Tag: Bill Butcher

  • HPH247 : Two radical retrofits that use an internal wall insulation strategy – with Bill Butcher

    HPH247 : Two radical retrofits that use an internal wall insulation strategy – with Bill Butcher

    Bill Butcher from Green Building Company, the construction division of Green Building Store, explains how they tackled two radical retrofit projects in West Yorkshire. Each took a ‘whole house’ fabric first approach in order to improve comfort levels and reduce the heating bills.

    Having been Passivhaus pioneers in the UK with their Denby Dale project, the building team at Green Building Company has kept honing their approach.

    There was Golcar new build project and Stirley Community Farm retrofit. Now we look at two of their radical retrofit projects, Cumberworth and Lower Royd, and how they embrace the same philosophy but still require bespoke solutions.

    Cumberworth retrofit after the work was completed

    Cumberworth radical retrofit

    Initially this was part barn conversion and part 1990s extension, so there needed to be two different strategies for this project.

    The existing property was hard to heat

    The owners were spending £3,500 a year on LPG trying to keep this 150m2 property warm but they were still cold!

    A whole house ‘fabric first’ strategy was adopted

    In order to make the house more comfortable and reduce heating bills they embarked on a deep retrofit. This embraced the Passivhaus methodology of making the house draught free, increasing the levels of insulation, reducing thermal bridging and introducing mechanical ventilation with heat recovery.

    The designs were modelled in the Passive House Planning Package (PHPP).

    Insulating internally maintained the natural stone facade

    While a lot of retrofits use external wall insulation, there are a few reasons why they didn’t. Cumberworth is at the top of the Pennines and it is exposed to a lot of moisture. The natural stone works well in these parts.

    Bill continues: “To build in any other way is totally out of character for this region. And that’s what the customer wants.”

    The three moisture risks had to be addressed

    The moisture risk depends on the wall build-up. The ex-barn wall had two stone leaves which were filled with rubble! Being a Victorian barn it was also susceptible to rising damp because there was no damp proof course.

    In this high exposure region on the Pennines rain driven damp through the porous stone was another risk.

    The third moisture risk is interstitial condensation which is the condensation of internal moist air reaching the dew point where it turns to water as it meets a cold wall.

    This section of the building was insulated was a product called TecTem, which is vapour open and breathes like the original building would have done.

    WUFI was used to model the moisture risks

    A German software package called WUFI was used to look at the moisture risks. To increase accuracy it requires a lot of information first.

    Bills gives a few examples: “It takes into account where you are, the orientation of the wall – obviously a West wall up here is in more danger than the East wall because most of our rain comes from the West – the rising damp, the type of stone it is, which quarry it’s from, the mortar joints and so forth, and then obviously the insulation.”

    Moisture sensors in the walls help monitor the situation and allow Bill to assess the accuracy of the program. “I might say that all of the buildings are performing fine.”

    Insulating the extension was simpler

    As the 1990s part of the Cumberworth project is a cavity wall construction it should be less susceptible to rain-driven damp. And it’s got a damp proof course which should deal with rising damp.

    A ground source heat pump is the heat source

    For a new build Passivhaus the energy demand would be so low that underfloor heating would not be appropriate. In a retrofit situation it becomes more relevant.

    Also the clients had a field in front of the house which they were keen to use for a ground source heat pump.

    Bill explains: “Air source and ground source heat pumps work most efficiently at delivering 35C water, hot water if you like, for your central heating system. And that suits underfloor heating more than radiators. That then informs how you do the floor. Because we don’t want to be heating up masses of concrete in a floor because of the slow cooling and heating – it doesn’t respond. “

    So it’s only 75mm of heating screed on top of the insulation.

    The insulation follows the line of the roof

    As with most of Green Building Company’s retrofit projects they have gone for a cathedral roof. This means the insulation is within the structural timber roof and that the loft space is inside the thermal envelope.

    Bill says: ” What we tend to end up doing is having a studwork parallel with our rafters. So we end up with insulation between the rafters, insulation again, and then within the studwork which is between the purlins more insulation. So, we would use more rigid bats between the rafters – a mineral wool in our case – and the studwork, and then just ordinary loft fibreglass insulation between.”

    MVHR duct runs were down corridors

    As this is a low energy retrofit a mechanical ventilation with heat recovery was specified. It goes without saying that these are fairly intrusive, requiring a plant room for the unit and ducting around the house.

    While a new build Passivhaus might use posijoists in the intermediate floor, in a retrofit situation you have to come up with other solutions.

    Bill explains that they ran the ducting down the corridor because this was an area where a lower ceiling is not so noticeable.

    Vaccuum insulated panels were used around some window reveals

    Green Building Store had already supplied outward-opening triple glazed windows to this property five years previously and hence they were keen to keep these!

    One challenge they faced was in maintaining the continuity of insulation.

    Bill explains: “If you do it [insulation] well in ninety percent of your building, for example, the ten percent becomes very vulnerable to condensation and cold bridging. So, the reveals between the very good wall insulation we were doing, in to the window frame, only allowed for a ten millimetre insulation.”

    To maintain that u-value at this thickness they needed to use vacuum insulated panels, custom made to fit!

    Lower Royd after retrofit work

    Lower Royd radical retrofit

    Much like Cumberworth, this project had two different parts. One was a virgin barn and the other was an existing farmhouse that hadn’t been touched since the 1960s. So it was ripe for a retrofit.

    A connection to mains gas helped inform the project

    Despite it’s fairly remote location Lower Royd had a mains gas connection.

    The clients had envisaged using a ground source heat pump to heat the house, but in terms of economics, their money could be better spent on insulation!

    Bill comments: “A ground source heat pump may cost you twenty-grand to get into the building as opposed to gas and the standard boiler – and we’re talking about the smallest condensing boiler, off the shelf from your local builder’s merchant – costing, installed, fifteen-hundred, two-grand. You’re better off with that saving of fifteen-grand, say, to be put into your fabric. The cheapest energy is the energy you save.“

    And of course this doesn’t rule out changing the heating system to an air source or ground source heat pump further down the line.

    A spray-on lime based insulation saved flattening the walls

    On the Cumberworth project they used a rigid insulation called TecTem. However, they had to invest a lot of time in flattening the walls to be able to apply it properly. So they were keen to consider other alternatives at Lower Royd.

    So they trialled a spray-on internal wall insulation from Italy called Diathonite Evolution.

    Not only is it airtight, but it is vapour and capillary open to address any moisture issues.

    And being a lime product, it naturally inhibits mould growth.

    Airtightness is the most important factor for comfort

    Having carried out a few deep retrofits, Bill believes that when it comes to energy and comfort, airtightness is the most important factor. Then insulation comes next.

    In fact they may experiment with reducing the insulation levels a little on future projects and look at the impact.

    Find out more

    Visit the website of Green Building Store

    Follow Green Building Store on Twitter

    Follow Bill Butcher on Twitter

    Transcript

    Please connect with me

    Subscribe, rate and review the podcast in iTunes

    Rate and review the podcast on Stitcher

    Like our Facebook page

    Follow us on Twitter

  • HPH014 : Low Energy Barn Conversions – with Bill Butcher from Green Building Store

    HPH014 : Low Energy Barn Conversions – with Bill Butcher from Green Building Store

    Bill Butcher from Green Building Store shares his approach to creating a low energy barn conversion by building a box within a box. Stirley Community Farm will meet the EnerPHit standard.

    Bill-Butcher

     

    Interview with Bill Butcher

    Bill started out, aged 16, at the tech college in Exeter doing an HNC in building. From there he pursued the quantity surveying route, before becoming a builder. He has always had an interest in the environment and founded Green Building Store with two other colleagues in 1995. Green Building Store focusses on supplying the components and services around low energy and sustainable construction.

     

    In 2007 They Realised The Potential of Passivhaus

    Bill tells the story of how his business partner, Chris Herring, had been over to Bregenz for the Passivhaus International Conference and had come back convinced that their business should go down this route.

     

    An Opportunity Presented Itself in Denby Dale

    When Geoff and Kate Tunstall approached the Green Building Store about constructing a ‘green house’, which in their eyes was going to be a dormer bungalow with a low of renewables, it presented the perfect opportunity to construct their new home to Passivhaus standard. In 2009, they started building. You can read a comprehensive blog on the whole project.

    Denby-Dale-night

     

    To Keep The Price Reasonable, Builders Will Stay Within Their Comfort Zones

    As Green Building Store had built with masonry and cavity wall in the past, this was the approach taken at Denby Dale. This meant that all the materials were available locally in Huddersfield, with the exception of triple-glazed windows with insulated frames, mechanical ventilation heat recovery (MVHR), and various tapes and membranes (all of which are now handily stocked by the Green Building Store!).

     

    Passivhaus is Not Restricted to a Single Construction Methodology

    Bill talks about other examples including John Williamson from JPW Construction building with timber frame and Bere Architects using a kit home imported from Austria for the Camden House.

    Denby-Dale-kitchen

     

    Passivhaus is as Much About Comfort as Anything

    Benefits of a fabric first approach not only include the performance of the building, but you also create an environment that is tranquil and comfortable. Even when it is -10°C outside there’ll be no internal surfaces less than 17°C. This drastically reduces convection. Bill explains with an analogy of standing in front of a fire on Bonfire Night, where you’re burning on the front side but freezing on your back! In a Passivhaus where you don’t have that convection of cold air falling you can keep the thermostat down to 18°C, whereas in a conventional build you might have to adjust the thermostat to 23°C to counteract that feeling.

    Denby-Dale-window

     

    Stirley Community Farm

    These were three bankrupt dairy farms on the outskirts of Huddersfield (in quite an exposed location) that were owned by Kirklees Council. Yorkshire Wildlife Trust took them over, and recognising that wildlife and farming are intertwined, they are now running the farms quite traditionally with minimal fertilisers. In addition to rearing a herd of beef cattle, they are growing food, and also showing how this can then be prepared and cooked inside the new education centre.

    Stirley-Community-Farm-barn-before-EnerPHit

     

    The Building Was Structurally Unsound

    After getting in the structural engineers, the existing buildings were found to be unstable. Therefore a lot of work had to be carried out on making the building stand up by underpinning the foundations. The foundations themselves were very minimal.

    Stirley-Farm-Artist-impressionAn artist’s impression of the new Stirley Community Farm, courtesy of Eco Arc

     

    Insulation is Put Under The Floor

    Bill explains the process of excavating down in order to insulate underneath the floor (200mm of polyurethane underneath a 6-inch concrete slab with the hard core). Alternate 1m by 1m concrete pads are also placed under the existing wall to stabilise it.

     

    Creating a Box Within a Box

    As a barn is just an open space, the pioneering approach on which they settled was to construct a timber frame building within the existing masonry. At the same time the existing masonry would be stabilised with the timber frame, and the envelope would be insulated and made airtight. The two structures will then be separated by a nominal cavity. Bill goes into more detail.

    Stirley-Community-Farm-Ground-Floor-Proposed-plan-High-Res

     

    A Building With No Windows or Doors Would Be More Energy Efficient!

    Bill explains to Ben that you can build a wall to a U value of 0.1 quite easily (which is currently 3 times better than building regulations in the UK). However when it comes to the windows and doors, even using the best components, you might get to a U value of 0.8. That’s 8 times worse than the wall next to it. Therefore how that’s installed in the wall is crucial. The frame must be wrapped with insulation from the walls or so that it’s continuing the insulation around the frames. They are a thermal bridge in their own right.

     

    Thermal Performance as Important as Keeping The Rain Out

    Bill believes we have to look at the concept right from the beginning in a different manner where thermal performance is as important as keeping the rain out. He stresses that you wouldn’t want steel balconies cantilevering out of your buildings because steel is one of the worst conductors of heat.

     

    Construction Industry Has an Opportunity to Raise its Game

    Buildings of this quality demand attention to detail, and skill and teamwork are more important than ever. This is not the last bastion of a school leaver. It is also an opportunity for the whole team, including the client, to gain a better understanding of what the project is about.

     

    Putting Tenders Out to 10 Builders Will Never Lead to High Performance

    Bill suggests a procurement method in which we put out tenders to 5 or 10 builders will never lead to high performance, because the builder hasn’t any ownership over the project. It’s far better to get a builder in partnership during the design stages so they can have their input into the design.

     

    Sources of Moisture

    The problem with moisture in buildings can come from several different angles. One is groundwater, which is why people use damp proof courses and so on, and tanking when below ground. There’s also moisture from wind-driven rain through a wall, through masonry because stone brick is porous and it has to be dealt with in one way or another.

     

    A Well-Ventilated Cavity Will Avoid Solar Driven Moisture

    Solar driven moisture is less well known. It can happen in the summertime and is a danger where you’ve got a radical construction. Once you’ve extremely well insulated internally, the external masonry wall will be colder and it becomes more like a garden wall (lime based mortars breathe, allowing moisture both in and out of the wall).

    When you’ve put internal insulation in with a complete air tightness layer, what can happen in the summer when you have a heavy rainstorm is that the wall gets very wet. After that the sun comes out and the heat from the sun drives the moisture inwards. If you haven’t got a well ventilated cavity, that moisture could potentially soak the timber frame inside. There was an example in Belgium where this damage occurred because there was not enough attention to detail during the planning stages.

     

    WUFI

    A software program called WUFI allows you work out the minimum air change rate that should be acceptable (in the cavity in this case) in order for moisture to be taken away as vapour. The calculation for this project shows that it is only if the cavity goes below 8 air changes per hour that there is a danger that moisture could start building up in timber frame. In other words, it can be designed out.

    StirleyCommunityFarm-positioning-concrete-wall-connectors

     

    Not Practical to Have Every Building With Moisture Sensors

    Stirley Farm will have moisture sensors but Bill suggests that it would be impractical to do it on every new building.

    g-b-s-logo-R

    Green Building Store’s Free Resources

     

    Transcript

    Download a transcript of the interview with Bill Butcher.

     

    Ask Your Questions or Share Your Feedback

     

    3 Videos on Energy-Efficient Homes

    Ben has been filming with former podcast guest Martin Evans from the Malthouse Consultancy. There’ll be 3 informative videos coming soon.

     

    Google+ Communities

    If you’re reluctant to take on more social media, find out why Google+ is important. We have set up 3 communities – Eco Homes, Energy-Efficient Homes and Passivhaus – which we’d love you to join.

     

    Please Connect With Me