  • HPH384: De-risking a Passivhaus project – with Sally Godber

    HPH384: De-risking a Passivhaus project – with Sally Godber

    Sally Godber, a Director at WARM consultancy explains why reducing the risks on her own Passivhaus project was so important, what that entailed and how it enabled her to deliver a healthy, comfortable and energy-efficient home on budget.

    Interview with Sally Godber

    Sally is a Chartered Mechanical Engineer and Passivhaus certifier who co-founded WARM consultancy with her father Peter Warm. She grew up with her dad building different houses, always experimenting with designs and construction systems to improve energy efficiency. It was never her intention to work in this field but somehow it had seeped in by osmosis, and after university and her growing awareness of the climate crisis she wanted to work in sustainability. With her engineering background she had gone into building service design, but it wasn’t rounded enough for her as it only dealt with a small part of the building process. Combining her experience from the commercial sector with her dad’s hands on practical experience and knowledge of domestic builds resulted in WARM energy consultancy. Their services include Passivhaus consultancy and certification, focusing mainly on commercial building projects. They also offer training through their sister organisation, Coaction.

    The juxtaposition of her work and her home situation became too much

    The driver for taking on a project came after living in a large, damp, Victorian house, whilst working on Passivhaus projects for other people. Initially Sally and her husband Mikey had started looking for a new home, but they found themselves wanting to change everything other people had done, which felt pointless. Either they needed to find somewhere that required a lot of renovation or to start from scratch.

    Managing risk became an integral part of taking on a project

    For Sally the prospect of taking on a new build or retrofit was exciting, but her husband Mikey was not so sure. So when they sat down at the beginning to discuss their priorities, risk came up. For Mikey, above anything else he did not want to be crippled financially by chasing the self build dream. Luckily a large part of Sally’s professional life is spent de-risking projects and also having had ‘the big house’ experience she was after the polar opposite.

    Scaling down a project scales down costs

    With a tight budget one of the most important decisions you’ll ever make is setting the size of the project. If you make it too big then it will be impossible to get the quality you desire. Sally and Mikey wanted to build to Passivhaus standard, but beyond that they just wanted a modest sized, warm and comfortable family home.

    “We had a young family, I had my business going on, and my husband was not totally sold into this. We really needed something that was going to be low risk. So all of the design work that we did was about being able to manage the budget.”

    Risks can often be identified

    Sally outlines multiple risks and how many of them can be reduced through good design. She explains that some risks start with our expectation about how a project is going to go and then the reality of what actually happens. We might be faced with cost increases or there might be a failure during construction, for example, through something not being protected on site, which results in water damage. In terms of the energy performance, the airtightness, the insulation continuity and the build quality are key. Sally sees projects go wrong when the contractor is not clear about the expectation for the build, or the design contains many complex details, which have been hard to price in advance. Although it’s a quantity surveyor’s job to cost up projects, when the design is complicated it’s much harder to work out accurately the time and effort needed to complete the build to a decent quality. So, the difference between the client’s expectation and reality could be quite significant.

    Reducing the number of ‘unknowns’ reduces the overall risk

    Sally will always look to pay a fair price for building work which has got the least of number of unknowns within it. She explains that it is impossible to take some guesswork out of retrofit projects because you can’t know what you are going to find. Likewise, there are always some unknowns around groundworks, but for a new build, once you are out the ground, the risks come from the things that you’ve added into the design.

    Complexity increases risk

    This means that the amount of risk you have on your project is down to how complex you’ve made the design. These risks can come from the geometry of the building or the construction choices. Sally explains that making good decisions during the design process may not save you money on paper, but reduce the risks of you having to build to a poorer quality and it not being what you wanted.

    “The amount of risk that you have on your project is about how complex you’ve made the design.”

    Know your absolute price when buying at auction

    Sally and Mikey considered a few plots and existing dwellings, before spotting a dilapidated pub at auction. Key opportunities included it being in a great location in Plymouth, which was at the entrance to the historic naval victualling yard and near to the WARM office, and having a sizeable garden with a beautiful old Holm oak tree in it. So they decided to bid for it.

    A top tip that Sally received from a friend is to work out your absolute maximum offer in advance of attending the auction and then not to go above it! While this may seem basic advice, as a novice it’s easy to get swept along in the moment.

    Sally also gets the feeling that most people at auctions are professionals, who are representing investors, so you will be competing in this arena. However, overall she thought it was a great way to buy a building, particularly because it’s so quick. Their last bid was their absolute maximum, so the adrenaline levels were high but they secured the property.

    Living in the pub gave them a better understanding of the work that was needed

    The pub had a flat upstairs, so they decided to live in it for a year to help get an idea of the space and make sure they understood what the retrofit required. They quickly realised that the pub was more dilapidated than they had thought, it wasn’t well connected to the garden and the refurbishment would cost a lot more than they were planning to spend. So they explored another option instead, which was to build a new home in the garden and then refurbish the pub at a later date.

    Achieving planning permission was an emotional roller coaster

    Sally has a lot of empathy for people who have been through the planning process or are going through it, as it was a real headache. It didn’t seem to matter that they wanted to build a good quality, high performance building that would fit into the local environment and last for generations. It felt like a lottery, particularly when they’d had a positive response to their pre-application, only to be turned down on their full application. Luckily their architect Jae Cotterell got involved and was able to present a good case for why it should be granted, and the planning department eventually saw sense and gave it the green light.

    Working with one company for the design and build was part of their original de-risking strategy

    Sally tells us that part of their de-risking strategy was to get Passivhaus Homes involved. Not only did they supply a kit that was tried and tested, and would easily reach the Passivhaus standard, but at the time they were also doing the construction work. So keeping the design and build with one company was a way to get cost certainty.

    With her second child on the way, however, Sally was keen to get moving as soon as possible. Unfortunately the time frame for Passivhaus Homes to carry out construction didn’t work out, so they considered another option.

    Their simple design made it easier to engage with another timber framing company

    The positive side of all the work they had carried out in the design stage to de-risk the build meant they could approach a more standard timber framing company.

    A simple design reduces the risks during construction

    The house has a simple rectangular form with a pitched roof. On one side there’s a single storey element with a flat roof to provide a view for their neighbours. This added some complexity to the detailing and being close to their neighbours also meant they had to lower the eaves on one side of the roof.

    The floor area internally is 120m² and it was a priority for Sally to make this space work hard. Downstairs is an open plan living room and kitchen, which has been designed so that a wall could be added later if they ever want to separate the rooms. There is also a spare bedroom downstairs, along with a utility room and a downstairs bathroom. Upstairs, there are three bedrooms and one bathroom.

    The emphasis was on making the spaces work, with Jae encouraging them not to scrimp everywhere! For example, creating a welcoming and spacious hallway was something they didn’t appreciate at first, it felt like a waste of space, but over time they have realised how valuable this is.

    There were challenges using a standard timber frame

    Sally explains that Passivhaus Homes use a portal timber frame, which doesn’t require a ridge beam and allows you to create spans without any supporting beams. Unfortunately, standard timber frame manufacturers are not used to doing the lift of the ground floor and first floor in one which is what you do with a portal frame. Separating it into a ground floor timber frame and a first floor timber frame meant that they needed steel beams to provide support. Sally hadn’t wanted to use steel as a material in the build and this then created some difficult detailing for the airtightness. This is where the standard timber frame suppliers really struggled and if it hadn’t been so late in the design process Sally would have changed the design to break up the spans, so they could still have used timber. She feels it’s really important for designers to understand the natural limitations of different materials rather than relying on engineers having to solve problems because you’ve created a span that’s too wide.

    Allwood Timber supplied the twin stud frame, which was then filled with Warmcel insulation. They have insulation under the slab and the roof is treated the same way as the walls, with blown-in cellulose. The structure is I beams, with OSB board on the inside.

    Another advantage of a simple design is that you can run your eye over everything to see it’s all in order, such as making sure the airtightness line is continuous.

    Remedial work enabled them to achieve the airtightness target

    They did some of the taping themselves, along with the timber framer and after a poor first air test (1.2 air changes per hour at 50 Pascals) they realised they hadn’t pressed down the tapes enough. As soon as they did this and activated the glues, they saved another 0.2 on their air test. There was also air leakage around the steel beam. If she’d done the project today Sally would have used an airtightness paint to sort this out, but back then she had to spend a late night putting a lot of tape on it. Their final air test achieved 0.56 which meets the Passivhaus standard performance criteria.

    Their windows and doors are from Rationel, because Sally had used them before and knew they were relatively cheap in comparison to others. They also designed all the windows so that they could be openable with a single span, with a lot of them being top hung so they could leave them open at nighttime. They’re a simple design with easy detailing, which all helped during construction. Sally feels it was still hard to achieve good airtightness when they didn’t have a lot of time themselves to check things and weren’t working with people with experience of this type of build.

    They achieved a better airtightness with the pub retrofit a few years later, working with a local contractor called Greenacre Design and Build who had an amazingly skilled team. They were great problem solvers and fantastic at detailing, so they did exceptionally well even though it was their first time doing a Passivhaus retrofit project. But sometimes you don’t have those teams, and so being able to keep the details simple is really helpful.

    Sally took over managing the build as soon as it was watertight

    Sally made the decision to take over the project once the building was watertight. This meant they could project manage, be in control of the individual contractors and communicate directly with them. For example they got a contractor in to do the plastering and did all the services themselves, apart from the final electrical bits. They brought in a friend, a carpenter, to do the internal finishes and he refused to use soft wood! This really put quality into the build and is now much appreciated by Sally and her husband. It did take longer to complete the build as they were quite restricted with the time they could make noise in the evenings and at weekends, but it was good to feel more in control.

    “We found that once it’s watertight, it feels like you can just breathe a bit, and it’s a bit easier to manage.”

    It’s worth taking the time to get things right

    It took two years from the point where they bought the pub to them being able to start construction and one year to do the build. The first year was deciding what they wanted, going from the pub renovation to a new build, then another year designing and getting planning permission. At the time all the faffing felt frustrating, but seven years on she can see that it was worthwhile and meant they ended up with a better home that will last them much longer as a family.

    Sally had also learnt from her parents’ projects that it’s best not to move in until the house is finished as the work just doesn’t get done after that. One of the things they hadn’t done was tile the kitchen, which was only done six years later!

    The house was delivered on budget, but the time put in hasn’t been calculated

    It was a real success for them to deliver the project on budget, but with a self-build the amount of time put in is huge and something Sally doesn’t want to calculate.

    There were some complications during the build, not necessarily associated with the design and things that they would definitely do better next time. They were very careful and conservative to achieve their budget and there are some things they might want to be different. Luckily noticing the faults wears off with time and over the whole project there is just one window that Sally wishes was larger.  She was worried during the build that they were being too careful and maybe the building would feel mean, but it doesn’t.

    “If you are on a tight budget, it makes a huge amount of difference feeling in control and that was ultimately why we took on the self-build.”

    Managing the contractors themselves meant there was no middleman, they could negotiate individual prices and have conversations about the materials they were using.

    Sally describes herself as a Passivhaus geek, but even so there was so much she didn’t know. This has given her a huge appreciation of all the different skills needed in a team to complete a build project.

    She tells us how she really enjoyed the whole experience, both stretching her mind and also physically doing stuff. She doesn’t think there’s enough of that crossover, with designers getting practical hands-on experience.  With the pub finished three years ago she’s definitely ready for another project but has nothing particular in mind.

    Sally got to appreciate Passivhaus certification from a client’s perspective

    They had designed the house to Passivhaus standard but hadn’t discussed certification until they were just about to start the build. Sally tells us that at the time she was absolutely exhausted and didn’t think she had the energy for it; it would be just too much hassle. Her dad, who doesn’t often tell her what to do was very clear that not doing it wasn’t an option, particularly considering her job!

    They employed Will South of Etude to do the certification so that they had someone independent looking at the project. In the end, the certification process proved incredibly valuable for Sally as she knew there was a second pair of eyes checking on the project details. She was doing her best to check things but was incredibly busy and Will picked up on a few things that were wrong. Will had identified that they’d got their shading wrong, which they were able to correct, but it was too late to change the insulation, which was not the right specification. They had enough margin in the calculations for this not to matter, but by identifying it early they could have made adjustments elsewhere if they’d needed to.

    It also gave Sally a real appreciation of just how hard it is as a client getting everything together for certification and the need to find the right level of checking. She is still a massive advocate for certification and as there’s very little quality control it’s good to have someone whose sole job is to check that you’ve built what you said you were going to build.

    Sally’s husband is now an advocate of Passivhaus!

    Sally says her husband wasn’t totally onboard with MVHR, triple glazing or even achieving the Passivhaus standard, but she was clear that these things would be worth it. They’d moved from a large Victorian house that was uncomfortable and difficult to manage into a tiny pub flat where she was cleaning mould off the walls. The flat was just 60m² and inevitably there were arguments and conflict. So, the experience of moving into somewhere that was a lot bigger was obviously like a revolution for the family. Sally tells us that it was so warm in the house that the kids wouldn’t believe they needed to put on coats to go outside. She had been spouting the theory to everyone, but it was still amazing to experience the comfort and warmth for herself. Her husband was quickly converted to this way of living. They also realised how they’d stopped inviting people round to the pub flat because it was so damp and at the time Sally hadn’t realised just how much inherent stress the mould and the dampness were giving her. She admits to being a total snowflake now, finding it very difficult to stay in other people’s houses.

    Try to enjoy the whole house-building journey

    In hindsight Sally reflects on the self build journey as a really lovely process, but this is not always how it feels at the time. She gives an analogy of when you have young kids you can feel like your hair is on fire, you’ve got sick down your front, and you’ve just stepped in something you’d rather not have. But when you look back, you think that was an absolutely incredible experience. She says to find ways to bring your family together through the process and the same with your wider building team. The relationship side of a building project is really important. So, as much as possible try to enjoy the sick down the front feeling!

    Find out more

    WARM

    Coaction

    Passivhaus Homes

    Transcript

    Download a transcript of this episode.

    Please connect with us

    Subscribe, rate and review us on Apple Podcasts

    Follow Ben Adam-Smith on LinkedIn

    Follow Ben Adam-Smith on Bluesky

  • HPH383: A beginner’s guide to creating a comfortable home – with Andy Mitchell

    HPH383: A beginner’s guide to creating a comfortable home – with Andy Mitchell

    Andy Mitchell, Managing Director of 21 Degrees, explains what factors influence human comfort and how we have tried to make our homes more comfortable through the years. Embracing building physics has been a turning point and while we have the knowledge and skills to create healthy and comfortable homes today, it’s still not the default approach. So Andy outlines the options available to get yourself into a better home.

    Interview with Andy Mitchell

    Andy Mitchell is the Managing Director of 21 Degrees. Engineering runs in the blood as he comes from a family of engineers and he has always been fascinated by houses and buildings, even considering architecture as a possible career path at one stage. Studying product design at A-Level he then became interested in company structure and business. His first significant role in sustainability was at a company called Natural Building Technologies in the early 2000s, where there was a focus on healthy bio-based materials. Today he heads up 21 Degrees, a company which supplies key technology to homeowners and architects enabling them to build more efficiently, and generate and store energy.

    In this podcast Andy explores the concept of comfort and explains why we can do much better when it comes to creating a comfortable and healthy home in which to thrive.

    We can define a comfortable temperature

    While we might think that we are all different and therefore prefer to live at different temperatures, that is not true. We can define a comfortable temperature range because of our physiology.

    “Any human being, no matter where they are on the planet is most comfortable between 20°C to 22°C. The reason is simple. If the temperature is higher, your body has to work harder to keep you cool; and if it’s colder, your body has to work harder to keep warm.”

    The body doesn’t cope well under 15°C

    Below 15°C humans have to work hard to keep warm. At 9°C or less, it’s a matter of survival.

    How active we are, alters what we perceive as a comfortable temperature

    If we’re engaging in a lot of activity, such as cleaning our homes, we are generating heat and keeping ourselves warm, so may desire a cooler temperature. Alternatively, if we are working at a desk and sedentary then the reverse is true and we may want it to be warmer. Generally speaking the impact of this is plus or minus 2°C.

    Putting on clothes is another dynamic

    You only need to look to the Inuit in parts of Greenland to understand what an impact clothing can have. They could survive in subzero temperatures. The downside is that their clothing was bulky and would limit the activities they could perform. Any clothing will go some way to making us feel warmer because it’s trapping the body’s heat and slowing it down from moving away from the body. It would be the same effect sleeping under a duvet. The duvet is insulating your body heat.

    Relative humidity levels impact our health and comfort

    Humidity, or the level of moisture that’s in the air relative to the temperature, has an impact on comfort. The warmer the air, the more moisture the air can hold. And generally, humans are most comfortable at 50%, plus or minus 5%. It’s quite hard to fix humidity levels but between 40-60% is seen as a healthy range. If the levels exceed 70% regularly then these conditions can lead to damp and mould, which are damaging to human health. Below 40% is not good either and could cause respiratory issues.

    Lowering the temperature to save money will create an unhealthy environment

    Andy explains that it may be a false economy to turn down the thermostat in winter to save money or reduce fossil fuel usage. This is because as you drop the temperature the relative humidity goes up.

    “If you had a temperature of 22°C and the relative humidity was 50%, and you dial the temperature down to 18°C, you’ll actually increase the relative humidity to 64%… You’ve made yourself slightly more uncomfortable because you’ve increased the relative humidity.”

    With poor ventilation, which is common in many British homes, the relative humidity may have been closer to 55% anyway.

    “If we’re closer to 55% relative humidity that really starts to get interesting, because if you dial down from 22°C to 18°C, you’re at 73% relative humidity and that starts affecting your health. For example, dust mites proliferate above 70%, eczema and asthma are a direct consequence of allergic reactions to dust mite poop. You’ve also got issues with mould growth.”

    Radiant heat also plays its part in comfort

    In addition to temperature and humidity, radiant heat plays a significant role in how comfortable we feel. Andy shares a couple of examples of when you might have experienced this.

    If you’re taking a stroll on a sunny day and a cloud goes in front of the sun, you might notice you suddenly feel a bit cold. The air temperature hasn’t changed. What’s happened is the radiant heat that’s been hitting your body has dropped because it’s been obscured by the cloud.

    Radiant heat is also absorbed and emitted by surfaces in our homes such as furnishings, walls, windows, etc. So the temperature of those surfaces will have a significant impact on your comfort levels.

    Our homes have got better over time!

    Over the centuries we have turned to fires to keep us warm. In Victorian times there were open fires, which were extremely inefficient because most of the heat went straight up the chimney. However, the rooms felt more comfortable because of the radiant heat being absorbed and then given off from walls and furnishings, etc.

    “The big, winged armchairs that we perhaps thought were to stop granddad falling out of his chair when he fell asleep were actually to keep the radiant heat in… It captured that heat that was being radiated out from the fireplace in the room.”

    With the advent of cheap energy, such as access to North Sea gas in the UK, we could pipe fuel straight into our houses. Burning this in boilers, heating water and then piping it around radiators was a big leap forwards. Although fossil fuels are energy dense and have been an easy source of fuel, their emissions have contributed to global warming and we have nearly exhausted the supply in a few decades. 

    Indoor temperatures have been increasing

    Back in the 1970s, the average temperature in a British house in winter was 12°C – 13°C. These days, it’s probably closer to 18°C – 19°C. Andy says that figure could be impacted by a number of people who are in genuine fuel poverty. In other words, they find it unaffordable to heat their homes. One reason for this is that the UK has a large amount of old and leaky properties.

    Leaky homes are just about tolerable in a mild climate

    Andy says that the UK has the most inefficient housing stock in Europe. While Germany is on a latitude further South and might face temperatures of -10°C, a British winter is milder and more akin with Italy. Therefore with a few token measures, such as double glazing, and cheap energy, we have got by.

    “Sadly, I think we focus more on basic survival and then toleration, rather than what makes for a great home? What really does give us that extra level above survival, so that we can thrive? Again, to me, this is very much what comfort brings… It means you can be more productive in terms of your work. You’ve got higher levels of energy, because you’re not using it to keep yourself warm or cooler.”

    Sensing a ‘muggy’ environment indicates pollutants have built up

    As we live in our homes the indoor air is changing. We exhale CO2 and generate moisture from our activities. Relative humidity builds up and there may even be VOCs given off from furniture, paints, etc. Our instinct is to open a window, which Andy says will solve the problem.

    “By opening the window, you purge the air to the outside, because generally warm air will move to the outside, particularly if there’s a bit of cross ventilation, and as a result, arguably, the temperature will be dropping a bit. But if you don’t leave that window open for too long you’ll have a complete air change, and the air that’s come into that room, because the walls and the fabric are warm, to some extent, that air will warm up. And what was outside air, which was probably around about 70% relative humidity, would have dropped down to around about 50% relative humidity, and suddenly you feel much better again!”

    The problem is this purge is needed regularly and is hard to manage. More often than not there will be a drop in internal temperature.

    In winter another source of discomfort is draughts, where you’re sensing changes in air temperature. For example, if you stand near windows that are single or double glazed, they are colder than the internal air temperature so you will feel the heat moving away from your body.

    You may also experience stratification of the air and this heat differential causes air movement, which in turn can make you feel uncomfortable. For example, your feet can feel colder than your torso. You may not even be aware of it.

    We have got to grips with the physics of buildings and know how to build better homes

    In the past we have simply put our buildings together without worrying too much about how effective they are, focusing more on aesthetics. However, there is an approach that works and has been around for over thirty years. Dr Wolfgang Feist and the team at the Passive House Institute decided to look at things from the first principles and get a holistic picture. This led to the development of the Passivhaus standard, which is a formula that anyone can follow to make a building that works. Core principles include insulation, airtightness, high performance components such as windows and doors, reducing or eliminating thermal bridges, introducing mechanical ventilation with heat recovery, and orientating the building towards the sun.

    Andy points out some of the benefits. For example, in a Passivhaus the temperature of the surfaces will be plus or minus 3°C of the air temperature. It will be draught-free and the heat loss will have been reduced significantly. The introduction of mechanical ventilation with heat recovery also means there’s constant fresh air coming into the building, but the heat from the outgoing stale air is retained. And this is a way of controlling the relative humidity, too.

    So building or buying a certified Passivhaus is one way of ensuring you have a comfortable and healthy home.

    Buying a new home doesn’t necessarily mean it’ll be efficient or healthy

    Although the Passivhaus standard was developed decades ago, the learnings and methodology have not been incorporated into the building regulations. Therefore there is still a performance gap in most new buildings, where the design intent is never reached in the completed building.

    We are all responsible for the status quo

    Not only do we as homeowners tend to accept the status quo rather than demanding higher standards, but architects, designers and contractors struggle to adopt new strategies. So sometimes the drawings fail to give enough detail, particularly around things like airtightness or thermal bridging, which is just where you’ve got surfaces or materials joining together, and you can get additional heat loss that you wouldn’t do through the principal wall or roof or floor areas. It can be the contractors on site, who don’t fully understand the goals of the project and might cut through a membrane not realising the impact of doing this.

    Then there’s the building standards themselves. The reality is the building standards stop at the point of design. Currently there is no ‘as-built’ check of the performance.

    “So the performance standard stops at the design stage because you demonstrate through something called SAP, Standard Assessment Procedure, what is the heat loss from this building based on the building fabric. It’s pushed through a calculation. Effectively, it says yes this fabric will pass, and that’s where the testing ends. There is nobody from Building Control actually measuring the heat loss of the building once it’s occupied.”

    The choices are getting better

    Andy believes that building to a performance standard above and beyond building regulations is becoming more common. We’ve mentioned the Passivhaus standard but there’s also the retrofit standard EnerPHit. The AECB New Build standard is another option, which is slightly easier to reach, but has the same rigorous building physics approach.

    Building your own home allows you to get what you want

    When people are building or commissioning their own homes they almost always strive for higher standards. And doing a self-build project is not quite as onerous as it might seem, with more and more help available. Andy says we build about 5% of our homes in the UK this way, or 15,000 homes a year, which is equivalent to the output of the fourth largest volume house-builder in the UK. This is a good start but to put it into perspective Germany deliver around 50% of their homes as self-build. So maybe it’s not surprising that these standards have taken time to be adopted.

    It is possible to improve the performance of an existing property

    If building new or buying from the open market is not proving successful, then there is another option. Existing homes can be retrofitted to a performance standard. It is often harder, and some homes will be more challenging than others. For example, how the building is orientated is something that is hard to change. There are also significant costs for a deep retrofit.

    “The more complex a building is in its form, often the more challenging it is to reduce the heating requirement, the heat load. You can still go a long way, though, to improve airtightness and therefore comfort levels but you might not achieve the same low energy results that other more simpler forms of building can.”

    On a phased retrofit, improve the ventilation first

    Doing a retrofit in one hit often makes life easier, but not everybody is in a position to do this. So another option is to do a phased retrofit. The most important part is to have a comprehensive whole house plan at the beginning.

    Andy says that a good first step is to improve the ventilation of a property because that will give you cleaner, fresher air, with more controlled levels of relative humidity. While it may cost a bit more in heating initially until you have reduced your heat loss, you can immediately benefit and also reduce the risk of damp and mould building up in places where you have improved the fabric but have not improved the ventilation yet.

    The average family home produces up to as much as 15 litres of moisture a day that goes into the air. This evaporates from our bodies when we’re sleeping or walking around the house. Moisture is also generated when we’re cooking, taking a shower or doing the washing, and it has to go somewhere.

    So after the ventilation has been addressed, the next phase might be looking at improving the airtightness and replacing the windows.

    Adding insulation changes the physics of the building

    When you apply products to your building, you are changing the physics of the building. So if you apply a piece of insulation to a part of your property, you are changing what was there before, and if it hasn’t been well thought through you could end up with unintended consequences. Andy gives an example of fitting closed cell insulation internally which is principally a bad idea because you are likely to trap moisture in the wall. This interstitial condensation could ultimately lead to the building fabric being damaged or breaking down, or potentially creating mould pockets, which then can affect the quality of the air in the room.

    Mechanical ventilation must be designed well

    There are various ducted ventilation systems on the market but they have to be designed well to be effective.

    “The ducting design, for example, in MVHR is far more important than the actual unit that you plug into the end of it. A decent fan and heat exchanger is important, but you can have the best MVHR unit on the market and you plug it into poor ducting design, and you’ll just have a poor system. Whereas you could have an average MVHR unit and plug it into some effectively designed ducting, and you’d have actually a very good system.”

    MVHR can be useful if the outdoor air is not clean

    If the external air quality is poor, such as on a busy road, or if there’s a lot of pollen that is having a particularly bad effect on a hayfever sufferer then a fully vented, ducted system often takes the air through filters. So you can filter particulates from outside and stop them coming into the house.

    Making a home more healthy and comfortable shouldn’t be about payback

    When people go on holiday they don’t look for the payback on their holiday! People are also prepared to spend a lot of money on a kitchen. However, when you tackle a big project that will improve health and save money on bills, they suddenly believe it should pay for itself.

    Treat homes as homes, not as assets

    It would be good if we moved away from viewing houses as assets, and actually looked at them as a way to help us live effectively.

    Andy is tackling his own retrofit

    We are all on a journey to creating better homes for ourselves and our families. And that includes Andy! He is making improvements to his Victorian home with a phased approach.

    “You do a measure to your own property, and you still find yourself being quite impressed! So we live in a Victorian property, and half of the floor of the property is a cellar. The other half is solid floor, and we insulated in the joists of effectively the cellar part, and that made a significant improvement. And then the following year, we had an airtightness membrane installed underneath the joist and the insulation, and that made as significant, if not more significant an improvement in both the thermal performance of that room.”

    Andy believes that most of us become complacent with our homes when we actually have the opportunity to enhance our lives.

    “As human beings, we have this incredible gift of adaptation. The problem is it’s also a curse, and we just tolerate an awful lot of rubbish. If our awareness was increased and we could begin to learn what is possible, particularly in terms of how we can live within our built environment I think the change for our welfare, both as individuals and society in general, would be significantly impactful.”

    Find out more

    21 Degrees

    Why MVHR maintenance and servicing is important

    What makes a well designed MVHR system?

    How do you specify high performance windows?

    Two radical retrofits that use an internal wall insulation strategy

    Low energy barn conversions

    Transcript

    Download a transcript of this episode.

    Please connect with us

    Subscribe, rate and review us on Apple Podcasts

    Follow Ben Adam-Smith on LinkedIn

    Follow Ben Adam-Smith on Bluesky

  • Ten things we learnt about building a house

    Ten things we learnt about building a house

    Janice Gardiner reflects on her eco build and shares ten of the most significant lessons from the project.

    1. Spend time thinking about how you want to live in your house

    We knew from the start that we wanted to build an eco house so contacted architectural practices that specialised in eco builds and soon found Green Trace Architects. Our architect, Joshua Wood, then took us through a process to determine our values, how we wanted to live in the house, how we wanted the spaces to interact with each other and what we wanted it to feel like, before any designs were put on paper. For us sustainable materials, along with a social space for family and friends to gather was important. We also wanted to feel that the house was connected to the land around it. This informed Josh’s designs which included a large open plan living area, a wood panelled ceiling, clay plaster walls and large windows that connect us to the outside. The end result has lived up to our vision.

    2. Visit other self-builds of a similar style

    Whilst researching different building systems Josh came across EcoCocon and discovered the architect Juraj Mikurcik had built with this system just up the road from our site. Juraj kindly showed us round his house, Old Holloway, which was the first time we experienced what might be possible. It’s all very well talking about and seeing images of Passivhauses, but it’s only when you experience one that it really sinks in. There was a calmness and a feeling of peace that had quite an emotional effect on Colin and that was the moment when we could imagine how fantastic our build could be. Juraj was also able to pass on lots of useful advice and ideas, which we incorporated into our designs. This included getting rid of the wood burning stove and underfloor heating as in his words they operate as very expensive pair of slippers. The reality is that we only need minimal additional heating in the coldest months.

    We didn’t go for the EcoCocon straw system, because we were building in the winter and didn’t want to risk the straw panels getting wet. In the end, we had a very dry winter and EcoCocon may have been an easier material to apply the clay plaster to, but that is just how things go.

    3. Understand the planning process

    We bought the land with outline planning permission, but no design for the new dwelling, which left us free to submit our own designs. Permission had been granted based on replacing an old wooden building, with the condition that the new house could not be more than 100m2 internal floor area. This is relatively small, but by including the double height ceiling over the dining area, Josh was able to increase the house footprint and make the house feel more spacious. Upstairs the roof line slopes to the floor in places, and anywhere where the height is 1.5m or less is not included in the floorspace calculation. Again, this added to the house volume and these areas became useful storage with built in cupboards. These design features have made the house feel bigger without adding to the internal floor area, showing that you can be creative within the planning restrictions.

    Whilst we never wanted a large house, in hindsight we could have made an argument to make the building slightly bigger. Areas like the second bedroom and the plant room would have benefitted from a few extra square metres and the site itself could also take a larger property.

    4. Do your own research even if you have a project manager

    As novice builders we were not sure what we didn’t know and maybe relied too heavily on the professionals around us, who didn’t always realise what we didn’t understand. At times it may feel like you’re speaking different languages! For example, with the cost of the round window we just thought about the actual window, not how it would fit to the external tin and how to produce a curved frame. So even though everyone was saying this will be expensive, we didn’t really get the whole picture. Doing research into the different stages of the build and becoming familiar with the different processes would have helped us to ask better questions and make more informed decisions.  

    5. Know your own strengths and weaknesses

    Personality traits are important, as they will influence your decisions, so really think about what you are good at and when you may need extra help. We knew what we wanted, had dreams of a Passivhaus, had watched Grand Designs avidly for years, but never thought we would be in the position to do it. So, when faced with a simple design or a more architecturally interesting one, we were instantly tempted by the latter, which inevitably led to us spending more money!  Our original design also didn’t include solar panels or aim to be Passivhaus certified, although we did ideally want to do both. So, when we found out our builder was also a solar panel engineer, and the designs were actually achieving Passivhaus standards we went for both. Consequently, we really stretched our finances but have achieved a better outcome. In general, we are better at interior design than sticking to budgets!

    6. Work with people with similar values and trust them

    The desire for an eco-build influenced our choices from the start and what we hadn’t realised is that Herefordshire is a hot spot for Passivhaus builders. Serendipity brought us Dai Rees, The Passive House Builder, who lived just 8 miles away. Dai and his team were brilliant to work with, had wide ranging skills, including carpentry and tiling, and put so much thought into making the house as beautiful as possible. One example is the internal wooden ceiling. Juraj from Old Holloway shared a photograph of his ceiling, where with 3 widths of timber he created a pattern that appeared random. Dai and his team painstakingly replicated this and then added new edging to create a slightly different feel.

    Inevitably there is problem solving needed during the build and it probably would have been useful to have had Dai on board before Josh’s designs were complete. This would have allowed them to work through some of the technical aspects together, like how the roof met the main beam, before starting the build. The downstairs shower room was another conundrum, with the design only getting finalised late on in the build.

    7. Your builder will follow your architect’s plans

    That may sound obvious, but we did forget that the plans contained things we weren’t totally sure about. For example, Josh was aware that we were doubtful about the external low wall around the front of the patio, but Dai was not party to those discussions, so footings for the wall were in place before we realised. In the end we didn’t build the wall, so work had been done unnecessarily.

    8. Effective and timely communications are important

    We found we were quite redundant in the early stages of the build; Dai was following Josh’s plans and we weren’t really needed. But when it came to the fitting out, we suddenly found we had numerous decisions to make. The first thing was:

     “Where would you like all the electrics? The electrician starts next week!”

    These weren’t on the plans, so a few late nights were spent working out socket positions, lighting and light switches. We had been a little naïve about this aspect and maybe too laid-back. We then had to look at light fittings, toilets, bath, showers, tiles, kitchen design and fittings, staircase, interior doors, handles – everything that goes inside a house needed to be chosen and sourced. Sometimes these decisions are needed to be made before the structures/walls were even in place, so it was hard to visualise the end result. How do you choose the colour of bathroom tiles when you have no walls or green OSB board as your backdrop? Never mind that every space looks so small before the walls are in place!

    Good fun when you get your head around it and you will never have to make this many decisions so quickly ever again in your life… unless you build another house.

    9. Look at different financial models

    We went for a cost-plus approach, where we had a broad indication of the cost of the build at the start, but were open to any fluctuations in material costs during the build. In effect we held the risk for price increases but potentially could also make savings along the way. Timber prices increased during this period of time, but we also chose a more cost-effective roofing/cladding material. We trusted our builder to get us good prices, and it gave us lots of flexibility during the build, but it was harder for us to keep on top of costs. We would also agree to things without asking for the full costs, often not factoring in the labour costs of a particular item, such as a custom-made sink unit for the main bathroom.

    Basically, we were dealing with a changing budget rather than having things agreed up front through a fixed price build. In some ways this flexibility suited us and resulted in better finishes, but it did mean we spent more overall.

    10. Don’t aim for perfection

    Things will inevitably go wrong, hopefully minor and easily put right, but problem solving is part of building a house. Sometimes potential problems will be spotted early on and so can be avoided. For us, it was Dai realising we needed to make one of the walls in the plant room removable in case the boiler broke down. We were very glad he did this as the boiler was faulty on installation, so had to be taken out and replaced straightaway. Other times you will make decisions you end up having to live with. For us, not putting a hand basin in the downstairs shower room was one of them. Water pipes and wastewater points are put in with the foundations and at that point we hadn’t decided on the layout of the shower room. As it was small, and we didn’t know how the shower doors would open and we decided to do without a handbasin. The room was next to the utility, which has a sink and most of the time this is okay, but it’s not ideal for people staying over. We can now see there actually would have been plenty of space for a hand basin.

    Working with a good team certainly made the build an enjoyable process for us. It didn’t necessarily stop us worrying about the decisions we were making, but that’s part of building a house. We now have a beautiful calm home that sits lightly on the land and will look after us for many years to come. We still have lots of external landscaping and gardening to do, but luckily we like doing that!

  • HPH375: A day in the life of a builder – with Mike Whitfield

    HPH375: A day in the life of a builder – with Mike Whitfield

    Mike Whitfield shares his experience of running a local construction company that specialises in Passivhaus. He explains how the business is structured, and what tasks are tackled on a daily and weekly basis.

    Interview with Mike Whitfield

    Mike Whitfield, the owner of Mike Whitfield Construction, began his career in his early twenties, working in America, Canada, and Australia. He had always wanted to be a carpenter and learnt about timber frame building whilst working abroad. Returning to the UK in the 1990s he got involved in oak frame construction for a while before rekindling his interest in energy-efficient buildings. The AECB was a great source of information to keep at the vanguard of green building, and so Mike was well placed to take on Passivhaus building when it came on the scene. 

    Mike has been a guest on the podcast before when he helped us identify the traits of a good builder.

    There is a demand for Passivhaus builders

    Once Mike Whitfield began to focus on building high performance homes it naturally led to more of this type of work. So from 2010 onwards nearly all his projects were to Passivhaus or EnerPHit. As these projects require a greater attention to detail and high quality workmanship, over time Mike Whitfield Construction has built up a reputation of being able to deliver.

    In fact, as they are seen as the go-to Passivhaus builders in Herefordshire, Mike even believes they may have missed out on jobs!

    “If you get a reputation for being too busy, you can miss out on jobs. People say I didn’t bother asking you, because you’re always busy.”

    A core team of people is key to his way of working

    Mike explains that he has a core team of people employed by his company. This is different to the typical British builder model, which uses self-employed subcontractors on ‘zero hours’ contracts.

    Being part of a regular team makes it possible to develop skills and knowledge, which is essential to a Passivhaus project.

    One of the advantages of being a well-established company is that Mike has built up a network of additional collaborators, from architects and groundworkers to electricians and consultants. It all helps the operation run smoothly.

    A local builder can often end up wearing many hats

    Mike is now 67 and trying to step back and hand over the reins to others.

    This has been an interesting process because he’s been able to contrast where the business is today, as it moves to become employee owned, versus how he started as a sole trader.

    In the early days, as is common with many small builders, the paperwork gets done in evenings or over weekends (which means working long hours each week).

    As a more established company of 11 people today, Mike has been clear that there needs to be more than one person stepping up so the load can be shared in a more sustainable way.

    There’s now a slightly different structure in place. For example they’ve got two site foremen, with one taking on more responsibility for liaising with the clients, and the other one able to concentrate on the construction. An office manager is also in place to handle the paperwork and order materials.

    Maintaining momentum requires good communication and organisation

    Mike’s work has changed recently now the foremen are taking on more responsibility. However, even with the new structure the same key tasks need to be completed.

    There’s a briefing on site at the beginning of the day so that each team member knows what needs to be achieved and can get to it. There’ll be various aspects for the foreman to oversee, such as the quality of work, the progress, and receiving deliveries.

    There’ll be meetings with the client or consultants, always looking ahead to the next steps.

    And in the office there’ll be various ordering and invoicing.

    “It’s just a question of keeping the materials flowing to it, making sure our office manager knows what’s going on and our office management system is working well. In my previous life I was on site at 7.30am to get people going, then in and out of the site hut organising things. I’d be lucky to do an hour or two of the practical work before leaving at 3.30 to go back to do a couple of hours work in the office.”

    Mike prefers a ‘collaborative procurement’ process

    Drumming up new business can be a process that takes years. It might start with a phone call from a potential client, who is looking for a plot of land. Mike would normally refer them to the architect he works with most frequently. It might go quiet for a couple of years, and then finally the discussions about the design begin.

    Costing a new scheme draws on data from previous projects

    Mike has detailed records for the outputs and costs for each stage of a build, so he can input prices at the design stage. He calls it a collaborative procurement, rather than doing a tender or some other method. A lot of architects in the Passivhaus world now accept that it can be good to find a builder you like and trust, and just work up the price with them.

    “Working from a basic sketch we can have a good go at pricing the build using our previous experience and our pricing programme. If we know the client’s budget, we can work with that and assess what is possible for the money. Mutual trust is important.”

    The team must always be working on a project

    One of the trickier elements of being a builder is keeping a steady flow of work for the whole team.

    Mike describes the ideal scenario being where their groundworkers have started the next project, whilst his team is on the main project, and maybe one or two people are second-fixing the last project.

    Of course life doesn’t unfold perfectly and sometimes they have to do things differently.

    Mike shares an example from last year when he had two jobs running in parallel. Luckily, they were only a few miles apart from each other, which helped.  

    A builder will often have a site on standby for quieter times

    When there are gaps in the schedule Mike can move the team onto one of his own projects. He says last year they had three jobs, totalling £1.5 million, in the pipeline but couldn’t start any of them. So having a plot as a fallback option means they can divert resources to do part or all of the build. Again, in a perfect situation the team would be completing the whole project in one go, but they could just do the groundworks and pause, or they could get the shell watertight and then bring things to a halt.

    Building to Passivhaus standard demands more from a business

    In Mike’s experience, Passivhaus building requires more attention to detail and greater supervision, and the profit margins are tighter.

    Although there is a lot of job satisfaction in delivering high quality buildings there is no doubt it is much harder than simply complying with building regulations. For a conventional build it is relatively easy to find a good site supervisor, use a quantity surveyor for pricing or give drawings to a builder’s merchant for them to work out the quantities you need. Mike has always had to do his own pricing and recognises it is harder.

    Want to see how a timber frame project comes together? Check out our Buckinghamshire Passivhaus case study in The Hub

    Track record is the best way to gauge a builder can deliver a Passivhaus

    Mike thinks that clients who commit to building to Passivhaus standard have thought a lot about what they want, and therefore the service needs to reflect this. In the early days people would realise part way through construction that they’d taken on the wrong builder and they weren’t going to get a Passivhaus at the end.

    It’s slightly easier now because a builder should be able to show you a portfolio of certified Passivhaus projects. If they’ve only completed one or perhaps just do ‘Passivhaus principles’ then this may be the point to ask a few more questions.

    Pricing up retrofit projects is challenging

    Although there is demand for retrofit projects Mike says they are certainly trickier. They’ve tackled 4 or 5 so far, and it took until the fourth one for them to make any money. There is an argument for doing them on a ‘cost plus’ basis as you don’t know what you’re going to find before you start.

    However Mike generally prefers to work on a fixed cost basis, with everything agreed at the start and then its up to him to bring it in for that price. It can mean tight margins if prices spiral after you’ve quoted, but on the whole it works well.

    It’s easier for builders to upskill today

    As Mike gradually steps back from the business he reflects on his career in a positive light.

    Some aspects of running a building company are tough, especially on your own, but he has always loved the craft of the work.

    To others who want to follow in his footsteps and build to Passivhaus standard, Mike says that the good news is that there is a lot more information and training available compared to when he started out. It will demand more from you and your team, but if you’re up for a challenge and committed to this way of working it can be extremely satisfying.

    “It is hard to find the right people, but if you can, and you’re all working together, it is so much easier.”

    His advice to young people starting a construction company now is to find men and women who share the same goals as you, so you can form a team to share the workload and support each other.

    Find out more

    Mike Whitfield Construction

    Transcript

    Download a transcript of this episode.

    Please connect with us

    Subscribe, rate and review us on Apple Podcasts

    Follow Ben Adam-Smith on Bluesky

  • HPH371: What is wood fibre insulation? – with Chris Brookman

    HPH371: What is wood fibre insulation? – with Chris Brookman

    Chris Brookman from Back to Earth explains what wood fibre insulation is, how it could be used on a project and why careful specification is required.

    Interview with Chris Brookman

    Chris Brookman, founder and owner of Back to Earth explains how his chemistry degree has been put to good use within the construction industry. His experience ranges from working with natural cob to examining the properties of different building materials to create specifications for particular needs. He has built his own Passivhaus and here shares his technical understanding of wood fibre and the many properties it offers for buildings.

    Chris working on a cob building

    Traditional cob building is strenuous

    Straight from university Chris worked as a cob builder. He explains that traditionally cob was a combination of clay, sub soil and straw mixed together by cattle treading over it to make a plasticine kind of mix, that was stacked on top of a low stone wall. These days sands, grits or aggregates might be added to adjust the properties of the mixture. One of the reasons Chris eventually moved on from cob building was because the nature of the work was extremely physical.

    Traditional materials can play a part in modern construction

    Chris then came across wood fibre, which worked well with cob and that got him interested in learning more about different materials. He was particularly interested in finding materials which have the properties of traditional materials, but are in a modern format, so are easy to use by a modern builder. He eventually moved away from the building business to create Back to Earth, which deals with the specification and supply of materials.

    Wood fibre is not just about thermal insulation

    For Chris, thermal insulation is only one of the reasons for using wood fibre products. Alongside this it offers acoustic insulation, thermal mass to help reduce summer overheating, and good fire resistance. It is also locking up carbon for the duration of its lifetime, which is really important.

    Wood fibre products start with waste timber

    As a by-product of the timber industry, the production process for wood fibre starts by grinding up the waste timber to fiberise it, which is then treated in one of two ways.

    The wet process uses the natural lignin to bond the product

    The more traditional process is to mix it with water and detergents to create a slurry, which is then put on a conveyer belt to strain all the water out, before it is compressed and steamed. Through steaming, the natural lignin glues the fibres together, producing a board around 20mm thick.

    The dry process uses a small about of glue

    The more modern way is the dry process, which uses a polyurethane-based glue to stick the fibres together. You blow the fiberised wood with the glue, compress it to the right thickness and density before curing it with warm humid air. This creates an homogeneous product, from 20mm up to 200 mm thick.

    The dry process makes a lower density product, which is a bit more rigid and has a lower thermal conductivity. However, it massively reduces the amount of energy used to make the product and is slightly cheaper to make. As it only uses a small amount of glue, maybe 3-4%, it has a minimal effect on moisture retention. Most boards are made in this way now and whilst it can be better to use wet processed boards for internal wall insulation they can generally be used interchangeably.  

    Check out our live training with Chris Brookman on the roles of insulation.

    The density of wood fibre can be a benefit over other natural products

    Chris explains that he chooses materials based on their properties but, in most scenarios, natural fibre products tend to work better than synthetic materials. Common uses include insulating timber frames, roofs or internal walls.

    The density of wood fibre is also a useful characteristic when it comes to adding thermal mass to a building, which in turn absorbs the heat more slowly and can make a big difference to summer comfort. This is one key difference to most other natural fibres.

    Building new made it possible to create an accessible home

    Chris’ first son was born disabled and it quickly became apparent that the small rooms of their old cob house were not going to work. The house was over three floors with no circulation space for a wheelchair, so they started thinking about building a new house.

    A Passivhaus would provide a good environment for his disabled son to stay warm

    Chris recalls that John Williamson, in Wales, had just built one of the early Passivhaus projects. He was also aware that when you’re sitting in a wheelchair, your environment needs to be warm.

    Bricks from the bungalow are reused as hardcore for the new house

    A specialist architect provided input on the designs

    In 2011 they found a suitable site, with a 1950s bungalow they planned to demolish and use as hardcore for the new build. Chris explains that they hired a specialist architect to look at their designs and make suggestions about circulation space, door widths and accessibility over the whole site. The whole plot was levelled as a consequence, with just a slight fall to help water drain away, all the thresholds are level.

    The office was built before the main house

    The office was built first to test their approach

    Chris worked on the detailing for the build, but it was a friend who carried out the construction. The office was their test case, and they made a few minor mistakes which meant they were just over the 0.6 air changes per hour at 50 Pascals required to meet the Passivhaus standard. This meant that when it came to the main house they really focused on airtightness.

    They used a timber frame filled with wood fibre insulation, which was relatively quick way to build. An airtight OSB was used internally as the airtight layer.

    Clay boards were added to the internal walls to improve the acoustics

    In a Passivhaus you need to have a little gap under the internal doors to help the air flow, but that can cause issues with sound transfer. So Chris used clay boards on all the internal partitions to improve the acoustics.

    Where structural, the internal partitions have Fermacell on one side and clay board on the other. The non-structural partitions have clay board on both sides with flexible wood fibre in between.

    The clay boards have given the added benefit of increasing the thermal mass of the building, so help to reduce summertime overheating.

    All new builds have a few niggles

    Chris and his family are really happy with their home but there were few things aspects they were keen to address. The biggest mistake they made was with the front door, where they cut a metre wide opening into the frame, but hadn’t realised the thickness of an external Passivhaus door. So they ended up with an opening width of 740mm which made it difficult to get in and out with a wheelchair. This was, however, changed a few years ago so now they have a 1300mm wide opening.

    They also swapped two of their clerestory windows to ones with electric openers to make it easier to purge ventilate in the summer. Chris had initially thought the MVHR system would be able to deal with this but it wasn’t enough on its own.

    Something that couldn’t be changed without substantial work was the liquid screed floor finish. They had intended to use underfloor heating tiles, but they were too expensive, so they used liquid screed instead. Chris regrets this choice as this floor transmits sound right across the house.

    One other regret was connecting the house to the gas main. Not only was it expensive to install but at the time grid electricity was about 500 grams of CO2 per kilowatt while gas was 180 grams of CO2 per kilowatt, so using gas to heat the home seemed like a good option. Chris may well switch his heating source in the coming years.

    Back to Earth’s specifications ensure their materials will give the right results

    Chris sees the primary role of Back to Earth as creating specifications for materials to ensure they achieve the best results on each construction project. Most of their work is on retrofit projects and they use WUFI to model the specifications they are producing.

    A WUFI analysis of a specification

    Chris sees them as problem solvers, looking at specifications to provide the right material for a particular function. His own construction experience also means they can add in practical details alongside the specifications.

    The Fibres Academy training platform

    Chris believes a lot more people would use natural materials if they understood them better. To that end, Back to Earth have just revised and relaunched their Fibres Academy training platform. This is free to use and gives you access to courses, 3D model and installation guides to help you use the materials with confidence.

    Chris tells us that Europe is a long way ahead in the amount of natural fibre materials that they use. Figures from a few years ago showed Europe’s use of natural fibres at around 10%, whereas in the UK we’re struggling to reach 1% of the market share. There is a fundamental difference in perception and accessibility between the UK and Europe. Back to Earth’s training platform is trying to improve people’s understanding of the products to increase use and push forward this agenda.

    Generally as a share of the market, Europe is using about 10 times more natural fibre than we are.

    Natural fibres are generally a bit more expensive but worth it

    Natural fibre products may be slightly more expensive, but for Chris it is like comparing apples with rotten eggs. People might say why use wood fibre instead of PIR? But often the installation of PIR isn’t good. It may just be wedged between timbers, resulting in air gaps opening up later and reducing the performance.

    So often the perception is that modern materials are cheap, but this can be because the time is not taken to install them correctly. Back to Earth give detailed guides, going through all the airtightness layers and the whole build up. This ensures correct installation so the product works.

    It’s also important to recognise the value and added benefits that you get with these materials. It’s not just about cost, there’s the environmental impact, the health of the installers and the health of the occupants years down the line, along with the longevity of the building and the finishes.

    A change in attitude and better regulation is needed in the UK

    Chris feels we have a different attitude to our housing than the rest of Europe. We’ve commodified housing, so we buy and sell with the expectation that we will make money from our properties. If people actually proiritised comfort and health, they would probably steer clear of major developers and make different choices.

    The building regulations also have a role to play in increasing the use of natural materials and better legislation from the Government would have a big impact. Government should not be a passive overseer, but be there to guide people’s activities, which could make a big difference in the emissions from the construction industry. This could include an assessment of the embodied carbon of products and the biogenic stored carbon. The locked-up carbon in wood fibre, may only be for the lifetime of the product, but surely that’s better than it not being locked up now.

    Find out more

    Back to Earth

    The Alliance for Sustainable Building Products

    Transcript

    Download a transcript of this episode.

    Please connect with us

    Subscribe, rate and review us on Apple Podcasts

    Like our Facebook page

    Follow Ben Adam-Smith on Bluesky

  • HPH361: What’s the difference between  a renovation and a retrofit?

    HPH361: What’s the difference between a renovation and a retrofit?

    Paul Testa from HEM Architects explains the difference between renovation and retrofit, using his own home as an example of a deep retrofit.

    Interview with Paul Testa

    Paul Testa is a director of HEM Architects in Sheffield. He’s been on the podcast before highlighting a few hidden costs you might experience on a house build project. Today he’s explaining some common terminology when it comes to altering homes: renovation, retrofit, remodel, extension and eco renovation.

    While these words might seem self-explanatory they can get lumped together and we perhaps miss some of the nuances. So Paul is going to explain each term as well as share a few details from his own retrofit.

    Renovation is about bringing your house back up to standard

    A renovation is work that brings a house back up to a good standard. Not only will it be about making it look nice but it will deal with any disrepair, and perhaps replace the electrics and plumbing. New windows might be installed. It may also include putting in new kitchens and bathrooms, and then plastering and repainting.

    Paul gives an example of buying a Victorian terrace that needs lots of work. You are renovating the house to bring it up to date and make it suitable for modern lifestyles.

    Remodelling is rethinking how the spaces work

    Remodelling is when you consider how the spaces work together at a more fundamental level. It’s not just about what the home looks like, but how the spaces are connected, maybe bringing multiple rooms into an open plan layout. Upstairs it may be about making better use of bathroom and bedroom spaces. It will likely involve moving internal doorways and removing walls, and whilst it could include external changes to doorways and windows this is less common.

    Extensions are about creating more space

    Extensions or additions are about adding more space. Sometimes a client may think they need more space but a remodel would actually solve the problem. Often extensions are needed as families grow or needs change. Paul says that it’s quite common for people to want a larger kitchen, dining space that faces onto the garden, which is very different from how houses were laid out in the past.

    “We live very differently now, we congregate in our kitchens, and often remodelling can deal with that, but sometimes you do need to gain more space in that area to fully enjoy those benefits.”

    Retrofit deals with performance

    Retrofit is a holistic approach that improves the building fabric, making a space more comfortable, healthy and energy efficient. As part of this upgrade moisture will need to be managed and a good ventilation strategy is required.

    Clients may have different drivers for carrying out this work, such as wanting consistent energy bills, so they are not so affected by energy price jumps, or increased comfort because they can’t get the house warm enough in the winter, or they may be motivated by reducing their carbon emissions.

    With the right budget a retrofit can deal with all of these pain points but often work might have to be phased and the immediate solution will address the priority.

    Doing work on your home locks in the performance for the coming years

    While a renovation project might create a beautiful home it may not improve the performance at all and once the work is complete the homeowner is unlikely to want to make any significant changes for the foreseeable future. So this might lock in poor performance for a number of years.

    The benefits of retrofit are ‘felt’ rather than seen

    When a retrofit is complete it may look much the same as if renovation work had been carried out. The difference will be in how the building feels and performs.

    The investment is going into modelling and understanding the initial home, developing detailed designs and then installing additional insulation and introducing an airtightness layer. High performance windows and doors will be added and ventilation will have to be addressed, often using mechanical ventilation with heat recovery (MVHR).

    Paul retrofitted a 1970s semi-detached home

    In 2013 Paul and his family bought a 1970s semi-detached house, which had a two storey side extension that was poorly laid out and a small sun room to the rear. The sun room was boiling in the summer and a cold store in the winter, and the main house was also freezing. This property was ripe for an intervention.

    The harsh winter of 2013 was the driver to do something about it but it wasn’t until 2018 that work began. These processes take a long time and architects, much like builders, are always last in the queue.

    Once the plans were formulated the main structural changes saw the original extension and old garage demolished. Although there would be a new single storey rear extension and a two storey side extension, overall there would only be 15m2 of extra space (making the floor area 136m2) when compared to the existing dwelling.

    Downstairs the suspended timber floor was removed and replaced with a concrete raft. This had between 20-70cm of insulation beneath it and provided both the new floor finish and also the structure for the extension to sit on (so there was no need for separate footings).

    The extension is timber frame, with 140mm deep studs, insulated with mineral wool in between and then wood fibre on the outside of the studs and rafters.

    The original house was insulated internally with wood fibre insulation and careful consideration was given to the thickness of this so that moisture is managed well and the risks of interstitial condensation are minimised.

    If this condensation appeared inside the construction it would damage the fabric over time and potentially produce mould spores that will end up in the air.

    The roof of the original house has also been well insulated with mineral wool and wood fibre.

    When it comes to the windows, Paul used a mixture or inward and outward opening triple glazed units. The reason for this was because it depended whether the insulation was internal as in the main house or external as in the extensions.

    Mechanical ventilation with heat recovery (MVHR) provides constant fresh air and Paul describes this as a game-changer.

    “The house always feels fresh, we don’t have any condensation anywhere, and we’re not losing that heat. I think the MVHR also helps with heat distribution, as we don’t have many heat emitters in the house. In 2018/19, when we were doing this work heat pumps were not as readily available as now, so we chose a boiler with a hot water tank. It’s the smallest system boiler we could buy, so that it can modulate down low enough for our 2 kW heat demand or heat load. This provides the hot water and runs a radiator in the living room and towel radiators in the bathroom and shower rooms.”

    Paul says that in the autumn and spring they don’t have the heating on at all. The house might be at 19C initially but by the time everyone is up and moving all the incidental heat gains (from activities such as showering and cooking) warm it up to 21C or 22C.

    They also have a couple of portable panel heaters (30W each) that can be moved around the house as required.

    Unfortunately Paul’s house did not reach the EnerPHit standard as the final airtightness test came in slightly above the required levels at 1.08 air changes per hour at 50 Pascals. Interestingly during the build process they were on track, with readings of around 0.7 air changes per hour at 50 Pascals.

    This goes to show how important it is to get the team to protect the airtightness layer once it’s in place.

    The space had to work well for the family and perform brilliantly

    As this conversation has been around the nuances between renovation, retrofit, remodelling and extensions, we asked Paul what his priorities were as he considered his funds.

    Our budget was fantastic for a renovation and remodelling project, but once you included the retrofit elements it was much more constrained. I wasn’t really willing to compromise on performance… I was also aware that whatever we were doing to the house we were likely to be investing more than the house was really worth. So it wasn’t about getting a monetary return but getting a return in terms of comfort and health.

    Although the work did put the family under financial strain at the time they don’t have a huge mortgage and now they’ve got some control over their heating bills.

    They also didn’t complete everything at the time and left some DIY jobs to tick off over the years.

    If you’re one of our Hub members, Paul also has a retrofit case study of Sycamore Hall.

    Quality assurance is a big part of performance

    If you can’t afford or don’t want to do a high performance retrofit you have to realise that there will be an impact on performance.

    Paul says that if you’re adding space and extending you will need to meet building regulations which are better than they once were. The challenge is in making sure there is good workmanship on site so insulation is well installed and continuous. Moisture must also be considered and good ventilation is important.

    Damp, mould and condensation are likely if you ‘just’ renovate

    Just renovating an existing dwelling will not change the performance. So if there were problems with discomfort then they will still be there.

    Paul has been to houses with brand new bathrooms and observed black mould around window frames. This is a sign that the moisture balance, ventilation and surface temperatures haven’t been considered.

    Stripping back a building can help identify and fix problems

    Quite often damp patches can stay hidden and you might not even realise you have a problem until something fails.

    So major work is an opportunity to check that the home really is in good health.

    National Retrofit Hub is providing a central Knowledge Hub to support all retrofitters

    In terms of useful resources Paul suggests looking at the National Retrofit Hub, which aims to collaborate with those already carrying out retrofit projects, empower the next generation and facilitate retrofits in the UK.

    It’s a nonprofit organisation that brings together all those involved in the retrofit sector to share their expertise and work together to enable a National Retrofit Strategy to be delivered.

    It’s also teaming up with various organisations to reach architects and builders as well as those who might be considering a DIY approach.

    Their goal is to see retrofit carried out at scale.

    We have to start valuing health and comfort

    The dial is moving slowly but we are starting to value good air quality and comfort in our homes. A few years ago internet speed was a more important factor!

    Also, historically, energy has been cheap and it has been simpler to keep heating our leaky homes. However, we’ve already experienced sudden energy price hikes and this has forced people to become more aware of energy performance. Although this may not be translating into people investing large amounts to save money on heating bills it does mean they are paying more attention to energy performance and EPC certificates when buying houses.

    Key challenges to consider for retrofit projects

    Before you embark on a retrofit project the first thing is to make your home retrofit ready. Deal with leaky gutters, a roof in poor repair or bad pointing to make sure your home is in a good state first.

    The second challenge is who to turn to for advice. You need to be sure that the advice is independent and solution agnostic. In other words you need to be careful the advice is not part of a sales pitch.

    Paul mentions a few organisations and community interest companies around the UK:

    Finally Paul underlines the importance of working with professionals who understand the moisture risks.

    The newer the building that you’re working with, the less of a risk that is, but for example, with an old stone barn conversion you need to be aware of moisture risks. We’re now starting to see some retrofit assessors and retrofit designers who are specifically qualified in heritage buildings as well.

    Find out more

    Visit the website of HEM Architects

    Please connect with us

    Subscribe, rate and review us on Apple Podcasts

    Like our Facebook page

  • HPH350: What is value engineering?

    HPH350: What is value engineering?

    Ben Adam-Smith explains what value engineering is and how it can help us to do more with less. He reflects on a short video about Slate House in Herefordshire that includes some great examples of value engineering.

    This video was produced for Coaction, a fantastic training initiative that aims to upskill the UK construction industry and encourage higher quality, more sustainable building practices.

    Coaction has allowed us to share this video with you, which explores some of the decisions made at Slate House and how they contributed to making a low budget but high value home.

    Value engineering is about doing more with less

    Value is defined as function divided by cost (value = function/cost).

    If we increase the function the value goes up.

    If we decrease the cost and value goes up.

    The only thing we need to bear in mind is that performance must not go down.

    Value engineering is about creating better solutions

    Value engineering is a creative endeavour and as such there is no limit to what you could do, so long as you’re following the principles mentioned. In fact, just building to Passivhaus standard will entail a fair amount of value engineering (orienting your building well would be one example).

    However, when it comes to housing there are some common examples which we are going to cover today.

    Photo credit – Graeme Deas and Stuart Hedley

    Passivhaus standard is within reach on low budgets (if you make good decisions)

    This podcast is looking at some of the value engineering examples at Slate House in Herefordshire.

    Graeme Deas and Stuart Hedley are the self-builders behind the project. Builder Mike Whitfield delivered an airtight, insulated shell with the ventilation system integrated, while Graeme and Stuart completed the internal fit-out.

    Nick Grant from Elemental Solutions was their Passivhaus Consultant and also a strong advocate of value engineering.

    Nick has been on the podcast before:

    How value engineering could benefit a house build

    Why an integrated design approach works well for self build

    How to share knowledge, test and debunk

    Nick is also Technical Director of UK Passivhaus Trust and a trainer with Coaction.

    Keeping things simple is not what they do on Grand Designs

    Graeme is a design professional so a lot of this came naturally to him.

    Stuart, however, was tentative at first because all he knew about building houses came from TV shows and glossy magazines. Just remember that often even award-winning projects do not perform particularly well.

    Although building to Passivhaus standard brings multiple benefits related to health, comfort and energy efficiency, is it worth doing if the house doesn’t make a statement?!

    Constraints were embraced

    The budget was a key constraint on this project but this also informed the choices ahead. If you like this idea of leaning into the constraints then check out our podcast with Andrew Michler on how to create beautiful designs through constraints.

    Value engineering happens at the beginning of a project

    Value engineering sometimes gets confused with cost-cutting but there’s an important distinction to be made: value engineering can only take place at the beginning of the project whereas cost-cutting is something that takes place at the end. The efficiencies that we’re talking about are decided in the early stages of the design process, not when construction is underway and we’re looking to downgrade materials, etc.

    Photo credit – Juraj Mikurcik

    Design from the inside out

    A driving philosophy on this project was to design from the inside out, with windows being sized sensibly and picking out views.

    Therefore nobody would be standing on the outside placing the windows where they would look good. The composition was something that emerged from the design process.

    However, Stuart had initially stated that he didn’t want asymmetrical windows.

    One of the few specifications I had was that the house should look good from the outside. And part of that for me was that it did not have asymmetrical windows. So I’ve really fallen in love with what I initially thought was rather an unexciting box.

    Photo credit – Graeme Deas and Stuart Hedley

    Keeping the shape of the house simple will make it cheaper to build

    You may hear the term ‘form factor’ mentioned a lot. This refers to how much surface area is losing heat (external surface area) relative to the useful floor area.

    So reducing this ratio as much as possible and keeping things simple will make construction easier and it will cost less.

    A form factor below 3 is starting to get good.

    We go into this in more depth in a podcast with Alan Budden on how simple design decisions can impact on energy performance.

    Photo credit – Graeme Deas and Stuart Hedley

    Photo credit – Graeme Deas and Stuart Hedley

    Simpler windows perform better and are cheaper

    Windows without extra frame and mullions and transoms perform better, and because they are simpler they are also cheaper. Although it’s logical, sometimes it can be a hard sell. For example, Ben and his wife Kay completely disagreed over the windows during their self build. It was only after a lot of discussion that Kay agreed to have windows without mullions and transoms. Even today, while she likes the view from the inside looking out she is still not sure from the outside looking in!

    Avoid the wall of glass

    Avoiding excessive glazing and sizing windows well will be cheaper and help summer comfort.

    There may also be opportunities within a house to have a fixed window. Obviously you want openable windows in every room for ventilation and safety but their may be awkward spots, like above the kitchen sink. A fixed unit here will be another cost saving.

    A concrete slab can take on two functions

    At Slate House there’s a concrete slab which provides structure but because it’s been polished on top it can serve as the finished floor surface.

    Photo credit – Graeme Deas and Stuart Hedley

    A tin roof is another cost effective solution

    So long as it is detailed simply then a tin roof is durable and low cost.

    This, along with many of the other value engineering examples we’ve included, have also been a part of Juraj Mikurcik’s self build project Old Holloway.

    Find out more

    Check out the Coaction website

    Coaction on Bluesky

    Elemental Solutions

    Passivhaus Trust

    Transcript

    Download a transcript of this episode.

    Please connect with us

    Subscribe, rate and review us on Apple Podcasts

    Follow Ben Adam-Smith on LinkedIn

    Follow Ben Adam-Smith on Bluesky

  • HPH347: Common pitfalls to avoid when building a house  – with Amelia Lee

    HPH347: Common pitfalls to avoid when building a house – with Amelia Lee

    Amelia Lee from Undercover Architect shares some common themes that tend to crop up on owner-builder projects (particularly with people who are doing this for the first time) and explains how they can be avoided by creating a clear foundation of your values and project intentions.

    Interview with Amelia Lee

    This is the second of Ben Adam-Smith’s interviews from his time in Australia and in this episode we have a chat Amelia Lee from Undercover Architect. Amelia has been an architect for 30 years and in that time worked on wide range of different projects, as well as three of her own renovations. 10 years ago she decided that she wanted to expand her reach to help more people and left her practice to start Undercover Architect as a platform to provide educational resources that help inform and empower new owner-builders (‘self-builders’ in the UK). In that time she has built a community of confident owner-builders that are well resourced to advocate for sustainable building practices and create homes that help them live well.

    In this chat, Amelia and Ben compare their experiences of working with people who want to build new or renovate existing dwellings, and identify the most common challenges that occur.

    Don’t rush the planing stages!

    Many people focus on the build stage of a project, but there are 3 crucial stages before you get there which will determine the success of your build.

    There a 4 phases to any project:

    1. Pre-design
    2. Design
    3. Pre-build
    4. Build

    Amelia emphasises that the more work you can do in those first three phases to anticipate and manage the potential risks, the more likely your build will go according to plan. Any changes or delays that happen during the build stage will be very costly so having a good plan in place will help your team work as efficiently as possible.

    Pre-design

    The pre-design stage forms the background research for your project. You will need to work out your local planning regulations, the limitations of your site and any council requirements that will need to be considered.

    Lots of people turn to neighbours or friends for advice on these things and then call it a day, but it is very important that you work out the bigger picture of your construction climate. Amelia explains that some councils in Australia allow owner-builders to fast track their projects through planning if their design meets certain requirements, so knowing these things will help you mould your building design to receive local support and avoid potential obstacles.

    “It’s like playing any game, when you find out the rules first, you can create the greatest strategy in order to be able to be most expeditious and efficient in how you do things.”

    Get to know your budget

    This stage is also where you figure out your budget. The budget must be revisited at every stage, but it is most important to start with a good understanding of what you have available so that anything you take on from this point will be working in accordance with this.

    Establish your values

    You also need to work out what you want to achieve and establish your values that will create the foundations of your design. What are your big picture goals? How do you want your house to work for you?

    “You will need to make something like 15,000 decisions. This gives you some way to anchor yourself to and check against to guide the decision making overall so you don’t get lost in the process.”

    Design

    The design phase is about figuring out how these spaces, places and rooms are going to work best for you. How do you need the house to function best for you?

    Your current home can tell you a lot about your future one

    You can begin to work this out by analysing your current home, looking at which bits work well for you – maybe you like how your kitchen is close to the front door so you can unpack your shopping easily or that your living room faces south so is always full of light. But also working out which parts don’t work for you, like the separate dingy dining room that becomes a dumping ground. Knowing how you want to use a space will help you create a design that works best for you.

    The orientation of your site is important to know

    Amelia explains that understanding the orientation of your site and working out how your house could sit best within it will allow you to optimise the liveability. By considering the positioning, the climate, neighbouring properties, surroundings and even a nice view or feature that you would like to showcase, you begin to create signposts for your design. Knowing these factors can also help to increase energy efficiency by utilising solar gains for heating or natural shading features that can help with cooling.

    Explore the different construction methods available

    In this phase it is also really important to explore all the construction and design options out there so you can pick the one that best meets the requirements you outlined in the pre-design stage. It can be easy to fall into the trap of following the standard or most common construction path, but this might not be the best path for you and your build.

    Always keep one eye on your budget to make sure you are still on track!

    The design stage will start giving you an idea of the cost of your project, make sure you are sticking to your budget and checking that you can afford what you are planning.

    “Your budget is going to dictate the size of your house right from the outset and the level of finish that you can expect. If it’s not going to be enough, then you need to figure out if you need to find more money? Or do you have to radically reduce the size of our property before we begin?”

    Pre-build

    The Pre-build phase is all about formulating your practical construction plan and assembling your team. This will include looking at your building approvals, finalising your building materials and construction methods and collating all of your documentation. In this section, you will need to keep referring to the values you established right at the beginning and make sure you are making decisions that are in alignment with those.

    Create a clear plan for your build

    This stage should focus on formulating a comprehensive build plan with detailed drawings and specifications that will hopefully reduce the need for you to make quick and maybe uniformed decisions under pressure.

    “Drawings, specifications, those kinds of things are the language with which the construction industry understands how things get done, and so the more you can put into that information is super important.”

    Test your energy efficiency now

    Make sure you spend some time testing the energy efficiency of your design, pre-build. PHPP will be very useful at this stage to test the functionality and provide a picture of the energy movement in your design before you have it set in stone… or timber.

    Assemble your dream team

    Choosing your team is very important – trust your gut and pick people who align with your values or have experience in what you are aiming to achieve. Remember, these people will be in your life for anywhere from a few months to a few years!

    Build

    This stage will involve spending the most money and watching the physical progress of your build but if you have completed the first three stages well, this should go pretty smoothly. Of course, there will always be a few hiccups along the way which you can’t predict, but the structure and values that you have created should help you navigate these with ease.

    Key things to remember here are to be as present as possible and make sure that you are referring back to your values when obstacles arise.

    Work out an accurate budget and stick to it

    A clear and realistic budget is very important in a build project. Amelia explains that in her 30 year career most of her clients have a budget that is 50 – 75% of where it needs to be to match their initial aspirations for their home. This figure has tracked consistently regardless of price rises in construction due to inflation, covid, etc. Being realistic about what you can get for your money and making sure you are including all costs (such as planning application fees, landscaping costs, internal finishes, etc) in your budget is crucial.

    Your team can help you predict your costs

    It can be a good idea to work with someone who has experience in the specifics of your build, so you know that they have some knowledge of how much it is likely to cost. It can be useful to include your builder in the design process as a consultant, in order to get a realistic idea of the cost whilst you still have time to amend designs.

    If you are working with someone who isn’t experienced with Passivhaus or sustainable building, Amelia recommends building in a 20-30% contingency into the budget as the cost of certain processes will probably be more than they have accounted for.

    “Your builder can actually be providing input on cost and buildability from the outset, and that includes at that very first meeting, when you say my budget is x, and I want to do y. The builder and the architect can sit there and say, well, from our previous projects, we know that the y that you’re asking for, it traditionally will cost this amount per square metre based on these kinds of finishes. Or if you want to do these kinds of finishes, it’ll cost this amount.”

    Don’t feel the need to max out your budget

    Owner-builders often push their budgets to the absolute max and this trend seems to be regardless of starting budget. Like many things in life, the bigger the budget, the more we try and do, which is consistently meaning people take it right up to the limit. In the planning stages, work out a realistic budget if you can and if you don’t have enough, work out if you can downsize the footprint or some way to reduce the cost.

    Amelia does point out that there are occasions where adding an extra bedroom to increase the property value, will also increase the build costs but may allow you to secure a higher loan to build with. Because of the way the housing market and financial services work, there might be creative solutions to be found but definitely try and work out what’s best for you.

    “My experience with homeowners doing their own homes, is that they will spend the most amount of money that they can without financially crippling themselves.”

    Your project starts with you

    Many people think that their project will begin when they have hired an architect or designer and therefore might put off doing so until they are ‘ready’. Amelia highlights that there are several steps you can take prior to this which include exploring how you want your house to function and establishing the values of your project. This may need to happen before you hire anyone as these will dictate who you are looking for, in regards to their experience, ethos and general practice.

    Amelia notes that it is crucial to be asking the right questions when meeting potential architects and designers. Rather than attempting to gain as much free information about your project as possible, try to get to know as much as you can about them and their practices.

    “Who is this person? What are they like? How do they run their business? How professional are they? What do they communicate like? Are you going to be able to handle having this person in your life for the next 12 months to two years? Are you aligned in the goals you operate your life with? And how are they going to best support you in navigating something you’ve never done before?”

    Don’t fall into the trap of the status quo

    It can often feel like the standard formula for house building is to prioritise size over quality. Amelia explains that when her clients spend time thinking frankly about who they are and how they want to live in their future home, they end up realising that they need less space than they initially thought. As a result they get their rooms and budgets working far harder for them and it sets them up to find the right people to support them in that journey as well.

    “One of my big, hairy, audacious goals is for everybody to build a site specific response. It’s how you create climate resilience, climate sensitivity, you improve the energy efficiency of your home, you lower its energy, heating and cooling costs, and most of all, you actually make it a better home to live in for yourself personally. The thing is that most of our housing stock doesn’t do this, so most people are living without that experience on a day to day basis. They just don’t understand from a firsthand point of view, the incredible difference it makes the everyday life to live in a house that works for your site.”

    Creating a design that maximises these things will help you follow the principles of Sarah Susanka and utilise every space in your house, everyday.

    Sustainability must be a foundational theme for it to be effective

    Sticking to your sustainable goals in an industry that has not embraced them yet can be quite challenging. It is all too common for it to fall by the wayside when clients hit a professional in the industry who says sustainability will just cost you more. It’s not the job of your professional to tell you it’s too expensive. It’s up to them to tell you what your choices will mean and cost, and you to decide what your priorities and values are. By assembling the right team and putting in the work in the early stages, you will be much more likely to succeed with your sustainability goals.

    Sustainability Bolt-ons

    Too often in house building we see sustainability advertised as a bolt on service. Amelia views this approach as a form of greenwashing in the industry, as it creates a false economy by giving people a free pass to design oversized and inefficient houses that are perceived as sustainable because they have solar panels on the roof.

    “We’re all living on a planet and we know our choices, impact everyone in everything that we do. Building a house is no different and you’re embedding those choices for a very long time.”

    It is important to view sustainability as a foundational concept in your design, so that the entire structure can be created with this in mind. It is crucial to not get distracted from this goal because the end product will not only improve the sustainability of your home, but also improve the way you get to live in it.

    “I feel that sustainability actually starts and is most heavily impacted in the decisions that you make before you begin, about the size of the project that you’re going to build and in how you’re going to make it suit its climate. If you can get those two things right, you will be 80% of the way there before you even start worrying about solar power”

    Don’t outsource your agency

    Amelia’s closing reflections highlight the importance of being an informed and confident owner-builder:

    “I really encourage people to not to not outsource their agency. At the end of the day, it’s your home, and so no one’s going to care as much about it as you do. I want you to know that you unlock what is possible for your future home because it’s your decisions, your money, your vision, that’s the reason this whole project is happening. So it’s really important that you get yourself educated and informed before you begin.”

    The journey can be a great opportunity for personal growth:

    “I love with empowering homeowners, particularly women who are stepping into a male dominated industry. In the renovation and construction industry, women are making 80% of the purchasing decisions and yet they’re dealing with mostly men as they do this. I see them get to the end of their project, and they turn around and look at what they’ve been able to accomplish for their family and consider what else they are capable of? I just get really excited about what it unlocks for people in terms of readjusting their expectations of themselves as well.”

    Find out more

    Visit the website of Undercover Architect

    Follow on Instagram

    Follow on Facebook

    Transcript

    Please connect with us

    Subscribe, rate and review us on Apple Podcasts

    Like our Facebook page

    Follow us on X

  • HPH288 : Renovating a 1960s house for comfort and efficiency – with Russel Hayden

    HPH288 : Renovating a 1960s house for comfort and efficiency – with Russel Hayden

    Architect Russel Hayden explains how he sought to renovate a derelict 1960s house to EnerPHit standards.

    Interview with Russel Hayden

    Russel is an architect who, up until four years ago, had spent his whole working life in London. Prompted by a desire to leave London and move closer to family, he and his wife bought a derelict house in Stockport with the intention of it being a project to renovate, before selling it on and moving out of suburbia.

    They bought the house through a sealed bid system

    At the time, Russel and his family were renting out their house in London and lodging with his in-laws in Stockport when the house opposite came on the market. It had been left in a state of abandonment for around ten years after the owner had died and heirs were being sought.

    The house went to sealed bids, and they won it with a bid of 5-10% over the asking price.

    The budget was set by what they thought the house would be worth when complete

    At around the same time they left London, they received an inheritance which enabled them to buy the house in Stockport, with enough left to cover the renovation works. Despite a few little extravagances, they mostly kept things simple, and having the budget set gave them a clear direction and target. They did end up spending a little more than they expected to, but felt they got good value.

    Upon completion, they had the house valued at significantly more than they had expected. And despite thinking this project would be a stepping stone to something else, they love the house and the area, and have no intentions of moving.

    Time pressures meant there was no fixed price with the builder

    As they hadn’t finished all the drawings, they recruited a local builder to get the house stripped back while they were still living in London. Once they moved, Russel was able to take on the project management role, finish the drawings and oversee the procurement of materials.

    Having that experience and understanding now, he does acknowledge a new found respect for builders for the work they put into getting the materials, finding the right price and coordinating their delivery.

    The builder embraced the learning involved

    The builder had been recommended to them, and although he had never done a project like this before, he had a good attitude and a genuine interest in learning about Passivhaus. That’s not to say there weren’t also times where he found it frustrating not being able to carry on with his work in the usual way.

    Russel paid him and his team of two helpers a daily rate, which isn’t something he would necessarily recommend a self-builder do, but he was living opposite with his in-laws and could be on-site every day to keep a close eye on things.

    Passivhaus consultants were employed

    Russel had done the Certified Passivhaus Designer course before leaving London, so understood the principles involved, but knew that he didn’t have the experience to tackle it on his own.

    They engaged Enhabit to help with the Passivhaus consultancy, who set out four options of how far they could take it: getting it to Building Regulations standard, to AECB Silver, to EnerPHit, and to Passivhaus standard.

    With Russel effectively wanting to use it as his business card for his new venture in the north, they felt it was important to do something that was certifiable and within a reasonable cost. Settling on EnerPHit basically then set their brief.

    “On reflection, it was a very helpful device actually because it then made everything very clear about what we had to do. I think that’s one of the beauties of Passivhaus. Although there are infinite ways of achieving it, you do have a very real target.”

    The building was wrapped externally with insulation

    The house needed a new roof, so making the decision to go with that and wrapping the brickwork in external wall insulation, gave them a clear steer of how they were going to develop the project.

    They sought planning permission because the 280mm insulation would increase the house footprint by around half a meter, and with an extra foot of height on the roof ridge line.

    One of the biggest challenges was with the concrete slab floor, and the problem of the cold bridge at the perimeter. Without wanting to spend huge amounts of money on it, they decided to accept there would be a cold bridge there, but put insulation on the retained slab. They mitigated that by dropping 150mm of insulation externally down to the foundation level.

    They kept structural changes to a minimum

    By deciding not to move windows and doors around unless absolutely necessary they were able to keep the costs down. They did need to remove a chimney breast though, as it wouldn’t have worked with Passivhaus.

    Adding the floor insulation meant the floor was raised to the level of the first step on their stairs. On the first floor they removed the ceiling plasterboard to expose the joists and give a sense of a bit more height.

    Copyright The Modern House

    One of the big changes they made was reducing the size of the garage and extending onto the back of it to make a space that is used as a garden room, office, and exercise studio. It has a timber frame construction with a straightforward flat roof, making it a cost-effective addition to the project.

    Russel’s wife Anna is also an architect and she spent a lot of time researching materials for the interior finishes, and finding fittings which weren’t necessarily particularly expensive.

    They chose a parquet flooring for the ground floor and a lighter oak parquet for the upstairs, which together with the full height doors in the rebuilt partitions, gives continuity between the spaces.

    They fell just short of their airtightness target

    One of the biggest challenges on the project was getting the connection to the existing house right, and particularly minimising the thermal bridges where the garage and extension connect.

    Russel thinks the workmanship around that connection was responsible for them just failing to achieve their airtightness target, with a result of just over 1.1 (where 1.0 is required for EnerPHit). By the time they had that final airtest they were past the point of being able to go back and remedy where the problem may have been. This did mean that frustratingly they weren’t able to get the certification they were hoping for.

    The hands-on experience has been invaluable professionally

    Among the things Russel learnt from this project, was about having the right and patient approach with people. This was particularly the case with having employed a builder on a daily rate rather than a contract.

    He also found that being so involved on site and doing the taping himself, meant that he was gaining a much better understanding of things that worked and things that didn’t, which invariably will influence the way he goes back and details buildings.

    “I think what’s been brilliant about the Passivhaus Designer Course is that I’ve realised that for the last thirty-odd years I’ve been detailing and designing buildings not terribly well without a proper understanding of moisture and how buildings work, thermal bridges and things like that.”

    Copyright The Modern House
    Copyright The Modern House

    He is now working on a Passivhaus self build

    They have since bought a 1960s concrete panel bungalow in the Lake District which was won through another sealed bidding process. With the bungalow quality not living up to that of the view, it became quickly apparent that their best option would be to demolish and replace it with a new building. It is currently at the planning stage and they are looking to make it a timber frame construction built to Passivhaus, or ideally Passivhaus Plus, standards. Being in a World Heritage Site they are keeping their fingers crossed!

    Know your limitations and keep things simple

    For anyone thinking of carrying out their own retrofit, Russel says the budget will be key but it can be very difficult to know how far you can go within that. The balance between getting to the level of comfort required without spending a huge amount of money can be a challenge.

    It is easier if a particular standard is the target, but without that you are left with a number of options.

    It is best therefore to understand the difference between what you want to spend and what you need to spend. Spend it carefully and you’ll get what you pay for. By keeping it simple it will be easier to design and build, and you’ll get a lot more for your money.

    Find out more

    Visit the website of HESKETHHAYDEN

    Follow Russel on Twitter

    Transcript

    Please connect with me

    Subscribe, rate and review the podcast in iTunes

    Rate and review the podcast on Stitcher

    Like our Facebook page

    Follow us on Twitter

  • HPH266 : How to invest sweat equity into a project while maintaining quality – with Ajay Boardman and Nigel Bowley

    HPH266 : How to invest sweat equity into a project while maintaining quality – with Ajay Boardman and Nigel Bowley

    Client Ajay Boardman and her builder/carpenter Nigel Bowley share their experience of working together on her self build project. In addition to project managing Ajay is labouring for Nigel. We look at why this relationship has worked well and consider how much money she is saving.

    Interview with Ajay Boardman and Nigel Bowley

    Ajay is building a 260m² Passivhaus in the South Downs National Park, using the PH15 build system. Having found Nigel Bowley to build the timber frame, it seemed natural that, being a practical person who didn’t have a job at the time, Ajay herself would take on the role of project manager and labourer.

    Parental support has been invaluable

    A big factor in Ajay being able to take on the project has been the support of her parents who live on a farm next to her and the site. Having plenty of experience helping her dad out with manual work on the farm has stood her in good stead for transferring her skills to the building project.

    Not only has her dad helped out with the labouring when she has needed a break or to concentrate on the project management side, but he also always has the right tools for the job. In addition, Ajay’s mum helping out with childcare has meant that Ajay has been able to put in the extra hours while still having the children close by.

    Nigel and Ajay quickly realised they would have a good working relationship

    A carpenter by trade since joining a YTS scheme in 1986, Nigel has had a varied career working on projects such as house building, extensions, internal renovations, roofing and some commercial work. He is equally used to working on his own or having a small number of sub-contractors and labourers alongside.

    From previous experience of working with labourers, Nigel had his doubts about how successful having Ajay and her dad work with him would be. However, Ajay soon demonstrated that she had a great interest in the building, listened, followed instructions and had good manual coordination and skills.

    Working on a weekly payment basis rather than a contract, Nigel had the ability to walk away if he needed to, but after a successful first week levelling the site they both realised they would be able to work together well.

    They also found that their different skills complemented each other well. Where Ajay’s knowledge of the parts and the process was lacking, her admin and communication skills helped take what was in Nigel’s head and translate it into something that she could work from.

    Breaking the jobs down makes the whole process less overwhelming

    Nigel explains that looking at the entire job and thinking about what needs doing can actually be pretty overwhelming. He tries to keep things more simple by breaking each job down into smaller parts. That way the focus only ever has to be on those few things that are needed over a short time span.

    Doing it yourself gives you control over the quality

    Having been to see a different PH15 house, Nigel was confident about the timber frame aspect and getting it level on the slab. Moving forward they may get an electrician and possibly a decorator in, but the rest of the work they are keen to do themselves. This includes the MVHR and all the taping and joining because they are so aware of the importance of getting it right for the airtightness.

    Ajay and Nigel have found a happy balance in what they each need to control based on their individual skills, without controlling each other. While Nigel is in control of the job, he’s also answerable to Ajay’s quality control. This method has worked for them and hasn’t caused any conflict.

    Nigel’s tips for anyone else in a similar situation would be around communication: listening to each other and knowing your boundaries on what to say and when.

    Quality hasn’t been compromised by the cost savings

    Taking on the role of labourer and project manager has obviously been a cost saving for Ajay, and by taking jobs like sweeping up and placing orders away from Nigel, it means his time can be spent more productively.

    Having a relative novice alongside and working out things like the airtightness has meant that the speed of work has sometimes been slower than on his other jobs. However the quality hasn’t been compromised, with architect and co-creator of the PH15 system, Jae Cotterell, crediting the workmanship being of very high quality and better than a lot of professionals.

    It’s physically very demanding

    Nigel believes that sweat equity can work whether it is a PH15, masonry or other build system.

    “I don’t think it matters on the style or the type of building. It’s just really if you’re prepared to work, properly work. Because I don’t think a lot of people really work that hard when it comes to physical.”

    But doing it themselves has allowed an element of flexibility when it comes to working hours and fitting in around school runs and other responsibilities.

    They are not working to a programme

    Nigel is used to working to a programme, so not having one on this project has been one of the hardest things for him to adjust to. He is used to setting an ambitious timeline in order to keep the labourers motivated.

    “On previous jobs, you can burn your labourers up quite quickly and they become unmotivated and they leave pretty quick. So, you’ve got to really manage their physical abilities, your own physical abilities, and so you kind of have to let the job lead you in that way really. And knowing when that is going to be a physical effort, a mental effort, a slow part of the job.”

    It’s more about the process than the end result

    With a few months left on the project, Ajay is relaxed about how the house will turn out. For her, the greatest satisfaction is the process of making it, though the air quality and comfort that comes with it being a Passivhaus is something she is particularly looking forward to.

    Passivhaus Workshop

    If you’re new to Passivhaus and want to find out more about it, then check out the National Self Build and Renovation Centre in Swindon which is running regular workshops. There will be explanations of the key principles along with case studies and demonstrations.

    Find out more

    Visit the website of Nigel’s South Downs Eco Homes

    Find Nigel on Facebook

    Read more about the PH15 build system

    Transcript

    Please connect with us

    Subscribe, rate and review us on Apple Podcasts

    Like our Facebook page

    Follow Ben Adam-Smith on Bluesky