Tag: blower door

  • HPH338: How to measure and monitor the performance of a home – with Luke Smith

    HPH338: How to measure and monitor the performance of a home – with Luke Smith

    Luke Smith from Build Test Solutions talks about making building performance measurement more commonplace, and how you can’t manage what you don’t measure.

    Interview with Luke Smith

    Luke Smith trained as an architectural technologist. He is now the Managing Director of Build Test Solutions, making building performance measurement and monitoring more accessible, affordable and mainstream.

    Being able to measure anything doesn’t mean you should measure everything

    The availability of low-cost sensors means there can be a risk of going too far with measurement. For a building that could stand for 50 or 100 years or more, building fabric performance is fundamental.

    Building fabric performance measurement includes the whole building heat loss rate (heat transfer coefficient), airtightness, and U-values of the walls, floors and roofs.

    Performance measurement is suitable for new-build and retrofit

    Non-invasive measurement techniques can be done at any time and with any occupancy, so they are equally suited to retrofit projects and new-builds.

    Checking the performance of new buildings immediately post-completion is ideal, but measurement can also support recommendations for single measures like heat pump installation or relatively modest fabric upgrades.

    Measurement is just one of the three ‘M’s

    Keep in mind the distinction between modelling, measurement and monitoring – the three ‘M’s.

    • Modelling is where you start before building anything. As a lot of it is based on prediction, its outputs will only ever be as good as the inputs.
    • Measurement checks the as-built performance of the new-build, or measures the before and after performance of a retrofitted building.
    • Monitoring is an ongoing process once the building is occupied.

    The three are interlinked. For example, by measuring in situ U-values, you can check that the insulation is doing its intended job. Those measurements can go back into the model and help to calibrate it, so you have a better idea of how the building should perform. The fine-tuned model can then be compared to monitoring data, helping to identify issues and suggest remedies.

    Smart HTC energy inputs and outputs

    Measuring heat transfer coefficient is a good place to start

    Understanding the building’s overall thermal performance won’t tell you specifically where heat is being lost, but it’s a good barometer of how well the fabric retains heat.

    Build Test Solutions uses a technique called Smart HTC, based on inputting internal temperature data and the total energy consumption over a three-week period into an algorithm. Smart HTC can be done without disrupting the day-to-day occupancy of the building.

    SmartHTC IHD

    Smart HTC charts

    Blower door fans aren’t the only way to measure airtightness

    Build Test Solutions uses a technique based on compressed air to measure airtightness. ‘The Pulse’ releases a burst of air and the instrument measures the pressure response – how quickly the background pressure in the building elevates and then recovers back to the original condition. It’s a quick and non-invasive way of measuring air leakage rate. And, because it’s at low pressure, it doesn’t exert high push and pull forces on the building fabric.

    Pulse air permeability testing

    In-situ U-value measurements can help to find specific issues

    To understand specifics, in-situ U-value measurement gives the heat loss through individual building fabric components. This is the next step if the whole building heat loss measurement has identified an issue and you’re trying to find exactly what the problem is. Taking several readings across the area of a floor, wall or roof helps to show if it has been constructed consistently.

    H3DU values

    Ongoing monitoring can be based around energy consumption or air quality

    From an energy consumption perspective, you could be looking at total energy consumption at the meter, or at a sub circuit level – lighting or ventilation systems, for example.

    In terms of health, the main things to monitor are relative humidity, carbon dioxide levels and ambient temperature. But you can also get more in-depth, especially if family members have respiratory illnesses or you’re keen to protect young children. Air quality aspects like particulates, VOCs, radon and carbon monoxide can all be monitored.

    What action will you take based on monitoring data?

    The main thing to ask is: how often will you look at data you collect? What action will you take based on it? The novelty of simply having data can wear off.

    At the same time, devices that can provide warnings – around carbon dioxide or humidity levels, for example – might provide the impetus for behaviour change.

    An example of a basic portable temperature and relative humidity logger

    Monitoring sensors can be portable, semi-permanent or hardwired

    Broadly, three categories of monitoring technologies are available.

    • Portable devices are battery powered or mains powered. They can be placed in a single, central location or you might move it throughout the home and check different rooms over different periods. Combined with an existing smart meter, you could begin to understand both energy consumption and air quality.
    • A semi-permanent installation might come from a company offering a monitoring platform. A central hub has multiple nodes connected to it. The sensors collect data across the home, all presented through a single dashboard.
    • A permanent system is hardwired and can be hugely complex – think a smart energy management system or home energy management platform, verging on home automation. For example, it might track internal humidity and trigger the ventilation system to boost, or open a window.

    Portable devices can be small and unobtrusive. Semi-permanent and permanent sensors can be integrated with the building fabric if they’re planned from the outset.

    A hardwired system is thousands of pounds, compared to a couple of hundred pounds for a portable sensor.

    Consider the Matter protocol if looking at monitoring platforms

    Matter is a universal communications protocol that allows devices to interface together. You could have a Matter-enabled smart thermostat, smart home speaker and EV charger, and they could all talk to one another and present you with information centrally.

    Devices can already give you a lot of energy consumption information

    The general direction of travel is for smart technology to give us a lot of monitoring information. EV chargers are likely to be smart, with an integrated metering capability. Heat pumps typically give the electricity they’ve consumed and the heat output they’ve delivered. Smart light bulbs, and other things like them, will come with a hub to track the energy they’ve consumed. Even without proprietary monitoring equipment it’s possible to get a detailed insight into the energy consumption of the home.

    Luke strongly advocates using a smart meter, to get gas and electricity consumption data broken down into 30-minute intervals. Consumer access devices (CADs) let you go further, even getting as granular as 10-second intervals. Shorter intervals can be useful if you’ve got solar panels generating during the day, or an EV discharging at night. It lets you track and understand what’s happening in more detail.

    Luke shares a few options for monitoring

    Portable monitoring options 

    These simple standalone devices are either battery powered or plug into the mains.

    Aranet4

    Airthings

    Amazon Air Quality Monitor

    Ikea Air Quality Sensor

    All of the above environmental condition sensors can be great alongside data from your smart meter, smart EV charger, and PV monitoring system. 

    Power metering smart plugs would also sit in this category.

    Semi-permanent monitoring options

    These are typically offering the capability to link numerous sensors through a single central hub or gateway

    Open Energy Monitor

    Purrmetrix

    Shelly

    Permanent/fixed monitoring

    These are hard wired solutions where the monitoring layer may form part of a wider smart home management platform.

    Loxone

    Smart thermostats are also examples of basic hardwired solutions that can also typically provide temperature and relative humidity data  – Nest, Hive, Tado, Honeywell, Drayton etc.

    Find out more

    Podcast interview with Tom Fenton (testing the thermal performance of a house)

    Podcast interview with Jonathan Dixon (combining smart home technology with energy efficiency)

    Please connect with us

    Subscribe, rate and review us on Apple Podcasts

    Like our Facebook page

    Follow us on Twitter

  • HPH095 : The Saskatchewan Conservation House – with Harold Orr

    HPH095 : The Saskatchewan Conservation House – with Harold Orr

    Harold Orr reflects on why the Saskatchewan Conservation House was a landmark on the road to high performance buildings.

    Harold_Orr

    Interview with Harold Orr

    Following his father and grandfather, Harold trained as a carpenter. From the age of 12 he had already spent a lot of time on building sites learning about the industry. After a 2 year spell reading mechanical engineering at university he met his future wife, dropped out of university and returned to carpentry. However, an opportunity arose to forge a career in architecture for a few years before returning to Saskatoon to complete a degree and then masters in mechanical engineering.

     

    Air Barriers Were the Subject of Harold’s Thesis

    At the time, it was possible to calculate heat loss in houses through the walls, ceilings, windows and doors, but there was no available way of calculating air leakage. Harold used helium as a tracer gas and developed an instrument that measured the percentage of helium lost in the helium / air mixture. The assumption was that the helium would be lost at the same rate as air, however it does not behave that way, leading to artificial measurements.

    Completing his masters and taking employment with the National Research Council, Harold continued to work on the problem and found that by changing the tracer gas to sulphur hexafluoride they were able to gain much more accurate readings, but it wasn’t a practical system for doing a number of houses because of the time involvement, equipment and processes required.

    By the late 1960s / early 1970s Harold’s work had led to the development of the blower door, and inspired one company to start manufacturing them.

     

    The Arab Embargo on Oil in the 1970s Prompted Research Into Solar Housing

    The Saskatchewan government asked their research arm, the Saskatchewan Research Council, to build a solar house appropriate for Saskatchewan. Harold was part of the committee that was formed to work on the challenge. Given the lack of solar availability between November and April, hot water was going to need to be stored over from the summer time, meaning more energy would have to be put in than they would ever get out!

     

    The Logical Solution was to Reduce Energy Consumption

    The committee looked at ways to reduce energy consumption and one of the first considerations was the amount of insulation to use. Harold’s suggestion was to avoid having a basement (which often led to problems), and use R30 insulation in the floor, R40 in the walls and R60 in the ceiling.

    Harold and a colleague installed the air barriers themselves which resulted in the Saskatchewan Conservation House being the most airtight building in the world at that time (with a reading of 0.5 air changes per hour at 50 Pascals).

    Photo: Harold Orr
    Photo: Harold Orr

     

    While the Committee Designed and Produced a Conserving House, the Government Still Wanted Solar!

    They subsequently modified the design to incorporate a solar hot water system, including an 18ft high tank that was insulated to R100. The cost of materials and labour for the house had been $60,000. The materials for the solar system were $65,000! This was combined with a first year maintenance cost of $10,000 to provide the equivalent of $45 worth of heat with oil. It was no surprise when the house was sold that the new owner removed the solar system!

     

    Such a Pioneering Project had Many Challenges and was a Steep Learning Curve

    At the time there was nobody manufacturing triple glazed windows. Instead they decided to put shuttering on the windows, which didn’t perform as they’d hoped, and with electronic operating switches on each individual one, they were never used! In at attempt to recover heat from grey water, the barrel system they developed had congealed waste soap from the baths and showers once the water had cooled down. And with such an airtight house, the airlock entry for the front and back doors proved to be ineffective.

    The elements which did perform were the insulation, airtightness and ventilation system.

     

    The Major Component of Heat Loss is Air Leakage

    Harold stresses that people think they’re doing the right thing by adding extra inches of insulation to their property, but without addressing airtightness they’re not going to realise a substantial saving in their energy consumption.

    As a rule, if building new houses, “build tight, ventilate right”. And if retrofitting, “make it tight and then ventilate right”.

     

    Related Articles

    The Saskatchewan Conservation House

    Saskatchewan Conservation House precedent honored at Passivhaus conference

    Harold Orr, Passive House pioneer, gets recognition in his own home town 40 years later

    Forgotten Pioneers of Energy Efficiency

    Transcript

    Download a transcript of the interview with Harold Orr.

     

    A Documentary on Airtightness

    Last year we made a documentary on the importance of airtightness. The aim was to explain the concepts in the simplest terms possible and hammer home the message.

    If you haven’t seen it yet, then we would encourage you to take a look.

     

    Please Connect With Me

  • Could ‘The Future of Housing’ be Homes Built to Passivhaus Standard?

    Could ‘The Future of Housing’ be Homes Built to Passivhaus Standard?

    In December 2014 we launched our first ever documentary ‘The Future of Housing – And How Airtightness Can Help’.

    I felt the subject matter was important because while insulation may register with most people as being essential for thermal efficiency, airtightness is still the mysterious cousin. So I wanted to produce a short and accessible programme that would help any homeowner understand how the two are linked.

    To my delight the idea of the film, crowd-funded on Kickstarter, was well received – the core support coming from the great and good of green building. Thank you again!

     

    Watch the Finished Documentary for Free

    Check out the documentary on YouTube – https://www.houseplanninghelp.com/futureofhousing

    Download the documentary in HD – https://www.houseplanninghelp.com/futureofhousingdownload

    If you find it useful I encourage you to share it with others – that’s what it’s there for!

    Already there have been screenings in London, Glasgow, Sydney, Melbourne and Auckland.

    Premiere-at-MildmayThe London premiere at Mildmay Community Centre

    What’s the Documentary About?

    It’s really about choices. We have to decide where and how we live.

    In my case, having recently started a family, my house feels cramped and we are naturally at a point where we’re thinking about our next home.

    I actually enjoy living in a small terraced house and there are many benefits that come with a modest home right in the heart of town. So what I want to avoid, at all costs, is moving to a bigger house and then struggling to heat and maintain it.

    This documentary is an exploration of the options available to me if I want a healthy, good quality home which will also be reducing my carbon emissions.

    Ben's-first-homeMy current home

    The Journey Begins

    I start by meeting an estate agent. This is what most people do if they’re looking for a new house. Unfortunately energy efficiency is not a market driver. It seems that it is primarily about location, followed by the price of the property and then the availability.

    What’s interesting is that most people questioned on the street still thought energy efficiency was important.

    [Tweet “Brenda Boardman: “Airtightness and good insulation go hand in hand.””]

    What Do We Mean by Energy Efficiency?

    In the UK, over 50% of the energy used in our homes is for heating. And we quickly discover that it doesn’t have to be this way. Mike Coe and Lizzie Stoodley live in The Autonomous House. Last year their heating bill was £2.50!

    Their home has just been built properly with attention to detail. It has high thermal mass, south facing glazing, super insulation, mechanical ventilation with heat recovery and the house is airtight (in fact it meets all of the Passivhaus standard criteria).

    cropthorne-house-in-winter

    The Autonomous House has no active heating system

    Expert Advice

    We then introduce Paul Jennings from Aldas who’s the UK’s most experienced airtightness tester. He goes around blowing air into or out of houses, to find out where and how much they leak. Building airtight is critical to energy efficiency as air leaks equal heat leaks. But airtightness is also an excellent guide to overall build quality as it’s difficult to ‘cheat’ to obtain a good result.

    Paul tests two houses: one built in the 1950s and a more recent developer house constructed in 2006. Bizarrely it’s the modern developer house that has the worse result! Its owner, Julia Bennett, cannot afford to keep it warm in the winter, and recognises that there’s no point even trying. So they live in one room – shut the door and have to wrap themselves up in blankets, while the rest of the house freezes. This is all despite it meeting the UK Building Regulations, which begs the question of whether they are fit for purpose.

    The result, the number, is an air permeability of 9.1 so that essentially means that if you had a 20mph wind, after about six and a half minutes your hot air is gone.

    Paul-anemometer

    We Need to Retrofit Our Homes

    While both of our example houses perform poorly in terms of airtightness they can be improved. Paul calls in ‘The Gunge Brothers’ (AKA Chris Dawson and Liam Schofield from DSAI) to seal up some of the gaps and cracks in our 1950s property. The remedial work sees the air permeability drop from 8.2 to 6.3, around 25% better.

    It’s important to note that there are many other factors, such as ventilation, to consider when sealing up.

    We also show a radical retrofit. Andy Simmonds externally insulated Grove Cottage. It now meets the EnerPHit standard.

    Grove-Cottage-(finished)-550-pixelsGrove Cottage was retrofitted to the EnerPHit Standard

    New Homes are Not Necessarily of High Quality

    The programme broadens out to look at how most houses are built in the UK – uniquely in Europe the industry is dominated by a small number of very large developers. They snap up almost all of the available building land, making self build very difficult.

    Ted Stevens, former Chair of NACSBA, sums it well: “We build in the UK the smallest houses in Europe and the most expensive houses in Europe. The average volume house builder is making a 20% profit margin every year. Brilliant, brilliant commercial success from their perspective and their shareholders point of view, but they won’t build to a higher spec unless they have to, unless they’re forced to.”

    We show that part of the problem comes down to the house-buying public – they need to be educated to consider energy efficiency when looking at a property purchase.

    Ashley-Vale-roof

    Ashley Vale group self build in Bristol

    Self Build has Numerous Benefits

    If large scale developers cannot be relied upon to deliver high quality housing then taking it into our own hands is a logical step.

    We feature Ashley Vale, a group self build project in Bristol, which has created a vibrant and diverse community. Interestingly, when this project got underway in 2000, the focus was on making this development as sustainable as possible yet airtightness was not on the agenda.

    We weren’t thinking about taping every seam and taping every joint around every time a pipe goes into the wall making sure that it’s completely sealed. And in hindsight I would want to do that now.

     

    Conclusions

    A combination of homeowners demanding higher standards and the Government driving up building regulations is what we need going forwards.

    The availability and affordability of land remains an issue in the UK.

    In terms of my build, I want my house to be future-proof and to me that means building to Passivhaus standard. It delivers genuinely comfortable, low emissions buildings where the running costs are minimal.

    It seems crystal clear to me that I need to reach the Passivhaus standard with my new house.

     

    The documentary includes interviews from academics and professionals to back up the information, and concludes with my search for a suitable site to self-build.

     

    Credits

    Camera/Director – Mike Coe

    Assistant Producer – Lizzie Stoodley

    Writer/Editor – Tim Waymouth

    Production Team – Kay Adam-Smith, Elrond Burrell, Lucy Cowell, Steve Folland

    Presenter/Producer – Ben Adam-Smith

     

    Find Out More

    Go behind the scenes of the documentary. Listen to our interview with Paul Jennings.

     

    Reviews of the Documentary

    Passivhaus Trust – House Planning Help highlights the importance of airtightness in new documentary

    Green Building Press – ‘Future of Housing’ – a new film to watch for free

  • HPH033 : Are Conservation Techniques Becoming More Energy Efficient? – with Douglas Kent from SPAB

    HPH033 : Are Conservation Techniques Becoming More Energy Efficient? – with Douglas Kent from SPAB

    Douglas Kent from The Society for the Protection of Ancient Buildings explains how to look after period properties and what advances are being made with conservation techniques in order to achieve greater energy efficiency.

    This podcast is about whether by conserving old buildings we can have sustainable and energy-efficient period properties.

    douglas-kent-spab

     

    Interview with Douglas Kent

    Douglas Kent was brought up in Saffron Walden, a village with a deep and rich architectural heritage. Douglas believes this influenced his choice of career and is why he became involved with The Society for the Protection of Ancient Buildings (SPAB) in the year 2000. He is now the Technical and Research Director.

     

    SPAB Aims to Save Old Buildings from Damage, Demolition or Decay

    SPAB was founded in 1877 by the designer William Morris and its objective is to save old buildings from damage, demolition or decay. At the time it was established they were very much trying to prevent buildings being restored and rewound back in time. Douglas explains this with an example of how a church could have been adapted or reconstructed to what medieval masons should have done at the time if they’d built it properly in the first place. So their focus is on conservation and repair rather than restoration.

     

    The Most Common Damage to Old Buildings is Often Unintentional

    While the threat to old buildings in the past was outright demolition today it does not happen very often. Expansion of airports, such as Stansted, would however be something that could have a catastrophic effect on the historic built environment.

    More often the damage occurs unintentionally by the way in which buildings are conserved. People use materials that don’t work sympathetically with older buildings and not just look different but perform differently.

     

    Older Building are More Analogous to an Overcoat Rather Than a Raincoat

    New buildings often rely on a system of cavities, barriers and membranes to exclude moisture and Douglas likens this to a raincoat. With an older building it’s more analogous to an overcoat so it allows some moisture to come into the building but it will evaporate out when the conditions change. Old buildings that work in this way are breathable.

     

    Historic Buildings Are Protected in Many Countries

    Douglas explains that although protection of old buildings exists in many countries, it varies hugely in the way it is implemented. The UK has three bands:

    Grade I – this is the top band and accounts for the smallest percentage of buildings

    Grade II* – these are still important buildings that also account for a small percentage of historic buildings

    Grade II – the vast majority of older buildings fall into this category.

    Finding out more about listed buildings from English Heritage.

    There are also conservation areas, wider zones of protection and things like scheduled monuments.

     

    When Improving Energy Efficiency You Must Avoid Creating a Warm Damp Building

    Most buildings predating 1919 are considered breathable (as mentioned above) and therefore the energy efficiency measures must be appropriate. For example, lime mortar or lime plaster have this breathable quality to them. Using inappropriate materials to improve thermal performance could mean that a cold damp building becomes a warm damp building. This could trigger off things like rot, decay, rusting and mould. It could even aggravate human health ailments such as asthma and so on.

     

    Original Components Often Have a Long Lifespan Left

    As well as affecting the aesthetic qualities of a building, removing original period components can be counterproductive when you consider that they might have a long lifespan left. Douglas gives the example of when people take out single-glazed windows that are built with really good timber and replace them, perhaps, with plastic double-glazed windows where often the seals will go within a couple of years.

    Blower-door-test

     

    Research Where Your Old House is Losing Heat

    Your goal should always be to retain as much as possible of the original fabric of the building and the overall essence of it. That can be achieved by using compatible materials and methods, and carrying out only work that is essential for the long term survival of the building. Also you should underpin that work with good information and a good understanding of the building.

    For example, rather than blitzing the building with new windows, consider where you are losing energy. This could be done by carrying out thermal imaging or an air pressurisation test, which will help you pinpoint where the draughts etc. are occurring. This is a much more targeted approach rather than doing something and hoping for the best.

    thermal-imaging

     

    Secondary Glazing Can be Better Than Double Glazing

    Research by Historic Scotland has shown that you can meet or even exceed the value of new double-glazing by upgrading existing windows using secondary glazing. So establish the full facts rather than rushing to make the changes because often the changes can save little energy and damage the building in the long term.

     

    Providing Decisive Advice for Old Buildings is Difficult

    Douglas says that at SPAB they are always refining their techniques. The difficulty is they are trying to base what they are doing on good information, which involves a number of research projects and that takes time. This has to be about robust scientific evidence.

    U-value-research

     

    Research Shows Actual Performance Often Exceeds Predicted Models

    One discovery they have made is that in 77% of cases the U value, or thermal transmittance, of an old wall is actually better than the calculated value when measured in situ. This is partly because when doing the calculations they don’t know quite what the construction of the wall is and even if they do, there is often very little data that relates to those materials to enter into the software. If the data going in is not reliable then neither will the data coming out.

    Supported by English Heritage and Dartmoor National Park Authority they have measured a range of different constructions and methods including wattle and daub, stone buildings, cob buildings and so on.

     

    Establishing the Limits to Insulation and Airtightness are the Priorities

    General conclusions that the SPAB are beginning to find is that insulating a traditionally built building below a U value of about 0.4 could result in the technical risks (described above) of mould, rot, etcetera. Equally when reducing the number of air changes per hour they are beginning to think that below about 0.4 or 0.5 there could be negative consequences.

    research-on-old-buildings

     

    More Research Must be Carried Out

    Douglas is aware that a lot more research needs to be done as well as refining useful tools, such as the hygrothermal modelling software WUFI . More data could be used to really improve the quality of the information and thus the basis upon which bigger decisions are made. Although there have been some interesting and helpful findings this is still very much the beginning.

     

    Old Buildings are Sustainable in Many Ways

    Old buildings are frequently built of materials with a lower embodied energy than their new counterparts. They also often have a longer lifespan and are easier to repair too.

    Douglas uses windows as an example. Timber windows can be easily repaired by a local carpenter thus extending the lifespan, whereas with modern counterparts there can be propriety systems. This means that if there are problems 20 or 30 years down the line and the supplier is no longer in business, then the windows cannot be fixed.

    Older buildings commonly possess features that are conducive to good energy efficiency, such as really thick thatched roofs, thick walls that are able to retain heat and release it gradually and windows that are disposed to maximise daylight but minimise heat loss. Not only that but as many old buildings are constructed with a lime mortar this makes recycling at the end of the life cycle much easier.

     

    Basic Maintenance Should be the First Step in Improving the Performance of an Old House

    SPAB recommends a step by step approach, which always starts with basic maintenance. All too often people think about microgeneration and putting up wind turbines without stopping their gutter leaking! Correcting a leaking gutter will prevent the wall becoming damp and obviously a damp wall is an energy inefficient wall.

    So undertake the basic maintenance first of all. Every year SPAB run National Maintenance Week to emphasise this point.

     

    Secondly Consider the Quick Wins

    This second step is about the things that have a short payback and cause little disturbance to the historic fabric of the building. For example, things like draught proofing windows and doors, topping up loft insulation and fitting thermostatic radiator valves and so on.

    window-repair

     

    Finally Consider the Major Work

    Only after completing the first two steps should you consider the major work. This might include upgrading the boiler and heating system, introducing a renewable heating source or reinstating a missing lime render externally on your stonework. Spending a little bit of time and money on targeting the measures (as described above) can reap big rewards later on.

     

    A Passivhaus Retrofit is Not Appropriate to a Traditionally Built House

    Douglas advocates that if a building predates about 1919 – in other words it is of traditional construction – then a traditional approach should apply. This includes 1 in 5 of the UK building stock, not just listed buildings.

    Anything post that 1919 period, generally speaking, would have a much freer hand to consider alternative approaches such as Passivhaus and approaches that hermetically seal a building.

    various-period-homes

     

    Older Buildings Must Not Become Seen as Liabilities

    SPAB are not totally against thermally upgrading older buildings because they understand that if they become too expensive to run then they may become liabilities. This could lead to increased demolition which is obviously against their core objective.

    However, Douglas does point out that as of the beginning of 2013 listed buildings no longer require energy performance certificates. Even before they were withdrawn, they were being taken with a pinch of salt because some of the recommendations did not add up. Commenting on retrofitting Douglas says: “We do need to be careful and to make them comfortable and fit for 21st century living.”

     

    Lifestyle is Just as Important When Saving Energy

    Having an energy-efficient building is one thing but if the occupants aren’t sympathetic with the overall aim of saving energy then it defeats the point. It’s often been shown that people who live in some of the more energy-efficient houses are using them perhaps in a more cavalier fashion and with the money that they are saving from being energy efficient they’re going off and flying around the world. Therefore the bigger picture is sometimes more complicated than it may first appear.

     

    Was William Morris in Fact the First Person to Talk About Sustainability?

    Conserving old buildings is about keeping as much as possible of the physical fabric of the old building and that comes back to the principles that were set up by William Morris when he founded the SPAB in 1877. Therefore it could be argued that, albeit unwittingly, perhaps William Morris in encouraging people to save old fabric and not to consume more resources in putting up new buildings was one of the first people to talk about sustainability.

     

    Find Out More about the SPAB

    SPAB

     

    Transcript

    Download a transcript of the interview with Douglas Kent.

     

    Grand Designs Live

    Ben attended Grand Designs Live and amongst his highlights from this year’s event was seeing the Cube Project. Dr Mike Page from the University of Hertfordshire designed a modern and practical micro-home (3m x 4m x 3m) in which a single person or couple could live a comfortable, low impact life. It illustrates, amongst other things, how we actually need much less space than we imagine.

    There was also a session on retrofitting which included Paul King Chief Executive of the UK Green Building Council and Grand Designs presenter Kevin McCloud on the panel. Kevin’s recommended resources for retrofitting period properties were Old House Eco Handbook and Warmer Bath. Radical retrofits were not mentioned in the discussions.

    However a few days before, in an article for the Telegraph, Sarah Lonsdale wrote about how period properties could become a luxury of the super-rich. By 2030 the predicted minimum income of a family wishing to live in a period house and avoid fuel poverty would be around £100,000 ($160,000).

     

    Our Question for the Comments Section

    Does conservation offer the best solution when making old houses energy efficient?

     

    Please Connect With Me

  • HPH026 : Achieving Airtightness in Low Energy Buildings – with Paul Jennings from Aldas

    HPH026 : Achieving Airtightness in Low Energy Buildings – with Paul Jennings from Aldas

    Paul Jennings from Aldas explains why airtightness is an important factor to grasp when constructing an energy efficient home. He also shares how forward planning, attention to detail and teamwork are imperative for achieving good airtightness results.

    paul-airtightness-1

     

    Interview with Paul Jennings

    After doing an engineering design degree in the 1980s, Paul worked for an energy charity in London. This charity acquired some air testing equipment because fuel poverty was becoming more of an issue and Paul began testing various council flats and houses for airtightness, with a view to improving the stock.

     

    Historically There Have Been Some Very Airtight Buildings

    Paul says that one of the most airtight structures he’s tested was part of Gloucester Cathedral. Despite being 600 years old, due to the nature of the construction with lime plaster over stone, it is pretty airtight. Conversely some modern housing – built by developers in the seventies, eighties and nineties – is not very airtight.

     

    Poorly-Built Modern Housing Will Need to Be Demolished

    Paul believes that it’s much easier to improve the airtightness of a property from the Victorian and Edwardian era than it is to fix poorly-built modern housing. He says that there’s too much to do and that we’ll end up just knocking them down and starting again.

     

    There Are Two Primary Measures of Airtightness

    1. Air permeability is the amount of air which flows through the fabric – the walls, the roof and the floor – of a building per hour at a particular pressure. This pressure is usually 50 pascals (50 Pa), which is equivalent to 5 millimetres of water gauge pressure. This is not a huge pressure and Paul puts it into perspective by saying that you would apply 2000 Pa with your mouth when you drink a milkshake through a straw. Yet it doesn’t hurt you. That is air permeability and it’s part of the (UK) building regulations for new builds.

    2. Air changes per hour is a volumetric measure of how much air passes into or out of a building per hour at a given pressure (which is also usually 50 Pa). This is most appropriate for conditioned buildings that have heat recovery ventilation, where the warmed or cooled air passes through the ventilation system rather than leaking out around doors, windows, through cracks, etc. So the measure of air changes per hour is what is used for more airtight buildings, such as buildings that meet the Passivhaus standard.

    The stringent airtightness target of a Passivhaus is 0.6 air changes per hour whereas UK building regulations require a maximum air permeability of 10. Therefore achieving the Passivhaus criteria is about 16 times more onerous. Also, the closer you get to the lower yield for which you are aiming, the harder it is. Getting airtightness down from 10 to 5 is easy, but getting it from 1 to 0.6 is generally very hard. Obviously this varies according to building design, building type, but above all it varies according to the quality of the builder. Paul stresses that the biggest issue we face with delivering airtightness is how we make our builders do what they need to do and work to these sufficiently high standards.

    paul-airtightness-2

     

    Good Design is Integral to Achieving an Airtight Building

    The first part of the process is to look at the design of the building because there are things that can be done to make it easier to achieve airtightness. For example, in Germany it is common to build upper floors with concrete rather than suspended timber. This is because where there’s suspended timber there are voids which air can pass through. Paul talks about doing tests on three storey town houses where the room thermostat on the internal wall of the mid-floor living room is leaking air. That’s because when you’re testing it, air is coming up through it because it’s connecting through the voids in the walls and floors. Having solid upper floors would make a significant difference.

    Also, warm roof construction (where the insulation follows the line of the roof) would be beneficial for airtightness. Paul says: “A cold roof often has a tricky detail at the eaves where you have to try and maintain airtightness but you also want ventilation into a cold loft space, so trying to have those two things in what is becoming a tight space in that angle in the eaves, often becomes difficult for people and one of the places it goes wrong.”

     

    Most Building Materials Are Pretty Airtight

    A lot of materials (including glass, plasterboard and solid timber) are pretty airtight. Blockwork, however, can vary a lot. Paul’s seen walls that he can blow through!

    “One of the things we say for new build [is] if you have blockwork coming off an external wall into the dwelling you have to make sure it is airtight for at least a metre into the dwelling. So you basically have to plaster, if you are doing a wet plaster system, on the return internal partition walls as well as on the inside of the external wall. Even then we’ve had cases where they are using recycled power station ash, fuel ash, in the blockwork, they can be very very porous and a metre is not enough. We’ve had air running through internal dividing walls by up to four metres, which goes beyond what you are expecting, it goes outside the design and then becomes a problem. So often with this it’s where you have variations, where people move a duct, people change a window size, people discover that blockwork is leaking where it is not, it goes wrong. If you are smart for airtightness you have a programme, because it doesn’t happen by accident.”

     

    There Should be a Minimum Airtightness Standard of 3

    The minimum airtightness standard that Paul tends to work to is 3 air changes per hour, which is the AECB Silver Standard, obviously going down to 0.6 for Passivhaus.

     

    Delivering Airtightness is All About Planning

    Specifying just the target or even the materials is not enough, it’s about the process. Air barrier drawings must be created, showing in a red line what the airtightness is, where it is, with notes specifying the material, the package of works and who is doing it. Then there is the process of going through and checking, which is called a design review, making sure that it all joins up.

     

    Mistakes During Construction Need to be Dealt with, Rather than Hidden

    Paul says that everyone makes mistakes but that part of the problem with the [UK] construction industry is mistakes are hidden. On many occasions he’s seen something that’s been put in the wrong place, like a hole for a boiler flue, a hole for a heat recovery duct or an extract fan. Instead of owning up to this, acknowledging it and dealing with it in the appropriate way it gets hidden. This can have ramifications for many years to come.

     

    As Soon as You Have Voids, Air Can Go Anywhere

    As soon as you have voids, such as a cavity wall, the air can go anywhere. Even if you can’t see a hole on the outside of the building, if there is a hole in the inner leaf connecting to the cavity that’s as good as to outside. This is also applicable with old buildings. For example, you may think you have a solid stone wall of half a metre in a church, but actually it’s stone on either side with a rubble-filled cavity. A lot of air will pass through those walls. As soon as it’s lime plastered on the inside, the problem goes. People do not expect buildings to leak where they do leak.

     

    Buildings Can be Tested for Airtightness with a Blower Door

    In order to carry out this test a calibrated small, big or very large trailer fan is mounted in an open doorway or window. There are various adjustable door systems, too. Paul describes how it has varying ranges of how much air it will blow, from small to very large. Normally the process begins with sucking air out of the building. This is called depressurisation. With the building at a lower pressure the atmospheric pressure forces air back through the cracks, the gaps, the leaky dampers, the windows that the draught seals are not quite right, etc. Above 25 Pa a strong draught is created, which is maintained for the duration of the test and then the locations of these draughts can be established.

     

    During Testing There are Numerous Ways to Detect Draughts

    Often you can feel draughts with your hand. If you put your eyeball next to a draught it may be even easier to perceive because your eyes are even more sensitive. There are also different sorts of chemical smoke and stage smoke that can be used. Acoustic testing is another option. You can also put anemometers next to where you think the whole is.

    Infrared cameras can help find leaks because, especially in the very airtight buildings, it can be the coldness where the air’s leaked that shows you where the leak is rather than feeling the leak itself. After ten minutes of cold air it starts to show up on a thermographic camera.

    paul-airtightness-3

     

    Builders Often Turn Air Tests into Leak Location Exercises

    Under (UK) building regulations, construction testing is required for houses, albeit sample testing. However, Paul says: “One of the current issues is that the building regulations say if you do a test and it fails you not only have to fix it and retest it you have to test another one of the same type as well – the sample size goes up. Yet there have been no failures or almost no failures reported, and why is that? Well we know why that is because any builder, sensible builder, says actually let’s make this a leak location exercise not a test and we’ll fix it and then you can test it again, which is legal but is definitely against the spirit and we definitely, I think as a nation, are building in problems for the future with poorly performing houses where we have small sample sizes on large volumes, large numbers of houses and especially where they are timber frame.”

     

    Research is Needed to Discover How Long Airtight Barriers will Last

    While the suppliers of materials, especially the better airtightness materials, do accelerated ageing on their products claiming they will perhaps last for 50 years, they are not in a 50 year old building. So nobody really knows how long airtightness barriers can remain and that’s why more research and monitoring is necessary. Most things are fairly stable, but it’s the joints, the interfaces and the penetrations that move. Very high quality mastics have a bit of give and allow the building to move, to shrink, to thermally change over time. At the other end of the scale, where builders have used very cheap caulk, cracks can begin to form within weeks of it being applied.

     

    Vapour Open Materials Allow Moisture Through Without Letting Air Through

    Vapour open materials will allow moisture through without letting air through. Moisture will wick through materials so will soak into a service, pass through the material and come out the other side. That doesn’t require a hole that will let air through – the building is vapour permeable. In the past they used to be called breathable but that’s a misnomer because it’s not. Recently they have created what they call ‘intelligent materials’ which vary according to temperature and pressure in which direction they allow moisture to move, but again they are airtight and nobody should be under the illusion that if they want a vapour permeable building they have to make it airtight.

     

    Extremes in Ventilation Often Occur in Traditionally-Built Buildings

    Paul says at the moment most UK houses have too much ventilation when the wind blows and not enough ventilation if the wind doesn’t blow. That means we have the worst of both worlds. However, as we move to more airtight constructions or very airtight with Passivhaus, there must be ventilation. People worry about this but we don’t need very much movement of air to give us the oxygen we need to breath. It is reckoned to be about thirty litres per second per person for moisture control and for breathing, depending on exercise levels, two three or four. It’s an order of magnitude difference. Paul jokes: “You will be getting black mould growing out of your ears before you suffocate in an airtight house!”

     

    Indoor Air Quality is Another Part of Airtightness

    When considering airtightness it’s important to remember there is less dilution of pollutants happening and that means avoiding paints that are going to give off volatile organics, for example. So, be careful about specification of paints, furniture and things like new computers that give off lots of toxic materials. All of these things become more of an issue in an airtight house, but of course the big one is moisture.

     

    Choose Contractors with a Good Track Record of Achieving Airtightness

    Paul recommends that when looking for contractors, you should find out what they’ve done elsewhere and what air results they have achieved. If you hire a bog standard builder without any knowledge of airtightness to carry out the work, then be aware that you will be paying for their learning curve. It does depend of the level of airtightness you are trying to achieve.

     

    We Need to be Delivering Better Quality Airtightness, Particularly in Refurbishment

    Paul reckons that when it comes to new build projects potentially we are not bad in terms of airtightness. In refurbishment he says we’ve [UK] got to learn a lot. The focus should be on improving the skills base and doing much more testing of refurbishment projects so that people understand the issues and can see the difference before and after. This is not only for energy efficiency but if we want buildings to last. Sustainable construction means construction that is not rotting from interstitial condensation 5,10 or 15 years down the line.

     

    Take a Fabric First and Avoid the Eco Bling

    While there is a place for solar panels and the like, our priority should be in getting the building fabric right first. Paul believes a lot of the construction industry should be taken to task for the poor quality they deliver in refurbishment.

     

    Transcript

    Download a transcript of the interview with Paul Jennings.

     

    Ask Your Questions or Share Your Feedback

     

    Please Connect With Me