we live today (perhaps 15 or 16 degrees).

     

    The Radiators Never Get Above 50 Degrees

    Many people say that you need to oversize the radiators when using a ground source heat pump, but Justin is using the same radiators that were heating his house when it ran on oil. The difference is that with oil, you tend to switch the heating on and off, especially if you think you’re saving money. What Justin does is put in a lower grade of temperature but for a 24-hour period. So it’s all about maintaining the temperature. Rather than the radiators getting up to 70 or 80 degrees, his radiators probably never go above 45 or 50 degrees.

     

    Heat Pumps Are Reliable

    Justin explains that more could go wrong with a boiler than it can with a heat pump. When it’s done properly it should be just as reliable as a fridge and most people replace their fridges when the door handle falls off or the seal breaks rather than when the compressor malfunctions.

    Plant-room-equipment

     

    Problems Arise if You Don’t Understand Where The Energy Comes From

    Some people perceive ground source heat pumps as magic, but there is an engineering reason why it works. You are taking a small amount of heat from a large area. For example if you tried to take half a million kilowatt hours out of a piece of land the size of a tennis court, it will turn into a block of ice. So you would need to take that half a million kilowatt hours out of a 5, 10, 15 or 20-acre field. The larger the better. The more the load is spread, the more efficient the system will be.

     

    The Ground Must be Taken Into Account

    There are many factors that must be understood before a system can be designed. For example, it matters how much water is in the ground, how much of a slope there is, what substance the ground is (e.g. clay, sand, shale, etc.). Different substances have different heating properties and different heat transfer ratios. So, it’s important to understand what they are and do the calculations properly. Equally it’s vital to make sure that the turbulence in the pipe is right so that you can extract the heat properly and that the flow pressures are right. Justin says it’s all about understanding pressure losses, heat curves and algorithms.

    Ground-Loops-12 Ground loops being laid

    Hydro Systems Can Payback Quickly

    Justin suggests that you need to consider the renewable technology that will work for your particular situation, whatever that might be. For example, if there’s a stream with a good flow and a good drop in it, then a hydro system could have potential. The payback can be very quick.

    Archimedes-Screw-going-in

     

    Be Aware of Government Grants

    In the UK, the government is bringing out the Renewable Heat Incentive. This will pay people to replace their oil fired boilers with heat pumps and biomass boilers to heat their houses. Those grants are looking like they’re going to be particularly generous. There is, of course, an upfront cost of installing the equipment.

     

    Find Out More About isoenergy

    isoenergy-logo

     

     

     

    Follow isoenergy on Twitter

    Download a PDF of case studies

     

    Transcript

    Download a transcript of the interview with Justin Broadbent.

     

    Ask Your Questions or Share Your Feedback

     

    Home Style Green Podcast

    If you enjoy listening to the House Planning Help Podcast, then Ben recommends that you check out Home Style Green. Matthew Cutler-Welsh is based in New Zealand and is involved in green building there. He shares some invaluable information.

     Home-Style-Green-logo

    Please Connect With Me

  • HPH002 : The House Design You Want And The Low Running Costs – with Martin Evans from The Malthouse Consultancy

    HPH002 : The House Design You Want And The Low Running Costs – with Martin Evans from The Malthouse Consultancy

    Martin Evans from The Malthouse Consultancy talks through how he built his own energy efficient home.

     

     

    Interview with Martin Evans

    Martin explains that he has been in construction all his life, starting as a civil engineer before moving into building. In the early nineties he experimented with renewable technologies and higher levels of insulation. This process developed through to the point where he built an example of a country house that is not compromised by any design constraints, but is built to be as energy efficient as possible.

     

    Energy Efficiency Doesn’t Have to Dictate The Design

    Martin describes how he set about designing a house (6,500 sq ft) that best suited the site and took advantage of the lovely views. Having created the optimum design, he then worked out how it could use the least energy possible. The main considerations are very high levels of insulation that go a long way above building regulations; the house is carefully air-sealed so there’s very little ingress of cold air from the outside during the winter; there is also a mechanical ventilation system (imported from Canada) to avoid stuffy conditions and fresh air passes through an efficient heat exchanger. Martin also generates his own energy from a ground source heat pump, which provides the main energy for the heating and hot water for the house. His total running costs are under £2000 a year.

    Steel

     

    Energy Efficiency is The Future

    The UK has not been good with energy in the past and has not built houses that are deliberately low energy, other than rather odd looking houses. Martin says that he wanted to demonstrate with his house that you don’t need to compromise on the look or the amount of glass, you just need to be careful in the way you specify and the way you build.

    Timber-frame-going-up

     

    LED Lighting

    Advances are happening all the time and Martin describes how LED lighting has moved on since his build nearly five years ago. He highlighted the fact that when you dim a light it doesn’t necessarily use less energy. So try to install a properly controlled lighting system, where the energy usage is proportional. Martin rarely needs to run his lighting in any room above 30% or 40%.

     

    Renewable Technology Can Be Used in Old Houses

    Martin talks about period homes that can be very efficiently heated by renewable technologies, such as ground source heat pumps. The key is to recognise the needs and to deliver a system that works properly. In the example of ground source, he said: “You can put in a very good ground source heat pump, which in theory can deliver the right energy for the house but if the heat emitters in the house aren’t matched to give you the optimum performance of that heat pump, you very quickly get a big drop in performance of that heat pump. So you’ll still get the house warm but it will cost you a lot more in energy. That’s just about not understanding the full process of extraction of energy from the ground and delivery of energy into the houses.” Martin believes you can make any house efficient.

     

    Sustainability in New Builds

    Martin likes timber frames, mainly because there’s very little embodied energy. He points to Canada as a good example of sustainability in wood – they grow the same amount of wood as they extract. That may not be true in Europe but things are moving in that direction. It’s much harder with brick and concrete products because they’ve got a lot more embedded energy in them. However, when you actually look at the energy lifetime of the building, the energy we put into heating it, living in it and ventilating it, it makes the energy involved in the actual construction look relatively insignificant. Martins says it’s probably right that we focus on what the building uses once it’s completed as the priority, rather than worrying about how much is embedded in the building process.

    justin

     

    An Energy Tax Might Provide The Right Incentives

    With predictions that fuel costs will continue to rise, Martin hopes that the UK government will move away from trying to support certain technologies. If that approach is made much more general and it is just applied as an energy tax, which encourages us to do the right thing, then people will become more and more incentivised to reduce the energy that their buildings use. We may want to do it for altruistic reasons but also it needs to be the right thing to do financially.

     

    The Passivhaus Standard

    Martin explains that he didn’t have his house certified but in terms of energy use, it exceeds the Passivhaus Standard. Whether you use a standard like Passivhaus absolutely or as a guide, there are lots of good learnings to be had from the methodology and approach.

     

    Gauging Your Carbon Footprint

    Martin talks about his consultancy work with England’s largest hotel group where, from the outset, they designed and built hotels to the very lowest energy possible without changing the customer experience. The carbon footprint of a night’s stay at one of these eco hotels compared to a top end, ‘energy is no object’ approach, is about 50 times less. As people start to understand the choices, it could also influence their decision-making. With cars it is a lot more straightforward – you know what you are getting – but with houses and overnight stays etc. it’s much more difficult. Of course, it’s moving in the right direction. On the Carbon Trust website you can benchmark your energy usage.

    Insulation-inside

     

    Getting The Right Advice

    There are lots of examples of things going wrong, where people have spent a lot of money and don’t get the right results. It’s usually about not getting the right advice. Quality of installation varies so dramatically that Martin stresses the importance of seeing how installed projects have worked. To do that you need proper data that shows the energy you’ve put into a scheme and the energy you got out so you can see how efficient the whole installation is. Martin wouldn’t buy from companies that can’t demonstrate seasonal figures showing how well their installations have performed.

     

    There is Smarter Cooling Than Air Conditioning

    Air conditioning is not energy efficient. In America they spend more money and more energy on cooling than they do on heating and Martin emphasises that we shouldn’t be moving in that direction. There are ways of making very efficient comfort cooling in a house without using much energy. This means simultaneous heating and cooling of hot water. If at the same time as generating hot water we are generating cold water, then it’s a free by-product of the process if we do it right. So you don’t want a gas boiler heating your hot water cylinder and an air conditioning unit cooling your lounge, for example. We can be much smarter.

    Beams-and-stove

     

    Martin’s Tips For Energy Efficiency

    • Make energy a consideration at the outset but it doesn’t have to compromise your design.
    • Technology should be a long way down your list of priorities. Design it right, specify it right, insulate it to very high levels, seal it well and mechanically ventilate it.
    • Invest in the best products. They may not be a substantial premium but they will save more energy and should perform well in 40 or 50 years.

     

    The Malthouse Consultancy

    The Malthouse Consultancy is a highly acclaimed independent environmental consultancy providing unbiased advice and project management services to property professionals in the planning design and construction fields.

    House-up

     

    Transcript

    Download a transcript of the interview with Martin Evans.

     

    Listeners’ Top 3 Tips

    In episode 1 Ben Adam-Smith asked for your top 3 tips if you had been through the building process or commissioned a custom build. Carol from France got in touch with 7 tips, which we decided ought to feature as an article.

     

    Listener Email About Poor Housing Development

    Anastasia from Pevensey, UK, wrote an email about her previous house in Sovereign Harbour South. She tells us that, despite the building being 15 years old, it seemed to lack even basic insulation. Consequently her bills were sky high. She described the worst part as being the damp and mould, with fungus growing all over the house. However, the house design also left a lot to be desired with bedrooms that barely had room for the beds and a large part of the living space that was practically unusable as it was under the stairs.

     

    Please Connect With Me