  • HPH138 : Why an integrated design approach works well for self build – with Charles Grylls and Nick Grant

    HPH138 : Why an integrated design approach works well for self build – with Charles Grylls and Nick Grant

    Charles Grylls and Nick Grant explain what is meant by integrated design and how it can benefit a self build project.

    Charles Grylls
    Charles Grylls – Dempsey Decourcy Architects
    Nick Grant - Elemental Solutions
    Nick Grant – Elemental Solutions

     

    Interview with Charles Grylls and Nick Grant

    For the last 5 years, architect Charles Grylls has been working with a design team on Passivhaus projects in Herefordshire. The team includes Nick Grant (Passivhaus Consultant), Alan Clarke (Services Engineer), Allan Pearce (Structural Engineer), and Mike Whitfield (Contractor). Although they are independently employed they collaborate together on projects, which benefits the client but also develops their expertise and aids their understanding for the future.

    Their first project working together was a Passivhaus in Garway, which has led on to subsequent builds.

    Garway
    Garway – Photo by George Mikurcik

    As Nick explains, traditionally it tends to be that the architect draws something, the engineer has to try and make it work, and the builder has to try and build it. A collaborative approach from the outset enables non-hierarchical input and advice, working together, to make the project a success.

     

    Working relationships and connections were already in place

    Charles knew Nick and Mike from working with them when he was an employed by Architype. Mike and Allan Pearce had both been involved when Nick had built his house, so there had already been working relationships in place for 15 years or so.

    Nick said: “We’re a bunch of friends. I know it’s often not the best thing to work with your friends, it can be a recipe for disaster, but we get on well and we respect each other.”

    It did take a few weeks of working together as an integrated team to understand what each members’ role would be and what each would be bringing to the design team.

    Nick stresses that although it’s an informal arrangement they have, it is based on trust and responsibility. The contractor particularly is seeing problems on site through the eyes of the rest of the team and has a responsibility to notify the others if they think something needs doing.

    Charles Grylls and Mike Whitfield
    Charles Grylls and Mike Whitfield

     

    There can be less risk using a negotiated tender process

    In a traditional contract a client would work with an architect from concept through to a detailed design, which would then go to planning. Once planning has been achieved it might go out to tender, so already you’re a long way through the process before even speaking to a contractor or consultant about how to build it or how to solve energy problems.

    Charles sees there being risks in terms of cost and quality control using builders through this process who don’t have Passivhaus experience. His experience of competitive tendering for a Passivhaus project is that they will either come in with a low price because they don’t understand what they’re going to have to build, or price it for risk and so overprice it. Using a negotiated tender process, which is still a traditional route to go down, can be less risky.

     

     

    It’s about quality and people who care!

    Nick says that you don’t necessarily need to find a builder or team members who have had Passivhaus experience, but they just need to care about what they’re doing. Often smaller builders will be at a disadvantage when it comes to tendering because they don’t have a department specifically geared to do that, but Nick says they’ll happily turn up, do the job and work for a fair price. By finding a small builder and speaking to previous clients, you could end up with a cheaper and better job.

     

     

    Good, but not superfluous, communication is required

    The team collaborate using shared folders online for consultants’ information so that everyone can cross-check, evaluate and provide an immediate response to information that goes out. The client can also be included in this way. They also make sure that people are only involved when they need to be, so their time is not being wasted.

    Being a group of friends, some of the team’s communication takes place down the pub, chewing over challenges and working out solutions and better ways of doing things in the future!

    Charles stresses that as a client, starting off with a good brief, keeping on-site changes to a minimum, and ensuring that communication lines are kept open throughout are some of the most helpful things you can do. He suggests a flow diagram can be useful in showing members’ roles and responsibilities if it gets complex. Within this team it tends to work slightly differently from a traditional procurement where the architect is project manager and administers the contract, because Mike (the contractor) forms a contract direct with the client. Charles explains that this keeps things simple because everything has been worked out between the team beforehand so there are not usually too many changes.

     

    Establish and be honest about your budget from the outset

    Nick explains that sometimes when projects are drawn up and put out to tender, they come in way over budget and so then go through a “value engineering” process to strip out all the good bits to make it affordable. Far better is to establish a budget and be honest about what that is. There’s no point in being coy and saying your budget is lower than it is because the danger is the design may not then include the features that you might have desired but, according to your stated budget, couldn’t afford.

    Having the builder involved early on is an advantage because they can give input from experience on how much things are likely to cost, so things are not added to the design that may later need to be removed because of budget constraints.

     

    Reviewing the finished project benefits the team as well as the client

    Going back and seeing how the building is performing can help the occupants establish whether it’s being used to its full potential and whether any adjustments can be made to increase comfort, etc.

    As Nick says, the team are only likely to be offering this if they’re fairly confident there won’t be too many problems! If there are problems they want to know about them and learn from them, to avoid them from happening again.

     

    Transcript

    Download a transcript of the interview with Charles Grylls and Nick Grant

     

    Find out more

    Visit the website of Dempsey Decourcy Architects

    Visit the website of Elemental Solutions

    Follow Charles Grylls on Twitter

    Follow Nick Grant on Twitter

     

    The Hub update

    We are currently looking for our next self build project to follow in The Hub. Ideally it would be a Passivhaus that is different from our first case study Long Barrow (e.g. not built with insulated concrete formwork) and again we would focus on the decision-making process from the design stage right through to construction.

    If you think you have a project that may be suitable, then please do get in touch and tell us about it.

     

    Please connect with me

  • HPH111 : How value engineering could benefit a house build – with Nick Grant from Elemental Solutions

    HPH111 : How value engineering could benefit a house build – with Nick Grant from Elemental Solutions

    Nick Grant of Elemental Solutions explains what is meant by value engineering and how it can be used in the house building process.

    DSC_0091

     

    Interview with Nick Grant

    Nick was a Trustee of the AECB and is Technical Director of the Passivhaus Trust. He is a sustainable building consultant with a background in engineering and, stemming from a childhood ‘make do and mend’ mentality, a lifelong passion for doing more with less.

     

    Giving maximum value through engineering

    As an engineer, one of the modules that most inspired Nick was one about value engineering.

    Value is defined by Nick as being performance divided by cost. If you maximise performance, or reduce cost, it increases value.

    Nick cites as an example the trend of smartphones having fewer buttons than ever before. An iPhone has been very value engineered in that “it manages to deliver a lot by doing very little and it takes a lot of effort to get to that”.

    In engineering it’s an incredibly positive thing and what is strived for, however when Nick started working in the construction industry he discovered that people were using the term to mean cost-cutting in a negative sense:

    “So I went from this thing being something I thought was inherently a great thing and a real challenge and exciting, and for me defined really good design, to this thing that people say “it’s been value engineered, they’ve ruined my project, they value engineered it.”

     

    Value engineering has to happen at the beginning of a project

    It needs to happen right at the start when the design is being developed. Decisions about the size, shape, orientation, etc all have an impact on the final value, cost and challenges that are going to arise. If the correct steps haven’t been taken at the beginning then it is likely that contracts in the tender will come back over budget, resulting in a cost-cutting exercise which will inevitably see the removal of features that you liked about the design.

    Dempsey Decourcy Architects - Vowchurch
    Dempsey Decourcy Architects – Vowchurch

     

    It should be integrated in the house building process

    Nick feels that everything he does is value engineering, but that people can be reluctant to pay for something which leaves them feeling like they’re actually getting less. It may be that they’ve been told about something which they didn’t need to do, thus saving money, but they haven’t actually got anything tangible for it.

    Typically in architecture it tends to be cost cutting and might be carried out by a Quantity Surveyor. Nick feels however that it should be completely integrated, with everyone on board and led by the lead designer. There should be encouragement, whether for the structural engineer, landscape architect, energy consultant etc, to find better, cheaper and easier ways of doing things.

    Example of VE interior detail - polished concrete floor / foundations
    Example of VE interior detail – polished concrete floor / foundations

     

    Example of VE interior detail - Kitchen cupboards made of shuttering ply and surplus stainless steel washers
    Example of VE interior detail – Kitchen cupboards made of shuttering ply and surplus stainless steel washers

     

    Having constraints on a project can be a positive

    Nick says that rather than having to make compromises if they’ve run out of time or budget, it should be the case that if the correct work has been put in during the process they should be able to come to something “where it kind of all works.”

    Having constraints can in some ways make the job easier. There can be fewer choices needing to be made and subsequently less things that they can get wrong. It can free the designer to focus on other things as well.

    “So the more constraints we have, I think as a designer I take that as, I like that. So if we’ve got a very small budget, limited palate of materials, I quite like the challenge of that.”

    By establishing a budget early on you can immediately realise that there are things that might not need to be considered, such as the indoor swimming pool and fancy finishes!

    Dempsey Decourcy Architects - Cae Duff
    Dempsey Decourcy Architects – Cae Duff

    “So you’ve got to do the value engineering, you’ve got to find a better way of doing things, find more clever materials, but you’ve got to also set a budget and then work to that budget. Otherwise everything will just expand to meet it.”

     

    You can do things cheaply, quickly or well: you can’t do all three!

    Nick and his partner designed and built their own home, blowing their original £30,000 budget and spending £40,000! While they like to think they did it well and cheaply, it did take them a long time to complete. They took inspiration from Christopher Alexander’s book A Pattern Language, but by doing that they did end up with a house that has a very complex form (a form factor of around 5) and which was a lot more time consuming to build.

    1

    3

    4

     

    It’s not easy to do simple!

    By working on repeat projects Nick has been able to invest the time into working out details that appear to be simple, but if they were that easy everyone would be doing them! The process can evolve very slowly but benefits are reaped by the experience gained, thus making things easier on the next projects.

    Dempsey_Decourcy Cae Duff 2
    Dempsey Decourcy Architects – Cae Duff

     

    Give a great deal of thought about the number and function of windows being used

    Nick is currently doing some work on overheating for the Passivhaus Trust. He explains that in our climate we tend to want to let the sunlight in and aren’t used to going out and putting the shutters down, whereas in warmer climes this is something people do automatically. It therefore shouldn’t be a surprise when we return home and find them overheating!

    So firstly it’s important to have enough glass for views and letting daylight in, but without having too much.

    8

    Glazing is expensive so, coming back to value engineering, make the window do as much work for you as possible. Thinking of function, if there are windows that can’t easily be accessed and opened, then consider a fixed rather than openable one, which typically you could pay 30% less for.

    Nick gives this example of his own window behind the kitchen sink which they can’t easily reach to open, and suggests that actually a fixed, single frame view would probably have been better.

    DSC_0080

    Have a guess what percentage of glass there is to frame, and find out the answer in the podcast. The answer may surprise you!
    Have a guess what percentage of glass there is to frame, and find out the answer in the podcast. The answer may surprise you!

    Ensure also that if your windows are to open, that they open enough to get the airflows. Often they open in a restricted reveal which doesn’t allow enough air in. Evolving over many buildings, Nick has learned to step the reveals in a way that when the window is tilted it still allows good airflow. It’s this repetition, and going back to review previous jobs, that is critical to learning and making improvements next time.

     

    Decide what matters and work to your budget

    Deciding what matters and working to your budget is Nick’s key piece of advice.

    “Everything isn’t possible. But again that shouldn’t mean there’s a compromise necessarily. What you end up with you shouldn’t be thinking oh I really miss the little Victorian fake windows, you should think oh thank God I didn’t do that!”

     

    Find out more

    Follow Nick Grant on Twitter

    Find out more about Elemental Solutions

    View Nick’s presentation: Value Engineering, What’s not to love?

    Find out more about Charles Grylls and Dempsey Decourcy Architects

     

    Transcript

    Download a transcript of the interview with Nick Grant.

     

    Inquiry into the Quality of New Build Housing in England

    Towards the end of last year, Ben was part of a panel at the Inquiry into the Quality of New Build Housing in England, at the Houses of Parliament. Presenting to a handful of politicians and construction professionals, those contributing included:

    • Phil Waller, who has previously worked for a major house builder. His opinion was that they could be doing much better, and he has set up a website to try and advise potential purchasers what they should be looking for if they’re intending to buy from a developer.
    • Geoff Peter from Wingrove Law is a solicitor who represents owners of new builds who have ongoing issues with their homes.

    We know what a lot of the issues are and a lot of good questions were being asked, but it just comes down to whether anything will actually get done.

     