Author: Ben

  • HPH250 : 10 inspiring self builds – with Ben Adam-Smith

    HPH250 : 10 inspiring self builds – with Ben Adam-Smith

    To celebrate our 250th podcast, Ben Adam-Smith picks out ten of his favourite new build homes. These are all homes he has visited and which have impressed him in different ways.

    1. Dundon Passivhaus

    Architect Graham Bizley and interior designer Emily Bizley have produced a magnificent, modern family home that takes in all of the surrounding countryside.

    There are some fantastic spaces in here and the timber theme flows effortlessly from outside to inside. Graham and Emily also did a lot of the work themselves – true craftsmanship – and this tailors the home perfectly to them.

    2. Treehouse

    Video from Homebuilding & Renovating

    While the finished house may look happily aloft, there were plenty of highs and lows for Jon Martin and Noreen Jaafar. They bought this plot without planning permission, even though the local planning authority said it would never get approval. Needless to say they got the green light!

    Then there is the technical challenge of building amongst mature trees. They used pile foundations which carefully stepped around the root structure! Oh, and let’s not forget that they used no concrete on the build. Even running out of money they pushed on to secure Passivhaus certification. A truly remarkable home.

    3. Fran Bradshaw’s house

    Located on the Norfolk coast this is a labour of love for architect Fran Bradshaw. There are beautiful materials – straw bales, thatch, lime render, clay plaster, timber – which pair up nicely with the home’s high performance credentials.

    4. The Autonomous House

    Mike Coe and Lizzie Stoodley went all out on this project to create an ultra low energy eco-build. The heat demand for this house is a tiny 4kWh per m2 per year. It brings all the services in house, so there’s no mains water or mains drainage. Instead rainwater is harvested from the roof and stored in large tanks (recycled orange juice containers) under the house. There are composting toilets, within the thermal envelope. And a PV array supplies the electricity.

    Mike and Lizzie, however, did not stay as long as they intended. Driven by how the climate is changing they decided to move further north to the Isle of Skye… and tackle their second self build!

    5. The Cut

    Self-builders Tara Murphy and Dimitri Daras spent their money wisely here. It’s another example of how a house with a simple form doesn’t have to be boring. On the contrary it is striking.

    Tara also specified a lot of the house with a baby in tow!

    6. Ashley Vale

    Yes, this is not strictly a self build but community-led housing. It got a place on this list for a few reasons. It’s inspired so many other community-driven projects as this was one of the early ones.

    They also managed to wrangle the land away from a volume house-builder, which is an incredible feat.

    And at the end of it all, one of their key players Jackson Moulding went on to set up Ecomotive, to empower other groups to do exactly the same.

    7. Lansdowne Drive

    Architect Bernard Tulkens was behind this project. It’s a modest house that embraces simplicity. The cross-laminated timber structure is exposed as is the ventilation ducting, but it works a treat.

    Throughout the building they have tried to make as much use as they can of recycled, reclaimed and other materials that have low embodied energy.

    And from a Passivhaus point of view there were plenty of challenges… three storey Victorian homes completely overshadow them on the south side. Therefore their West-facing glazing has to be carefully controlled with blinds.

    8. Hampshire Passivhaus

    Architect Ruth Butler perhaps took on a site that others would dismiss. It was a brownfield site that is overlooked by 13 neighbours. So her constraint-led design would need to rise to the challenge.

    And it certainly does. A wonderful contemporary home that feels extremely private from the inside.

    9. Buckinghamshire Passivhaus

    This was one of the UK’s first Passivhaus Plus projects. The architect, Jae Cotterell, was also supplying the build system (PH15). It recorded an outstanding airtightness result of 0.07 ach@50Pa.

    A large solar PV, beautifully integrated, helps them deal with a lot of their energy needs before the surplus is exported.

    10. Chiswick Eco Lodge

    Architect Richard Dudzicki delivered this project for client Oliver Smallman. Oliver lived in a Victorian house next door and had built this property to rent out. But, he liked it so much, after renting it out for a couple of years he decided to move in.

    This house feels wonderfully at home on this street and the clever design must take the credit.

    Please connect with me

    Subscribe, rate and review the podcast in iTunes

    Rate and review the podcast on Stitcher

    Like our Facebook page

    Follow us on Twitter

  • HPH247 : Two radical retrofits that use an internal wall insulation strategy – with Bill Butcher

    HPH247 : Two radical retrofits that use an internal wall insulation strategy – with Bill Butcher

    Bill Butcher from Green Building Company, the construction division of Green Building Store, explains how they tackled two radical retrofit projects in West Yorkshire. Each took a ‘whole house’ fabric first approach in order to improve comfort levels and reduce the heating bills.

    Having been Passivhaus pioneers in the UK with their Denby Dale project, the building team at Green Building Company has kept honing their approach.

    There was Golcar new build project and Stirley Community Farm retrofit. Now we look at two of their radical retrofit projects, Cumberworth and Lower Royd, and how they embrace the same philosophy but still require bespoke solutions.

    Cumberworth retrofit after the work was completed

    Cumberworth radical retrofit

    Initially this was part barn conversion and part 1990s extension, so there needed to be two different strategies for this project.

    The existing property was hard to heat

    The owners were spending £3,500 a year on LPG trying to keep this 150m2 property warm but they were still cold!

    A whole house ‘fabric first’ strategy was adopted

    In order to make the house more comfortable and reduce heating bills they embarked on a deep retrofit. This embraced the Passivhaus methodology of making the house draught free, increasing the levels of insulation, reducing thermal bridging and introducing mechanical ventilation with heat recovery.

    The designs were modelled in the Passive House Planning Package (PHPP).

    Insulating internally maintained the natural stone facade

    While a lot of retrofits use external wall insulation, there are a few reasons why they didn’t. Cumberworth is at the top of the Pennines and it is exposed to a lot of moisture. The natural stone works well in these parts.

    Bill continues: “To build in any other way is totally out of character for this region. And that’s what the customer wants.”

    The three moisture risks had to be addressed

    The moisture risk depends on the wall build-up. The ex-barn wall had two stone leaves which were filled with rubble! Being a Victorian barn it was also susceptible to rising damp because there was no damp proof course.

    In this high exposure region on the Pennines rain driven damp through the porous stone was another risk.

    The third moisture risk is interstitial condensation which is the condensation of internal moist air reaching the dew point where it turns to water as it meets a cold wall.

    This section of the building was insulated was a product called TecTem, which is vapour open and breathes like the original building would have done.

    WUFI was used to model the moisture risks

    A German software package called WUFI was used to look at the moisture risks. To increase accuracy it requires a lot of information first.

    Bills gives a few examples: “It takes into account where you are, the orientation of the wall – obviously a West wall up here is in more danger than the East wall because most of our rain comes from the West – the rising damp, the type of stone it is, which quarry it’s from, the mortar joints and so forth, and then obviously the insulation.”

    Moisture sensors in the walls help monitor the situation and allow Bill to assess the accuracy of the program. “I might say that all of the buildings are performing fine.”

    Insulating the extension was simpler

    As the 1990s part of the Cumberworth project is a cavity wall construction it should be less susceptible to rain-driven damp. And it’s got a damp proof course which should deal with rising damp.

    A ground source heat pump is the heat source

    For a new build Passivhaus the energy demand would be so low that underfloor heating would not be appropriate. In a retrofit situation it becomes more relevant.

    Also the clients had a field in front of the house which they were keen to use for a ground source heat pump.

    Bill explains: “Air source and ground source heat pumps work most efficiently at delivering 35C water, hot water if you like, for your central heating system. And that suits underfloor heating more than radiators. That then informs how you do the floor. Because we don’t want to be heating up masses of concrete in a floor because of the slow cooling and heating – it doesn’t respond. “

    So it’s only 75mm of heating screed on top of the insulation.

    The insulation follows the line of the roof

    As with most of Green Building Company’s retrofit projects they have gone for a cathedral roof. This means the insulation is within the structural timber roof and that the loft space is inside the thermal envelope.

    Bill says: ” What we tend to end up doing is having a studwork parallel with our rafters. So we end up with insulation between the rafters, insulation again, and then within the studwork which is between the purlins more insulation. So, we would use more rigid bats between the rafters – a mineral wool in our case – and the studwork, and then just ordinary loft fibreglass insulation between.”

    MVHR duct runs were down corridors

    As this is a low energy retrofit a mechanical ventilation with heat recovery was specified. It goes without saying that these are fairly intrusive, requiring a plant room for the unit and ducting around the house.

    While a new build Passivhaus might use posijoists in the intermediate floor, in a retrofit situation you have to come up with other solutions.

    Bill explains that they ran the ducting down the corridor because this was an area where a lower ceiling is not so noticeable.

    Vaccuum insulated panels were used around some window reveals

    Green Building Store had already supplied outward-opening triple glazed windows to this property five years previously and hence they were keen to keep these!

    One challenge they faced was in maintaining the continuity of insulation.

    Bill explains: “If you do it [insulation] well in ninety percent of your building, for example, the ten percent becomes very vulnerable to condensation and cold bridging. So, the reveals between the very good wall insulation we were doing, in to the window frame, only allowed for a ten millimetre insulation.”

    To maintain that u-value at this thickness they needed to use vacuum insulated panels, custom made to fit!

    Lower Royd after retrofit work

    Lower Royd radical retrofit

    Much like Cumberworth, this project had two different parts. One was a virgin barn and the other was an existing farmhouse that hadn’t been touched since the 1960s. So it was ripe for a retrofit.

    A connection to mains gas helped inform the project

    Despite it’s fairly remote location Lower Royd had a mains gas connection.

    The clients had envisaged using a ground source heat pump to heat the house, but in terms of economics, their money could be better spent on insulation!

    Bill comments: “A ground source heat pump may cost you twenty-grand to get into the building as opposed to gas and the standard boiler – and we’re talking about the smallest condensing boiler, off the shelf from your local builder’s merchant – costing, installed, fifteen-hundred, two-grand. You’re better off with that saving of fifteen-grand, say, to be put into your fabric. The cheapest energy is the energy you save.“

    And of course this doesn’t rule out changing the heating system to an air source or ground source heat pump further down the line.

    A spray-on lime based insulation saved flattening the walls

    On the Cumberworth project they used a rigid insulation called TecTem. However, they had to invest a lot of time in flattening the walls to be able to apply it properly. So they were keen to consider other alternatives at Lower Royd.

    So they trialled a spray-on internal wall insulation from Italy called Diathonite Evolution.

    Not only is it airtight, but it is vapour and capillary open to address any moisture issues.

    And being a lime product, it naturally inhibits mould growth.

    Airtightness is the most important factor for comfort

    Having carried out a few deep retrofits, Bill believes that when it comes to energy and comfort, airtightness is the most important factor. Then insulation comes next.

    In fact they may experiment with reducing the insulation levels a little on future projects and look at the impact.

    Find out more

    Visit the website of Green Building Store

    Follow Green Building Store on Twitter

    Follow Bill Butcher on Twitter

    Transcript

    Please connect with me

    Subscribe, rate and review the podcast in iTunes

    Rate and review the podcast on Stitcher

    Like our Facebook page

    Follow us on Twitter

  • HPH241 : 10 tips for better budgeting on a self build – with Ben Adam-Smith

    HPH241 : 10 tips for better budgeting on a self build – with Ben Adam-Smith

    Ben Adam-Smith shares 10 tips for creating a budget, which is detailed and realistic.

    1. Start a budget… and keep fine-tuning it!

    The greatest sin is to be casual about this. A budget is an essential part of any construction project, and even if you haven’t done this before you must get to grips with it.

    And budgets do not stay still. They will evolve with the project as more decisions are made on what is going to be built and how.

    2. Start with cost tables

    Initially your budget is going to be rough, but by nailing down (or playing with) a few variables you can start to get a broad picture.

    It starts with land. What will be the finished value of the house on the street? You can come up with a figure for this by using websites such as RightMove to look at what other houses nearby have sold for. This will help you pin down a ceiling value and from there you can work backwards.

    Other key questions:

    What is the floor area going to be?

    What will be the build quality?

    What build route am I going to choose?

    The self build magazines all have useful ‘cost per square metre’ tables that allow you to fill in the following equation.

    Land cost + build cost + profit 20-30% < value of the finished house

    3. Budget for the completed home, not a house build

    The build cost is not all encompassing (as may seem logical to the uninitiated). So remember that there is lots more to consider than just the basic shell of the house, however finished that is.

    Run through in your mind all the items that will make it a finished home. This may include things like…

    Hard landscaping – driveways, paving, fences

    Soft landscaping – laying turf, trees, hedges, plants

    Interior – curtains/blinds, furniture, new equipment

    There will also be things like the architect’s fees to factor in.

    4. Set a contingency

    If you’re creating a budget you need a contingency. There will always be unforeseen costs. If the professionals need a budget then so do you!

    The jury is out as to what percentage of the overall budget it should be. For first-timers a minimum of 10% is a good idea.

    For those who have more experience, maybe it will be closer to 5%. Needless to say most people dip into their contingency. Groundworks can often be a stage of the process with the biggest risk of an overspend.

    5. Use a quantity surveyor

    The problem with people who worry about cost is that they want to make as many cutbacks as possible. Sometimes consultants can seem expensive, but you’ve always got to remind yourself of the value they deliver.

    Having a strong degree of cost certainty is a wonderful thing. And what better way is there of getting this than someone that does this day in day out.

    6. Don’t overspend in the early days

    When you discover that you can’t buy your dream plot for the money you thought you could, there is a temptation to spend more.

    Unless you are consciously increasing your budget and can afford to, it’s dangerous to start down this road. Spending more early on means spending less later in the project. This is of course possible if it’s thought through but there has got to be a balance. It just doesn’t make sense to have the most amazing site, and then really be scrimping on what you build on it.

    Adam Cohen had a buckets approach to the budget, whereby the buckets must balance. He says the bucket with the most flexibility is the ‘finishes’ bucket.

    7. Invest in the fabric of the building

    If money is tight, the logical thing is to build something smaller!

    If you don’t think this option is right, then for heavens sake don’t scrimp on the building elements which will be really hard to change further down the line.

    For example, reducing the specification of the insulation will save money but in the long term it’s a false economy.

    Perhaps a better approach is to keep that investment in the fabric of the building and specify a cheaper kitchen. Kitchens can cost £5000 or £50,000! And it will be a lot easier to replace the kitchen than increasing the insulation levels at a later date.

    8. Don’t be afraid to bring things to a halt

    If you discover you don’t have the finances to see your project through, be brave and bring things to a halt. It may be a hard decision to make – particularly if you will lose some money in the process – but ending up with a half-built house will be a lot more stressful.

    Don’t be a victim of the sunk cost fallacy.

    And being flexible may allow you to phase parts of the project. For example, perhaps you can build a house but it’s the garage that will have to be put on hold.

    9. Choose architects/designers who have a proven track record of building to budgets

    If you make this a project priority, then you can enter into an agreement with your chosen architect/design that they must provide designs that can be built within the budget. And if they don’t end doing this, then the plans are deemed not fit for purpose and will not be paid for.

    The good thing about this is that an architect/designer who does agree to this approach will go out of their way to keep the project on track.

    10. Bank up your cost savings… don’t spend them

    You can and will make savings on your project, but make sure these do not get immediately spent on something else. Instead put them in the contingency fund.

    Related podcasts

    How to budget for a house build

    Budgeting for our eco home

    What are the hidden costs of building a house?

    Making Passive House homes affordable

    Please connect with me

    Subscribe, rate and review the podcast in iTunes

    Rate and review the podcast on Stitcher

    Like our Facebook page

    Follow us on Twitter

  • HPH240 : How to start planning a self build – with Ben Adam-Smith

    HPH240 : How to start planning a self build – with Ben Adam-Smith

    Ben Adam-Smith runs through a few ideas of how to get started on your self build journey.

    Get realistic with your finances

    It’s easy to skip this step in the early days because you have all the excitement that comes with the desire to build a new home.

    Without nailing down what funds are available, you are living in a dream world. Unfortunately our expectations tend to go beyond what we can afford.

    What money do I have?

    Do this first… and do it properly! You need to look at what assets you have and are prepared to dispose of. This could be in the form of investment properties, shares, savings, etc. If you own your own home, what additional funds could this add to the pot.

    How much could I borrow?

    Then consider how much you can borrow or are prepared to borrow? Sit down with a company, like BuildStore, and crunch the numbers. It may be that your finances don’t stretch as far as you would like. Well, you’re much better off finding this out on day one than when you’ve finalised what you want to build.

    And whatever you do, don’t imagine that the funds will magically appear from somewhere. This time next year, Rodney, we’ll be millionaires!

    Start the land search

    Without land you don’t have a project and although I’m not saying you need to buy land on day one, I think you need to start grounding yourself in reality.

    You will quickly get a feel for the market and whether you’re going to be able to build in your area… or perhaps have to relocate to somewhere cheaper.

    Begin background learning

    Magazines

    One of the best things about subscribing to a self build magazine is that the information is up to date. The most popular magazines are also designed to be accessible to a beginner.

    If you subscribe for a couple of years you may feel like you’ve read the information before, but this is probably is good sign. It means you have a good grounding of all the essentials.

    Finally make sure you’re ‘a magazine person’ because there’s no point taking out a subscription if they sit in a pile in their cellophane wrappers unread!

    The major UK magazines are:

    Books

    If you want to go in-depth and focus for a few hours, a book is probably what you need.

    While there are lots of books on house-building there aren’t many that are reliably up to date.

    That’s why we’re big fans of The Housebuilder’s Bible by Mark Brinkley. He puts in the legwork to keep the information fresh. And he’s even recently completed another project of his own.

    Buy a copy of the Housebuilder's Bible

    Exhibitions, shows and workshops

    There’s only one permanent exhibition space for self-builders: the National Self Build and Renovation Centre. It’s certainly worth a visit, whether to attend one of their three big shows, a course or a free workshop.

    The NSBRC
    The National Self Build and Renovation Centre in Swindon

    And the magazines hold numerous events across the year:

    The Homebuilding & Renovating Show

    Build It Live

    The Self Build & Design Show

    Grand Designs Live

    Forums and groups

    These free groups are a great resource. Our favourites are:

    Visit as many finished homes as possible

    There is perhaps no better learning ground than visiting a construction site or finished home. And luckily self-builders tend to be generous with their time and are willing to share what they have learnt.

    Passivhaus open days (from the International Passive House Association) seems to have developed into one of the biggest open house events, but watch out for other events in your local area.

    The Hub

    Of course we have to give our own membership community a plug too! We’re constantly trying to build up our digital vault of videos, courses and conference calls to help simplify your self build journey.

    Join The Hub

    However you do your research (and most people use a range of resources) it is essential you do your learning. Try to stay open, too. We all carry baggage from the past!

    Remember this is probably the biggest ticket item you will ever buy. So keep the research going until you feel in a good position.

    Consider your build route

    There are a few different ways to procure your project. At one extreme you can hire a project manager who can be your single point of contact… and at the other extreme you can be a true self-builder and carry out a lot of the work yourself.

    Know thy self

    Choosing your route starts with self-analysis. Where is your time best spent? How involved do you want to be? What skills can you bring to the table?

    The famous ‘quality, speed, cost’ triangle reminds us we can’t have it all.

    For example you can have a quick, high quality build but it is not going to be cheap.

    Or you can have a cheap, high quality build but is not going to be quick.

    Anyway you get the idea. So your key options are:

    • Hire a project manager to organise everything
    • Buy from a turnkey operation (as a package)
    • Custom build
    • Architect and main contractor
    • Project manage the stages
    • DIY… do as much as humanly possible yourself!

    Put together a brief

    A brief is essential to communication and therefore achieving the outcome you want. In the early stages it’s quite fluid. Plus this is the exciting bit of building a house.

    There’s no set way to put together a brief although there are common themes:

    • Accommodation and space needed
    • Thoughts on how you like to live (use your existing house to examine your habits; and what would you like to change about your current home?)
    • Stylistic preferences
    • Quality/performance/sustainability of the home
    • Budget
    • Constraints
    • Flexibility (over time)

    We’ve got a couple of really good podcasts on forming a brief (if you want to go in-depth):

    Progressing your house build before you have land

    Briefing our architect for our house build

    Find the right people for your project

    Hiring a strong team will not only get you what you want but will probably make this a much more enjoyable process.

    There is definitely a fair amount of legwork to drawing up shortlists of builders and architects you would like to work with. However, in the very early days of a project you are under absolutely no pressure. So use this as time to meet people and get to know them.

    The upside of my 4-year research period (due to my struggle to find land) was that choosing a great architecture firm was easy. So don’t be afraid to hang out where architects hang out! In my case, wanting to build an energy-efficient home, the Passivhaus Trust, AECB and ASBP events were perfect.

    Your input

    So you’ve heard my tips. What would you add to the list?

    Leave a comment below.

    Please connect with me

    Subscribe, rate and review the podcast in iTunes

    Rate and review the podcast on Stitcher

    Like our Facebook page

    Follow us on Twitter

  • HPH236 : What next for House Planning Help? – with Ben Adam-Smith

    HPH236 : What next for House Planning Help? – with Ben Adam-Smith

    Ben Adam-Smith’s house build was a core part of House Planning Help. Having completed the project in 2018, Ben Adam-Smith looks at what should come next.

    Our first session of 2019 is slightly different to normal. I’m going to stop for a moment and take stock. While everyone else is making New Year’s resolutions I want to do a bit of dreaming and consider what might be my next adventure.

    What I am clear about

    I need to take a break because ‘self build fatigue’ is real! Even just being the client can take its toll. I want a bit of normality for a few months and then, when my energy has returned, I can cement my plans for the next couple of years.

    I’m excited about having more time to spend with our Hub members. I’m also looking to upgrade the experience this year and fill in a few gaps I’ve spotted (in things like our courses).

    I don’t plan to do another self build any time soon. Having tailored a house to our family’s needs, I would like to stay in it for as long as possible. Of course, you never know what the future may bring. So if I there’s a strong reason (like I need to relocate for work) then I wouldn’t hesitate to take on another self build.

    I want to take on another development. I’m so pleased that my first build has been a positive experience. It has left me wanting to do more and learn more.

    Ideas for a second project

    I have only really scratched the surface so there is plenty more to investigate, but I do need a mission. That’s why I want to throw around a few ideas. This can get my mind buzzing for when I’m ready to take action.

    Keep to a specific budget

    When you’re building a house for yourself the temptation is to increase your budget to get what you want. In the worse case scenario you spend more in the early stages, believing you will somehow find more money by the end… only to find yourself in a sticky situation.

    So it would be great to do a project where we carefully consider the finances, set a budget and then – on all accounts – stick to it.

    Choose a different procurement route

    There are various routes to realising a new home. I perhaps did what many people do and hired an architecture firm and a main contractor. This allowed me to focus on being the client.

    However, it would be interesting to project manage… or even tackle some of the physical work, etc.

    Design and build is also another avenue I’d like to explore.

    Divide up a larger piece of land

    Finding affordable land is often the biggest barrier to building a house. For major developers, however, this is not really an issue. So could we follow their lead? What would it take to buy a bigger piece of land and provide serviced plots?

    We’ve seen schemes like Graven Hill successfully demonstrate this model. More self and custom build opportunities can only be a good thing.

    Deliver quality housing whilst making a healthy profit

    Most of the UK’s housing is delivered by volume house-builders who are sitting on a cash cow. With basic products that sell, there is little incentive to build better homes.

    What if we set out to explore whether we could deliver a housing scheme that also made a decent amount of money? If this worked, could it be possible to repeat this at scale?

    Build an intentional community

    It’s one thing to build a house well, but the story doesn’t really end there. How does the house fit amongst neighbours and its surroundings?

    We could investigate what makes for a thriving community and whether it can be built to order.

    Reduce the timescale

    My self build project took 6 years to complete. Two and a half years of that was looking for and then purchasing the land. Designing, getting planning permission and going out to tender took the best part of another year. The actual construction phase was only 10 months!

    Obviously research is valuable but I spent two years doing little else. So how long do you really need? And with the knowledge I’ve built up over the last 6 years could I do it all again in a much shorter timeframe?

    Go all out to be ecological

    I built a Passivhaus but really didn’t go much further than that. I go into the reasons why in the podcast where I evaluate my own performance.

    Could this be an opportunity to nail the ecological credentials. While it would probably still be a Passivhaus, could we do it with straw bales… and scrutinise every material used on the project. And it would be good to include a PV array or other renewables if it made sense.

    Find alternative ways to finance the project

    If this is going to be more of a development (with a profit attached), then can we find other ways to get funding?

    This could be as simple as bringing investors on board or using crowdfunding to drum up support

    Adjust key variables

    At House Planning Help we’re always aiming to learn so there is little point repeating what we have just done unless it is about refining processes. So another project would look to work with a different architect, use a different construction system and aim for a different style.

    Please connect with me

    Subscribe, rate and review the podcast in iTunes

    Rate and review the podcast on Stitcher

    Like our Facebook page

    Follow us on Twitter

  • HPH235 : My entire 6-year house build (told through my audio journal) – with Ben Adam-Smith

    HPH235 : My entire 6-year house build (told through my audio journal) – with Ben Adam-Smith

    Having recorded an audio journal the whole way through his project, Ben Adam-Smith plays back some key moments so you can hear what was involved in his self build (within a single podcast episode).

    Although it’s not going to be comprehensive it’ll give you a flavour of what you might be undertaking if you’re tackling your own eco build.

    6 years to build a Passivhaus

    It started in the summer of 2012 when I set myself the challenge of building an energy-efficient home before I turned 40 in August 2016. In the first couple of years it was just about learning but when I actively started to search for land I discovered that it wasn’t that easy. I live in Hertfordshire which is one of the hardest counties in which to find a plot. I faced multiple dead ends but eventually struck gold.

    Finding and hiring an architect was a little easier. I’d spent so much time chatting them over the years I knew a number of people in my area who would be good. In the end I hired Parsons + Whittley, a firm with a lot of experience in Passivhaus.

    Chris Parsons

    If you’re interested in going into more detail of how the designs for my house have evolved then here are a few podcasts to check out:

    Briefing our architect for our house build

    Feeding back to our architect

    Addressing height issues on our self build

    An overview of the journey from briefing to planning submission

    A recap of my self build journey (after reviewing 200 podcasts)

    Designing the ventilation, heating, and hot and cold water systems

    Specifying a house and creating tender documents

    Opening our tender returns

    Bringing down the cost of my self build

    How does a local building contractor approach a competitive tender?

    10 things I’ve learned during construction

    What to do if your partner wants to build a house?

    Why landscaping plans always get put on hold

    The build schedule for my cavity wall Passivhaus home

    10 things I’m looking forward to about my new house

    Our last site meeting

    What is lime render?

    How to design an interior for a modern home

    How well did I do on my self build?

    Please connect with me

    Subscribe, rate and review the podcast in iTunes

    Rate and review the podcast on Stitcher

    Like our Facebook page

    Follow us on Twitter

  • HPH234 : How well did I do on my self build?  – with Ben Adam-Smith

    HPH234 : How well did I do on my self build? – with Ben Adam-Smith

    Having completed his house build this year, Ben Adam-Smith evaluates his own performance as a self-builder.

    It’s sometimes tricky to draw a line and say that you are at end of a self build. While there are lots of little tweaks to decor and a lot of work to do in the garden, our contract has been fulfilled and everything is functional.

    So for the last two podcasts of 2018 I’m going to reflect on my build. Then in 2019 I’ll wipe the slate clean!

    In this podcast I’m going to analyse how well I did as a self-builder. What did I get right and what could have been better.

    Ben Adam-Smith on site

    What went well

    We have created a home that we love

    Until you move into your house you can never guarantee it’ll feel like a home. When we moved in, almost immediately it felt like we’d lived there for years. Our children didn’t even blink when they were introduced to their new bedrooms. The layout is instinctive. We want for nothing.

    We hired a competent team

    From architecture firm to main contractor and interior designer, everyone delivered for us. Sometimes it feels like we got lucky! But I think spending time hiring the right people was one of the smartest moves we made.

    We paid for a full service

    Not everyone can afford to do this, but it was within our means to get all the work carried out by a main contractor with the architecture firm overseeing the project.

    Of course this is not the cheapest way of doing things but with two young kids we did not have lots of time to play with. Also, I think we knew ourselves. In fact I classify myself as a DIY disaster, so it was an obvious choice to let the professionals get on with things. That left us to ‘be the client’.

    We have built to Passivhaus standard

    Right at the top of our brief was to build a house to Passivhaus standard. Although it’s too early to look at the bills our home is certainly comfortable, with the even heat synonymous with Passivhaus. It also has all the other benefits you would come to expect. There’s no condensation on the inside of the windows. We have constant fresh air and the smells created from cooking disappear.

    My wife and I worked well as a team

    We brought different skills to the table, which is always handy. Kay had project managed marketing campaigns before so was comfortable with staying on top of emails, listing priorities and updating budgets. I had the more technical insights as to what we should be doing… and I liked to focus on the big decisions.

    While we probably had momentary disputes, I can’t really remember many of them now! And I even won the odd discussion.

    What could have been better

    There are always things to learn on a project, but I think it must be a good sign that I can’t think of a single clanger.

    The project is not as ecological as I would have liked

    This is probably my biggest regret of the project but I made all these decisions with my eyes open.

    One challenge we had was that my wife did not want to live in a ‘new house’ with a roof full of solar PV! I, on the other hand, was really keen to try not to copy a style from the past. I wanted to build a house fit for the 21st century. That meant we had to find the middle ground.

    So we built a Passivhaus that has traditional form and uses traditional materials.

    We went down a masonry route to keep things cost effective. I was also keen to understand more about building with masonry (as it is one of the main construction methods in the UK).

    So we have no renewables and we are a masonry build. I know why we ended up here, but I do look at other projects and get slightly envious about what they have achieved!

    We increased our budget

    Some people say a budget is the budget. When we went out to tender we got a bit of a shock!

    Plenty of value engineering suggestions were made but we didn’t feel comfortable compromising on what we wanted. Fortunately we were in a position to pay more.

    But the point here is that overall we have spent massively more than we were planning on day one!

    Our cost-cutting didn’t always work!

    After the shock of our tender returns, we had to make some cutbacks. Some of these I wouldn’t even be able to tell you what they were now.

    However there are a few that I would like to revert (as soon as is financially possible). The driveway is top of that list. We changed from a resin surface to shingle. This saved us over £20,000. The downside is we have a noisy driveway, with stones go everywhere and it’s tricky to walk on.

    The shingle driveway is incredibly noisy to drive across

    Following on from this we also got rid of the paving around the house and put shingle down there too. There’s no doubt that this also saved a lot of money. We had always anticipated using this back door most of the time. That doesn’t really happen. We almost exclusively use the front door… and I do wonder whether a large part of that is the surface.

    I didn’t catch the little things in time

    The more you are on site, the more you can spot little things that might be about to go wrong. I was on site every couple of days but it’s amazing how much progress can be made in that time.

    I’ll give you an example. In the guest en-suite bathroom we wanted the following tiling pattern.

    The tiler did not get this information and tiled it horizontally.

    This was his error and we could have got him to redo it. However, it would mean half a bathroom’s worth of tiles would go in the bin and he’d be out of pocket £1000.

    Needless to say the conventional tiling pattern still looks pretty damn good, so we decided to leave it that.

    If I’d been on site when the first few tiles were going up, we could easily have corrected course.

    I got tired by the end of the project

    Self build fatigue is real. As it got towards the end of the project I perhaps got a little casual with some of the furniture purchases. It would have been lovely to dig into the specifications and find out what was in them and where they’d come from.

    Instead we would take a cursory glance and if it looked like it would fit the bill, then we’d go for it!

    Overall, we did really well

    I’m in a fortunate position to get to see lots of eco homes and hear first hand from the self-builders what it’s really been like. As such, I think we’ve got a lot to celebrate.

    Funnily enough the majority of the ‘little niggles’ get forgotten. After all, life moves on.

    Please connect with me

  • HPH232 : Which parts of a house build can you do yourself? – with Ben Ribbans

    HPH232 : Which parts of a house build can you do yourself? – with Ben Ribbans

    Ben Ribbans is a self-builder who decided to take on more and more responsibility during his project. He explains how he gained the confidence to do this, and why research and planning are vital to success.

    Interview with Ben Ribbans

    Ben Ribbans (and his wife Elle) never planned to build their own home but one of their relatives had secured planning permission on a piece of land in the early 1990s and kept renewing the application. After a couple of decades the opportunity fell to them to take on the build.

     

    A fabric first approach seemed logical

    Originally Ben had thought about building a standard house and adding lots of renewables.

    However, with his engineering background, the more he researched the more he saw the sense of building an efficient house that would then need little energy to run it.

    Ben says: “If you address the fabric of the building first, get that right, then actually your energy requirements change quite dramatically.”

     

    They created their own floor plan

    As there had been planning permission for a house for over two decades, the designs had changed a couple of times.

    On one of these occasions Ben had used an architect but not been pleased with the outcome. Ben felt that he was doing a lot of the work himself.

    Therefore, for the final designs, he chose to create his own floor plan.

    Ben explains: “We just thought about all the things that we wanted in the house and how we wanted the layout to be, what would work for us as a family and the way we like to live.”

     

    The core team had all worked together before

    Having hired Passivhaus specialists Touchwood Homes to erect their timber frame, they then referred Ben to architect Peter Smithdale and energy consultant Rod Williams.

    Ben liked the idea that they knew how each other worked and thought that this should make the process easier.

     

    Ben took ‘time off’ from his business to focus on the build

    Ben says: “We’re in a very fortunate position that the company we run had a core team already in place that could run that company without us being there. That allowed me and my wife to be fairly hands-on and free every day as much as we needed to, which was perfect.”

    Without this time there is no way Ben could do as much as he ended up doing. He started as the project manager but gradually took on more responsibility.

     

    Learning new skills helped build up confidence

    Ben explains that throughout the process he would research an aspect of the project, give it a go, realise that he could do it and therefore feel more confident to tackle something else.

    He gives an example of clearing the site at the beginning of the project. A friend who is a ground-worker said that he could do the job for £15,000… but suggested that if Ben bought a digger he would be capable of doing it himself. And it would also mean that the digger could be used throughout the project. Ben couldn’t see a downside.

     

    Forums and YouTube were great for learning

    Whenever Ben got stuck he found help online.

    He also did the work upfront so that once on site there was a plan to follow.

    Ben comments: “I tried to look at each part of the house as a design engineer, rather than as a DIYer. I tried to design the systems that were going to run the house. So, for the plumbing, I had a full plumbing schematic that I’d drawn out. So I knew the design before we started to cut any pipes or put any holes in.”

     

    Staying motivated was the biggest challenge

    Doing more of your project yourself is a massive commitment so you must expect to have days when you’re tired and frustrated and you want to give up.

    Ben believes it was a massive help to have done the planning upfront because that meant there were fewer problems and thus he could stay motivated. Also seeing daily progress on site was another key to driving him on.

     

    If a supplier goes quiet, check your order

    During the project the supplier of Ben’s bifold doors went bust. He only discovered this when he tried to get in touch with them and couldn’t get hold of anyone!

    This put him £5000 out of pocket… or so he thought.

    Amazingly, the manufacturer Solarlux offered to take the financial hit if Ben paid the rest of the deposit.

    Ben comments: “They turned the doors around in, I think, seven weeks, and it was supposed to be a ten-week lead time. So, they did everything they could. They went above and beyond for sure.”

     

    Ben delayed his preliminary air test

    As the bifold doors were delayed Ben had to decide what to do about the preliminary air test.

    He could board up the openings and then continue, but the result might not tell him much.

    So he elected to press on with the build and wait until the doors were in.

    By that stage a lot of the plastering had been done so he was resigned to the fact he would not be able to improve the airtightness.

    Fortunately the timber frame system is inherently airtight and they achieved a result of 0.23 air changes per hour at 50 Pascals (well inside the Passivhaus criteria).

     

    A self-builder still needs assistance!

    Even doing more yourself ‘self build’ is a misnomer.

    Ben believes you always need someone else with you. Sometimes it might be for something physical but it could also be to talk through a problem and potential solutions.

     

    The running costs are minimal

    As a certified Passivhaus the energy requirements are extremely low.

    With an air source heat pump for additional and a 10.8 kilowatt PV system on the roof, the house costs about £100 a year to run!

     

    Find out more

    Touchwood Homes

    Peter Smithdale

    Solarlux

     

    Like the idea of doing more of your project yourself?

    Check out our podcast with Jeremy Harris. He took on many of the roles on his own build, including designing the house himself.

     

    Transcript

    Download a transcript of the interview with Ben Ribbans.

     

    Please connect with me

  • HPH228 : What is a site meeting? – with Ben Adam-Smith

    HPH228 : What is a site meeting? – with Ben Adam-Smith

    Having had his last site meeting this month, Ben Adam-Smith explains what they are and how they fit into the construction process when building a new house.

    What is a site meeting?

    As with any project, you want to keep track of things and make sure everything is running smoothly. And that’s what this is all about: getting the key team members together on a regular basis. In our case that was once a month.

    Clients – Ben Adam-Smith and Kay Adam-Smith

    Architects – Chris Parsons, boss of Parsons + Whittley

    Main contractor – Mark Feldman from Mars Builders.

    Chris Parsons says: “A site meeting is a regular meeting that’s held to try to keep an eye on progress, keep an eye on issues that crop up and make sure everyone is well informed as we go through the process.”

    Mark Feldman adds: “Having all parties there at the same time, being able to discuss the issues, run through them and hopefully come up with solutions works very well. It’s much easier than doing it remotely, with emails flying backwards and forwards.”

     

    What gets discussed?

    Everyone knows that there are lots of decisions to be made during the course of a self build. Although they don’t all have to be made at once they do become more critical if left unresolved. So a site meeting can flag up the priorities (allowing you to keep ahead of the decision-making curve).

    A site meeting also helps everyone understand progress since the last meeting and what is planned to be achieved by the next meeting.

     

    The main benefits of a site meeting

    If you actually examine what you’re doing in these meetings a lot of it comes down to problem solving. There are countless issues that arise during construction so discussing the options and coming up with potential solutions is time well spent.

    Other than that it can be an opportunity for the architect or builder to explain something to the client.

     

    What is the format?

    In our case we had a walk around the site and then held a sit down meeting (typically lasting between 1 – 3 hours).

    1. Introduction/apologies
    2. Matters arising from previous meeting
    3. Contractor’s report
    4. Contractor administrator/architect/CDM matters
    5. Quantity surveyor matters
    6. Employers matters
    7. Any other business
    8. Date of next meeting

     

    Documenting meetings makes sure nothing is forgotten

    Chris Parsons comments: “I think minuting any meeting is probably sensible. The notes form a structure for the following meeting and make sure items that are discussed are not forgotten. So they are picked up and continually dealt with until such time as they are cleared.”

    Having minutes which have been agreed by all parties also provides a contractual record so that in the event of a dispute there is a bit more information about what went on.

    Extract from one of the first meetings

     

    Ben’s top tips

    – Make sure you don’t run out of biscuits!

    – Don’t attempt to look after young children and hold your meeting.

     

    Find out more

    Visit the website of Parsons + Whittley

    Visit the website of Mars Builders

    Please connect with me

  • HPH226 : 10 things I’m looking forward to about my new home – with Ben Adam-Smith

    HPH226 : 10 things I’m looking forward to about my new home – with Ben Adam-Smith

    With a matter of weeks until he moves into his new home, Ben Adam-Smith shares a list of ten things that he’s excited about. And it’s not necessarily what you might expect!

    Copyright Georgina Edwards Photography

    10 things I’m looking forward to about my new home

     

    1. Living in the comfort of a house built to Passivhaus standard

    In my mind this is the major advance in housing. When you experience what a comfortable house is, you won’t ever want to look back. Enjoying that comfort through the winter is one thing, but I’m hoping this is all year round. With an overheating risk of 0, I am excited to see what this means going through another hot spell.

    2. The ability to have family and friends to stay

    I have thoroughly enjoyed living in small houses, but one definite down side is that you can’t accommodate guests easily. Either they have to sleep on the floor or stay at a nearby hotel.

    A dedicated guest room will change all of that. And although we only have one, we have a number of flexible spaces which can do double duty (e.g. the office can transform into another guest room).

     

    3. Having a quick way to dry clothes and towels

    Sometimes in life it is the little things! In our last two houses we have had to dry clothes inside the house in winter. It goes without saying that this is not too healthy. It introduces lots of moisture into the house, which can lead to mould, etc. And it can take forever!

    So the ability of remove moisture from our wet rooms is a huge plus. It will also mean dry towels.

    4. Not having a loft

    I have spent way too much of my life climbing up and down a ladder into the loft. And most of the time I was carrying a heavy box or awkward shaped item!

    The new house has everything from a storage room to storage nooks and crannies… all inside the thermal envelope.

    I refuse to accept we need any more space beyond this.

     

    5. Sharing my self build experience with others

    In my mind, one of the best things about the self build community is how generous self-builders are with their time.

    I have seen countless eco homes, and the owners are always happy to take me on a tour and reveal what they’ve learnt going through the process. Moving into my new house is an opportunity to give back. And I’m really looking forward that.

     

    6. A fresh smelling house

    Imagine you’ve been out for a while, you get back to the house, open the front door… and are greeted by a musty smell. Consequently you have to open all the windows to flush out the aroma and light a few scented candles!

    This is certainly the case with the property we’ve been renting, but even in the Victorian house we used to own it was an issue.

    With a ventilation system in the new house and I’m looking forward to a constant supply of fresh air. Hopefully stale smells are a thing of the past.

     

    7. Developing the garden over time

    The garden is a blank canvas. Although we have a plan it will have to be implemented in stages.

    As someone who enjoys gardening I’m excited to witness this slower journey and see things mature.

    I’ll also be able to grow some veggies.

     

    8. The ability to retreat to the far end of the house

    One of the challenges of having young children is that they seem determined to keep you up for as much of the night as possible!

    This means a good night’s sleep is often a distant memory.

    Having a big house comes with the benefit of being able to retreat to the far end (away from noise).

    If you’re playing tag team as a parent, this should ensure at least a few hours of solid sleep.

     

    9. Having a dishwasher

    Much as it pains me to share this one, it is true.

    I’ve been cooking in such a small kitchen that you do one job and you have to wash up. I would be fascinated to know how much time I have spent at the kitchen sink this past year!

    Anyway, First World problems. The new house has a dishwasher.

    10. Seeing the house my ancestors built

    One of the quirks of where I ended up building was that one of my ancestors had built his house close by.

    We can’t see many houses from the new house, but that is definitely one.

    I will always be grateful for that.

     

     

    My new house is in the countryside. That means leaving behind the town where I’ve been for the last 14 years.

    5 things I’m going to miss (about my previous homes)

     

    1. Compact living

    We always stress how important scale is if you want to build an eco home. Well, I am moving to a house that is nearly four times the size of the house we used to own.

    Even though the new house is built to Passivhaus standard there is no two ways about it, my old life was more ecologically sound.

    We probably were due to upsize when we started a family but we perhaps didn’t need to go this far. The plot we bought naturally required a bigger house (unless you were prepared to make a loss financially).

     

    2. Being able to walk to the centre of town

    The location of our Victorian house was pretty sweet.

    So much so, that I even made a video about it.


    I am going to miss having access to supermarkets, restaurants, coffee shops and the park. I barely had to drive anywhere.

    Although our new home is in a village with a couple of pubs, a school and one shop, for everything else we’ll have to jump in the car.

     

    3. Completing the gardening in no time!

    As you might expect, town houses have smaller gardens than houses in the countryside.

    So, spending half an hour in the garden every week is enough to have a well kept garden. I am under no illusion that gardening half an acre will be so easy.

     

    4. High speed internet

    A lot of what I do is over the internet and as such I’m always happy to pay more for faster internet speeds.

    In the countryside, even a stone’s throw from the town where we’ve been, internet speeds are much more hit and miss.

    What is worse is the service providers won’t actually tell you whether a fibre connection is possible.

    They will put you on a standard package and then investigate the possibility of getting a faster connection.

     

    5. Old things

    When you build a new house, there are lots of new things that go into it. More so with us where we’re actually moving to a bigger space… and thus we need more things to fill it.

    With all this comes the risk of getting precious over your new items. We’ve already had talks that we’re going to be operating a strict ‘shoes off’ policy (so bring your slippers!).

    That was certainly never the case in our houses to date because everything was pretty beaten up already. Kids and new stuff is a worry.

    Please connect with me